Intelligent production safety management and control platform based on industrial internet and implementation method
Through the intelligent production safety control platform based on the industrial Internet, production data is analyzed and abnormal processes are marked, the problem of inability to monitor different production processes in industrial production is solved, production efficiency and safety are improved, and product quality is ensured.
Patent Information
- Application Number
- CN202411068964.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-11-19
AI Technical Summary
During industrial production, it is impossible to monitor production devices or equipment in different production processes in a targeted manner, resulting in the inability to identify abnormal conditions in a timely manner, affecting production continuity and product quality.
Through the intelligent production safety control platform based on the industrial Internet, we analyze the data of multiple historical production orders, calculate the production rate and process efficiency, mark abnormal processes, and generate abnormal signals and stop control signals to deal with abnormalities in a timely manner.
A comprehensive monitoring of the production process is achieved, abnormalities are discovered and prevented in a timely manner, production continuity and product quality are ensured, and potential safety risks are prevented.
Smart Images

Figure CN118982288A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of intelligent factory production control technology, and specifically to an intelligent production safety control platform based on the industrial Internet and an implementation method. Background Art
[0002] Industrial product production technology is complex, the process is long, and the communication cost between departments is high. Industrial production is facing an important opportunity for transformation and upgrading. With the increasing application of industrial Internet technology in the production process, whether in discrete industries (such as machinery manufacturing, electronic assembly) or process industries (such as chemicals, metallurgy, etc.), it has brought important means for production companies to improve production efficiency, ensure production safety and improve product quality;
[0003] However, in the industrial production process, there are many potential safety risks and efficiency challenges. Therefore, it is particularly important to carry out real-time and accurate safety monitoring and efficiency optimization in different production stages. When monitoring the production status of industrial production devices or equipment, it is impossible to carry out targeted monitoring of the production conditions corresponding to the production devices or equipment in different production processes, and mark abnormal processes. There is a lack of in-depth analysis and targeted monitoring of the entire industrial production process, and it is impossible to accurately identify abnormal conditions that may occur in different production stages, which affects the continuity of production and the quality of products, resulting in low product production efficiency, waste of resources and potential safety hazards. Based on this, an intelligent production safety management and control platform based on the Industrial Internet and its implementation method are proposed. Summary of the invention
[0004] The purpose of the present invention is to provide an intelligent production safety management and control platform based on the industrial Internet and an implementation method, which solves the technical problem that in the industrial production process, it is impossible to conduct targeted monitoring of the production conditions corresponding to different production processes of production devices or equipment, and mark abnormal processes, which affects the continuity of production and the quality of products.
[0005] The purpose of the present invention can be achieved through the following technical solutions:
[0006] The intelligent production safety management and control platform and implementation method based on the industrial Internet include the following steps:
[0007] Step 1: Analyze the production output or quantity and production duration of multiple historical production orders corresponding to the production device or equipment, and then obtain the calculation rate corresponding to the production device or equipment;
[0008] Step 2: According to the production time of historical production orders, obtain the analysis process corresponding to each production order according to the preset proportion mark;
[0009] Step 3: Analyze the production data of each production order in its corresponding analysis process to obtain the process efficiency corresponding to each analysis process;
[0010] Step 4: Obtain each analysis process corresponding to the expected production order according to the expected production output or quantity of the expected production order. At the end of each analysis process, analyze the real-time production data corresponding to the expected production order in the corresponding analysis process to obtain the real-time standard effect corresponding to each analysis process of the expected production order;
[0011] Step 5: Compare and analyze the real-time standard efficiency corresponding to the expected production order in each analysis process with the process standard efficiency corresponding to each analysis process, obtain the abnormal process according to the analysis results, and output the corresponding abnormal process.
[0012] As a further solution of the present invention: obtaining the calculation rate corresponding to the production device or equipment, the specific method is:
[0013] The production output or quantity and production duration corresponding to each historical production order are marked as BAi and CTi, respectively, where i refers to the quantity corresponding to the historical production order, i≥1;
[0014] The production rate DBi corresponding to each historical production order is calculated through the formula (BAi / CT i)×β1=DBi, where β1 is a preset fixed proportional coefficient; the value DBc that satisfies the formula L1 in the production rate DBi corresponding to each historical production order is obtained, and it is analyzed to obtain the calculated rate ED, where the formula L1 is |DBi-DBp|<Q1, i≥c≥1, DBp is the mean value of DBi, and Q1 is the preset value.
[0015] As a further solution of the present invention: the specific method of analyzing DBc is:
[0016] When c>Q2, the mean DBp of DBi is used as the calculation rate ED. When c≤Q2, the mean of the maximum and minimum values of DBi is used as the calculation rate ED, that is, (DBmax+DBmin) / 2=ED, where DBmax is the maximum value in DB i, DBmin is the minimum value in DB i, and Q2 is the preset value.
[0017] As a further solution of the present invention: the specific method of marking and obtaining the analysis process corresponding to each production order is:
[0018] On the production time of each production order, multiple analysis processes are marked in sequence according to the same preset ratio B1, and each analysis process is: [0, B1×CT i], (B1×T i, 2B1×CT i], ..., (f-1 / f×CT i, CTi], where f is the corresponding number of analysis processes, f≥1, and it will be used as the label corresponding to each analysis process.
[0019] As a further solution of the present invention, the specific method of obtaining the process efficiency corresponding to each analysis process is:
[0020] Step S1: randomly select a process from each analysis process as the target process;
[0021] Step S2: The production output or quantity and production duration corresponding to each production order in the target process are marked as FAi and DT i respectively;
[0022] The production efficiency DFi corresponding to each production order in the target process is calculated by the formula (FAi / DTi)×β2=DFi, where β2 is a preset fixed proportional coefficient;
[0023] Step S3: Obtain the average of the production efficiencies DF i corresponding to each production order in the target process, and use it as the process standard efficiency BF1 corresponding to the production device or equipment in the target process, and bind it to the corresponding target process;
[0024] Step S4: Repeat the above steps S3 to S4 to obtain the process efficiency BFr corresponding to each analysis process of the production device or equipment, f≥r≥1.
[0025] As a further solution of the present invention, the specific method of obtaining the real-time standard efficiency corresponding to each analysis process of the estimated production order is:
[0026] The estimated production output or quantity corresponding to the estimated production order is obtained, and marked as G1. According to the formula (G1 / ED)×β3=R1, the estimated production time R1 corresponding to the estimated production order is obtained, where β3 is a preset fixed proportional coefficient. According to the estimated production time R1 corresponding to the estimated production order, multiple analysis processes corresponding to the estimated production order are obtained according to the same preset proportion B1, namely [0, B1×R1], (B1×R1, 2B1×R1], ... (f-1 / f×R1, R1];
[0027] At the end of each analysis process, the production output or quantity and production time corresponding to the expected production order in the corresponding analysis process are obtained, and they are marked as HAr and HBr respectively. The real-time standard efficiency Kr corresponding to the expected production order in each analysis process is calculated through the formula HAr / HBr=Kr.
[0028] As a further solution of the present invention: the specific method of obtaining the abnormal process is:
[0029] Kr is compared and analyzed with BFr. When Kr>BFr×θ1 or Kr<BFr×θ2, it is judged that there is an abnormality in the corresponding analysis process, and the corresponding abnormal process is output. No processing is performed in other cases, where θ1 and θ2 are both preset coefficients.
[0030] As a further solution of the present invention: the specific method of generating the device abnormality signal and the stop control signal is:
[0031] The number of abnormal processes corresponding to the expected production order is obtained and marked as m. When m / f>Q3, an equipment abnormality signal and a stop control signal are generated. When m / f≤Q3, no processing is performed, where Q3 is a preset coefficient.
[0032] The intelligent production safety management and control platform based on the Industrial Internet includes:
[0033] Data acquisition end, acquisition of multiple historical production order data corresponding to production devices or equipment;
[0034] The data analysis end analyzes multiple historical production order data corresponding to the production device or equipment to obtain the production rate corresponding to each production order, and then analyzes them to obtain the calculation rate corresponding to the production device or equipment;
[0035] The analysis process acquisition end marks and obtains the analysis process corresponding to each production order according to the production time corresponding to each historical production order and the same preset ratio B1;
[0036] The process efficiency acquisition end analyzes the production data of each production order in its corresponding analysis process, and then obtains the process efficiency corresponding to each analysis process;
[0037] The real-time standard efficiency acquisition end obtains the real-time standard efficiency corresponding to each analysis process of the expected production order according to each analysis process corresponding to the expected production order and the real-time production data corresponding to the expected production order in the corresponding analysis process;
[0038] At the abnormal process acquisition end, the real-time standard efficiency corresponding to the expected production order in each analysis process is compared and analyzed with the process standard efficiency corresponding to each analysis process to obtain the abnormal process.
[0039] Beneficial effects of the present invention:
[0040] (1) The present invention obtains the process efficiency corresponding to the production device or equipment in different production processes by analyzing multiple historical production order data, and then obtains the real-time efficiency corresponding to the expected production order in each analysis process, and compares and analyzes it with the process efficiency corresponding to each analysis process, obtains the abnormal process according to the analysis result, and outputs the corresponding abnormal process, so as to timely discover and handle the corresponding abnormal situations in different production processes, which can help improve production efficiency, realize comprehensive monitoring of the production process, and timely discover and prevent potential problems, thereby ensuring the continuity of product production and product quality;
[0041] (2) The present invention analyzes the number of abnormal processes corresponding to the expected production orders. When the abnormal process accounts for a high proportion, an abnormal signal of the production device or equipment is generated to warn of the abnormality of the product production device or equipment, and remind relevant personnel to inspect and maintain the production device or equipment in time to ensure the normal operation of the production device or equipment;
[0042] (3) The present invention generates abnormal signals of production devices or equipment to warn of abnormalities in production devices or equipment, and reminds relevant personnel to promptly inspect and maintain the production devices or equipment to ensure the normal operation of the product production devices or equipment. It also generates stop control signals to ensure production safety and prevent further expansion of abnormal situations. It automatically or prompts operators to suspend or stop the operation of relevant production devices or equipment to prevent them from continuing production operations, which poses potential safety risks. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] The present invention will be further described below in conjunction with the accompanying drawings.
[0044] Figure 1 It is a schematic diagram of the framework structure of the method of the present invention;
[0045] Figure 2 It is a schematic diagram of the platform framework structure of the present invention. DETAILED DESCRIPTION
[0046] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0047] Embodiment 1
[0048] See also Figure 1 As shown, the present invention is an intelligent production safety management and control platform based on the industrial Internet and an implementation method, comprising the following steps:
[0049] Step 1: The technical department uses multiple historical production order data corresponding to the production device or equipment to analyze the historical production order data, including production output or quantity and production time;
[0050] Step 2: Analyze multiple historical production order data corresponding to the production device or equipment, and then obtain the production rate corresponding to each production order, and then analyze it to obtain the calculation rate corresponding to the production device or equipment. The specific method is as follows:
[0051] Obtain the production output or quantity corresponding to each historical production order, and mark them as BAi, obtain the production time corresponding to each production order, and mark them as CT i, where i refers to the quantity corresponding to the historical production order, i ≥ 1;
[0052] The production rate DBi corresponding to each historical production order is calculated by the formula (BAi / CTi)×β1=DBi, where β1 is a preset fixed proportional coefficient. The specific value of β1 is formulated by relevant staff according to actual application scenarios and actual needs;
[0053] Obtain the values of the production rates DBi corresponding to each historical production order that satisfy the formula L1 and mark them as DBc. The formula L1 is |DB i-DBp|<Q1, where DBp is the mean value of DB i, i≥c≥1;
[0054] When c>Q2, the mean value DBp of DBi is used as the calculation rate ED. When c≤Q2, the mean value of the maximum and minimum values of DBi is used as the calculation rate ED, that is, (DBmax+DBmin) / 2=ED, where DBmax is the maximum value in DB i, DBmin is the minimum value in DB i, Q1 and Q2 are both preset values, and the specific values are formulated by relevant staff according to needs;
[0055] Step 3: According to the production time corresponding to each historical production order, according to the same preset ratio B1, mark and obtain the analysis process corresponding to each production order. The specific method is as follows:
[0056] On the production time of each production order, multiple analysis processes are marked in sequence according to the same preset ratio B1, and each analysis process is: [0, B1×CT i], (B1×T i, 2B1×CT i], ..., (f-1 / f×CT i, CTi], where f is the number of analysis processes, f≥1, and it will be used as the label corresponding to each analysis process. The specific value of the preset ratio B1 is formulated by relevant staff according to actual application scenarios and actual needs;
[0057] For example, when the preset ratio B1 is 1 / 6, the analysis processes of the production duration of each production order are [0, 1 / 6CT i], (1 / 6CT i, 2 / 6CT i], (2 / 6CT i, 1 / 2CT i], (1 / 2CT i, 4 / 6CT i], (4 / 6CT i, 5 / 6CT i] and (5 / 6CT i, CT i];
[0058] Step 4: Analyze the production data of each production order in its corresponding analysis process, and then obtain the process efficiency corresponding to each analysis process. The specific method is as follows:
[0059] Step S1: randomly select a process from each analysis process as the target process;
[0060] Step S2: The production output or quantity and production duration corresponding to each production order in the target process are marked as FAi and DT i respectively;
[0061] The production efficiency DFi corresponding to each production order in the target process is calculated by the formula (FAi / DTi)×β2=DFi, where β2 is a preset fixed proportional coefficient. The specific value of β2 is formulated by relevant staff according to actual application scenarios and actual needs;
[0062] Step S3: Obtain the average of the production efficiencies DF i corresponding to each production order in the target process, and use it as the process standard efficiency BF1 corresponding to the production device or equipment in the target process, and bind it to the corresponding target process;
[0063] Step S4: Repeat the above steps S3 to S4 to obtain the process efficiency BFr corresponding to each analysis process of the production device or equipment, f≥r≥1;
[0064] Step 5: Obtain the estimated production time corresponding to the estimated production order based on the estimated production output or quantity corresponding to the estimated production order, and then obtain the various analysis processes corresponding to the estimated production order based on the estimated production time. At the end of each analysis process corresponding to the estimated production order, obtain the real-time production data corresponding to the estimated production order in the corresponding analysis process in real time, and analyze it, so as to obtain the real-time standard efficiency corresponding to the estimated production order in each analysis process. The specific method is as follows:
[0065] Obtain the estimated production output or quantity corresponding to the estimated production order, and mark it as G1. According to the formula (G1 / ED)×β3=R1, obtain the estimated production time R1 corresponding to the estimated production order, where β3 is a preset fixed proportional coefficient. The specific value of β3 is formulated by relevant staff according to actual application scenarios and actual needs;
[0066] According to the estimated production time R1 corresponding to the estimated production order, multiple analysis processes corresponding to the estimated production order are obtained according to the same preset ratio B1 mark, that is, [0, B1×R1], (B1×R1, 2B1×R1], ..., (f-1 / f×R1, R1];
[0067] At the end of each analysis process, the real-time production data corresponding to the expected production order in the corresponding analysis process is obtained in real time, and analyzed to obtain the real-time standard efficiency corresponding to the expected production order in each analysis process. The specific method of obtaining the real-time standard efficiency corresponding to the expected production order in each analysis process is as follows:
[0068] At the end of each analysis process, the production output or quantity and production duration of the estimated production order in the corresponding analysis process are obtained, and marked as HAr and HBr respectively;
[0069] The real-time standard efficiency Kr corresponding to the expected production order in each analysis process is calculated by the formula HAr / HBr=Kr;
[0070] Step 6: Compare and analyze the real-time standard efficiency Kr corresponding to each analysis process of the expected production order with the process standard efficiency BFr corresponding to each analysis process, obtain the abnormal process according to the analysis result, and output the corresponding abnormal process;
[0071] That is, Kr is compared and analyzed with BFr. When Kr>BFr×θ1 or Kr<BFr×θ2, it is judged that there is an abnormality in the corresponding analysis process, and the corresponding analysis process is marked as an abnormal process, and the corresponding abnormal process is output. No processing is done in other cases. θ1 and θ2 are both preset coefficients, and the specific values are formulated by relevant personnel according to actual needs;
[0072] By analyzing multiple historical production order data, the process efficiency corresponding to the production equipment or devices in different production processes is obtained, and then the real-time efficiency corresponding to the expected production order in each analysis process is obtained, and compared with the process efficiency corresponding to each analysis process. According to the analysis results, the abnormal process is obtained, and the corresponding abnormal process is output, so as to timely discover and deal with the corresponding abnormal situations in different production processes, which can help improve production efficiency, reduce waste, and promote continuous improvement. It can realize comprehensive monitoring of the production process, timely discover and prevent potential problems, thereby ensuring the continuity of product production and product quality.
[0073] Embodiment 2
[0074] As the second embodiment of the present invention, when the present application is specifically implemented, compared with the first embodiment, the technical solution of the present embodiment is different from the first embodiment only in that the present embodiment further includes step seven;
[0075] Step 7: Obtain the number of abnormal processes corresponding to the expected production order and mark it as m. When m / f>Q3, an equipment abnormality signal is generated. When m / f≤Q3, no processing is performed. Q3 is a preset coefficient, and the specific value is determined by relevant staff according to needs.
[0076] In order to ensure production safety and prevent the abnormal situation from further expanding, when m / f>Q3, a stop control signal is generated to automatically or prompt the operator to suspend or stop the operation of the relevant production device or equipment to prevent them from continuing production operations and posing potential safety risks;
[0077] When the number of abnormal processes corresponding to the expected production order accounts for a high proportion, an equipment abnormality signal is generated to warn of the abnormality of the production device or equipment, and remind relevant personnel to promptly inspect and maintain the production device or equipment to ensure the normal operation of the production device or equipment. In order to ensure production safety and prevent the abnormal situation from further expanding, a stop control signal is generated at the same time to automatically or prompt the operator to suspend or stop the operation of the relevant production device or equipment to prevent it from continuing coal chemical production operations, which poses potential safety risks. After the abnormal signal and stop control signal are generated, relevant personnel should intervene in time to conduct a detailed analysis of the abnormal process, find out the root cause of the problem and take corresponding measures to deal with it. At the same time, the processing process is recorded for subsequent problem tracing and continuous improvement. After the abnormality is handled, it is verified that the production device or equipment has returned to normal, and production can be restarted to continue to complete the production tasks of the expected production order.
[0078] Embodiment 3
[0079] As the third embodiment of the present invention, please refer to Figure 2As shown, this embodiment also provides an intelligent production safety management and control platform based on the industrial Internet, which is used to execute the aforementioned disclosed intelligent production safety management and control implementation method based on the industrial Internet, specifically including:
[0080] Data acquisition end, acquisition of multiple historical production order data corresponding to production devices or equipment;
[0081] The data analysis end analyzes multiple historical production order data corresponding to the production device or equipment to obtain the production rate corresponding to each production order, and then analyzes them to obtain the calculation rate corresponding to the production device or equipment;
[0082] The analysis process acquisition end marks and obtains the analysis process corresponding to each production order according to the production time corresponding to each historical production order and the same preset ratio B1;
[0083] The process efficiency acquisition end analyzes the production data of each production order in its corresponding analysis process, and then obtains the process efficiency corresponding to each analysis process;
[0084] The real-time standard efficiency acquisition end obtains the real-time standard efficiency corresponding to each analysis process of the expected production order according to each analysis process corresponding to the expected production order and the real-time production data corresponding to the expected production order in the corresponding analysis process;
[0085] At the abnormal process acquisition end, the real-time standard efficiency corresponding to the expected production order in each analysis process is compared and analyzed with the process standard efficiency corresponding to each analysis process to obtain the abnormal process.
[0086] Embodiment 4
[0087] As the fourth embodiment of the present invention, when the present application is specifically implemented, compared with the first, second and third embodiments, the technical solution of this embodiment is to combine and implement the solutions of the first, second and third embodiments.
[0088] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters and thresholds in the formula are set by technicians in this field according to actual conditions.
[0089] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A method for realizing intelligent production safety management and control based on the industrial Internet, characterized in that: The following steps are involved: Step 1: Analyze the production output or quantity and production duration of multiple historical production orders corresponding to the production device or equipment, and then obtain the calculation rate corresponding to the production device or equipment; Step 2: According to the production time of historical production orders, obtain the analysis process corresponding to each production order according to the preset proportion mark; Step 3: Analyze the production data of each production order in its corresponding analysis process to obtain the process efficiency corresponding to each analysis process; Step 4: Obtain each analysis process corresponding to the expected production order according to the expected production output or quantity of the expected production order. At the end of each analysis process, analyze the real-time production data corresponding to the expected production order in the corresponding analysis process to obtain the real-time standard effect corresponding to each analysis process of the expected production order; Step 5: Compare and analyze the real-time standard efficiency corresponding to each analysis process of the expected production order with the process standard efficiency corresponding to each analysis process, obtain the abnormal process according to the analysis result, and output the corresponding abnormal process; Step 6: Obtain the number of abnormal processes corresponding to the expected production order, and determine whether to generate abnormal signals and stop control signals for the production device or equipment based on the number of abnormal processes. When the stop control signal is generated, the production operation of the production device or equipment is stopped.
2. The method for realizing intelligent production safety management and control based on the industrial Internet according to claim 1 is characterized in that: Obtain the calculation rate corresponding to the production device or equipment in the following way: The production output or quantity and production duration corresponding to each historical production order are marked as BAi and CTi, respectively, where i refers to the quantity corresponding to the historical production order, i≥1; The production rate DBi corresponding to each historical production order is calculated through the formula (BAi / CTi)×β1=DBi, where β1 is a preset fixed proportional coefficient; the value DBc of the production rate DBi corresponding to each historical production order that satisfies the formula L1 is obtained, and it is analyzed to obtain the calculated rate ED, where the formula L1 is |DBi-DBp|<Q1, i≥c≥1, DBp is the mean value of DBi, and Q1 is the preset value.
3. The method for realizing intelligent production safety management and control based on industrial Internet according to claim 2 is characterized in that: The specific method of analyzing DBc is as follows: When c>Q2, the mean DBp of DBi is used as the calculation rate ED. When c≤Q2, the mean of the maximum and minimum values of DBi is used as the calculation rate ED, that is, (DBmax+DBmin) / 2=ED, where DBmax is the maximum value in DBi, DBmin is the minimum value in DBi, and Q2 is the preset value.
4. The method for realizing intelligent production safety management and control based on the industrial Internet according to claim 3 is characterized in that: The specific method of marking and obtaining the analysis process corresponding to each production order is as follows: On the production time of each production order, multiple analysis processes are marked in sequence according to the same preset ratio B1, and each analysis process is: [0, B1×CTi], (B1×Ti, 2B1×CTi], ..., (f-1 / f×CTi, CTi], where f is the corresponding number of analysis processes, f≥1, and it will be used as the label corresponding to each analysis process.
5. The method for realizing intelligent production safety management and control based on the industrial Internet according to claim 4 is characterized in that: The specific method of obtaining the process standard efficiency corresponding to each analysis process is: Step S1: randomly select a process from each analysis process as the target process; Step S2: The production output or quantity and production duration corresponding to each production order in the target process are marked as FAi and DTi respectively; The production efficiency DFi corresponding to each production order in the target process is calculated by the formula (FAi / DTi)×β2=DFi, where β2 is a preset fixed proportional coefficient; Step S3: Obtain the average of the production efficiencies DFi corresponding to each production order in the target process, and use it as the process standard efficiency BF1 corresponding to the production device or equipment in the target process, and bind it to the corresponding target process; Step S4: Repeat the above steps S3 to S4 to obtain the process efficiency BFr corresponding to each analysis process of the production device or equipment, f≥r≥1.
6. The method for realizing intelligent production safety management and control based on the industrial Internet according to claim 5 is characterized in that: The specific method of obtaining the real-time standard efficiency corresponding to the estimated production order in each analysis process is as follows: The estimated production output or quantity corresponding to the estimated production order is obtained, and marked as G1. According to the formula (G1 / ED)×β3=R1, the estimated production time R1 corresponding to the estimated production order is obtained, where β3 is a preset fixed proportional coefficient. According to the estimated production time R1 corresponding to the estimated production order, multiple analysis processes corresponding to the estimated production order are obtained according to the same preset proportion B1, namely [0, B1×R1], (B1×R1, 2B1×R1], ... (f-1 / f×R1, R1]; At the end of each analysis process, the production output or quantity and production time corresponding to the expected production order in the corresponding analysis process are obtained, and they are marked as HAr and HBr respectively. The real-time standard efficiency Kr corresponding to the expected production order in each analysis process is calculated through the formula HAr / HBr=Kr.
7. The method for realizing intelligent production safety management and control based on industrial Internet according to claim 6 is characterized in that: The specific method of obtaining abnormal processes is: Kr is compared and analyzed with BFr. When Kr>BFr×θ1 or Kr<BFr×θ2, it is judged that there is an abnormality in the corresponding analysis process, and the corresponding abnormal process is output. No processing is performed in other cases, where θ1 and θ2 are both preset coefficients.
8. The method for realizing intelligent production safety management and control based on industrial Internet according to claim 7 is characterized in that: The specific method of generating abnormal signal and stop control signal of production device or equipment is as follows: The number of abnormal processes corresponding to the expected production order is obtained and marked as m. When m / f>Q3, an abnormal signal of the production device or equipment and a stop control signal are generated. When m / f≤Q3, no processing is performed, where Q3 is a preset coefficient.
9. The intelligent production safety management and control platform based on the industrial Internet according to any one of claims 1 to 8, characterized in that: The platform is used to implement the intelligent production safety management and control implementation method based on the Industrial Internet, including: Data acquisition end, acquisition of multiple historical production order data corresponding to production devices or equipment; The data analysis end analyzes multiple historical production order data corresponding to the production device or equipment to obtain the production rate corresponding to each production order, and then analyzes them to obtain the calculation rate corresponding to the production device or equipment; The analysis process acquisition end marks and obtains the analysis process corresponding to each production order according to the production time corresponding to each historical production order and the same preset ratio B1; The process efficiency acquisition end analyzes the production data of each production order in its corresponding analysis process, and then obtains the process efficiency corresponding to each analysis process; The real-time standard efficiency acquisition end obtains the real-time standard efficiency corresponding to each analysis process of the expected production order according to each analysis process corresponding to the expected production order and the real-time production data corresponding to the expected production order in the corresponding analysis process; At the abnormal process acquisition end, the real-time standard efficiency corresponding to the expected production order in each analysis process is compared and analyzed with the process standard efficiency corresponding to each analysis process to obtain the abnormal process.
Citation Information
Patent Citations
MES-based production and manufacturing order system
CN112116413A
Production management method and system based on active identification, equipment and storage medium
CN113780506A
Production management method and system
CN115049278A
Industrial safety data association analysis system and method
CN117745127A
Cited By
Intelligent interconnection factory resource collaborative management method and system