Electric energy storage detection system
By real-time detection and analysis of the charging speed of energy storage units, and flexible frequency adjustment and optimization, the problems of uneven charging and performance degradation in energy storage power stations are solved, thereby improving system efficiency and safety.
Patent Information
- Application Number
- CN202411119893.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-11-19
AI Technical Summary
Existing energy storage power stations' battery management systems suffer from response delays during charging due to equipment aging, making it impossible to promptly address charging imbalances. Relying on short-term solutions based on battery management systems cannot fundamentally solve the performance degradation of energy storage units, increasing maintenance costs and safety risks.
By real-time monitoring of the charging speed of energy storage units, charging difference analysis and frequency adjustment are performed. Combined with the charging quality evaluation module, energy storage units with performance degradation are identified and optimized, enabling flexible adjustment and equalization control of charging detection frequency.
It improves the efficiency of the battery management system, promptly identifies and optimizes energy storage units with performance degradation, extends battery pack life, reduces operating costs, reduces safety accidents, and maintains charging stability and safety.
Smart Images

Figure CN118980931A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of electric energy storage monitoring, and in particular relates to a charging balance detection technology for an energy storage power station, and specifically is an electric energy storage detection system. Background Art
[0002] As society's reliance on renewable energy sources such as wind and solar power increases, energy storage power stations have become an important tool for regulating the fluctuations of renewable energy. The instability and intermittency of renewable energy allow energy storage power stations to store excess energy and release it when needed to balance the supply and demand of the power grid and improve the stability and reliability of the grid.
[0003] Charging in an energy storage power station is a basic operation to maintain the normal operation of the power station. In order to meet the power supply capacity requirements of the energy storage power station, most of the current energy storage power stations are composed of multiple energy storage units. When charging, in order to improve the charging efficiency, all energy storage units are generally charged at the same time. Different energy storage units have different charging characteristics. These differences will cause the charging speed of each energy storage unit to be inconsistent under the same charging conditions, resulting in uneven charging. In order to solve the problem of uneven charging, modern energy storage power stations usually use advanced battery management systems to adjust the charging current and time of each energy storage unit through precise monitoring, real-time data processing and feedback control to achieve the best balancing effect.
[0004] However, the existing monitoring frequency for charge balancing is too rigid and does not take into account the response delay of the battery management system. The sensors, controllers and other equipment in the battery management system may age with age, which will weaken the processing capability of the controller and inevitably lead to response delays. If the original set monitoring frequency is maintained, the monitoring data will continue to accumulate and cannot be processed in time, which may exceed the processing capacity of the system storage capacity, thereby reducing the efficiency of the battery management system to a certain extent. It will not only delay the processing time of charge imbalance, but also increase the maintenance cost of the battery management system.
[0005] In addition, relying on the battery management system to deal with charging imbalance can only provide a short-term solution and cannot fundamentally solve the performance degradation of the energy storage unit. However, the existing excessive reliance on the battery management system when charging imbalance occurs and the lack of regular performance evaluation and optimization of the energy storage unit will make it difficult to timely identify energy storage units with degraded performance. Energy storage units with degraded performance will cause further deterioration of charging imbalance and even cause safety problems, causing the system to operate in a bad state, which is likely to cause a decrease in system efficiency, increase energy consumption, and may affect the overall performance and economy of the energy storage power station.
[0006] Therefore, it is necessary to provide a new power storage detection system to solve the above technical problems. Summary of the invention
[0007] In view of this, the present invention aims to propose an electric energy storage detection system to effectively solve the problems raised in the above background technology.
[0008] The purpose of the present invention can be achieved through the following technical solutions: An electric energy storage detection system includes the following modules: a charging detection module, which is used to use a detection terminal to detect the charging speed of each energy storage unit in real time during the charging process of the energy storage power station.
[0009] The charging difference analysis module is used to perform charging difference analysis based on the charging speed of each energy storage unit detected in real time.
[0010] The charging equalization control trigger module is used to identify whether to trigger the battery management end to perform equalization control based on the charging difference analysis results, trigger the equalization control when it is identified that triggering is required, and record the trigger response time.
[0011] The charging detection frequency adjustment module is used to set the adjustment period, thereby retrieving the trigger record of the battery management end within the adjustment period, and extracting the trigger response duration from the trigger record, thereby adjusting the charging detection frequency of the energy storage power station.
[0012] The charging quality evaluation module is used to retrieve the charging records of the energy storage power station within the adjustment period, and extract the real-time detected charging speed of each energy storage unit from the charging records to perform charging performance attenuation analysis and charging imbalance analysis, thereby evaluating the charging quality coefficient of each energy storage unit.
[0013] The energy storage unit optimization module is used to screen out unsuitable energy storage units for optimization based on the charging quality coefficient of each energy storage unit within the adjustment period.
[0014] One of the improvements of the above technical solutions is that the charging difference analysis is as follows:
[0015] Compare the charging speeds of each energy storage unit at the same detection time, select the maximum charging speed and the minimum charging speed, and use the expression Calculate the charging difference Where max P 、min P They represent the maximum charging speed and the minimum charging speed respectively, and e represents a natural constant.
[0016] An improvement of one of the above technical solutions is that the identification of whether to trigger the battery management end to perform balancing control based on the charging difference analysis result is as follows: the charging difference calculated at each detection time is compared with the allowable threshold set by the system. If the charging difference calculated at a certain detection time is greater than the allowable threshold, it is identified that the battery management end needs to be triggered to perform balancing control. Otherwise, it is identified that the battery management end does not need to be triggered to perform balancing control.
[0017] An improvement of one of the above technical solutions is that before the charging detection frequency of the energy storage power station is adjusted, it also involves the judgment of whether the charging detection frequency is adjusted. The specific operation is as follows: the trigger response time of each trigger record is compared with the ideal trigger response time of the battery management end to obtain the trigger response time difference, and compared with the ideal trigger response time to obtain the trigger response delay of each trigger record.
[0018] The charging detection frequency adjustment demand coefficient is calculated based on the trigger response delay of each trigger record. The specific calculation formula is: In the formula Indicates the average trigger response delay of each trigger record.
[0019] The charging detection frequency adjustment demand coefficient is compared with the critical demand coefficient set by the system. If the charging detection frequency adjustment demand coefficient is greater than the critical demand coefficient, it is judged that the charging detection frequency adjustment is required, otherwise it is judged that the charging detection frequency adjustment is not required.
[0020] One of the improvements of the above technical solutions is that the charging detection frequency of the energy storage power station is adjusted according to the following process: the current charging detection frequency is obtained based on the charging state detection interval duration of the current energy storage power station.
[0021] The charging detection frequency adjustment demand coefficient is combined with the current charging detection frequency using the formula Calculate the required charging detection frequency f, where f 0 Indicates the current charging detection frequency, ψ 临界 represents the critical demand coefficient.
[0022] Obtain the charging detection frequency range that the detection terminal can support, and compare the required charging detection frequency with the lower limit detection frequency in the charging detection frequency range. If the required charging detection frequency is less than the lower limit detection frequency, adjust the charging detection frequency of the energy storage power station according to the lower limit detection frequency; if the required charging detection frequency is higher than the lower limit detection frequency, adjust the charging detection frequency of the energy storage power station according to the required charging detection frequency.
[0023] One improvement of the above technical solution is that the charging record is formed by using a detection terminal to detect the charging speed of each energy storage unit in real time between the start and end of charging of the energy storage power station, forming the charging speed of each energy storage unit at each detection time.
[0024] One of the improvements of the above technical solutions is that the charging performance decay analysis is as follows:
[0025] The charging time at each detection time is obtained by subtracting the charging start time from each detection time in the charging record.
[0026] With the charging time as the horizontal axis and the charging speed as the vertical axis, a charging speed variation curve of each energy storage unit corresponding to each charging record is formed for the charging time and charging speed corresponding to each energy storage unit at each detection time in each charging record.
[0027] The charging speed increase rate of the same energy storage unit in each charging record is obtained by performing charging speed change curve.
[0028] The maximum value of the charging speed increase rate of the same energy storage unit in each charging record is selected, and the timestamps of the charging records corresponding to the maximum charging speed increase rate and the minimum charging speed increase rate are obtained, thereby obtaining the interval duration.
[0029] The maximum charging speed increase rate and the minimum charging speed increase rate corresponding to each energy storage unit are subtracted, and the subtraction result is divided by the interval time to obtain the charging performance attenuation degree corresponding to each energy storage unit.
[0030] An improvement of one of the above technical solutions is that the charging imbalance analysis includes the following process: identifying whether the retrieved charging record triggers the battery management end balancing management, and thereby screening out the charging record that has triggered the battery management end balancing management and recording it as the target charging record.
[0031] The target charging record is extracted to calculate the median charging speed of each energy storage unit when the battery management end balancing management is triggered, and then the charging speed of each energy storage unit is compared with the median charging speed, and the energy storage units with a charging speed lower than the median charging speed are screened out and recorded as abnormal energy storage units.
[0032] The abnormal energy storage units existing in each target charging record are classified to obtain the occurrence ratio of each abnormal energy storage unit, which is used as the charging imbalance degree corresponding to each abnormal energy storage unit.
[0033] The improvement of one of the above technical solutions is that the evaluation of the charging quality coefficient of each energy storage unit is as follows: the charging performance attenuation and charging imbalance corresponding to each energy storage unit are evaluated by the evaluation formula Get the charging quality coefficient Q corresponding to each energy storage unit, where φ represents the charging performance attenuation and charging imbalance corresponding to each energy storage unit.
[0034] An improvement of one of the above technical solutions is that the operation of screening out unsuitable energy storage units is as follows: comparing the charging quality coefficient corresponding to each energy storage unit within the adjustment period with the standard charging quality coefficient initially set by the system, and screening out energy storage units with a charging quality coefficient less than the standard as unsuitable energy storage units.
[0035] Compared with the prior art, the beneficial effects of the present invention are as follows: 1. The present invention retrieves the charge balancing control trigger record of the battery management end to judge the need for charging detection frequency adjustment based on the analysis of the trigger response delay, and adjusts the detection frequency when it is judged that the detection frequency adjustment is needed, thereby achieving targeted and flexible adjustment of the charging detection frequency of different energy storage units in the energy storage power station. It can not only adapt to the response capability of the current battery management end, but also avoid the continuous accumulation of charging detection data, which is beneficial to improving the efficiency of the battery management end.
[0036] The present invention adds charging performance decay analysis and charging imbalance analysis of energy storage units when performing charging detection on different energy storage units in the energy storage power station, thereby regularly evaluating the charging quality of the energy storage units, thereby timely screening out unsuitable energy storage units for optimization, effectively making up for the problem that cannot be solved by relying on the battery management end, and being able to timely identify batteries with serious performance decay. By early identification and optimization or replacement of batteries with poor performance, the life of the entire battery pack can be effectively extended, and operating costs can be reduced. At the same time, the incidence of safety accidents caused by improper charging of the battery can be reduced, which is beneficial to maintaining charging stability and safety in the long run. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 This is a schematic diagram of the connection of various modules of the power storage detection system provided by the present invention. DETAILED DESCRIPTION
[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0039] See also Figure 1 As shown, the present invention proposes an electric energy storage detection system, including a charging detection module, a charging difference analysis module and a charging quality evaluation module connected to the charging detection module, a charging equalization control trigger module connected to the charging difference analysis module, a charging detection frequency adjustment module connected to the charging equalization control trigger module, and an energy storage unit optimization module connected to the charging quality evaluation module.
[0040] The charging detection module is used to detect the charging speed of each energy storage unit in real time using the detection terminal during the charging process of the energy storage power station.
[0041] As a specific implementation of the above solution, the detection terminal can be a power sensor for detecting the capacity of the energy storage unit. The charging speed can be calculated by obtaining the power change at adjacent detection moments. Assuming that between time t1 and time t2, the power changes from E1 to E2, the charging speed can be simply calculated as:
[0042] As another example of the above solution, the detection terminal may be a voltage sensor or a current sensor for detecting the charging voltage and the charging current, and the charging speed may be estimated by multiplying the charging current and the charging voltage.
[0043] The charging difference analysis module is used to perform charging difference analysis based on the charging speed of each energy storage unit detected in real time. The specific analysis is as follows: the charging speed of each energy storage unit at the same detection time is compared, and the maximum charging speed and the minimum charging speed are selected from them. The expression Calculate the charging difference Where max P 、min P They represent the maximum charging speed and the minimum charging speed respectively, and e represents a natural constant. The greater the difference between the maximum charging speed and the minimum charging speed, the greater the charging difference.
[0044] The charging equalization control trigger module is used to identify whether to trigger the battery management end to perform equalization control based on the charging difference analysis result. When the trigger is identified, the equalization control trigger is performed and the trigger response time is recorded. The trigger response time here refers to the time between triggering the battery management end and the battery management end performing imbalance processing.
[0045] In one achievable method, whether to trigger the battery management end to perform balancing control is identified based on the charging difference analysis result as follows: the charging difference calculated at each detection time is compared with the allowable threshold set by the system. If the charging difference calculated at a certain detection time is greater than the allowable threshold, it is identified that the battery management end needs to be triggered to perform balancing control. Otherwise, it is identified that the battery management end does not need to be triggered to perform balancing control.
[0046] The present invention automatically identifies charging imbalance and triggers equalization control by setting an allowable threshold of charging difference, thereby reducing the need for manual intervention. This can optimize the workflow of the operation and maintenance team, improve response speed, and reduce maintenance and management costs.
[0047] The charging detection frequency adjustment module is used to set the adjustment period, thereby retrieving the trigger record of the battery management terminal within the adjustment period, and extracting the trigger response duration from the trigger record, thereby adjusting the charging detection frequency of the energy storage power station.
[0048] It should be added that the purpose of setting the adjustment cycle is to achieve regular and periodic dynamic adjustment of the charging detection frequency. By retrieving the trigger records of the battery management end within the adjustment cycle, it is possible to respond more accurately to changes in the system's charging detection requirements and achieve targeted adjustment of the charging detection frequency based on the cycle. However, the adjustment cycle should not be too long or too short. A cycle that is too long may make it impossible for the energy storage power station to adjust the charging detection frequency in time when a charging imbalance occurs, resulting in a slower response speed of the system to the charging detection requirements, affecting the system's operating efficiency and stability. If the cycle is too short, the data obtained during the adjustment cycle will be too little and not representative. At the same time, adjustments under short cycles will bring additional resource consumption and management burdens, and increase the risk of misoperation.
[0049] Applicable to the above supplementary instructions, the adjustment period may be 6 months.
[0050] As an innovation of the above solution, before the charging detection frequency of the energy storage power station is adjusted, it is also involved in the judgment of whether the charging detection frequency should be adjusted. The specific operation is as follows: the trigger response time of each trigger record is compared with the ideal trigger response time of the battery management end to obtain the trigger response time difference, and compared with the ideal trigger response time to obtain the trigger response delay of each trigger record, wherein the larger the trigger response time difference, the greater the trigger response delay.
[0051] It should be pointed out that the ideal trigger response time of the battery management end is set based on the data transmission bandwidth and data processing capability when the battery management end is initially designed. For example, the ideal trigger response time is 2s. However, as the battery management end is continuously put into use, the data processing capability of the battery management end decreases, causing the trigger response time to show a trend of being higher than the ideal trigger response time.
[0052] The charging detection frequency adjustment demand coefficient is calculated based on the trigger response delay of each trigger record. The specific calculation formula is: In the formula Indicates the average trigger response delay of each trigger record.
[0053] The charging detection frequency adjustment demand coefficient is compared with the critical demand coefficient set by the system. For example, the critical demand coefficient may be 0.8. If the charging detection frequency adjustment demand coefficient is greater than the critical demand coefficient, it is judged that the charging detection frequency adjustment is required, otherwise it is judged that the charging detection frequency adjustment is not required.
[0054] The present invention analyzes the demand for adjusting the charging detection frequency based on the trigger response duration of the trigger record of the battery management end, and can provide a reasonable automatic judgment on whether to adjust the charging detection frequency, which is beneficial to improving the adjustment control accuracy of the charging detection frequency.
[0055] Preferably, the charging detection frequency adjustment of the energy storage power station is implemented as follows: the current charging detection frequency is obtained based on the current charging state detection interval duration of the energy storage power station.
[0056] It should be noted that the charging detection frequency mentioned in the present invention refers to the frequency of charging detection performed per unit time, for example, charging detection is performed 6 times per hour.
[0057] The charging detection frequency adjustment demand coefficient is combined with the current charging detection frequency using the formula Calculate the required charging detection frequency f, where f 0 Indicates the current charging detection frequency, ψ 临界 It represents the critical demand coefficient. From this formula, it can be seen that the larger the charging detection frequency adjustment demand coefficient calculated based on the trigger response delay of the battery management end, the more it is necessary to reduce the charging detection frequency to avoid the accumulation of detection data.
[0058] Obtain the charging detection frequency range that the detection terminal can support, and compare the required charging detection frequency with the lower limit detection frequency in the charging detection frequency range. If the required charging detection frequency is less than the lower limit detection frequency, adjust the charging detection frequency of the energy storage power station according to the lower limit detection frequency; if the required charging detection frequency is higher than the lower limit detection frequency, adjust the charging detection frequency of the energy storage power station according to the required charging detection frequency.
[0059] The charging detection frequency range supported by the detection terminal can be obtained from the user instructions of the detection terminal.
[0060] It should be added that the lower limit of the charging detection frequency is set to ensure that the system can maintain stability and good performance at the minimum required monitoring frequency. When the required charging detection frequency is less than the lower limit detection frequency, by adjusting according to the lower limit detection frequency, it can ensure that the system can maintain the most basic operating requirements under any circumstances, avoiding insufficient monitoring or missed detection due to too low frequency. When the required charging detection frequency is higher than the lower limit detection frequency, adjusting according to the required charging detection frequency can ensure that the system can be flexibly adjusted according to specific operating needs and situations. This method can provide sufficient data support when more frequent monitoring is required to cope with high demand in specific periods or specific situations of the system.
[0061] The charging quality evaluation module is used to retrieve the charging records of the energy storage power station within the adjustment period, and extract the real-time detected charging speed of each energy storage unit from the charging records to perform charging performance decay analysis and charging imbalance analysis, thereby evaluating the charging quality coefficient of each energy storage unit.
[0062] It should be noted that the charging record is the charging speed of each energy storage unit at each detection time formed by real-time detection of the charging speed of each energy storage unit by the detection terminal between the start and end of charging of the energy storage power station.
[0063] Furthermore, the charging performance decay analysis is performed as follows: each detection time in the charging record is subtracted from the charging start time to obtain the charging duration at each detection time.
[0064] A coordinate system is constructed with the charging time as the horizontal axis and the charging speed as the vertical axis, and a charging speed change curve of each energy storage unit corresponding to each charging record is formed according to the charging time and charging speed corresponding to each energy storage unit at each detection time in each charging record.
[0065] The charging speed increase rate of the same energy storage unit in each charging record is obtained by performing charging speed change curve.
[0066] It should be noted that, since the charging speed of the energy storage unit increases continuously during charging until the charging speed stops increasing when the energy storage unit is fully charged, the rate of change of the charging speed change curve is the charging speed increase rate.
[0067] In a possible design of the above scheme, the charging speed rising rate based on the charging speed change curve can be obtained by differentiating or differencing the curve, wherein the differentiation method is to use the calculus method to calculate the slope of the charging speed change, which represents the charging speed rising rate, and the difference method is to calculate the difference in charging rate at adjacent time points, and then divide it by the time interval to obtain the average change rate of the charging speed as the charging speed rising rate.
[0068] The maximum value of the charging speed increase rate of the same energy storage unit in each charging record is selected, and the timestamps of the charging records corresponding to the maximum charging speed increase rate and the minimum charging speed increase rate are obtained, thereby obtaining the interval duration.
[0069] Subtract the maximum charging speed increase rate from the minimum charging speed increase rate corresponding to each energy storage unit, and divide the subtraction result by the interval length to obtain the charging performance attenuation corresponding to each energy storage unit. The calculation result of the attenuation degree can help quantify the attenuation degree of the charging performance of the energy storage unit. The larger the value, the greater the reduction in charging speed within a certain period of time, and the more serious the attenuation.
[0070] Furthermore, the charging imbalance analysis includes the following process: identifying whether the retrieved charging record triggers the battery management end balancing management, and thereby screening out the charging record that has triggered the battery management end balancing management and recording it as the target charging record.
[0071] The target charging record is extracted to calculate the median charging speed of each energy storage unit when the battery management end balancing management is triggered, and then the charging speed of each energy storage unit is compared with the median charging speed, and the energy storage units with a charging speed lower than the median charging speed are screened out and recorded as abnormal energy storage units.
[0072] It is important to know that when the charging record triggers the balancing management of the battery management end, the charging speeds of the energy storage units in the energy storage power station vary greatly. At this time, the median charging speed can better reflect the charging status and performance characteristics of the entire energy storage power station. The median, as a measurement method in statistics, can effectively eliminate extreme values (such as extremely low or extremely high charging speeds), thereby providing a more stable and representative charging speed indicator. The median charging speed reflects the intermediate level of the charging speed of most energy storage units under the current charging trigger event. Based on the median charging speed, the energy storage units with a charging speed lower than the median charging speed are screened out, indicating that the charging speed cannot maintain the intermediate level, which means that the energy storage unit may have an abnormal situation.
[0073] The abnormal energy storage units existing in each target charging record are classified to obtain the occurrence ratio of each abnormal energy storage unit, which is used as the charging imbalance degree corresponding to each abnormal energy storage unit.
[0074] Furthermore, the charging quality coefficient of each energy storage unit is evaluated as follows: the charging performance attenuation and charging imbalance corresponding to each energy storage unit are evaluated by the evaluation formula Get the charging quality coefficient Q corresponding to each energy storage unit, where φ represents the charging performance attenuation and charging imbalance corresponding to each energy storage unit, where both the charging performance attenuation and charging imbalance have a negative impact on the charging quality.
[0075] The energy storage unit optimization module is used to screen out incompatible energy storage units for optimization based on the charging quality coefficients of each energy storage unit within the adjustment period. Specifically, the operation of screening out incompatible energy storage units is as follows: the charging quality coefficients corresponding to each energy storage unit within the adjustment period are compared with the qualified charging quality coefficients initially set by the system. Exemplarily, the qualified charging quality coefficient is 0.75, and energy storage units with charging quality coefficients less than the qualified charging quality coefficients are screened out as incompatible energy storage units.
[0076] In the improved implementation of the above scheme, the optimization measures for the screened-out incompatible energy storage units may be replacement of the energy storage units or technical upgrades of the original energy storage units.
[0077] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they shall all fall within the protection scope of the present invention.
Claims
1. An electric energy storage detection system, characterized in that , including the following modules: A charging detection module is used to detect the charging speed of each energy storage unit in real time using a detection terminal during the charging process of the energy storage power station; A charging difference analysis module, used to perform charging difference analysis based on the charging speed of each energy storage unit detected in real time; The charging equalization control trigger module is used to identify whether to trigger the battery management end to perform equalization control based on the charging difference analysis results, trigger the equalization control when it is identified that triggering is required, and record the trigger response time; The charging detection frequency adjustment module is used to set the adjustment period, thereby retrieving the trigger record of the battery management terminal within the adjustment period, and extracting the trigger response duration from the trigger record, thereby adjusting the charging detection frequency of the energy storage power station; The charging quality evaluation module is used to retrieve the charging records of the energy storage power station within the adjustment period, and extract the real-time detected charging speed of each energy storage unit from the charging records to perform charging performance attenuation analysis and charging imbalance analysis, thereby evaluating the charging quality coefficient of each energy storage unit; The energy storage unit optimization module is used to screen out unsuitable energy storage units for optimization based on the charging quality coefficient of each energy storage unit within the adjustment period.
2. The power storage detection system according to claim 1, characterized in that: The charging difference analysis process is as follows: Compare the charging speeds of each energy storage unit at the same detection time, select the maximum charging speed and the minimum charging speed, and use the expression Calculate the charging difference Where max P 、min P They represent the maximum charging speed and the minimum charging speed respectively, and e represents a natural constant.
3. An electric energy storage detection system according to claim 2, characterized in that: The method of identifying whether to trigger the battery management end to perform balancing control based on the charging difference analysis result is as follows: The charging difference calculated at each detection time is compared with the allowable threshold set by the system. If the charging difference calculated at a certain detection time is greater than the allowable threshold, it is identified that the battery management end needs to be triggered for balancing control. Otherwise, it is identified that the battery management end does not need to be triggered for balancing control.
4. The power storage detection system according to claim 1, characterized in that: Before the charging detection frequency of the energy storage power station is adjusted, it is also necessary to judge whether the charging detection frequency should be adjusted. The specific operation is as follows: Compare the trigger response time of each trigger record with the ideal trigger response time of the battery management end to obtain the trigger response time difference, and compare it with the ideal trigger response time to obtain the trigger response delay of each trigger record; The charging detection frequency adjustment demand coefficient is calculated based on the trigger response delay of each trigger record. The specific calculation formula is: In the formula Indicates the average value of the trigger response delay of each trigger record; The charging detection frequency adjustment demand coefficient is compared with the critical demand coefficient set by the system. If the charging detection frequency adjustment demand coefficient is greater than the critical demand coefficient, it is judged that the charging detection frequency adjustment is required, otherwise it is judged that the charging detection frequency adjustment is not required.
5. The power storage detection system according to claim 4, characterized in that: The energy storage power station charging detection frequency adjustment refers to the following process: The current charging detection frequency is obtained based on the charging status detection interval of the current energy storage power station; The charging detection frequency adjustment demand coefficient is combined with the current charging detection frequency using the formula Calculate the required charging detection frequency f, where f0 represents the current charging detection frequency, ψ 临界 represents the critical demand coefficient; Obtain the charging detection frequency range that the detection terminal can support, and compare the required charging detection frequency with the lower limit detection frequency in the charging detection frequency range. If the required charging detection frequency is less than the lower limit detection frequency, adjust the charging detection frequency of the energy storage power station according to the lower limit detection frequency; if the required charging detection frequency is higher than the lower limit detection frequency, adjust the charging detection frequency of the energy storage power station according to the required charging detection frequency.
6. The power storage detection system according to claim 1, characterized in that: The charging record is the charging speed of each energy storage unit at each detection time formed by using the detection terminal to detect the charging speed of each energy storage unit in real time between the start and end of charging of the energy storage power station.
7. The power storage detection system according to claim 6, characterized in that: The charging performance decay analysis process is as follows: Subtract each detection time in the charging record from the charging start time to obtain the charging time at each detection time; With the charging time as the horizontal axis and the charging speed as the vertical axis, a charging speed change curve of each energy storage unit corresponding to each charging record is formed according to the charging time and charging speed corresponding to each energy storage unit at each detection time in each charging record; Obtain the charging speed increase rate of the charging speed change curve of each charging record of the same energy storage unit; Select the maximum value of the charging speed increase rate of the same energy storage unit in each charging record, and obtain the timestamps of the charging records corresponding to the maximum charging speed increase rate and the minimum charging speed increase rate, thereby obtaining the interval duration; The maximum charging speed increase rate and the minimum charging speed increase rate corresponding to each energy storage unit are subtracted, and the subtraction result is divided by the interval time to obtain the charging performance attenuation degree corresponding to each energy storage unit.
8. The power storage detection system according to claim 7, characterized in that: The charging imbalance analysis process is as follows: Identify whether the retrieved charging record triggers the balancing management of the battery management end, and thereby select the charging record that has triggered the balancing management of the battery management end and record it as the target charging record; Extract the target charging record to calculate the median charging speed of each energy storage unit when the battery management end balance management is triggered, and then compare the charging speed of each energy storage unit with the median charging speed, and select the energy storage unit with a charging speed lower than the median charging speed, which is recorded as an abnormal energy storage unit; The abnormal energy storage units existing in each target charging record are classified to obtain the occurrence ratio of each abnormal energy storage unit, which is used as the charging imbalance degree corresponding to each abnormal energy storage unit.
9. The power storage detection system according to claim 8, characterized in that: The process of evaluating the charging quality coefficient of each energy storage unit is as follows: The charging performance attenuation and charging imbalance of each energy storage unit are evaluated by the formula Get the charging quality coefficient Q corresponding to each energy storage unit, where φ represents the charging performance attenuation and charging imbalance corresponding to each energy storage unit.
10. The power storage detection system according to claim 1, characterized in that: The operation of screening out unsuitable energy storage units is as follows: The charging quality coefficient corresponding to each energy storage unit in the adjustment period is compared with the standard charging quality coefficient initially set for the system, and the energy storage units with charging quality coefficients less than the standard are screened out as unsuitable energy storage units.