Method for testing and evaluating process grounding electromagnetic sensitivity of particle accelerator

Through the particle accelerator process grounding electromagnetic sensitivity test and evaluation method, the noise problem caused by high electromagnetic sensitivity of process grounding is solved, the electromagnetic compatibility performance is improved, and the low-noise test environment is ensured. It is suitable for evaluating electromagnetic compatibility of process grounding and new equipment. sex.

CN118980879APending Publication Date: 2024-11-19INST OF MODERN PHYSICS CHINESE ACADEMY OF SCI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411100360.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The particle accelerator process grounding has a high electromagnetic sensitivity, which causes the transient noise such as surges and pulse groups formed in the system to "leak" through process grounding, affecting the normal operation and electromagnetic compatibility of sensitive equipment. During operation, due to radiation protection requirements, it is impossible to conduct timely testing and analysis.

Method used

The particle accelerator process grounding electromagnetic sensitivity test and evaluation method includes determining the sensitivity test experimental content and spectrum management requirements, conducting test experiments and performance monitoring through the test system, and evaluating the electromagnetic sensitivity and rationality of the grounding subsystem. Ensure electromagnetic compatibility control of the access device.

Benefits of technology

Effectively test and evaluate the electromagnetic interference problem of particle accelerator process grounding, improve electromagnetic compatibility performance, ensure the low-noise test environment of scientific research experiments, and is suitable for evaluating the electromagnetic compatibility of the process grounding itself and the new access equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118980879A_ABST
    Figure CN118980879A_ABST
Patent Text Reader

Abstract

The invention relates to a particle accelerator process grounding electromagnetic sensitivity test and evaluation method, which comprises the following steps of: determining the content of a sensitivity test experiment and spectrum management requirements, and determining the content of electromagnetic sensitivity evaluation; determining a test system and test arrangement requirements; and on the basis of the content of the sensitivity test experiment, the spectrum management requirement and the content of the electromagnetic sensitivity evaluation, the test experiment and performance monitoring are carried out through the test system under the test arrangement requirement, and the electromagnetic sensitivity evaluation is carried out. According to the method, the electromagnetic sensitivity of process grounding, the rationality of grounding distribution and the electromagnetic compatibility control of access equipment can be evaluated and constrained.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of electromagnetic compatibility and grounding of a particle accelerator, and in particular to a method for testing and evaluating electromagnetic sensitivity of process grounding of a particle accelerator. Background Art

[0002] Particle accelerators are widely used in scientific research, aerospace, medical treatment, industry and other fields. Process grounding is used for safety protection, signal reference ground, circuit ground and electromagnetic compatibility ground in particle accelerators. In order to achieve the above functions, particle accelerator process grounding usually adopts a multi-point lead-out and classified use scheme, that is, the process grounding consists of a series of grounding subsystems connected to different grounding lead-out points. In practice, particle accelerators are composed of many devices and have high electromagnetic emission levels. Some working signals may also be noise sources for sensitive equipment; in addition, the interconnection structure of particle accelerators is complex, and the ground wire has grounding impedance, which makes process grounding one of the main coupling interference channels. The electromagnetic sensitivity of particle accelerator process grounding is high. The transient noise such as surge and pulse group formed in the system and the conductive electromagnetic noise will be "discharged" through the process grounding, causing damage to sensitive equipment, abnormal operation or electromagnetic interference problems such as sensitive signals affected by high electromagnetic noise emission levels; in addition, due to radiation protection requirements during the operation of particle accelerators, personnel cannot test and analyze interference problems in time, which makes it very important to evaluate the process grounding before it is put into use.

[0003] In summary, in order to evaluate the structure, electromagnetic sensitivity, rationality of use of process grounding, and whether the electromagnetic emission level of the connected equipment meets the control requirements and ensure the electromagnetic compatibility of the particle accelerator, a particle accelerator process grounding electromagnetic sensitivity test and evaluation method was designed. Summary of the invention

[0004] In view of the above problems, the purpose of the present invention is to provide a particle accelerator process grounding electromagnetic sensitivity testing and evaluation method, which can evaluate and constrain the electromagnetic sensitivity of process grounding, the rationality of grounding distribution, and the electromagnetic compatibility control of access equipment.

[0005] To achieve the above object, the present invention adopts the following technical solutions: The particle accelerator process grounding electromagnetic sensitivity testing and evaluation method of the present invention is characterized by comprising the following steps: Determine the content of sensitivity test experiments and spectrum management requirements, and determine the content of electromagnetic sensitivity evaluation; Determine test system and test layout requirements; Based on the content of sensitivity test experiments, spectrum management requirements and electromagnetic sensitivity evaluation, test experiments and performance monitoring are carried out through the test system under the test layout requirements, and electromagnetic sensitivity evaluation is performed.

[0006] The particle accelerator process grounding electromagnetic sensitivity testing and evaluation method, preferably, the sensitivity test experiment includes experiment categories and experiment items; The experiment categories include: testing within the grounding subsystem and between several grounding subsystems; The experimental items include: surge test, pulse group test and conducted emission immunity test.

[0007] The particle accelerator process grounding electromagnetic sensitivity testing and evaluation method, preferably, determining the sensitivity test experiment spectrum management requirements specifically includes the following steps: Classify the loads of process grounding into sensitive loads and general loads according to their sensitivity; The frequency range and amplitude limit requirements of conducted emission immunity are determined by sensitive loads, and the sensitivity requirements of conducted emission are determined by the frequency range and amplitude limit requirements of conducted emission immunity; Strong noise sources in general loads may cause surge and pulse group levels higher than the national standard, and may also cause specific interference phenomena. At this time, if the transient interference level is higher than the national standard, the transient interference level of the general load should be used as the experimental level, otherwise the experimental level of the relevant national standard should be used to determine the transient immunity level; The sensitivity test experiment spectrum management requirements are determined by the conducted emission sensitivity requirements and the transient immunity level.

[0008] The particle accelerator process grounding electromagnetic sensitivity testing and evaluation method, preferably, the electromagnetic sensitivity evaluation content includes evaluation categories and evaluation indicators; The evaluation categories include: evaluation of the electromagnetic interference effects within a single grounding subsystem and on other subsystems; The evaluation index includes: directly testing the noise level received by the interference point and the impact on sensitive equipment; The impacts on the sensitive equipment include: electromagnetic sensitivity to process grounding, rationality of grounding allocation, and control of electromagnetic emission levels of newly connected equipment.

[0009] The particle accelerator process grounding electromagnetic sensitivity testing and evaluation method, preferably, the testing system comprises: Signal generating components, used to generate surge signals, pulse group signals and conducted emission signals; An injection component, used for injecting the interference signal generated by the signal generator into the object under test; A receiving component, used to test interference signals received by sensitive objects; Calibration components, used to self-calibrate the test system to ensure that the interference signal injection efficiency meets the experimental level requirements; Related accessories, etc.; used to realize auxiliary functions of the test system.

[0010] The particle accelerator process grounding electromagnetic sensitivity test and evaluation method, preferably, the test arrangement requirements include: The test site is the process grounding installation site; In order to avoid the impact of the environment on the test results, irrelevant equipment should be turned off before the experiment, and the environment should be tested and confirmed; The auxiliary equipment connected during the test should not affect the test results; The access equipment of the grounding subsystem needs to be arranged and operated according to the actual working conditions.

[0011] The particle accelerator process grounding electromagnetic sensitivity testing and evaluation method, preferably, the test experiment and performance monitoring are specifically: setting the corresponding signal source according to the experimental content, injecting the interference signal into the grounding point terminal through the injection component, and realizing performance monitoring by monitoring the working status of the subsystem equipment and the noise level of the grounding point of other subsystems.

[0012] The particle accelerator process grounding electromagnetic sensitivity testing and evaluation method, preferably, the electromagnetic sensitivity evaluation is specifically as follows: during the test, if the noise level meets the limit requirements and the relevant equipment works normally, the electromagnetic sensitivity is good, otherwise, the opposite is true.

[0013] The present invention adopts the above technical solution, which has the following advantages: (1) The present invention innovatively tests and evaluates the electromagnetic interference problem of particle accelerator process grounding, which is of great significance for improving the electromagnetic compatibility of particle accelerators and ensuring a low-noise test environment for scientific research experiments; (2) The electromagnetic sensitivity testing and evaluation method of the particle accelerator process grounding provided in the present invention is suitable for testing and evaluating the electromagnetic compatibility of the process grounding structure, usage distribution and newly connected equipment. It is systematic and has strong engineering practicality. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Throughout the accompanying drawings, the same reference numerals are used to represent the same components. In the accompanying drawings: Figure 1It is a simplified diagram of the process grounding structure in the present invention; Figure 2 It is a design flow chart of process ground spectrum management in the present invention; Figure 3 It is a schematic diagram of the composition and arrangement of the side view system in the present invention; Figure 4 It is a flow chart of the electromagnetic sensitivity test and evaluation described in the present invention.

[0015] The reference numerals in the figures are as follows: 1.1-process ground grid; 1.2-lead-out point; 1.3-connecting ground wire; 1.4-grounding bar; 1.5-equipment ground wire; 2.1-reference grounding point; 2.2-AC power distribution and filtering unit; 2.3-grounding plate; 3.1-signal generator host; 3.2-signal output line; 3.3-injection probe; 4.1-calibration equipment; 4.2-calibration probe; 5-equipment performance monitoring device; 6.1-receiving host; 6.2-receiving probe; 7-data processing device. DETAILED DESCRIPTION

[0016] The exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.

[0017] The present invention provides a particle accelerator process grounding electromagnetic sensitivity testing and evaluation method, which can evaluate the structure of the process grounding, electromagnetic sensitivity, rationality of use, and whether the electromagnetic emission level of the access equipment meets the control requirements, so as to ensure the electromagnetic compatibility of the particle accelerator.

[0018] First, if Figure 1 As shown, the process grounding structure of the present invention includes a process ground network 1.1, a grounding bar 1.4 and a plurality of devices. At least two lead-out points 1.2 are led out from the process ground network, and each lead-out point is connected to the grounding bar 1.4 through a connecting ground wire 1.3; the devices are divided into two groups, and each group of devices is connected to the corresponding grounding bar 1.4 through a device ground wire 1.5.

[0019] from Figure 1 It can be seen that the electromagnetic interference problem of process grounding comes from "common ground interference" through the same grounding point (1.2) and the same grounding line (1.3), and electromagnetic interference with adjacent grounding subsystems caused by grounding grids or other paths.

[0020] like Figure 4As shown, the particle accelerator process grounding electromagnetic sensitivity testing and evaluation method provided by the present invention comprises the following steps: S1. Determine the content of sensitivity test experiments and spectrum management requirements, and determine the content of electromagnetic sensitivity evaluation; S2. Determine the test system and test layout requirements; S3. Based on the contents of sensitivity test experiments, spectrum management requirements and electromagnetic sensitivity evaluation, test experiments and performance monitoring are carried out through the test system under the test layout requirements, and electromagnetic sensitivity evaluation is carried out.

[0021] In the above embodiment, preferably, the content of the sensitivity test experiment includes an experiment category and an experiment item; The experiment categories include: testing within the grounding subsystem and between several grounding subsystems; The experimental items include: surge test, pulse group test and conducted emission immunity test.

[0022] In the above embodiment, preferably, Figure 2 As shown, determining the spectrum management requirements for the sensitivity test experiment specifically includes the following steps: (1) Classify the loads of process grounding into sensitive loads and general loads according to their sensitivity; (2) The conducted emission immunity frequency range and amplitude limit requirements are determined by the sensitive load, and the conducted emission sensitivity requirements are determined by the conducted emission immunity frequency range and amplitude limit requirements; (3) Strong noise sources in general loads may cause surge and pulse group levels higher than the national standard, and may also cause specific interference phenomena. At this time, if the transient interference level is higher than the national standard, the transient interference level of the general load should be used as the experimental level, otherwise the experimental level of the relevant national standard should be used to determine the transient immunity level; (4) The spectrum management requirements for the sensitivity test experiment are determined by the conducted emission sensitivity requirements and the transient immunity level.

[0023] In the above embodiment, preferably, the content of the electromagnetic sensitivity evaluation includes evaluation categories and evaluation indicators; The evaluation categories include: evaluation of the electromagnetic interference effects within a single grounding subsystem and on other subsystems; The evaluation index includes: directly testing the noise level received by the interference point and the impact on sensitive equipment; The impacts on the sensitive equipment include: electromagnetic sensitivity to process grounding, rationality of grounding allocation, and control of electromagnetic emission levels of newly connected equipment.

[0024] In the above embodiment, preferably, Figure 3 As shown, the test system comprises: Signal generating components, used to generate surge signals, pulse group signals and conducted emission signals; An injection component, used for injecting the interference signal generated by the signal generator into the object under test; A receiving component, used to test interference signals received by sensitive objects; Calibration components, used to self-calibrate the test system to ensure that the interference signal injection efficiency meets the experimental level requirements; Related accessories, etc.; used to realize auxiliary functions of the test system; Among them, the signal generating component includes a signal generator host 3.1 and a signal output line 3.2, and the injection component is an injection probe 3.3; the injection probe 3.3 is mounted on the first connecting ground line 1.3, and the signal generator host 3.1 is connected to the injection probe 3.3 through the signal output line 3.2; the receiving component includes a receiving host 6.1 and a receiving probe 6.2, the receiving probe 6.2 is mounted on the second connecting ground line 1.3, and the receiving host 6.1 is connected to the receiving probe 6.2 through a connecting line; the calibration component includes a calibration device 4.1 and a calibration probe 4.2, the calibration probe 4.2 is connected to the first grounding bar 1.4, and the calibration device 4.1 is connected to the calibration probe 4.2 through a connecting line; the related accessories include two AC power distribution and filtering units 2.2, an equipment performance monitoring device 5 and a data processing device, and the two AC power distribution and filtering units 2.2 are respectively below the process ground grid and the process ground grid. A grounding plate 2.3 is provided on it, and an AC power distribution and filtering unit 2.2 is arranged on the grounding plate 2.3 and connected to the grounding plate 2.3. A reference grounding point 2.1 is led out from the process ground network, and the reference grounding point 2.1 is connected to the grounding plate 2.3 through a connecting line. One of the AC power distribution and filtering units 2.2 is connected to the signal generator host 3.1 through a connecting line, and the other AC power distribution and filtering unit 2.2 is connected to the receiving component through a connecting line; there are two equipment performance monitoring devices 5, one end of one equipment performance monitoring device 5 is connected to the first AC power distribution and filtering unit 2.2, and the other end is connected to the first device; one end of the other equipment performance monitoring device 5 is connected to the second AC power distribution and filtering unit 2.2, and the other end is connected to the last device; the data processing device is respectively connected to the second equipment performance monitoring device 5, the receiving host 6.1 and the second AC power distribution and filtering unit 2.2.

[0025] It should be noted that the signal generator host includes the conducted emission sensitivity, surge and pulse group transient interference generator. According to the specific test selection, the AC power supply of the signal generator host is equipped with a filter to avoid affecting the test; the reference grounding point 2.1 uses the grounding point on the same grounding network, and the distance between the reference grounding point and the grounding point to be tested is not less than 5m. The injection probe 3.3 uses coupling clamps, current clamps, etc. according to the test requirements. In some test occasions, the transient interference injection method can be used to wrap the cable around the ground wire to be tested (tightly wrapped, the winding length is 80-100cm), and the injection is achieved by coupling. The calibration component is used to test and verify the injection efficiency and level of the signal generator. When it does not meet the test level requirements, it is calibrated by adjusting the signal source level or injection method. The performance monitoring component can be realized by using auxiliary equipment of sensitive equipment or detection instruments such as oscilloscopes to monitor related waveforms, data and other indicators.

[0026] In the above embodiment, preferably, the test arrangement requirements include: The test site is the process grounding installation site; In order to avoid the impact of the environment on the test results, irrelevant equipment should be turned off before the experiment, and the environment should be tested and confirmed; The auxiliary equipment connected during the test should not affect the test results; The access equipment of the grounding subsystem needs to be arranged and operated according to the actual working conditions.

[0027] In the above embodiments, preferably, the test experiment and performance monitoring are specifically as follows: setting the corresponding signal source according to the experimental content, injecting the interference signal into the grounding point terminal through the injection component, and realizing performance monitoring by monitoring the working status of the subsystem equipment and the noise level of other subsystem grounding points.

[0028] In the above embodiment, preferably, the electromagnetic sensitivity evaluation is specifically as follows: during the test, if the noise level meets the limit requirement and the relevant equipment works normally, the electromagnetic sensitivity is good, otherwise, the opposite is true.

[0029] Embodiment 1: like Figure 3 , Figure 4As shown, in a conducted emission sensitivity embodiment, the signal source is set according to the spectrum management requirements (including frequency range and amplitude), and the injection probe preferably selects the current clamp. The calibration system consists of a receiver (or oscilloscope) and a calibration probe, and a voltage probe or a current probe is selected according to the needs. The receiving component mainly includes a receiving host, a receiving probe and a PC software system (data processing). The receiving probe uses a voltage probe or a current probe according to the test requirements. The receiving probe tests the grounding wires connected to the ground wire 1.3 and the equipment ground wire 1.5 respectively, and is used to test whether the conducted emission level of the newly connected equipment meets the limit requirements and the interference level between the adjacent grounding subsystems.

[0030] Test and verify whether the test environment applicability and the electromagnetic interference injection level meet the test requirements. If they meet the test requirements, the test steps are carried out.

[0031] The equipment of the evaluated grounding subsystem works separately and simultaneously, and the noise level on the connecting ground line 1.3 of the subsystem and the adjacent grounding subsystem is tested respectively and compared with the signal spectrum of sensitive equipment to determine whether the spectrum management requirements and the ground line emission level of the newly connected equipment meet the limit requirements.

[0032] Based on the test results, a comprehensive evaluation conclusion is given from the aspects of process grounding structure, system composition requirements, grounding distribution, and equipment working characteristics; the conducted emission sensitivity test and evaluation are completed.

[0033] Embodiment 2: In one surge sensitivity embodiment, Figure 3 The signal source is a surge generator, the injection method is implemented by winding cable coupling injection, the receiving instrument in the calibration and receiving component is an oscilloscope, and the probe is preferably a voltage probe. The auxiliary system of the device under test is used for performance monitoring equipment.

[0034] The test arrangement is as follows Figure 3 Complete and perform system calibration.

[0035] The device under test operates according to the rated working conditions, and the surge interference signal is applied. The monitoring data of the receiving components and data processing, as well as the data of the performance monitoring equipment of the device under test, are used as the basis for the performance judgment of the test. The monitoring data includes the noise level and the working conditions of the device under test.

[0036] Based on the test results, a comprehensive evaluation conclusion is given from the aspects of process grounding structure, system composition requirements, grounding distribution, and equipment working characteristics; surge sensitivity testing and evaluation are completed.

[0037] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A particle accelerator process grounding electromagnetic sensitivity testing and evaluation method, characterized in that: The steps include: Determine the content of sensitivity test experiments and spectrum management requirements, and determine the content of electromagnetic sensitivity evaluation; Determine test system and test layout requirements; Based on the content of sensitivity test experiments, spectrum management requirements and electromagnetic sensitivity evaluation, test experiments and performance monitoring are carried out through the test system under the test layout requirements, and electromagnetic sensitivity evaluation is performed.

2. The particle accelerator process grounding electromagnetic sensitivity testing and evaluation method according to claim 1, characterized in that: The content of the sensitivity test experiment includes experimental categories and experimental items; The experiment categories include: testing within the grounding subsystem and between several grounding subsystems; The experimental items include: surge test, pulse group test and conducted emission immunity test.

3. The particle accelerator process grounding electromagnetic sensitivity testing and evaluation method according to claim 1, characterized in that: Determining the spectrum management requirements for the sensitivity test experiment specifically includes the following steps: Classify the loads of process grounding into sensitive loads and general loads according to their sensitivity; The frequency range and amplitude limit requirements of conducted emission immunity are determined by sensitive loads, and the sensitivity requirements of conducted emission are determined by the frequency range and amplitude limit requirements of conducted emission immunity; Strong noise sources in general loads may cause surge and pulse group levels higher than the national standard, and may also cause specific interference phenomena. At this time, if the transient interference level is higher than the national standard, the transient interference level of the general load should be used as the experimental level, otherwise the experimental level of the relevant national standard should be used to determine the transient immunity level; The sensitivity test experiment spectrum management requirements are determined by the conducted emission sensitivity requirements and the transient immunity level.

4. The particle accelerator process grounding electromagnetic sensitivity testing and evaluation method according to claim 1, characterized in that: The content of the electromagnetic sensitivity evaluation includes evaluation categories and evaluation indicators; The evaluation categories include: evaluation of the electromagnetic interference effects within a single grounding subsystem and on other subsystems; The evaluation index includes: directly testing the noise level received by the interference point and the impact on sensitive equipment; The impacts on the sensitive equipment include: electromagnetic sensitivity to process grounding, rationality of grounding allocation, and control of electromagnetic emission levels of newly connected equipment.

5. The particle accelerator process grounding electromagnetic sensitivity testing and evaluation method according to claim 1, characterized in that: The test system comprises: Signal generating components, used to generate surge signals, pulse group signals and conducted emission signals; An injection component, used for injecting the interference signal generated by the signal generator into the object under test; A receiving component, used to test interference signals received by sensitive objects; Calibration components, used to self-calibrate the test system to ensure that the interference signal injection efficiency meets the experimental level requirements; Related accessories, etc.; used to realize auxiliary functions of the test system.

6. The particle accelerator process grounding electromagnetic sensitivity testing and evaluation method according to claim 5, characterized in that: The test arrangement requirements include: The test site is the process grounding installation site; In order to avoid the impact of the environment on the test results, irrelevant equipment should be turned off before the experiment, and the environment should be tested and confirmed; The auxiliary equipment connected during the test should not affect the test results; The access equipment of the grounding subsystem needs to be arranged and operated according to the actual working conditions.

7. The particle accelerator process grounding electromagnetic sensitivity testing and evaluation method according to claim 1, characterized in that: The test experiment and performance monitoring specifically include: setting the corresponding signal source according to the experimental content, injecting the interference signal into the grounding point terminal through the injection component, and realizing performance monitoring by monitoring the working status of the subsystem equipment and the noise level of the grounding point of other subsystems.

8. The particle accelerator process grounding electromagnetic sensitivity testing and evaluation method according to claim 1, characterized in that: The electromagnetic sensitivity evaluation is specifically as follows: during the test, if the noise level meets the limit requirements and the relevant equipment works normally, the electromagnetic sensitivity is good, otherwise, the opposite is true.