Monitoring method and device of intelligent power distribution cabinet and power distribution cabinet
By monitoring and analyzing the aging assessment and electrical safety information of the smart distribution cabinet, the problems of aging and safety hazards are solved, timely warning and maintenance of safety hazards are achieved, and the occurrence of safety accidents is reduced.
Patent Information
- Application Number
- CN202411040757.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-07-31
AI Technical Summary
Smart distribution cabinets age rapidly due to long-term exposure to the external environment and are difficult to analyze their operating status, which poses safety risks.
By monitoring and collecting the cabinet surface information and internal line information of the distribution cabinet, calculating the equipment aging evaluation coefficient, and comparing it with the preset threshold, obtaining operating status and electrical safety information, comprehensive analysis to confirm the comprehensive evaluation coefficient and judge safety hazards. And early warning and repair.
It effectively reduces the safety hazards of smart distribution cabinets, promptly warn and maintain, and reduces the probability of safety accidents.
Smart Images

Figure CN118983936A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of monitoring and analysis technology, and in particular to a monitoring method and device for an intelligent power distribution cabinet and a power distribution cabinet. Background Art
[0002] Intelligent power distribution cabinet is also called precision power distribution cabinet. It is a power distribution cabinet for the energy terminal of the data center computer room. It comprehensively collects all energy data, provides high-precision measurement data for the terminal energy monitoring system, and reflects the power quality data in real time through the display unit. And upload it to the background environment control system through digital communication. In order to achieve real-time monitoring of the entire power distribution system and effective management of operation quality. Help users optimize network data centers, strengthen energy consumption management, improve server rack operation efficiency, and provide reliable guarantee for all-round green IDC.
[0003] In the related art, smart distribution cabinets are often configured outdoors, causing the smart distribution cabinets to be exposed to the external environment for a long time, which in turn causes the smart distribution cabinets to age rapidly. During the operation of the smart distribution cabinets, the operating status of the smart distribution cabinets cannot be analyzed, which causes certain safety hazards in the smart distribution cabinets and there is room for improvement. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present application provides a monitoring method and device for an intelligent power distribution cabinet and a power distribution cabinet.
[0005] In a first aspect, the present application provides a monitoring method for an intelligent power distribution cabinet, comprising the following steps:
[0006] Monitor and collect cabinet surface information and internal circuit information corresponding to the target distribution cabinet, analyze the cabinet surface information and internal circuit information corresponding to the target distribution cabinet, and then confirm the equipment aging assessment coefficient corresponding to the target distribution cabinet;
[0007] Compare the equipment aging assessment coefficient corresponding to the target power distribution cabinet with the equipment aging threshold interval, and obtain the operating status information and electrical safety information corresponding to the target power distribution cabinet based on the comparison result;
[0008] Analyze the operating status information corresponding to the target power distribution cabinet to confirm the operating status assessment coefficient corresponding to the target power distribution cabinet, and analyze the electrical safety information corresponding to the target power distribution cabinet to confirm the electrical safety assessment coefficient corresponding to the target power distribution cabinet;
[0009] A comprehensive analysis is performed on the operating status assessment coefficient corresponding to the target distribution cabinet and the electrical safety assessment coefficient corresponding to the target distribution cabinet, and then the comprehensive assessment coefficient corresponding to the target distribution cabinet is confirmed, and adjustments are made based on the comprehensive assessment coefficient corresponding to the target distribution cabinet.
[0010] Preferably, analyzing the cabinet surface information and internal circuit information corresponding to the target power distribution cabinet specifically includes:
[0011] Based on the deployed monitoring device, the monitoring video corresponding to the target area is obtained, and the cabinet surface information corresponding to the target distribution cabinet is extracted from the monitoring video, and then the cabinet shell aging area S corresponding to the target distribution cabinet is confirmed, and the surface area S′ corresponding to the target distribution cabinet is extracted from the cloud database;
[0012] By formula Determine the cabinet surface aging assessment coefficient ψ corresponding to the target distribution cabinet, where T represents the corresponding usage time of the target distribution cabinet, ρ represents the aging coefficient corresponding to the preset unit usage time, and ξ represents the correction coefficient corresponding to the cabinet surface aging assessment coefficient;
[0013] By formula The line aging assessment coefficient μ corresponding to the target distribution cabinet is calculated, where Fp, Fi, and Fm represent the aging factor, load factor, and maintenance factor corresponding to the internal line of the target distribution cabinet, respectively, and ω1, ω2, and ω3 are represented as weight coefficients.
[0014] Preferably, confirming the equipment aging assessment coefficient corresponding to the target power distribution cabinet specifically includes:
[0015] Substitute the cabinet surface aging assessment coefficient ψ corresponding to the target distribution cabinet and the line aging assessment coefficient μ corresponding to the target distribution cabinet into the equipment aging assessment formula The equipment aging assessment coefficient φ corresponding to the target distribution cabinet is obtained, where ψ′ and μ′ represent the preset cabinet surface aging assessment threshold and line aging assessment threshold, respectively.
[0016] Preferably, comparing the equipment aging assessment coefficient corresponding to the target power distribution cabinet with the equipment aging threshold range specifically includes:
[0017] Compare the equipment aging assessment coefficient μ corresponding to the target distribution cabinet with the equipment aging threshold interval [μ1, μ2];
[0018] If the equipment aging assessment coefficient μ corresponding to the target power distribution cabinet is less than μ1, it is determined that there is no safety hazard in the target power distribution cabinet and no processing is required;
[0019] If the equipment aging assessment coefficient μ corresponding to the target power distribution cabinet is between [μ1, μ2], it is necessary to obtain the operating status information and electrical safety information corresponding to the target power distribution cabinet, and perform safety analysis on the operating status information and electrical safety information corresponding to the target power distribution cabinet;
[0020] If the equipment aging assessment coefficient μ corresponding to the target power distribution cabinet is greater than μ2, it is determined that there is a safety hazard in the target power distribution cabinet, and the target power distribution cabinet needs to be repaired or replaced.
[0021] Preferably, a safety analysis is performed on the operating status information and electrical safety information corresponding to the target power distribution cabinet, specifically including:
[0022] Collecting the operating status information corresponding to the target power distribution cabinet at a preset collection time node, wherein the operating status information includes the operating voltage, the operating current and the power factor;
[0023] Substitute the operating status information of the target distribution cabinet at each collection time node into the operating status evaluation formula Confirm the operating status evaluation coefficient αi of the target distribution cabinet at each collection time node, where i represents the number corresponding to each collection time node, i=1,2,3......j, Vi, Ii, Pi represent the working voltage, working current, and power factor corresponding to the i-th collection time node, V′, I′, P′ represent the preset standard working voltage, standard working current, and standard power factor, and c1, c2, c3 represent weight coefficients.
[0024] Preferably, a safety analysis is performed on the operating status information and electrical safety information corresponding to the target power distribution cabinet, specifically including:
[0025] Confirm the preset collection time nodes, and monitor the electrical safety information of the target distribution cabinet corresponding to each collection time node based on the environmental monitoring device arranged in the distribution cabinet, wherein the electrical safety information includes temperature value, humidity value and dust concentration value;
[0026] Substitute the electrical safety information of the target distribution cabinet at each collection time node into the electrical safety assessment formula Confirm the electrical safety assessment coefficient βi corresponding to the target distribution cabinet at each collection time node, where Temi, Humi, and Ni represent the temperature value, humidity value, and dust concentration value corresponding to the i-th collection time node, respectively, Tem′, Hum′, and N′ represent the preset standard temperature value, standard humidity value, and standard dust concentration value, and b1, b2, and b3 represent weight coefficients.
[0027] Preferably, confirming the comprehensive evaluation coefficient corresponding to the target power distribution cabinet and making adjustments based on the comprehensive evaluation coefficient corresponding to the target power distribution cabinet specifically includes:
[0028] Substitute the operating status assessment coefficient αi of the target distribution cabinet at each acquisition time node and the electrical safety assessment coefficient βi of the target distribution cabinet at each acquisition time node into the formula Obtain the comprehensive evaluation coefficient δ corresponding to the target power distribution cabinet;
[0029] Compare the comprehensive evaluation coefficient δ corresponding to the target distribution cabinet with the preset comprehensive evaluation threshold δ′;
[0030] If the comprehensive evaluation coefficient δ ≥ δ′ corresponding to the target distribution cabinet, it is determined that there is no safety hazard in the target distribution cabinet and no processing is required;
[0031] If the comprehensive evaluation coefficient δ corresponding to the target power distribution cabinet is less than δ′, it is determined that there is a safety hazard in the target power distribution cabinet, and the target power distribution cabinet needs to be repaired or replaced.
[0032] Preferably, after confirming the comprehensive evaluation coefficient corresponding to the target power distribution cabinet, the method further includes:
[0033] In the selected time window, the comprehensive evaluation coefficient corresponding to the target distribution cabinet is obtained, and a real-time change curve δ(t) corresponding to the comprehensive evaluation coefficient of the target distribution cabinet is established;
[0034] By formula Confirm the risk change coefficient Risk corresponding to the target distribution cabinet;
[0035] Compare the risk change coefficient Risk corresponding to the target distribution cabinet with the preset risk change threshold Risk′;
[0036] If Risk>Risk′, it is determined that the safety risk of the target distribution cabinet in the future will increase, and the staff will be notified for early warning; otherwise, it is determined that the safety risk of the target distribution cabinet in the future will not increase.
[0037] In a second aspect, the present application provides a monitoring device for an intelligent power distribution cabinet, comprising:
[0038] The distribution cabinet information collection and processing module is used to monitor and collect the cabinet surface information and internal line information corresponding to the target distribution cabinet, analyze the cabinet surface information and internal line information corresponding to the target distribution cabinet, and then confirm the equipment aging assessment coefficient corresponding to the target distribution cabinet;
[0039] A comparison module is used to compare the equipment aging assessment coefficient corresponding to the target distribution cabinet with the equipment aging threshold interval, and obtain the operating status information and electrical safety information corresponding to the target distribution cabinet based on the comparison result;
[0040] An analysis module is used to analyze the operating status information corresponding to the target power distribution cabinet to confirm the operating status evaluation coefficient corresponding to the target power distribution cabinet, and to analyze the electrical safety information corresponding to the target power distribution cabinet to confirm the electrical safety evaluation coefficient corresponding to the target power distribution cabinet;
[0041] The comprehensive adjustment module is used to comprehensively analyze the operating status assessment coefficient corresponding to the target distribution cabinet and the electrical safety assessment coefficient corresponding to the target distribution cabinet, and then confirm the comprehensive assessment coefficient corresponding to the target distribution cabinet, and make adjustments based on the comprehensive assessment coefficient corresponding to the target distribution cabinet.
[0042] In a third aspect, the present application provides an intelligent distribution cabinet, including a computer-readable storage medium, wherein the computer-readable storage medium stores instructions. When the instructions are executed on a computer, the computer executes any one of the above-described methods for monitoring an intelligent distribution cabinet.
[0043] In summary, the present application includes at least one of the following beneficial technical effects:
[0044] 1. The present invention provides a monitoring method for an intelligent power distribution cabinet, which analyzes the cabinet surface information and internal line information corresponding to the target power distribution cabinet, confirms the equipment aging assessment coefficient corresponding to the target power distribution cabinet, compares the equipment aging assessment coefficient corresponding to the target power distribution cabinet with the equipment aging threshold interval, obtains the operating status information and electrical safety information corresponding to the target power distribution cabinet based on the comparison result, confirms the operating status assessment coefficient corresponding to the target power distribution cabinet and the electrical safety assessment coefficient corresponding to the target power distribution cabinet, and then confirms the comprehensive assessment coefficient corresponding to the target power distribution cabinet, and makes adjustments based on the comprehensive assessment coefficient corresponding to the target power distribution cabinet, thereby effectively reducing the safety hazards of the intelligent power distribution cabinet;
[0045] 2. By confirming the risk change coefficient corresponding to the target distribution cabinet and comparing it with the preset risk change threshold, the safety risk potential situation of the target distribution cabinet in the future period can be judged, and early warning can be issued based on the safety risk potential situation in the future period, thereby effectively reducing the occurrence of safety accidents in smart distribution cabinets. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] Figure 1 It is a flow chart of the method for monitoring the intelligent distribution cabinet in the embodiment of the present application.
[0047] Figure 2 It is a schematic diagram of a device for monitoring an intelligent distribution cabinet according to an embodiment of the present application. DETAILED DESCRIPTION
[0048] The following is combined with Figure 1-2 This application is described in further detail.
[0049] Example 1
[0050] An embodiment of the present application discloses a monitoring method for an intelligent power distribution cabinet.
[0051] Reference Figure 1, a monitoring method for an intelligent distribution cabinet comprises the following steps:
[0052] S1. Monitor and collect cabinet surface information and internal line information corresponding to the target distribution cabinet, analyze the cabinet surface information and internal line information corresponding to the target distribution cabinet, and then confirm the equipment aging assessment coefficient corresponding to the target distribution cabinet;
[0053] S2. Compare the equipment aging assessment coefficient corresponding to the target distribution cabinet with the equipment aging threshold interval, and obtain the operating status information and electrical safety information corresponding to the target distribution cabinet based on the comparison result;
[0054] S3. Analyze and confirm the operating status information corresponding to the target distribution cabinet to determine the operating status evaluation coefficient corresponding to the target distribution cabinet, and analyze and confirm the electrical safety information corresponding to the target distribution cabinet to determine the electrical safety evaluation coefficient corresponding to the target distribution cabinet;
[0055] S4. Comprehensively analyze the operating status assessment coefficient corresponding to the target distribution cabinet and the electrical safety assessment coefficient corresponding to the target distribution cabinet, and then confirm the comprehensive assessment coefficient corresponding to the target distribution cabinet, and make adjustments based on the comprehensive assessment coefficient corresponding to the target distribution cabinet.
[0056] It should be noted that the cabinet surface information and internal circuit information corresponding to the target distribution cabinet are analyzed, including:
[0057] Based on the deployed monitoring device, the monitoring video corresponding to the target area is obtained, and the cabinet surface information corresponding to the target distribution cabinet is extracted from the monitoring video, and then the cabinet shell aging area S corresponding to the target distribution cabinet is confirmed, and the surface area S′ corresponding to the target distribution cabinet is extracted from the cloud database;
[0058] By formula Determine the cabinet surface aging assessment coefficient ψ corresponding to the target distribution cabinet, where T represents the corresponding usage time of the target distribution cabinet, ρ represents the aging coefficient corresponding to the preset unit usage time, and ξ represents the correction coefficient corresponding to the cabinet surface aging assessment coefficient;
[0059] By formula The line aging assessment coefficient μ corresponding to the target distribution cabinet is calculated, where Fp, Fi, and Fm represent the aging factor, load factor, and maintenance factor corresponding to the internal line of the target distribution cabinet, respectively, and ω1, ω2, and ω3 are represented as weight coefficients.
[0060] Specifically, the aging factor needs to be determined through data obtained from laboratory tests, and a function related to the degree of aging is obtained through data fitting. The load factor and maintenance factor need to be analyzed through historical operating data and maintenance records.
[0061] Furthermore, confirm the equipment aging assessment coefficient corresponding to the target power distribution cabinet, including:
[0062] Substitute the cabinet surface aging assessment coefficient ψ corresponding to the target distribution cabinet and the line aging assessment coefficient μ corresponding to the target distribution cabinet into the equipment aging assessment formula The equipment aging assessment coefficient φ corresponding to the target distribution cabinet is obtained, where ψ′ and μ′ represent the preset cabinet surface aging assessment threshold and line aging assessment threshold, respectively.
[0063] Furthermore, the equipment aging assessment coefficient corresponding to the target distribution cabinet is compared with the equipment aging threshold range, specifically including:
[0064] Compare the equipment aging assessment coefficient μ corresponding to the target distribution cabinet with the equipment aging threshold interval [μ1, μ2];
[0065] If the equipment aging assessment coefficient μ corresponding to the target power distribution cabinet is less than μ1, it is determined that there is no safety hazard in the target power distribution cabinet and no processing is required;
[0066] If the equipment aging assessment coefficient μ corresponding to the target power distribution cabinet is between [μ1, μ2], it is necessary to obtain the operating status information and electrical safety information corresponding to the target power distribution cabinet, and perform safety analysis on the operating status information and electrical safety information corresponding to the target power distribution cabinet;
[0067] If the equipment aging assessment coefficient μ corresponding to the target power distribution cabinet is greater than μ2, it is determined that there is a safety hazard in the target power distribution cabinet, and the target power distribution cabinet needs to be repaired or replaced.
[0068] It should be noted that the safety analysis of the operating status information and electrical safety information corresponding to the target distribution cabinet includes:
[0069] Collecting the operating status information corresponding to the target power distribution cabinet at a preset collection time node, wherein the operating status information includes the operating voltage, the operating current and the power factor;
[0070] Substitute the operating status information of the target distribution cabinet at each collection time node into the operating status evaluation formula Confirm the operating status evaluation coefficient αi of the target distribution cabinet at each collection time node, where i represents the number corresponding to each collection time node, i=1,2,3......j, Vi, Ii, Pi represent the working voltage, working current, and power factor corresponding to the i-th collection time node, V′, I′, P′ represent the preset standard working voltage, standard working current, and standard power factor, and c1, c2, c3 represent weight coefficients.
[0071] Specifically, the operating status information corresponding to the target distribution cabinet is compared and calculated with the standard operating status information, and then the operating status evaluation coefficient corresponding to the target distribution cabinet at each collection time node is confirmed.
[0072] It should be noted that the safety analysis of the operating status information and electrical safety information corresponding to the target power distribution cabinet also includes:
[0073] Confirm the preset collection time nodes, and monitor the electrical safety information of the target distribution cabinet corresponding to each collection time node based on the environmental monitoring device arranged in the distribution cabinet, wherein the electrical safety information includes temperature value, humidity value and dust concentration value;
[0074] Substitute the electrical safety information of the target distribution cabinet at each collection time node into the electrical safety assessment formula Confirm the electrical safety assessment coefficient βi corresponding to the target distribution cabinet at each collection time node, where Temi, Humi, and Ni represent the temperature value, humidity value, and dust concentration value corresponding to the i-th collection time node, respectively, Tem′, Hum′, and N′ represent the preset standard temperature value, standard humidity value, and standard dust concentration value, and b1, b2, and b3 represent weight coefficients.
[0075] Furthermore, the comprehensive evaluation coefficient corresponding to the target distribution cabinet is confirmed, and adjustments are made based on the comprehensive evaluation coefficient corresponding to the target distribution cabinet, specifically including:
[0076] Substitute the operating status assessment coefficient αi of the target distribution cabinet at each acquisition time node and the electrical safety assessment coefficient βi of the target distribution cabinet at each acquisition time node into the formula Obtain the comprehensive evaluation coefficient δ corresponding to the target power distribution cabinet;
[0077] Compare the comprehensive evaluation coefficient δ corresponding to the target distribution cabinet with the preset comprehensive evaluation threshold δ′;
[0078] If the comprehensive evaluation coefficient δ ≥ δ′ corresponding to the target distribution cabinet, it is determined that there is no safety hazard in the target distribution cabinet and no processing is required;
[0079] If the comprehensive evaluation coefficient δ corresponding to the target power distribution cabinet is less than δ′, it is determined that there is a safety hazard in the target power distribution cabinet, and the target power distribution cabinet needs to be repaired or replaced.
[0080] Furthermore, after confirming the comprehensive evaluation coefficient corresponding to the target power distribution cabinet, it also includes:
[0081] In the selected time window, the comprehensive evaluation coefficient corresponding to the target distribution cabinet is obtained, and a real-time change curve δ(t) corresponding to the comprehensive evaluation coefficient of the target distribution cabinet is established;
[0082] Specifically, multiple time periods are obtained and the comprehensive evaluation coefficient corresponding to each time period is confirmed to form a time series, and then the real-time change curve corresponding to the comprehensive evaluation coefficient of the target distribution cabinet is confirmed.
[0083] By formula Confirm the risk change coefficient Risk corresponding to the target distribution cabinet;
[0084] Through the above technical solution, using the formula The risk change coefficient Risk corresponding to the target distribution cabinet is identified, and the size of the safety risk hidden danger of the target distribution cabinet in the future is estimated based on the risk change coefficient corresponding to the target distribution cabinet, thereby playing the role of safety warning and effectively reducing the probability of safety accidents.
[0085] Compare the risk change coefficient Risk corresponding to the target distribution cabinet with the preset risk change threshold Risk′;
[0086] If Risk>Risk′, it is determined that the safety risk of the target distribution cabinet in the future will increase, and the staff will be notified for early warning; otherwise, it is determined that the safety risk of the target distribution cabinet in the future will not increase.
[0087] Through the above technical solution, the risk change coefficient Risk corresponding to the target distribution cabinet is compared with the preset risk change threshold Risk′. If Risk>Risk′, it is determined that the safety risk hidden danger of the target distribution cabinet in the future will increase, and the staff will be notified for early warning. Through this judgment method, the safety risk hidden danger of the target distribution cabinet in the future can be predicted, potential safety hazards can be discovered in time, so as to take preventive measures in advance and reduce the probability of safety accidents.
[0088] Example 2
[0089] The embodiment of the present application also discloses a monitoring device for an intelligent power distribution cabinet.
[0090] Reference Figure 2 , a monitoring device for an intelligent power distribution cabinet, comprising:
[0091] The distribution cabinet information collection and processing module is used to monitor and collect the cabinet surface information and internal line information corresponding to the target distribution cabinet, analyze the cabinet surface information and internal line information corresponding to the target distribution cabinet, and then confirm the equipment aging assessment coefficient corresponding to the target distribution cabinet;
[0092] A comparison module is used to compare the equipment aging assessment coefficient corresponding to the target distribution cabinet with the equipment aging threshold interval, and obtain the operating status information and electrical safety information corresponding to the target distribution cabinet based on the comparison result;
[0093] An analysis module is used to analyze the operating status information corresponding to the target power distribution cabinet to confirm the operating status evaluation coefficient corresponding to the target power distribution cabinet, and to analyze the electrical safety information corresponding to the target power distribution cabinet to confirm the electrical safety evaluation coefficient corresponding to the target power distribution cabinet;
[0094] The comprehensive adjustment module is used to comprehensively analyze the operating status assessment coefficient corresponding to the target distribution cabinet and the electrical safety assessment coefficient corresponding to the target distribution cabinet, and then confirm the comprehensive assessment coefficient corresponding to the target distribution cabinet, and make adjustments based on the comprehensive assessment coefficient corresponding to the target distribution cabinet.
[0095] The above contents are merely examples and explanations of the concept of the present invention. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the claims, they should all fall within the protection scope of the present invention.
[0096] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0097] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A monitoring method for an intelligent power distribution cabinet, characterized in that: The following steps are involved: Monitor and collect cabinet surface information and internal circuit information corresponding to the target distribution cabinet, analyze the cabinet surface information and internal circuit information corresponding to the target distribution cabinet, and then confirm the equipment aging assessment coefficient corresponding to the target distribution cabinet; Compare the equipment aging assessment coefficient corresponding to the target power distribution cabinet with the equipment aging threshold interval, and obtain the operating status information and electrical safety information corresponding to the target power distribution cabinet based on the comparison result; Analyze the operating status information corresponding to the target power distribution cabinet to confirm the operating status assessment coefficient corresponding to the target power distribution cabinet, and analyze the electrical safety information corresponding to the target power distribution cabinet to confirm the electrical safety assessment coefficient corresponding to the target power distribution cabinet; A comprehensive analysis is performed on the operating status assessment coefficient corresponding to the target distribution cabinet and the electrical safety assessment coefficient corresponding to the target distribution cabinet, and then the comprehensive assessment coefficient corresponding to the target distribution cabinet is confirmed, and adjustments are made based on the comprehensive assessment coefficient corresponding to the target distribution cabinet.
2. The monitoring method of a smart power distribution cabinet according to claim 1, characterized in that: Analyze the cabinet surface information and internal circuit information corresponding to the target distribution cabinet, including: Based on the deployed monitoring device, the monitoring video corresponding to the target area is obtained, and the cabinet surface information corresponding to the target distribution cabinet is extracted from the monitoring video, and then the cabinet shell aging area S corresponding to the target distribution cabinet is confirmed, and the surface area S′ corresponding to the target distribution cabinet is extracted from the cloud database; By formula Determine the cabinet surface aging assessment coefficient ψ corresponding to the target distribution cabinet, where T represents the corresponding usage time of the target distribution cabinet, ρ represents the aging coefficient corresponding to the preset unit usage time, and ξ represents the correction coefficient corresponding to the cabinet surface aging assessment coefficient; By formula The line aging assessment coefficient μ corresponding to the target distribution cabinet is calculated, where Fp, Fi, and Fm represent the aging factor, load factor, and maintenance factor corresponding to the internal line of the target distribution cabinet, respectively, and ω1, ω2, and ω3 are represented as weight coefficients.
3. The monitoring method of a smart power distribution cabinet according to claim 2, characterized in that: Confirm the equipment aging assessment coefficient corresponding to the target power distribution cabinet, including: Substitute the cabinet surface aging assessment coefficient ψ corresponding to the target distribution cabinet and the line aging assessment coefficient μ corresponding to the target distribution cabinet into the equipment aging assessment formula The equipment aging assessment coefficient φ corresponding to the target distribution cabinet is obtained, where ψ′ and μ′ represent the preset cabinet surface aging assessment threshold and line aging assessment threshold, respectively.
4. The monitoring method of a smart power distribution cabinet according to claim 3 is characterized in that: Compare the equipment aging assessment coefficient corresponding to the target power distribution cabinet with the equipment aging threshold range, including: Compare the equipment aging assessment coefficient μ corresponding to the target distribution cabinet with the equipment aging threshold interval [μ1, μ2]; If the equipment aging assessment coefficient μ corresponding to the target power distribution cabinet is less than μ1, it is determined that there is no safety hazard in the target power distribution cabinet and no processing is required; If the equipment aging assessment coefficient μ corresponding to the target power distribution cabinet is between [μ1, μ2], it is necessary to obtain the operating status information and electrical safety information corresponding to the target power distribution cabinet, and perform safety analysis on the operating status information and electrical safety information corresponding to the target power distribution cabinet; If the equipment aging assessment coefficient μ corresponding to the target power distribution cabinet is greater than μ2, it is determined that there is a safety hazard in the target power distribution cabinet, and the target power distribution cabinet needs to be repaired or replaced.
5. The monitoring method of an intelligent power distribution cabinet according to claim 4, characterized in that: Conduct safety analysis on the operating status information and electrical safety information corresponding to the target power distribution cabinet, including: Collecting the operating status information corresponding to the target power distribution cabinet at a preset collection time node, wherein the operating status information includes the operating voltage, the operating current and the power factor; Substitute the operating status information of the target distribution cabinet at each collection time node into the operating status evaluation formula Confirm the operating status evaluation coefficient αi of the target distribution cabinet at each collection time node, where i represents the number corresponding to each collection time node, i=1,2,3......j, Vi, Ii, Pi represent the working voltage, working current, and power factor corresponding to the i-th collection time node, V′, I′, P′ represent the preset standard working voltage, standard working current, and standard power factor, and c1, c2, c3 represent weight coefficients.
6. A monitoring method for an intelligent power distribution cabinet according to claim 5, characterized in that: Conduct safety analysis on the operating status information and electrical safety information corresponding to the target power distribution cabinet, including: Confirm the preset collection time nodes, and monitor the electrical safety information of the target distribution cabinet corresponding to each collection time node based on the environmental monitoring device arranged in the distribution cabinet, wherein the electrical safety information includes temperature value, humidity value and dust concentration value; Substitute the electrical safety information of the target distribution cabinet at each collection time node into the electrical safety assessment formula Confirm the electrical safety assessment coefficient βi corresponding to the target distribution cabinet at each collection time node, where Temi, Humi, and Ni represent the temperature value, humidity value, and dust concentration value corresponding to the i-th collection time node, respectively, Tem′, Hum′, and N′ represent the preset standard temperature value, standard humidity value, and standard dust concentration value, and b1, b2, and b3 represent weight coefficients.
7. The monitoring method of an intelligent power distribution cabinet according to claim 6, characterized in that: Confirm the comprehensive evaluation coefficient corresponding to the target distribution cabinet, and make adjustments based on the comprehensive evaluation coefficient corresponding to the target distribution cabinet, including: Substitute the operating status assessment coefficient αi of the target distribution cabinet at each acquisition time node and the electrical safety assessment coefficient βi of the target distribution cabinet at each acquisition time node into the formula Obtain the comprehensive evaluation coefficient δ corresponding to the target distribution cabinet; Compare the comprehensive evaluation coefficient δ corresponding to the target distribution cabinet with the preset comprehensive evaluation threshold δ′; If the comprehensive evaluation coefficient δ ≥ δ′ corresponding to the target distribution cabinet, it is determined that there is no safety hazard in the target distribution cabinet and no processing is required; If the comprehensive evaluation coefficient δ corresponding to the target power distribution cabinet is less than δ′, it is determined that there is a safety hazard in the target power distribution cabinet, and the target power distribution cabinet needs to be repaired or replaced.
8. The monitoring method of an intelligent power distribution cabinet according to claim 7, characterized in that: After confirming the comprehensive evaluation coefficient corresponding to the target power distribution cabinet, it also includes: In the selected time window, the comprehensive evaluation coefficient corresponding to the target distribution cabinet is obtained, and a real-time change curve δ(t) corresponding to the comprehensive evaluation coefficient of the target distribution cabinet is established; By formula Confirm the risk change coefficient Risk corresponding to the target distribution cabinet; Compare the risk change coefficient Risk corresponding to the target distribution cabinet with the preset risk change threshold Risk′; If Risk>Risk′, it is determined that the safety risk of the target distribution cabinet in the future will increase, and the staff will be notified for early warning; otherwise, it is determined that the safety risk of the target distribution cabinet in the future will not increase.
9. A monitoring device for an intelligent power distribution cabinet, applied to a monitoring method for an intelligent power distribution cabinet according to claims 1 to 8, characterized in that: include: The distribution cabinet information collection and processing module is used to monitor and collect the cabinet surface information and internal line information corresponding to the target distribution cabinet, analyze the cabinet surface information and internal line information corresponding to the target distribution cabinet, and then confirm the equipment aging assessment coefficient corresponding to the target distribution cabinet; A comparison module is used to compare the equipment aging assessment coefficient corresponding to the target distribution cabinet with the equipment aging threshold interval, and obtain the operating status information and electrical safety information corresponding to the target distribution cabinet based on the comparison result; An analysis module is used to analyze the operating status information corresponding to the target power distribution cabinet to confirm the operating status evaluation coefficient corresponding to the target power distribution cabinet, and to analyze the electrical safety information corresponding to the target power distribution cabinet to confirm the electrical safety evaluation coefficient corresponding to the target power distribution cabinet; The comprehensive adjustment module is used to comprehensively analyze the operating status assessment coefficient corresponding to the target distribution cabinet and the electrical safety assessment coefficient corresponding to the target distribution cabinet, and then confirm the comprehensive assessment coefficient corresponding to the target distribution cabinet, and make adjustments based on the comprehensive assessment coefficient corresponding to the target distribution cabinet.
10. An intelligent power distribution cabinet, characterized in that: It comprises a computer-readable storage medium, wherein the computer-readable storage medium stores instructions, and when the instructions are executed on a computer, the computer executes a monitoring method for an intelligent distribution cabinet as claimed in any one of claims 1 to 8.
Citation Information
Patent Citations
Real-time monitoring system of low-voltage power distribution cabinet
CN107946908A
Device of switch cabinet integrated holographic sensing intelligent terminal
CN111371032A
Electric power station operation and maintenance inspection form data analysis processing method and analysis processing system
CN115221851A
Comprehensive electrical monitoring system
CN115356975A
Environment-friendly gas ring main unit remote control method
CN117081261A
Cited By
Monitoring management method and system based on distribution automation
CN119853273A
Current monitoring method based on laboratory environment
CN120235614A
Intelligent power distribution cabinet control method and power distribution cabinet
CN120750032A
Intelligent power distribution cabinet control method and power distribution cabinet
CN120750032B