Optical storage combined system energy storage capacity optimal configuration method considering source-load uncertainty
By establishing a source-load uncertain output model and a multi-objective optimization model, the improved squid group algorithm is used to optimize the energy storage capacity configuration of the photovoltaic system, and the source-load uncertainty and system loss problems in the photo storage joint system are solved, and the problem of source-load uncertainty and system loss is achieved. Low abandonment, low cost and low loss photovoltaic absorption effects.
Patent Information
- Application Number
- CN202410764815.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-14
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-06-14
AI Technical Summary
The existing combined optical storage systems do not fully reflect the source-load uncertainty problem in the optimized configuration, and most mathematical models ignore the internal loss of the system, resulting in high light abandonment rate, high investment and operation and maintenance costs and large power losses.
By establishing a source-load uncertain output model, combining Markov Monte Carlo algorithm and clustering algorithm to obtain typical load demand operation scenarios, building a multi-objective mathematical optimization model, and using the improved squid group algorithm to solve it to minimize the light abandonment rate. The objective function with the lowest investment operation and maintenance costs and the smallest power loss, optimizes the energy storage capacity configuration of the photovoltaic system.
Effectively reduce light abandonment rate, reduce investment and maintenance costs and electricity losses, improve photovoltaic absorption capacity, and achieve green and sustainable development.
Smart Images

Figure CN118983830A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of new energy consumption and optimization technology, and in particular to a method for optimizing energy storage capacity of a photovoltaic energy storage combined system considering source-load uncertainty. Background Art
[0002] In the face of the current "low-carbon and environmentally friendly" concept, the status of distributed photovoltaics as a zero-carbon power source has been rising year by year. Considering the timing characteristics of source-load, the source-load output in the same time period cannot be fully absorbed, resulting in reverse flow within the system, and changes in the distribution patterns of distribution network voltage, line loss, etc. The energy storage system is used in conjunction with the photovoltaic system, and the characteristics of energy storage are used to smooth the photovoltaic output, improve the absorption of photovoltaics and reduce the abandonment of light, so that the distribution network can operate stably and safely.
[0003] Since the capacity configuration of energy storage system and photovoltaic system affects the operation characteristics of photovoltaic storage combined system, many scholars have carried out a lot of research on the capacity optimization configuration of photovoltaic storage combined system in recent years. For example, some scholars take peak shaving and valley filling and load smoothing as the energy storage configuration goals, and achieve the optimal capacity configuration of energy storage by controlling the load peak-valley difference, load variance and load change rate. Some scholars have proposed a coordinated optimization configuration method of energy storage and new energy based on the "equal area principle". By establishing a power grid power balance model, a new energy consumption working principle diagram and an "equal area principle" optimization model for energy storage and new energy consumption, energy storage and new energy installations are configured according to the characteristics of new energy and the system balance principle to achieve decoupled configuration and coordinated planning. Other scholars have also considered the impact of demand response on capacity configuration, established a demand response model, and improved the impact of high-penetration distributed photovoltaic distribution systems through energy storage devices. Some scholars have also proposed a distributed photovoltaic and energy storage site selection and capacity planning method for distribution networks based on cluster division. After clustering the distribution network according to the grid structure and node load characteristics, a distributed photovoltaic and energy storage double-layer coordinated site selection and capacity planning model is established, and solved by a hybrid particle swarm algorithm.
[0004] However, the source-load uncertainty problem is not fully reflected in the optimization configuration research, there is little research on distribution substations with dispersed load density, and most of the established mathematical models are based on economic perspectives, ignoring problems such as internal system losses. Therefore, there is a great need for a method that can effectively optimize the configuration of energy storage capacity of a photovoltaic-storage combined system that takes into account source-load uncertainty. Summary of the invention
[0005] The technical problem to be solved by the present invention is to provide a method for optimizing the configuration of energy storage capacity of a photovoltaic-storage combined system considering source-load uncertainty. By establishing a source-load uncertain output model and performing simulation and reduction, a description of the source-load output under typical load demand operation scenarios and photovoltaic operation scenarios is obtained, and the severe load operation scenarios are determined; by constructing a multi-objective mathematical optimization model, an objective function with minimum abandonment rate, minimum investment and operation and maintenance cost, and minimum power loss is determined, and constraints are determined; the optimization model is solved using an improved salp swarm algorithm to obtain the optimal configuration results under different photovoltaic operation scenarios. The present invention improves the photovoltaic absorption capacity, reduces abandonment, and achieves green and sustainable development.
[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is: a method for optimizing the energy storage capacity of a photovoltaic energy storage system considering source-load uncertainty, which specifically includes the following steps:
[0007] Step S1, collecting and obtaining the system structure and related data of the distribution station area to be analyzed;
[0008] Step S2, establishing a source-load uncertain output model, simulating the source-load uncertain output model in combination with the Markov Monte Carlo algorithm, and obtaining the source-load uncertain output operation scenario throughout the year; reducing the source-load uncertain operation scenario throughout the year by a clustering algorithm, and obtaining the source-load output description under the typical load demand operation scenario and the photovoltaic operation scenario;
[0009] Step S3, using the forward-backward power flow method to calculate the voltage and power loss of the typical load demand scenario after the reduction in step S2, and determine the worst voltage typical load demand operation scenario;
[0010] Step S4: construct a multi-objective mathematical optimization model, determine the objective function of minimizing the abandoned light rate, minimizing the investment and operation cost, and minimizing the power loss, and determine the constraints, including node voltage constraints, energy storage power constraints, state of charge constraints, reverse power constraints, and power balance constraints;
[0011] Step S5: using the improved salp swarm algorithm to solve the optimization model of step S4, and obtain the optimization configuration results under different photovoltaic operation scenarios.
[0012] A further improvement of the technical solution of the present invention is that the relevant data in step S1 includes obtaining the network topology diagram and line parameters of the distribution station area system, the number of system nodes, user load demand data at different nodes of the area system, and regional solar radiation intensity.
[0013] A further improvement of the technical solution of the present invention is that the step of establishing the source-load uncertain output model in step S2 is:
[0014] 21) Establishing the uncertainty model of photovoltaic output: by using the mean value of light intensity μ gq and standard deviation σ gq The key parameters θ1 and θ2 of the Beta distribution are obtained, and the uncertainty model of photovoltaic output is obtained:
[0015]
[0016] Where: gq is the standard deviation of light intensity; is the maximum photovoltaic output; N PV is the number of photovoltaic cells; S PV is a single photovoltaic area; η PV is the photovoltaic efficiency; is the predicted value of photovoltaic power at time t;
[0017] 22) Establish a load output uncertainty model: Considering the large random differences in loads between different seasons, the load demand of users at different nodes is simulated using a time series load model to obtain a load output uncertainty model:
[0018]
[0019] Where: Load is the standard deviation of load forecast, ξ Load =P Load ·r%; r% is the percentage of standard deviation in load output; is the system load forecast value; μ Load is the mean value of load forecast.
[0020] The further improvement of the technical solution of the present invention is that: in step S2, the Markov Monte Carlo algorithm is combined to simulate the load output uncertainty model and the photovoltaic output uncertainty model at different nodes in the source-load uncertain output model to obtain the source-load output uncertainty operation scenario throughout the year; and the load demand data of users at different nodes are calculated to obtain the 24-hour total load demand output, thereby obtaining the matrix of the source-load uncertain operation scenario throughout the year. and
[0021]
[0022] A further improvement of the technical solution of the present invention is that: in step S2, the uncertain source-load operation scenarios throughout the year are reduced by a clustering algorithm to obtain a source-load output description under a typical load demand operation scenario and a photovoltaic operation scenario. The specific process is as follows;
[0023] Sure and The number of clusters C and fuzzy factor m are used to cluster the and Perform scenario reduction to obtain a representative typical load demand operation scenario. The steps are as follows:
[0024] k1, parameter setting: set the number of clusters C, fuzzy factor b and number of iterations;
[0025] k2, set the initial cluster center;
[0026] k3, according to formula (7), calculate the membership degree between the sample and the cluster center;
[0027]
[0028] Where d() is the Euclidean distance from the sample data to the cluster center;
[0029] k4, update the cluster center according to formula (8);
[0030]
[0031] k5, update the membership matrix according to formula (9);
[0032]
[0033] k6. If the number of iterations reaches the maximum number of iterations or the difference between the two Js is less than the maximum allowable error, the iteration ends. Otherwise, jump to step k3 to obtain C typical load demand operation scenarios and photovoltaic operation scenarios.
[0034] A further improvement of the technical solution of the present invention is that the specific steps of step S3 are as follows:
[0035] Based on the calculation of the power flow of the 24-hour distribution substation system under C typical load demand operation scenarios in each time period, the voltage change of each node in 24 hours is obtained, and the load demand operation scenario under the worst voltage conditions is determined.
[0036] A further improvement of the technical solution of the present invention is that the specific steps in step S4 are as follows:
[0037] 41) Establish multi-objective function of optimization model:
[0038] F min ={F 1.min ,F 2.min ,F 3.min} (10)
[0039] Where: F 1.min The minimum light abandonment rate is F 2.minMinimize system investment and maintenance costs F 3.min The minimum power loss is ΔA;
[0040] 42) Calculate the abandoned light rate;
[0041]
[0042] Where: is the photovoltaic abandonment rate; N t is the total number of time periods; is the total power generation at time t after the photovoltaic power is output; The photovoltaic power consumed by the load at time t after the photovoltaic power is output; The photovoltaic power consumed by the energy storage system at time t after the photovoltaic power is output;
[0043] 43) Calculate investment and operation and maintenance costs;
[0044]
[0045] Where: The total investment and maintenance cost of the energy storage system; R ESS Planning capacity for energy storage systems; Plan the unit capacity investment cost for energy storage systems; is the annual maintenance cost per unit capacity of the energy storage system; r is the discount rate; N ESS The economic service life of the energy storage system;
[0046] 44) Calculate power loss;
[0047]
[0048] Where: ΔA t is the theoretical line loss of the distribution network in the tth period, kW·h; B is the total number of distribution network branches; Δt is the time of the tth period, h (in hours), I l is the current in branch l, A; R l is the resistance of branch l, Ω;
[0049] 46) Establish constraints, including node voltage constraints, energy storage power constraints, state of charge constraints, reverse power constraints and power balance constraints.
[0050] A further improvement of the technical solution of the present invention is that: in step 45)
[0051] The node voltage constraints are as follows:
[0052] U i,min ≤U i ≤U i,max (14)
[0053] Where: U i,max and U i,min They represent the upper and lower limits of the voltage at node i under the nominal voltage respectively;
[0054] The energy storage power constraints are as follows:
[0055]
[0056] Where: is the ESS charging power during period t, kW; is the ESS discharge power in period t, kW; η + and η - is the charge and discharge efficiency; is the maximum value of ESS charging power, kW; is the maximum value of ESS discharge power, kW;
[0057] The state of charge constraints are as follows:
[0058] SOC min ≤SOC(t)≤SOC max (16)
[0059] Where: SOC min and SOC max They represent the lower and upper limits of the state of charge of the energy storage system, ranging from 20% to 90%;
[0060] The reverse power constraints are as follows:
[0061]
[0062] Where: is the reverse power of the photovoltaic and energy storage combined system, kW; The maximum value of the reverse power allowed in kW;
[0063] The system power balance constraints are as follows:
[0064]
[0065] Where: P si The active power injected into the system at node i; P pvi P is the active power injected into node i by distributed photovoltaic; loadi is the active power consumed by node i; Absorbed active power of the energy storage system; The active power generated by the energy storage system; Q si The reactive power injected into the system at node i; Q pvi The reactive power injected into node i by distributed photovoltaic; Q loadi is the reactive power consumed by node i; The absorbed reactive power of the energy storage system; The reactive power generated by the energy storage system; G ij B is the conductance of the branch to the ground; ij is the branch circuit's admittance to ground.
[0066] A further improvement of the technical solution of the present invention is that the specific steps of step S5 are as follows:
[0067] 51) The improvements of the salp swarm algorithm include population initialization, leader and follower position update strategies;
[0068] 52) Based on the original population, the hybrid chaotic mapping is introduced to improve the population initialization;
[0069] X D×N =rand(D,N)·(ub-lb)+lb (19)
[0070] +cos(π(4RX i (1-X i )+(1-R)sin(πX i )-0.5))
[0071] 53) Introducing the golden sine to improve the leader position update strategy;
[0072]
[0073] Where: R0 and R1 are random numbers, R0 determines the moving distance of the individual in the next iteration,
[0074] R0∈[0,2π]; R1 determines the position update direction of the i-th individual in the next iteration, R1∈[0,π];
[0075] X1 and X2 are the coefficients obtained by introducing the golden section. The specific formula is as follows:
[0076]
[0077] 54) Introducing inertia factor to improve follower position update strategy;
[0078]
[0079] Where: initial and ω final are the initial value and final value of the inertia factor, t is the current iteration number, t max is the maximum number of iterations;
[0080] 55) According to the typical operation scenario after photovoltaic curtailment, the optimization model of step S4 is solved using the improved Salp Swarm algorithm. After multiple iterations, the optimal Pareto solution set is obtained, and then the optimal configuration plan of energy storage capacity under the typical photovoltaic operation scenario is obtained.
[0081] Due to the adoption of the above technical solution, the technical progress achieved by the present invention is:
[0082] The present invention provides a method for optimizing the configuration of energy storage capacity of a photovoltaic and storage combined system considering source-load uncertainty. The Markov Monte Carlo algorithm is used to simulate the source-load situation of user load demands at different nodes in the substation throughout the year, and the fuzzy C-means clustering algorithm is used to obtain typical scenarios. A multi-objective function model with minimum abandonment rate, minimum investment and maintenance cost, and minimum power loss is established. In addition, multiple constraints such as the charge and discharge balance and power flow reverse transmission of energy storage are considered. The objective function is solved by an improved intelligent optimization algorithm to obtain the optimal configuration of energy storage, which can greatly reduce the abandonment rate, reduce investment and maintenance costs, and reduce power losses, improve the photovoltaic absorption capacity, reduce abandonment, and achieve green and sustainable development. BRIEF DESCRIPTION OF THE DRAWINGS
[0083] Figure 1 It is the overall flow chart of the present invention;
[0084] Figure 2 This is the structural diagram of the 33-node distribution network area of 0.4kV;
[0085] Figure 3 The following is a schematic diagram of the establishment process of a typical scenario;
[0086] Figure 4 Determine the process for severe operating scenarios;
[0087] Figure 5 Schematic diagram of the dynamic balance of power within the system. DETAILED DESCRIPTION
[0088] The present invention is further described in detail below in conjunction with embodiments:
[0089] like Figure 1 As shown, the present invention provides a method for optimizing energy storage capacity configuration of a photovoltaic energy storage system considering source-load uncertainty, which specifically includes the following steps:
[0090] Step S1: Collect and obtain the system structure and related data of the distribution area to be analyzed. The related data includes: Figure 2 Take the example of obtaining the network topology diagram and line parameters of the distribution area system, the number of system nodes, the user load demand data at different nodes of the area system, and the regional solar intensity;
[0091] Step S2: Establish a source-load uncertain output model, simulate the source-load uncertain output model in combination with the Markov Monte Carlo algorithm, and obtain the source-load uncertain output operation scenario throughout the year; reduce the source-load uncertain operation scenario throughout the year by the clustering algorithm, and obtain the source-load output description under the typical load demand operation scenario and the photovoltaic operation scenario; the steps for establishing the source-load uncertain output model are as follows:
[0092] 21) Establishing the uncertainty model of photovoltaic output: by using the mean value of light intensity μ gq and standard deviation σ gq The key parameters θ1 and θ2 of the Beta distribution are obtained, and the uncertainty model of photovoltaic output is obtained:
[0093]
[0094]
[0095] Where: gq is the standard deviation of light intensity, is the maximum photovoltaic output; N PV is the number of photovoltaic cells; S PV is a single photovoltaic area; η PV is the photovoltaic efficiency; is the predicted value of photovoltaic power at time t.
[0096] 22) Establish a load output uncertainty model: Considering the large random differences in loads between different seasons, the load demand of users at different nodes is simulated using a time series load model to obtain a load output uncertainty model:
[0097]
[0098] Where: Load is the standard deviation of load forecast, ξ Load =P Load ·r%; r% is the percentage of standard deviation in load output; is the system load forecast value; μ Load is the mean value of load forecast.
[0099] 23) Combined with the Markov Monte Carlo algorithm, the load output uncertainty model and photovoltaic output uncertainty model at different nodes in the source-load uncertain output model are simulated to obtain the full energy-load output uncertainty operation scenario; and the user load demand data at different nodes are calculated to obtain the 24-hour total load demand output, thereby obtaining the matrix of the source-load uncertain operation scenario throughout the year. and
[0100]
[0101] 24) Figure 3 For example, determine and The number of clusters C and fuzzy factor m are used to cluster the and Perform scenario reduction to obtain representative typical load demand operation scenarios and photovoltaic operation scenarios. The steps are as follows:
[0102] k1, parameter setting: set the number of clusters C, fuzzy factor b and number of iterations;
[0103] k2, set the initial cluster center;
[0104] k3, according to formula (7), calculate the membership degree between the sample and the cluster center;
[0105]
[0106] Where d() is the Euclidean distance from the sample data to the cluster center;
[0107] k4, update the cluster center according to formula (8);
[0108]
[0109] k5, update the membership matrix according to formula (9);
[0110]
[0111] k6. If the number of iterations reaches the maximum number of iterations or the difference between the two Js is less than the maximum allowable error, the iteration ends. Otherwise, jump to step k3 to obtain C typical load demand operation scenarios.
[0112] Step S3, using the forward-backward power flow method to calculate the voltage and power loss of the typical load demand scenario after the reduction in step S2, and determine the worst voltage typical load demand operation scenario;
[0113] The specific steps are as follows:
[0114] by Figure 4 Taking the example of Figure 1, the power flow of the 24-hour distribution substation system under C typical load demand operation scenarios is calculated based on each time period, the voltage change of each node in 24 hours is obtained, and the load demand operation scenario under the worst voltage conditions is determined.
[0115] Step S4: construct a multi-objective mathematical optimization model, determine the objective function of minimizing the abandoned light rate, minimizing the investment and operation cost, and minimizing the power loss, and determine the constraints, including node voltage constraints, energy storage power constraints, state of charge constraints, reverse power constraints, and power balance constraints;
[0116] The specific steps are as follows:
[0117] 41) Establish multi-objective function of optimization model:
[0118] F min ={F 1.min ,F 2.min ,F 3.min} (10)
[0119] Where: F 1.min The minimum light abandonment rate is F 2.min Minimize system investment and maintenance costs F 3.min The minimum power loss is ΔA;
[0120] 42) Calculate the abandoned light rate;
[0121]
[0122] Where: is the photovoltaic abandonment rate; N t is the total number of time periods; is the total power generation at time t after the photovoltaic power is output; The photovoltaic power consumed by the load at time t after the photovoltaic power is output; The photovoltaic power consumed by the energy storage system at time t after the photovoltaic power is output;
[0123] 43) Calculate investment and operation and maintenance costs;
[0124]
[0125] Where: The total investment and maintenance cost of the energy storage system; R ESS Planning capacity for energy storage systems; Plan the unit capacity investment cost for energy storage systems; is the annual maintenance cost per unit capacity of the energy storage system; r is the discount rate; N ESS The economic service life of the energy storage system;
[0126] 44) Calculate power loss;
[0127]
[0128] Where: ΔA tis the theoretical line loss of the distribution network in the tth period, kW·h; B is the total number of distribution network branches; Δt is the time of the tth period, h (in hours). l is the current in branch l, A; R l is the resistance of branch l, Ω;
[0129] 47) Establish constraints, including node voltage constraints, energy storage power constraints, state of charge constraints, reverse power constraints and power balance constraints.
[0130] The node voltage constraints are as follows:
[0131] U i,min ≤U i ≤U i,max (14)
[0132] Where: U i,max and U i,min They represent the upper and lower limits of the voltage at node i under the nominal voltage respectively;
[0133] The energy storage power constraints are as follows:
[0134]
[0135] Where: is the ESS charging power during period t, kW; is the ESS discharge power in period t, kW; η + and η - is the charge and discharge efficiency; is the maximum value of ESS charging power, kW; is the maximum value of ESS discharge power, kW;
[0136] The state of charge constraints are as follows:
[0137] SOC min ≤SOC(t)≤SOC max (16)
[0138] Where: SOC min and SOC max They represent the lower and upper limits of the state of charge of the energy storage system, ranging from 20% to 90%;
[0139] The reverse power constraints are as follows:
[0140]
[0141] Where: is the reverse power of the photovoltaic and energy storage combined system, kW; The maximum value of the reverse power allowed in kW;
[0142] The system power balance constraints are as follows:
[0143]
[0144] Where: P si The active power injected into the system at node i; P pvi P is the active power injected into node i by distributed photovoltaic; loadi is the active power consumed by node i; Absorbed active power of the energy storage system; The active power generated by the energy storage system; Q si The reactive power injected into the system at node i; Q pvi The reactive power injected into node i by distributed photovoltaic; Q loadi is the reactive power consumed by node i; The absorbed reactive power of the energy storage system; is the reactive power generated by the energy storage system, G ij is the branch-to-ground conductance, B ij is the branch circuit's admittance to ground.
[0145] Step S5: using the improved salp swarm algorithm to solve the optimization model of step S4, and obtain the optimization configuration results under different photovoltaic operation scenarios.
[0146] The specific steps are as follows:
[0147] 51) The improvements of the salp swarm algorithm include population initialization, leader and follower position update strategies;
[0148] 52) Based on the original population, the hybrid chaotic mapping is introduced to improve the population initialization;
[0149] X D×N =rand(D,N)·(ub-lb)+lb (19)
[0150] +cos(π(4RX i (1-X i )+(1-R)sin(πX i )-0.5))
[0151] 53) Introducing the golden sine to improve the leader position update strategy;
[0152]
[0153] Where: R0 and R1 are random numbers, R0 determines the moving distance of the individual in the next iteration, R0∈[0,2π]; R1 determines the position update direction of the i-th individual in the next iteration, R1∈[0,π];
[0154] X1 and X2 are the coefficients obtained by introducing the golden section. The specific formula is as follows:
[0155]
[0156] 54) Introducing inertia factor to improve follower position update strategy;
[0157]
[0158] Where: initial and ω final are the initial value and final value of the inertia factor, t is the current iteration number, t max is the maximum number of iterations;
[0159] 55) According to the typical operation scenario after photovoltaic curtailment, the optimization model of step S4 is solved using the improved salp swarm algorithm, and the steps are as follows:
[0160] 551) Set the population size with chaotic mapping, the maximum number of iterations, and algorithm-related parameters of the algorithm;
[0161] 552) Calculate the fitness value of each individual and select the best individual as the food source;
[0162] 553) Update parameter C1, leader and follower positions;
[0163] 554) Compare and store the found individual fitness values;
[0164] 555) repeats 553)-554) until the convergence accuracy or the maximum number of iterations is reached, and the current food position is output as the best solution set, thereby obtaining the optimal configuration scheme of energy storage capacity under the typical photovoltaic operation scenario. Figure 5 For example, the power flow inside the distribution station area system of the present invention is used to achieve dynamic balance of the system in the area.
[0165] The above embodiments are only for illustrating the technical concept and features of the present invention, and their purpose is to enable people familiar with the technology to understand the content of the present invention and implement it accordingly, and they cannot be used to limit the protection scope of the present invention. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention shall be included in the protection scope of the claims of the present invention.
Claims
1. A method for optimizing energy storage capacity of a photovoltaic-storage combined system considering source-load uncertainty, characterized by: The specific steps include: Step S1, collecting and obtaining the system structure and related data of the distribution station area to be analyzed; Step S2, establishing a source-load uncertain output model, simulating the source-load uncertain output model in combination with the Markov Monte Carlo algorithm, and obtaining the source-load uncertain output operation scenario throughout the year; reducing the source-load uncertain operation scenario throughout the year by a clustering algorithm, and obtaining the source-load output description under the typical load demand operation scenario and the photovoltaic operation scenario; Step S3, using the forward-backward power flow method to calculate the voltage and power loss of the typical load demand scenario after the reduction in step S2, and determine the worst voltage typical load demand operation scenario; Step S4: construct a multi-objective mathematical optimization model, determine the objective function of minimizing the abandoned light rate, minimizing the investment and operation cost, and minimizing the power loss, and determine the constraints, including node voltage constraints, energy storage power constraints, state of charge constraints, reverse power constraints, and power balance constraints; Step S5: using the improved salp swarm algorithm to solve the optimization model of step S4, and obtain the optimization configuration results under different photovoltaic operation scenarios.
2. The method for optimizing energy storage capacity of a photovoltaic-storage combined system considering source-load uncertainty according to claim 1 is characterized in that: The relevant data in step S1 include obtaining the network topology diagram and line parameters of the distribution station area system, the number of system nodes, user load demand data at different nodes of the area system, and regional solar radiation intensity.
3. The method for optimizing energy storage capacity of a photovoltaic-storage combined system considering source-load uncertainty according to claim 1 is characterized in that: The steps for establishing the source-load uncertain output model in step S2 are: 21) Establishing the uncertainty model of photovoltaic output: by using the mean value of light intensity μ gq and standard deviation σ gq The key parameters θ1 and θ2 of the Beta distribution are obtained, and the uncertainty model of photovoltaic output is obtained: Where: gq is the standard deviation of light intensity; is the maximum photovoltaic output; N PV is the number of photovoltaic cells; S PV is a single photovoltaic area; η PV is the photovoltaic efficiency; is the predicted value of photovoltaic power at time t; 22) Establish a load output uncertainty model: Considering the large random differences in loads between different seasons, the load demand of users at different nodes is simulated using a time series load model to obtain a load output uncertainty model: Where: Load is the standard deviation of load forecast, ξ Load =P Load ·r%; r% is the percentage of standard deviation in load output; is the system load forecast value; μ Load is the mean value of load forecast.
4. The method for optimizing energy storage capacity configuration of a photovoltaic-storage combined system considering source-load uncertainty according to claim 3 is characterized in that: In step S2, the Markov Monte Carlo algorithm is combined to simulate the load output uncertainty model and the photovoltaic output uncertainty model at different nodes in the source-load uncertain output model to obtain the source-load output uncertainty operation scenario throughout the year; and the load demand data of users at different nodes are calculated to obtain the 24-hour total load demand output, thereby obtaining the matrix of the source-load uncertain operation scenario throughout the year. and 5. The method for optimizing energy storage capacity configuration of a photovoltaic-storage combined system considering source-load uncertainty according to claim 4 is characterized in that: In step S2, the source-load uncertain operation scenarios throughout the year are reduced by a clustering algorithm to obtain a source-load output description under a typical load demand operation scenario and a photovoltaic operation scenario. The specific process is as follows; Sure and The number of clusters C and fuzzy factor m are used to cluster the and Perform scenario reduction to obtain representative typical load demand operation scenarios and photovoltaic operation scenarios. The steps are as follows: k1, parameter setting: set the number of clusters C, fuzzy factor b and number of iterations; k2, set the initial cluster center; k3, according to formula (7), calculate the membership degree between the sample and the cluster center; Where d() is the Euclidean distance from the sample data to the cluster center; k4, update the cluster center according to formula (8); k5, update the membership matrix according to formula (9); k6. If the number of iterations reaches the maximum number of iterations or the difference between the two Js is less than the maximum allowable error, the iteration ends. Otherwise, jump to step k3 to obtain C typical load demand operation scenarios and photovoltaic operation scenarios.
6. The method for optimizing energy storage capacity configuration of a photovoltaic-storage combined system considering source-load uncertainty according to claim 5 is characterized in that: The specific steps of step S3 are as follows: Based on the calculation of the power flow of the 24-hour distribution substation system under C typical load demand operation scenarios in each time period, the voltage change of each node in 24 hours is obtained, and the load demand operation scenario under the worst voltage conditions is determined.
7. The method for optimizing energy storage capacity configuration of a photovoltaic-storage combined system considering source-load uncertainty according to claim 1 is characterized in that: The specific steps in step S4 are as follows: 41) Establish multi-objective function of optimization model: F min ={F 1.min ,F 2.min ,F 3.min } (10) Where: F 1.min The minimum light abandonment rate is F 2.min Minimize system investment and maintenance costs F 3.min The minimum power loss is ΔA; 42) Calculate the abandoned light rate; Where: is the photovoltaic abandonment rate; N t is the total number of time periods; is the total power generation at time t after the photovoltaic power is output; The photovoltaic power consumed by the load at time t after the photovoltaic power is output; The photovoltaic power consumed by the energy storage system at time t after the photovoltaic power is output; 43) Calculate investment and operation and maintenance costs; Where: The total investment and maintenance cost of the energy storage system; R ESS Planning capacity for energy storage systems; Plan the unit capacity investment cost for energy storage systems; is the annual maintenance cost per unit capacity of the energy storage system; r is the discount rate; N ESS The economic service life of the energy storage system; 44) Calculate power loss; Where: ΔA t is the theoretical line loss of the distribution network in the tth period, kW·h; B is the total number of distribution network branches; Δt is the time of the tth period, h (in hours), I l is the current in branch l, A; R l is the resistance of branch l, Ω; 45) Establish constraints, including node voltage constraints, energy storage power constraints, state of charge constraints, reverse power constraints and power balance constraints.
8. The method for optimizing energy storage capacity configuration of a photovoltaic-storage combined system considering source-load uncertainty according to claim 1 is characterized in that: In the step 45) The node voltage constraints are as follows: IN i,min ≤U i ≤U i,max (14) Where: U i,max and U i,min They represent the upper and lower limits of the voltage at node i under the nominal voltage respectively; The energy storage power constraints are as follows: Where: is the ESS charging power during period t, kW; is the ESS discharge power in period t, kW; η + and η - is the charge and discharge efficiency; is the maximum value of ESS charging power, kW; is the maximum value of ESS discharge power, kW; The state of charge constraints are as follows: SOC min ≤SOC(t)≤SOC max (16) Where: SOC min and SOC max They represent the lower and upper limits of the state of charge of the energy storage system, ranging from 20% to 90%; The reverse power constraints are as follows: Where: is the reverse power of the photovoltaic and energy storage combined system, kW; The maximum value of the reverse power allowed in kW; The system power balance constraints are as follows: Where: P si The active power injected into the system at node i; P pvi P is the active power injected into node i by distributed photovoltaic; loadi is the active power consumed by node i; Absorbed active power of the energy storage system; The active power generated by the energy storage system; Q si The reactive power injected into the system at node i; Q pvi The reactive power injected into node i by distributed photovoltaic; Q loadi is the reactive power consumed by node i; The absorbed reactive power of the energy storage system; The reactive power generated by the energy storage system; G ij B is the conductance of the branch to the ground; ij is the branch circuit's admittance to ground.
9. The method for optimizing energy storage capacity configuration of a photovoltaic-storage combined system considering source-load uncertainty according to claim 1 is characterized in that: The specific steps of step S5 are as follows: 51) The improvements of the salp swarm algorithm include population initialization, leader and follower position update strategies; 52) Based on the original population, the hybrid chaotic mapping is introduced to improve the population initialization; 53) Introducing the golden sine to improve the leader position update strategy; Where: R0 and R1 are random numbers, R0 determines the moving distance of the individual in the next iteration, R0∈[0,2π]; R1 determines the position update direction of the i-th individual in the next iteration, R1∈[0,π]; X1 and X2 are the coefficients obtained by introducing the golden section. The specific formula is as follows: 54) Introducing inertia factor to improve follower position update strategy; Where: initial and ω final are the initial value and final value of the inertia factor, t is the current iteration number, t max is the maximum number of iterations; 55) According to the typical operation scenario after photovoltaic curtailment, the optimization model of step S4 is solved using the improved Salp Swarm algorithm. After multiple iterations, the optimal Pareto solution set is obtained, and then the optimal configuration plan of energy storage capacity under the typical photovoltaic operation scenario is obtained.
Citation Information
Patent Citations
Final benefit hybrid energy storage optimization capacity configuration ratio based on optimization algorithm
CN111654028A
Double-layer energy storage configuration method for alternating current and direct current hybrid power distribution network system
CN114336636A
Wind-light-gas complementary combined energy storage hydrogen production system and coordination control method
CN116995729A
Cited By
Contract maximum demand optimization method based on user side energy storage
CN119398278A
Distributed energy storage configuration method and system containing distributed photovoltaic power distribution network
CN119602352A
Energy storage investment measuring and calculating method and system
CN120562721A
Zone area two-stage distribution robust line loss optimization method considering wind and light uncertainty
CN121238567A
Power grid planning optimization method and system based on multi-scene and multi-form collaborative evaluation
CN121461297A