Cascading failure risk assessment method and system for power distribution network with large-scale distributed energy access
By establishing a distributed photovoltaic low-voltage crossing capability uncertainty model and fault scenario set, the risk of chain failure of distribution networks is evaluated, and the problem of inaccurate evaluation under large-scale distributed energy access in the existing technology is solved, and more accurate failure risk forecast and grid management.
Patent Information
- Application Number
- CN202410926599.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-11-19
AI Technical Summary
The existing distribution network chain fault risk assessment method is inaccurate in the large-scale distributed energy access scenario, and it is impossible to effectively evaluate the impact of the low voltage crossing capability of distributed generator sets on the power grid, resulting in inaccurate quantification of chain fault risk.
By obtaining line fault data of the distribution network, photovoltaic unit output status data and load level data, a distributed photovoltaic low voltage crossing capability uncertainty model and fault scenario set are established, and simulation calculations are carried out to evaluate the risk of chain failures and consider uncertainty. Average power shortage in areas and in different fault scenarios.
It improves the accuracy of the distribution network chain fault risk assessment, can accurately predict the fault propagation path and risk responsibilities, and provides a more reliable grid operation and management strategy.
Smart Images

Figure CN118983852A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of distribution network cascading failure risk assessment, and in particular to a distribution network cascading failure risk assessment method and system with large-scale distributed energy access. Background Art
[0002] In recent years, with the large-scale access of distributed energy, the morphological characteristics of the distribution network will undergo a fundamental subversion. Part of the electricity load will become a "producer and seller", and the radial flow will also become a bidirectional flow, resulting in significant changes in the outage mechanism of the distribution network. Traditional reliability assessment methods are difficult to apply, and it is urgent to propose a distribution network outage mechanism analysis method suitable for large-scale distributed energy access.
[0003] The existing distribution network outage mechanism analysis methods mainly include:
[0004] 1) Power supply reliability assessment: Power supply reliability assessment methods are widely used to quantitatively analyze the mechanism of power outages in distribution networks. These methods include but are not limited to failure mode effect analysis, fault tree analysis, Markov model, Monte Carlo simulation, etc., to assess the reliability of each component in the system and the power outage risk of the system.
[0005] 2) Fault propagation analysis: The fault propagation analysis method is based on graph theory, network analysis, complex system theory and other methods. It is used to study the propagation path and impact range of faults in the distribution network and reveal the mechanism and law of fault diffusion.
[0006] 3) Dynamic simulation: Dynamic simulation is based on time series data and models. It simulates different fault events, load changes and distributed energy access scenarios to analyze the outage mechanism of the distribution network.
[0007] The existing distribution network cascading failure risk assessment method is relatively one-sided, assuming that the distributed generator will be disconnected from the grid when the voltage exceeds the limit. However, the inverter of the existing distributed generator can ensure that it will not be disconnected from the grid and operate continuously within the specified range of variation and time interval. That is, the existing method is inaccurate in quantifying the risk of cascading failures in the distribution network. Summary of the invention
[0008] The purpose of this section is to summarize some aspects of embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.
[0009] In view of the above existing problems, the present invention is proposed.
[0010] Therefore, the present invention provides a method and system for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access, which can solve the problems mentioned in the background technology.
[0011] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0012] In a first aspect, the present invention provides a method for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access, comprising:
[0013] Obtain line fault data, photovoltaic unit output status data and load level data in the target distribution network;
[0014] Based on the line fault data, photovoltaic unit output status data and load level data in the target distribution network, a distributed photovoltaic low voltage ride-through capability uncertainty model and a distribution network fault scenario set including large-scale distributed energy access are established;
[0015] The distributed photovoltaic low voltage ride-through capability uncertainty model is simulated to output the average power shortage in each scenario and evaluate the risk of cascading failures.
[0016] As a preferred scheme of the method for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access described in the present invention, the uncertainty model of the distributed photovoltaic low voltage ride-through capability includes: an uncertain area, a non-offline operation area and an off-grid operation area, and the uncertain area includes three uncertain sub-areas.
[0017] As a preferred scheme of the method for assessing the risk of cascading failures of distribution networks with large-scale distributed energy access described in the present invention, the distributed photovoltaic low voltage ride-through capability uncertainty model also includes: setting photovoltaic terminal voltage drops in five situations s1 to s5, which are respectively located in the uncertain area, the non-off-grid operation area and the off-grid operation area.
[0018] As a preferred solution of the method for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access described in the present invention, wherein: the distribution network failure scenario set with large-scale distributed energy access includes: a failure scenario set of three states: very serious, generally serious and not serious;
[0019] When the line fault is one of the three most serious lines, the output state of the photovoltaic unit is weak and the load level is the load peak, it is a very serious state;
[0020] When the line fault is one of the three most serious lines, the output state of the PV unit is medium and the load level is normal, it is a general serious state;
[0021] When the line fault is one of the three most serious lines, the output state of the photovoltaic unit is at full power and the load level is lower than the normal level, it is a non-serious state.
[0022] As a preferred scheme of the method for assessing the risk of cascading failures of distribution networks with large-scale distributed energy access described in the present invention, the set of distribution network failure scenarios with large-scale distributed energy access also includes indicators affecting the severity of line fault consequences, including branch disconnection fragility indicators, node voltage offset indicators, and electrical structure importance indicators.
[0023] As a preferred solution of the method for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access described in the present invention, the method for establishing a distributed photovoltaic low voltage ride-through capability uncertainty model based on line fault data, photovoltaic unit output status data and load level data in the target distribution network and the distribution network fault scenario set with large-scale distributed energy access also includes:
[0024] Assess the comprehensive impact of line faults on the power grid, and record the branch circuit breaker vulnerability index as f i 1 , the node voltage offset index is f i 2 , the electrical structure importance index is f i 3 , comprehensive risk responsibility evaluation index f i 4 The calculation steps are as follows:
[0025] The number of construction lines is N l , the fuzzy membership matrix R with 3 columns;
[0026] Calculate the index f separately 1 、f 2 and f 3 The entropy of each indicator is used to calculate the corresponding entropy weight of the indicator.
[0027] Calculate the comprehensive risk responsibility evaluation index f of line i i 4 , according to the comprehensive risk responsibility index f i 4 , the comprehensive impact of line faults on the power grid can be evaluated and a grid distribution network fault scenario set can be constructed.
[0028] As a preferred solution of the method for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access described in the present invention, wherein: the uncertainty model of the distributed photovoltaic low voltage ride-through capability is simulated to output the average power shortage in each scenario, and the assessment of the cascading failure risk includes:
[0029] Establish the uncertainty model of distributed photovoltaic low voltage ride-through capability;
[0030] Establish a grid distribution network fault scenario set;
[0031] Traverse the scenario set and extract fault information related to fault type and fault duration;
[0032] The power flow after a short-circuit fault occurs in the distribution network is calculated based on the PSCAD platform. The fault duration and the voltage of each node are substituted into the uncertainty model of the distributed photovoltaic low voltage ride-through capability to obtain the probability of distributed photovoltaic disconnection.
[0033] With probability β k Extract the grid-connected status of distributed photovoltaics to determine whether there is a line overload. If so, disconnect the line;
[0034] If not, the cascading failure ends, and the power shortage is calculated according to the failure sequence of the components, and the average power shortage in each scenario is output.
[0035] In a second aspect, the present invention provides a distribution network cascading failure risk assessment system with large-scale distributed energy access, comprising:
[0036] A data acquisition module is used to acquire line fault data, photovoltaic unit output status data and load level data in the target distribution network;
[0037] A scenario set establishment module, used to establish a distributed photovoltaic low voltage ride-through capability uncertainty model and a distribution network fault scenario set containing large-scale distributed energy access based on line fault data, photovoltaic unit output status data and load level data in the target distribution network;
[0038] The evaluation module is used to simulate the uncertainty model of the distributed photovoltaic low voltage ride-through capability, output the average power shortage under each scenario, and evaluate the risk of cascading failures.
[0039] In a third aspect, the present invention provides a computer device, comprising a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the above-mentioned method when executing the computer program.
[0040] In a fourth aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program implements the steps of the method described above when executed by a processor.
[0041] Compared with the prior art, the beneficial effects of the present invention are as follows: the present invention proposes a method and system for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access, obtaining line fault data, photovoltaic unit output status data and load level data in the target distribution network; establishing a distributed photovoltaic low voltage ride-through capability uncertainty model and a distribution network fault scenario set with large-scale distributed energy access based on the line fault data, photovoltaic unit output status data and load level data in the target distribution network; simulating the distributed photovoltaic low voltage ride-through capability uncertainty model, outputting the average power shortage in each scenario, and assessing the risk of cascading failures. The present invention takes into account the uncertainty of the low voltage ride-through capability of distributed generators in the cascading failure risk assessment of the distribution network with large-scale distributed energy access, and the assessment result is more accurate, and the propagation path of cascading failures can be predicted more accurately. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:
[0043] Figure 1 A method flow chart of a method and system for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access provided by an embodiment of the present invention;
[0044] Figure 2 A photovoltaic power generation low voltage ride-through curve and test result schematic diagram of a distribution network cascading failure risk assessment method and system with large-scale distributed energy access provided by an embodiment of the present invention;
[0045] Figure 3 A schematic diagram of a low voltage ride-through uncertainty region of a distribution network cascading failure risk assessment method and system with large-scale distributed energy access provided by an embodiment of the present invention;
[0046] Figure 4 A schematic diagram of uncertainty quantification of low voltage ride-through of a distribution network cascading failure risk assessment method and system with large-scale distributed energy access provided by an embodiment of the present invention;
[0047] Figure 5 A schematic diagram of an example test system for a method and system for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access provided by an embodiment of the present invention;
[0048] Figure 6A schematic diagram of voltage probability distribution of nodes where photovoltaic 2 and photovoltaic 3 are located, provided in accordance with an embodiment of the present invention, for a method and system for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access;
[0049] Figure 7 An internal structural diagram of a computer device of a method and system for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0050] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.
[0051] Example 1
[0052] Reference Figure 1-Figure 7 , which is the first embodiment of the present invention, and provides a method and system for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access, including:
[0053] Before describing the embodiments of the present application in detail, some related concepts are first explained for the sake of clarity.
[0054] Weak photovoltaic output: refers to the working state of a photovoltaic power generation system when the lighting conditions are poor or the efficiency of the components is low, and the power generation power at this time is lower than its designed maximum output power. For example, on cloudy, rainy days, or when the surface of the photovoltaic panel is blocked (such as leaves or dust), the solar radiation energy received by the photovoltaic panel is reduced, resulting in the power output generated being significantly lower than the level in clear weather.
[0055] Moderate PV output: This refers to the working state of the PV system when the light conditions are moderate, neither too strong nor too weak. In this case, the PV panels can stably output a portion of their rated power, but have not yet reached the maximum design output value. This usually corresponds to weather conditions with partial sunshine or slight cloud cover.
[0056] Photovoltaic output is full: refers to the photovoltaic power generation system under ideal lighting conditions, such as clear and cloudless weather, the photovoltaic panels can receive the maximum intensity of solar radiation, and thus output electrical energy at a power close to or reaching its designed maximum power. At this time, the photovoltaic system has the highest working efficiency and the power generation reaches the theoretical maximum. The full power state reflects the best working efficiency of the photovoltaic system.
[0057] In the related technology, the existing distribution network cascading failure risk assessment method is relatively one-sided, assuming that the distributed generator will be disconnected from the grid when the voltage exceeds the limit, but the inverter of the existing distributed generator can ensure that it will not be disconnected from the grid and operate continuously within the specified range of changes and time intervals. That is, the existing method is inaccurate in quantifying the risk of cascading failures in the distribution network.
[0058] The present application provides a method that can effectively solve the above-mentioned problems. Next, a method and system for evaluating the risk of cascading failures in a distribution network with large-scale distributed energy access will be described in detail in combination with multiple embodiments.
[0059] Figure 1 A method flow chart of a method and system for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access is shown, including:
[0060] S101, obtaining line fault data, photovoltaic unit output status data and load level data in the target distribution network;
[0061] It should be noted that, since the short-circuit current in the initial stage of a power grid fault is of greater concern and the fault clearing time is usually within 0.4 s, the present invention only considers the operation of photovoltaic power generation within 0.4 s.
[0062] According to GB / T 37408-2019 "Technical Requirements for Photovoltaic Power Generation Grid-connected Inverters", when the AC output voltage of large and medium-sized photovoltaic power station inverters exceeds the normal operating range due to power system accidents or disturbances, the inverters can ensure continuous operation without disconnection within the specified range of variation and time interval, providing support for maintaining grid stability. Figure 2 As shown by the thick solid line, if it is below the LVRTC, that is, in the shaded area, photovoltaic power generation will be withdrawn from the grid; otherwise, it will be in the grid-connected operation state.
[0063] S102, establishing a distributed photovoltaic low voltage ride-through capability uncertainty model and a distribution network fault scenario set including large-scale distributed energy access based on line fault data, photovoltaic unit output status data and load level data in the target distribution network;
[0064] Among them, the uncertainty model of distributed photovoltaic low voltage ride-through capability includes: uncertain area, non-offline operation area and off-grid operation area. The uncertain area includes three uncertain sub-areas.
[0065] In the embodiment of the present application, since the short-circuit current injected into the grid by photovoltaic power generation is jointly determined by the voltage drop degree at the grid connection point during a fault and the low voltage ride-through capability of the unit, and the photovoltaic low voltage ride-through capability is uncertain, whether the photovoltaic power generation is disconnected from the grid is jointly determined by the voltage drop degree and duration of the grid connection point, it is necessary to quantify the low voltage ride-through capability of photovoltaic power generation.
[0066] It is worth noting that different inverter models have different low voltage ride-through capabilities; even if the inverter model is the same, due to differences in manufacturing processes among manufacturers, there are also great differences in low voltage ride-through capability tests. It can be roughly considered that their low voltage ride-through capabilities fluctuate in the area near the national standard curve, that is, the mean values of t and U are 0.15s and 0.2 (pu) respectively, thus forming an uncertainty area (shaded area) such as Figure 3 shown.
[0067] Figure 3 The thick solid line in the middle is the first half of the LVRTC. To obtain the range of the uncertainty area, it is necessary to determine the location of the upper and lower solid lines in the figure. Since the low voltage ride-through capabilities of different types of inverters are different, it is necessary to test multiple inverters and determine the range of the above area based on the test data. The test results of the two types of inverters are analyzed below.
[0068] In the embodiment of the present application, a low voltage ride-through capability test is performed on multiple inverters, and some of the inverters can still maintain grid operation for a certain period of time when the terminal voltage drops to 0 (pu) (analogous to the aforementioned ES-5TLT inverter). max and U min Determine the lower boundary of the region where t max Indicates the longest time that the inverter can maintain grid operation when the terminal voltage drops to 0 (pu) in the test results of multiple inverters, U min Indicates that the non-offline operation time is greater than t max The other case is that some inverters are disconnected from the grid before the terminal voltage drops to 0 (pu) (similar to the ES-8TLT inverter mentioned above). Therefore, the upper boundary of the region is determined by U max OK, U max It indicates the maximum terminal voltage that can maintain the operation without disconnecting from the grid in the test results of multiple inverters.
[0069] In the embodiment of the present application, for the convenience of analysis, the present invention divides the uncertainty region into three sub-regions: A, B, and C, where region A is a two-dimensional function of t and U, and is given by Figure 3 It can be seen that the range of Area A includes U min <U<U max And t<t maxArea; Area B and Area C are one-dimensional functions of t and U respectively, where Area B includes U<U min And t<t max Area, Area C includes U min <U<U max And t>t max In addition, the area above the uncertainty region D (U>U max The remaining area E (U<U min And t>t max Part) is the off-grid operation area.
[0070] Figure 3 The photovoltaic power plant in region D remains in grid-connected operation, while the photovoltaic power plant in region E will be disconnected from the grid. Due to the influence of factors such as manufacturer, equipment model, and operating environment, the probability of photovoltaic power plant disconnection in region ABC is uncertain, that is, t and U are both random variables. The present invention uses the normal distribution function to characterize the randomness of random variables t and U. Suppose the probability density functions of the one-dimensional random variables t and U in region B and region C are fx(t) and fy(U), respectively, which are specifically expressed as
[0071]
[0072]
[0073] Among them, t∈[0,t max ],U∈[U min ,U max ],σ 1 and σ 2 are the distribution densities of regions B and C respectively. Since t and U are two independent random variables, the joint probability density function of t and U in region A can be expressed as
[0074]
[0075] According to the 3σ principle, σ can be further solved 1 and σ 2 , as shown below
[0076]
[0077] Obtain t through inverter test max , U max , U min Substituting the value of into the above formula and combining it with the above probability expression, we can get the probability density function of the entire uncertain region.
[0078] In an embodiment of the present application, the distributed photovoltaic low voltage ride-through capability uncertainty model also includes: setting five situations of photovoltaic terminal voltage drops s1 to s5, which are respectively located in the uncertain area, the non-offline operation area and the off-grid operation area.
[0079] Specifically, assume that the photovoltaic terminal voltage drops into five situations s1 to s5, which are located in areas A, B, C, D, and E respectively. Figure 4 As shown. Among them, s1 is located in area D, the photovoltaic power generation keeps connected to the grid and injects short-circuit current into the grid, that is, the probability of grid disconnection is 0; s2 is in area E, the photovoltaic power generation withdraws from the grid, that is, the probability of grid disconnection is 1; U 3 and t 3 are the voltage drop amplitude and duration of s3 respectively; t 4 is the voltage drop duration of s4; U 5 is the voltage drop amplitude of s5.
[0080] In the embodiment of the present application, when s1 to s5 drop occurs, the probability of photovoltaic off-grid is expressed as
[0081]
[0082] It should be noted that the distribution network fault scenario set with large-scale distributed energy access includes three fault scenario sets: very serious, generally serious and not serious;
[0083] When the line fault is one of the three most serious lines, the output state of the photovoltaic unit is weak and the load level is the load peak, it is a very serious state;
[0084] When the line fault is one of the three most serious lines, the output state of the PV unit is medium and the load level is normal, it is a general serious state;
[0085] When the line fault is one of the three most serious lines, the output state of the photovoltaic unit is at full power and the load level is lower than the normal level, it is a non-serious state.
[0086] In the embodiment of the present application, in order to adapt to the significant changes in the power outage mechanism of the distribution network, the present invention proposes a grid distribution network fault scenario set to analyze the power outage mechanism of the distribution network under different operating scenarios. The present invention takes line faults, photovoltaic unit output status, and load level as extreme operating parameters of the distribution network with large-scale distributed energy access, as shown in Table 1. Then, the extreme parameters are cross-randomly combined to construct a grid distribution network fault scenario set.
[0087] Table 1 Extreme operating parameters
[0088]
[0089] Since there are many power grid lines and their vulnerability levels are different, it is not practical to treat each line fault as an extreme parameter. The present invention evaluates the comprehensive impact of line faults on the power grid based on the fuzzy entropy weight method and selects three lines as line faults.
[0090] In an embodiment of the present application, the distribution network fault scenario set with large-scale distributed energy access also includes: indicators affecting the severity of line fault consequences include branch disconnection fragility indicators, node voltage offset indicators, and electrical structure importance indicators.
[0091] 1) Branch circuit breaking vulnerability index
[0092] The present invention introduces the power transfer entropy to analyze the degree of power transfer after the branch is disconnected. Entropy is a measure of the chaotic and disordered state of a system. It was originally applied in thermodynamics to indicate the degree of disorder of the molecular state. The disconnection of a line may cause the power flow of the line to be transferred to other lines, thereby increasing the risk of overload of other lines. The power transfer entropy evaluates the vulnerability of the line from the perspective of the dynamic process of interaction between lines.
[0093] Defined as follows: Under operating scenario s, when branch i in the power grid is disconnected, the flow increment shared by branch k is:
[0094]
[0095] in, is the active power flow of branch k after branch i is disconnected; is the initial active power flow of branch k.
[0096] Then, in scenario s, the impact ratio of power flow transfer on branch k caused by disconnection of branch i is:
[0097]
[0098] Based on the entropy theory, the power flow transfer entropy of disconnected branch circuit i under scenario s is defined as:
[0099]
[0100] 2) Node voltage offset index
[0101]
[0102] in, and are the voltages of node i after branch k is disconnected in scenario s.
[0103] 3) Electrical structure importance index
[0104] For an N bThe electrical connectivity of the distribution network of the node is defined as the sum of the equivalent impedances of all branches, that is:
[0105]
[0106] Among them, Z ij It is the element in the i-th row and j-th column of the network node impedance matrix.
[0107] The electrical structure importance of branch k is defined as follows:
[0108]
[0109] Among them, Z G-k is the electrical connectivity of the grid after branch k is removed.
[0110] In the embodiment of the present application, the uncertainty model of distributed photovoltaic low voltage ride-through capability and the distribution network fault scenario set including large-scale distributed energy access are established based on the line fault data, photovoltaic unit output status data and load level data in the target distribution network, and also include:
[0111] Assess the comprehensive impact of line faults on the power grid, and record the branch circuit breaker vulnerability index as f i 1 , the node voltage offset index is f i 2 , the electrical structure importance index is f i 3 , comprehensive risk responsibility evaluation index f i 4 The calculation steps are as follows:
[0112] The number of construction lines is N l , the fuzzy membership matrix R with 3 columns;
[0113] Calculate the index f separately 1 、f 2 and f 3 The entropy of each indicator is used to calculate the corresponding entropy weight of the indicator.
[0114] Calculate the comprehensive risk responsibility evaluation index f of line i i 4 , according to the comprehensive risk responsibility index f i 4 , the comprehensive impact of line faults on the power grid can be evaluated and a grid distribution network fault scenario set can be constructed.
[0115] Specifically, for the sake of convenience, the branch breaking vulnerability index is denoted as f i 1 , the node voltage offset index is f i 2, the electrical structure importance index is f i 3 Comprehensive risk responsibility evaluation indexf i 4 The calculation steps are as follows:
[0116] Step 1) Construct the number of rows to be N l , a fuzzy membership matrix R with 3 columns. The element r im Calculated as:
[0117]
[0118] Step 2) Calculate the risk index f 1 、f 2 and f 3 The entropy of is:
[0119]
[0120] Based on the entropy of each risk indicator, the corresponding indicator entropy weight is calculated as:
[0121]
[0122] Step 3) Set the risk preference weights of the operator for adequacy and safety as α A and α S . Risk indicator f 1 、f 2 and f 3 The fuzzy entropy weight is calculated as:
[0123]
[0124] Step 4) Calculate the comprehensive risk responsibility evaluation index f of line i i 4 for
[0125]
[0126] According to the comprehensive risk responsibility index f i 4 , the comprehensive impact of line faults on the power grid can be evaluated and a grid distribution network fault scenario set can be constructed.
[0127] It should be noted that by converting each influencing factor, namely the branch disconnection vulnerability index, node voltage offset index and electrical structure importance index, into fuzzy entropy weights that take into account uncertainty, the comprehensive impact of line faults on the dynamic stability and structural integrity of the power grid can be more accurately reflected. This quantitative method not only considers the original value of each index, but also considers the complexity caused by uncertainty, making the evaluation results more comprehensive and objective.
[0128] In addition, by introducing the risk preference weight setting of operators, risks can be adjusted subjectively according to actual operating conditions and management strategies, increasing the flexibility and adaptability of the evaluation system. For example, if the priority of power grid security is higher than stability in a specific period or under specific conditions, this can be highlighted by adjusting the weight. The calculation process in step 4) is actually to multiply the entropy weight of each indicator with the original value and weighted sum it to obtain a comprehensive evaluation index, which can quantify the comprehensive risk responsibility of line faults to the power grid and provide a scientific basis for fault management and the formulation of preventive measures.
[0129] Therefore, this comprehensive risk responsibility evaluation method based on entropy theory and fuzzy theory provides a new and effective tool for fault analysis and risk assessment of distribution networks, which helps to improve the operational safety and reliability of power grids.
[0130] S103, simulate the uncertainty model of distributed photovoltaic low voltage ride-through capability, output the average power shortage in each scenario, and evaluate the risk of cascading failures.
[0131] The uncertainty model of distributed photovoltaic low voltage ride-through capability is simulated to output the average power shortage in each scenario and evaluate the cascading failure risk, including:
[0132] Establish the uncertainty model of distributed photovoltaic low voltage ride-through capability;
[0133] Establish a grid distribution network fault scenario set;
[0134] Traverse the scenario set and extract fault information related to fault type and fault duration;
[0135] The power flow after a short-circuit fault occurs in the distribution network is calculated based on the PSCAD platform. The fault duration and the voltage of each node are substituted into the uncertainty model of the distributed photovoltaic low voltage ride-through capability to obtain the probability of distributed photovoltaic disconnection.
[0136] With probability β k Extract the grid-connected status of distributed photovoltaics to determine whether there is a line overload. If so, disconnect the line;
[0137] If not, the cascading failure ends, and the power shortage is calculated according to the failure sequence of the components, and the average power shortage in each scenario is output.
[0138] In the embodiment of the present application, the specific steps of the distribution network cascading failure risk assessment using hybrid simulation based on Matlab and PSCAD platform can be as follows:
[0139] Step 1) Establishing a distributed photovoltaic low voltage ride-through capability uncertainty model;
[0140] Step 2) Establish a grid distribution network fault scenario set Ω s ;
[0141] Step 3) Traverse the scene set Ω s (including line faults, photovoltaic unit output status, and load level), let s = 1;
[0142] Step 4) extracting fault information such as fault type and fault duration ts;
[0143] Step 5) Calculate the power flow after the short circuit fault occurs in the distribution network based on the PSCAD platform (including the voltage U i s ), set flag = 0;
[0144] Step 6) The fault duration ts and the node voltage U i s Substituting into the uncertainty model of distributed photovoltaic low voltage ride-through capability, the probability β of distributed photovoltaic off-grid is obtained k ;
[0145] Step 7) With probability β k Extract the grid-connected status of distributed photovoltaics: take a random number rk, if rk is less than β k , distributed photovoltaic is off-grid, set flag = 1, otherwise, distributed photovoltaic remains connected to the grid;
[0146] Step 8) Determine whether there is a line overload, if so, disconnect the line and set flag = 1;
[0147] Step 9) If flag = 1, go to step 5), if flag = 0, the cascading failure ends, calculate the power shortage according to the failure sequence of the components, and go to step 4) until the variance coefficients of each reliability index converge;
[0148] Step 10) Output the average power shortage in each scenario.
[0149] Because the fault duration is usually much longer than the relay protection action time, the present invention does not consider the change of ts during the propagation of the chain fault.
[0150] In summary, the present invention proposes a method for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access, obtaining line fault data, photovoltaic unit output status data, and load level data in a target distribution network; establishing a distributed photovoltaic low voltage ride-through capability uncertainty model and a distribution network fault scenario set with large-scale distributed energy access based on the line fault data, photovoltaic unit output status data, and load level data in the target distribution network; simulating the distributed photovoltaic low voltage ride-through capability uncertainty model, outputting the average power shortage in each scenario, and assessing the risk of cascading failures. The present invention takes into account the uncertainty of the low voltage ride-through capability of distributed generators in the cascading failure risk assessment of distribution networks with large-scale distributed energy access, and the assessment result is more accurate, and the propagation path of cascading failures can be predicted more accurately.
[0151] This embodiment also provides a distribution network cascading failure risk assessment system with large-scale distributed energy access, including:
[0152] A data acquisition module is used to acquire line fault data, photovoltaic unit output status data and load level data in the target distribution network;
[0153] A scenario set establishment module is used to establish a distributed photovoltaic low voltage ride-through capability uncertainty model and a distribution network fault scenario set with large-scale distributed energy access based on line fault data, photovoltaic unit output status data and load level data in the target distribution network;
[0154] The evaluation module is used to simulate the uncertainty model of distributed photovoltaic low voltage ride-through capability, output the average power shortage in each scenario, and evaluate the risk of cascading failures.
[0155] The above-mentioned unit modules may be embedded in or independent of a processor in a computer device in the form of hardware, or may be stored in a memory in a computer device in the form of software, so that the processor can call and execute operations corresponding to the above-mentioned modules.
[0156] This embodiment also provides a computer device, which may be a terminal, and its internal structure diagram may be as shown in FIG. Figure 7As shown. The computer device includes a processor, a memory, a communication interface, a display screen and an input device connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be achieved through WIFI, an operator network, NFC (near field communication) or other technologies. When the computer program is executed by the processor, a method for assessing the risk of chain failures of a distribution network with large-scale distributed energy access is implemented. The display screen of the computer device can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covered on the display screen, or a button, trackball or touchpad set on the computer device housing, or an external keyboard, touchpad or mouse.
[0157] This embodiment further provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the following steps are implemented:
[0158] Obtain line fault data, photovoltaic unit output status data and load level data in the target distribution network;
[0159] Based on the line fault data, PV unit output status data and load level data in the target distribution network, a distributed PV low voltage ride-through capability uncertainty model and a distribution network fault scenario set with large-scale distributed energy access are established;
[0160] The uncertainty model of distributed photovoltaic low voltage ride-through capability is simulated to output the average power shortage in each scenario and evaluate the risk of cascading failures.
[0161] Example 2
[0162] Reference Figure 2-Figure 6 , which is an embodiment of the present invention, provides a method and system for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through experiments.
[0163] The present invention assumes that the fault duration follows a normal distribution with an expected value of 0.21s and a standard deviation of 0.07s, and that the fault transition impedance follows a normal distribution with an expected value of 6Ω and a standard deviation of 2Ω. Figure 5The 10kV distribution network shown in the figure is analyzed as an example. Each distributed photovoltaic system in the figure is composed of a 500kW photovoltaic generator set, and its basic parameters are shown in Table 2. The controllers all use the low voltage ride-through control and protection links specified in GB / T32826-2016. When the grid fails, the DC voltage of the inverter remains constant, and the output current limit of a single photovoltaic inverter is 1.5 times the rated current. The peak load of the load point is 0.5MW.
[0164] The extreme operating parameters of load levels and distributed PV output are: 1) 100% peak load, 25% PV installed capacity; 2) 75% peak load, 50% PV installed capacity; 3) 50% peak load, 75% PV installed capacity.
[0165] Table 2 Parameters of photovoltaic generator set
[0166]
[0167] The present invention sets the sampling times to 2000, and the probability distribution of the voltage of each node can be drawn based on the voltage drop data sampled 2000 times. Figure 6 It is the probability distribution of the voltage at the nodes where PV2 and PV3 are located after a short circuit fault occurs in line 2.
[0168] Before PV 2 is disconnected from the grid, the probability of PV 3 being disconnected from the grid is 0.026; after PV 2 is disconnected from the grid, the probability of PV 3 being disconnected from the grid is 0.083. It can be seen that when PV 2 is disconnected from the grid, the probability of PV 3 being disconnected from the grid will increase significantly. This is because the node where PV 3 is located is connected to a load. When PV 2 is disconnected from the grid, the injected power at the node decreases, the injected power at the main power supply point increases, and the line voltage drop increases, causing the terminal voltage at the node where PV 3 is located to further decrease.
[0169] The cascading failure risks in different scenarios are shown in Table 3. It can be seen from Table 3 that when the load level is high, the photovoltaic power generation is weak, and a short-circuit fault occurs in line 2, the cascading failure risk of the distribution network is the highest. This is because when the load level is high and the photovoltaic power generation is weak, the load node itself may have a low voltage phenomenon. If a short-circuit fault occurs in line 2 at this time, the cascading failure risk of the distribution network will be further aggravated. Comparing scenario 1 and scenario 4, it can be seen that the average power shortage when the photovoltaic power generation is full is reduced by 0.0336MW compared with the average power shortage when the photovoltaic power generation is weak. This is because distributed energy has a supporting role in the reliability of the distribution network. This example shows that the supporting role of distributed energy on the reliability of the distribution network is uncertain. In order to give full play to the supporting role of distributed energy on the reliability of the distribution network, the risk of cascading failures must be reduced as much as possible. The present invention provides an accurate cascading failure risk assessment method for formulating a distribution network cascading failure blocking strategy.
[0170] Table 3 Risk of cascading failures in some scenarios
[0171]
[0172] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
[0173] Those skilled in the art will appreciate that the embodiments of the present application can be provided as methods, systems, or computer program products. Therefore, the present application can adopt the form of complete hardware embodiments, complete software embodiments, or embodiments in combination with software and hardware. Moreover, the present application can adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code. The scheme in the embodiments of the present application can be implemented in various computer languages, for example, object-oriented programming language Java and literal scripting language JavaScript, etc.
[0174] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0175] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0176] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0177] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.
[0178] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
Claims
1. A method for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access, characterized in that: include: Obtain line fault data, photovoltaic unit output status data and load level data in the target distribution network; Based on the line fault data, photovoltaic unit output status data and load level data in the target distribution network, a distributed photovoltaic low voltage ride-through capability uncertainty model and a distribution network fault scenario set including large-scale distributed energy access are established; The distributed photovoltaic low voltage ride-through capability uncertainty model is simulated to output the average power shortage in each scenario and evaluate the risk of cascading failures.
2. The method for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access as claimed in claim 1, characterized in that: The distributed photovoltaic low voltage ride-through capability uncertainty model includes: an uncertain area, a non-offline operation area and an off-grid operation area, and the uncertain area includes three uncertain sub-areas.
3. The method for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access as claimed in claim 2, characterized in that: The distributed photovoltaic low voltage ride-through capability uncertainty model also includes: setting photovoltaic terminal voltage drops in five situations s1 to s5, which are respectively located in the uncertain area, the non-offline operation area and the off-grid operation area.
4. The method for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access as claimed in claim 3, characterized in that: The distribution network fault scenario set with large-scale distributed energy access includes: a fault scenario set of three states: very serious, generally serious and not serious; When the line fault is one of the three most serious lines, the output state of the photovoltaic unit is weak and the load level is the load peak, it is a very serious state; When the line fault is one of the three most serious lines, the output state of the PV unit is medium and the load level is normal, it is a general serious state; When the line fault is one of the three most serious lines, the output state of the photovoltaic unit is at full power and the load level is lower than the normal level, it is a non-serious state.
5. The method for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access as claimed in claim 4, characterized in that: The distribution network fault scenario set with large-scale distributed energy access also includes: indicators affecting the severity of line fault consequences include branch disconnection fragility indicators, node voltage deviation indicators, and electrical structure importance indicators.
6. The method for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access as claimed in claim 5, characterized in that: The establishment of a distributed photovoltaic low voltage ride-through capability uncertainty model based on line fault data, photovoltaic unit output status data and load level data in the target distribution network and a distribution network fault scenario set including large-scale distributed energy access also includes: Assess the comprehensive impact of line faults on the power grid, and record the branch circuit breaker vulnerability index as f i 1 , the node voltage offset index is f i 2 , the electrical structure importance index is f i 3 , comprehensive risk responsibility evaluation index f i 4 The calculation steps are as follows: The number of construction lines is N l , the fuzzy membership matrix R with 3 columns; Calculate the index f separately 1 、f 2 and f 3 The entropy of each indicator is used to calculate the corresponding entropy weight of the indicator. Calculate the comprehensive risk responsibility evaluation index f of line i i 4 , according to the comprehensive risk responsibility index f i 4 , the comprehensive impact of line faults on the power grid can be evaluated and a grid distribution network fault scenario set can be constructed.
7. The method for assessing the risk of cascading failures in a distribution network with large-scale distributed energy access as claimed in claim 6, characterized in that: The simulating of the uncertainty model of the distributed photovoltaic low voltage ride-through capability, outputting the average power shortage in each scenario, and evaluating the cascading failure risk include: Establish the uncertainty model of distributed photovoltaic low voltage ride-through capability; Establish a grid distribution network fault scenario set; Traverse the scenario set and extract fault information related to fault type and fault duration; The power flow after a short-circuit fault occurs in the distribution network is calculated based on the PSCAD platform. The fault duration and the voltage of each node are substituted into the uncertainty model of the distributed photovoltaic low voltage ride-through capability to obtain the probability of distributed photovoltaic disconnection. With probability β k Extract the grid-connected status of distributed photovoltaics to determine whether there is a line overload. If so, disconnect the line; If not, the cascading failure ends, and the power shortage is calculated according to the failure sequence of the components, and the average power shortage in each scenario is output.
8. A distribution network cascading failure risk assessment system with large-scale distributed energy access, characterized in that: include: A data acquisition module is used to acquire line fault data, photovoltaic unit output status data and load level data in the target distribution network; A scenario set establishment module, used to establish a distributed photovoltaic low voltage ride-through capability uncertainty model and a distribution network fault scenario set containing large-scale distributed energy access based on line fault data, photovoltaic unit output status data and load level data in the target distribution network; The evaluation module is used to simulate the uncertainty model of the distributed photovoltaic low voltage ride-through capability, output the average power shortage under each scenario, and evaluate the risk of cascading failures.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.
Citation Information
Cited By
Voltage sag domain identification system based on multiple uncertainty scene generation