New energy power generation data automatic acquisition system

By designing a new energy power generation data automatic acquisition system and selecting appropriate data acquisition equipment according to the power generation type, the problems of single acquisition type and poor accuracy of existing systems are solved, and the adaptation of multiple power generation equipment and the accuracy of data acquisition are achieved. and stability.

CN118983952AInactive Publication Date: 2024-11-19ANHUI ZHONGNENG NEW ENERGY CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411472752.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-22
Publication Date
2024-11-19
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing automatic data acquisition system has a single type of data acquisition, and the accuracy of the acquisition equipment is poor, which affects the use of the system.

Method used

A new energy power generation data automatic acquisition system has been designed, including a power generation information acquisition module, a hardware preparation module, a data processing and analysis module and an information transmission module. The appropriate data acquisition equipment is selected according to the new energy power generation type for detection and analysis to ensure data acquisition. accuracy and stability.

Benefits of technology

The system adaptation to a variety of new energy power generation equipment is achieved, the accuracy and stability of data collection is improved, data abnormalities are discovered in a timely manner, and accidents are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118983952A_ABST
    Figure CN118983952A_ABST
Patent Text Reader

Abstract

The invention discloses a new energy power generation data automatic acquisition system. The system comprises a power generation information acquisition module, a hardware preparation module, a data processing analysis module and an information sending module. The power generation information acquisition module is used for acquiring new energy power generation type information; the hardware preparation module is used for preparing and detecting data acquisition equipment according to the new energy power generation type information, performing new energy power generation related data acquisition if detection is passed to obtain new energy power generation related information, adjusting the data acquisition equipment for new energy power generation if detection is passed and detection is not passed, and then performing detection again; if continuous acquisition does not pass more than three times, integral adjustment information is generated; and the data analysis module is used for performing data analysis on the new energy power generation related information to obtain power generation warning information. According to the invention, more comprehensive and more accurate new energy power generation data automatic acquisition can be realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of data collection, and in particular to an automatic data collection system for renewable energy power generation. Background Art

[0002] New energy power generation refers to the process of generating electricity by using new technologies and new materials to convert renewable energy in nature. These renewable energy sources include solar energy, wind energy, water energy (hydropower), biomass energy, etc. In the process of renewable energy power generation, it is necessary to collect a variety of data to ensure the safety and stability of renewable energy power generation. In the process of data collection for renewable energy power generation, the automatic data collection system will be used.

[0003] The existing automatic data collection system has a single type of automatic data collection, and the data collection accuracy of the data collection equipment is poor, which has a certain impact on the use of the automatic data collection system. Therefore, a new energy power generation data automatic collection system is proposed. Summary of the invention

[0004] The technical problem to be solved by the present invention is: how to solve the problem that the existing automatic data collection system has a single type of automatic data collection, the data collection accuracy of the data collection equipment is poor, which has brought certain impacts on the use of the automatic data collection system, and provides a new energy power generation data automatic collection system.

[0005] The present invention solves the above technical problems through the following technical solutions, which include a power generation information acquisition module, a hardware preparation module, a data processing and analysis module, and an information sending module; The power generation information collection module is used to collect new energy power generation type information; The hardware preparation module is used to prepare and test the data acquisition equipment according to the type information of renewable energy power generation. If the test is passed, the data acquisition related to renewable energy power generation is collected to obtain the relevant information of renewable energy power generation. If the test is passed or not, the data acquisition equipment for renewable energy power generation is adjusted and tested again. If the continuous collection fails for more than three times, the overall adjustment information is generated. The data analysis module is used to perform data analysis on the information related to the new energy power generation and obtain the power generation warning information; The information sending module is used to send the power generation warning information to a preset receiving terminal after the power generation warning information is generated.

[0006] Furthermore, the specific process of the hardware preparation module preparing and testing the data acquisition equipment according to the new energy power generation type information is as follows: extracting the collected new energy power generation type information, importing the new energy power generation type information into a preset database, collecting the type of data acquisition equipment that needs to be set from the preset database, selecting the corresponding type of data acquisition equipment, installing the data acquisition equipment, and performing equipment detection on it. The equipment detection performs data acquisition by controlling its operation.

[0007] Furthermore, the new energy power generation type information includes solar power generation, wind power generation and biomass power generation; When the renewable energy generation type information is solar power generation, the types of data acquisition equipment retrieved from the preset database include photovoltaic panel monitoring equipment, inverter monitoring equipment, transmission line detection equipment and energy storage battery monitoring equipment; When the renewable energy generation type information is wind power generation, the types of data acquisition equipment retrieved from the preset database include wind power equipment monitoring devices, cable monitoring equipment, and energy storage battery monitoring equipment; When the new energy power generation type information is biomass power generation, the types of data acquisition equipment retrieved from the preset database include exhaust gas monitoring equipment, image acquisition equipment and energy storage battery equipment.

[0008] Furthermore, when the renewable energy generation type information is solar power generation, the detection process of the data acquisition device is as follows: Collect relevant information in real time from photovoltaic panel monitoring equipment and determine the status of relevant information in real time; Collect real-time inverter monitoring equipment information from the inverter monitoring equipment, and determine the status of the real-time inverter monitoring equipment information; Collect real-time line detection equipment information from the transmission line detection equipment, and determine the status of the real-time line detection equipment information; Collect real-time information of the energy storage battery monitoring equipment and determine the information status of the real-time energy storage battery monitoring equipment; When the photovoltaic panel monitoring equipment, the inverter monitoring equipment, the transmission line detection equipment, and the energy storage battery monitoring equipment all pass the detection, that is, the data collection equipment passes the detection when the new energy power generation type information is solar power generation; When any one of the photovoltaic panel monitoring equipment, inverter monitoring equipment, transmission line detection equipment, and energy storage battery monitoring equipment fails to pass the test, that is, the data collection equipment fails to pass the test when the new energy power generation type information is solar power generation; The process of determining the state of the real-time related information is as follows: extracting the collected real-time related information, the real-time related information including the quantity information of the photovoltaic panel monitoring equipment and the installation information of the photovoltaic panel monitoring equipment; The process of determining the status of the real-time inverter monitoring device information is as follows: the real-time inverter monitoring device information includes the quantity information of the photovoltaic power generation equipment, and the ratio of the quantity information of the photovoltaic power generation equipment to the quantity information of the photovoltaic panel monitoring equipment is calculated to obtain the evaluation ratio. When the evaluation ratio is less than the preset value, it means that the status of the real-time related information is abnormal and the device monitoring test fails. When the evaluation ratio is greater than or equal to the preset value, it means that the status of the real-time related information is normal and the device monitoring test passes. The specific process of determining the status of the inverter monitoring device information is as follows: extracting the collected inverter monitoring device information, the inverter monitoring device information is the real-time position information of the inverter monitoring device, when the deviation between the real-time position information of the inverter monitoring device and the preset standard position is greater than a preset value, it means that the inverter monitoring device fails the detection, and when the deviation between the real-time position information of the inverter monitoring device and the preset standard position is less than a preset value, it means that the inverter monitoring device passes the detection; The process of determining the status of the real-time line detection device information is as follows: extracting the real-time line detection device information, the real-time line detection device information includes line length information, the number of line detection devices and the position information of the line detection devices, calculating the ratio of the line length information to the number of line detection devices, obtaining a first parameter, processing the line detection device position information, collecting the number information of two adjacent line detection devices, and obtaining i-1 second parameters, where i is the number of line detection devices; When the first parameter is greater than the preset value, and any one of the i-1 second parameters is greater than the preset distance, it means that the line detection device fails the detection; when the first parameter is less than or equal to the preset value, and the i-1 second parameters are all greater than the preset distance, it means that the line detection device passes; The specific process of determining the information status of the real-time energy storage battery monitoring device is as follows: extracting the collected real-time energy storage battery monitoring device information, the real-time energy storage battery monitoring device information includes the number of installed energy storage battery monitoring devices and the number of energy storage batteries, calculating the ratio of the number of energy storage batteries to the number of installed energy storage battery monitoring devices, that is, obtaining the energy storage battery monitoring device parameters, when the energy storage battery monitoring device parameters are greater than or equal to the preset values, it means that the energy storage battery monitoring device has failed the detection, and when the abnormal parameters of the energy storage battery monitoring device are less than the preset values, it means that the energy storage battery monitoring device has passed the detection.

[0009] Furthermore, when the new energy power generation type information is wind power generation, the detection process of the data acquisition equipment is as follows: the wind power equipment monitoring device, the cable monitoring device and the energy storage battery monitoring device are detected, and the wind power equipment monitoring device parameters, the cable monitoring device parameters and the energy storage battery monitoring device parameters are obtained. When there is no abnormality in the wind power equipment monitoring device parameters, the cable monitoring device parameters and the energy storage battery monitoring device parameters, it means that the detection of the data acquisition equipment for the new energy power generation equipment has passed; The process of acquiring the parameters of the wind equipment monitoring device and the process of determining the abnormality are as follows: collecting the relevant information of the wind equipment monitoring device, the relevant information of the wind equipment monitoring device includes the number of wind equipment monitoring devices and the real-time installation height of each wind equipment monitoring device; Calculate the difference between the number of wind power equipment monitoring devices and the standard installation number to obtain the number difference, calculate the difference between the real-time installation height of each wind power equipment monitoring device and the corresponding standard installation height to obtain the height difference; The quantity difference and the height difference constitute the parameters of the wind equipment monitoring device. When the quantity difference is less than the preset value and the height difference is within the preset range, it means that the parameters of the wind equipment monitoring device are normal. Except for the above situation, the parameters of the wind equipment monitoring device are abnormal. The process of obtaining the parameters of the cable monitoring equipment and the process of determining the abnormality are as follows: collecting the quantity information of the cable monitoring equipment and the cable length information, calculating the ratio of the cable length information to the quantity information of the cable monitoring equipment, obtaining the parameters of the cable monitoring equipment, and when the parameters of the cable monitoring equipment are greater than the preset value, it means that the parameters of the cable monitoring equipment are abnormal; The process of acquiring the parameters of the energy storage battery monitoring device is the same as that of acquiring the parameters of the energy storage battery monitoring device during solar power generation. When the parameters of the energy storage battery monitoring device are greater than or equal to the preset values, it means that the energy storage battery monitoring device is abnormal.

[0010] Furthermore, when the new energy power generation type information is biomass power generation, the detection process of the data acquisition equipment is as follows: the exhaust gas monitoring equipment, the image acquisition equipment and the energy storage battery equipment are processed to obtain the exhaust gas monitoring equipment parameters, the image acquisition equipment parameters and the energy storage battery equipment parameters; When the exhaust gas monitoring equipment parameters, image acquisition equipment parameters and energy storage battery equipment parameters are all normal, it means that the new energy power generation equipment has passed the data acquisition equipment test. When any one of the exhaust gas monitoring equipment parameters, image acquisition equipment parameters and energy storage battery equipment parameters is abnormal, it means that the test has failed. The process of obtaining the parameters of the exhaust gas monitoring equipment and the abnormality judgment process are as follows: collect the number of exhaust gas monitoring equipment, then collect the area information of the bioenergy power plant, calculate the ratio of the area information of the bioenergy power plant to the number of exhaust gas monitoring equipment, that is, obtain the exhaust gas monitoring equipment parameters. When the exhaust gas monitoring equipment parameters are greater than the preset value, it means that there is an abnormality; The process of acquiring image acquisition device parameters and judging abnormalities is as follows: collect the number of image acquisition devices, collect the number of bioenergy power generation devices, calculate the ratio of the number of bioenergy power generation devices to the number of image acquisition devices, that is, obtain the image acquisition device parameters. When the image acquisition device parameters are greater than the preset value, it means that there is an abnormality. The process of acquiring the energy storage battery device parameters is the same as that of acquiring the energy storage battery monitoring device parameters during solar power generation. When the energy storage battery monitoring device parameters are greater than or equal to the preset values, it means that the energy storage battery monitoring device is abnormal.

[0011] Furthermore, when the renewable energy power generation type information is solar power generation, the data analysis module performs data analysis on the renewable energy power generation related information as follows: analyze and process the photovoltaic panel monitoring information collected by the photovoltaic panel monitoring device, the inverter monitoring information collected by the inverter monitoring device, the transmission line information collected by the transmission line detection device, and the energy storage device information collected by the energy storage battery monitoring device to generate photovoltaic panel adjustment information, inverter abnormality information, transmission line abnormality information, and energy storage battery abnormality information, and the photovoltaic panel monitoring information, inverter monitoring information, transmission line information, and energy storage device information are renewable energy power generation related information when the photovoltaic panel monitoring information, the inverter monitoring information, the transmission line information, and the energy storage device information are solar power generation; The specific processing process of the photovoltaic panel adjustment information is as follows: extract the collected photovoltaic panel monitoring information, the current photovoltaic panel orientation information of the photovoltaic panel monitoring information, then collect the current direct light direction information, calculate the angle between the current photovoltaic panel orientation information and the previous direct light direction information, and obtain the evaluation angle. When the evaluation angle is greater than the preset value, the photovoltaic panel adjustment information is generated; The specific processing process of the inverter abnormal information is as follows: extract the inverter monitoring information, which is the inverter temperature information monitored by the inverter monitoring device installed on the inverter. When the inverter temperature information is greater than the preset value for more than the preset time, the inverter abnormal information is generated; The specific processing process of the transmission line abnormal information is as follows: the collected transmission line information is extracted, and the transmission line information is the transmission line stress information. When the transmission line stress information is greater than a preset value, the transmission line abnormal information is generated.

[0012] The specific processing process of energy storage battery abnormal information is as follows: extract the collected energy storage device information, which includes the grounding resistance information of the energy storage device, the pressure bearing information of the energy storage device, the ambient temperature of the energy storage device and the ambient humidity of the energy storage device; When any of the following occurs: the grounding resistance information is greater than the preset value, the pressure bearing information of the energy storage device is greater than the preset value, the ambient temperature of the energy storage device is not within the preset range, and the ambient humidity of the energy storage device is greater than the preset value, energy storage battery abnormality information is generated.

[0013] Furthermore, when the renewable energy power generation type information is wind power generation, the data analysis module performs data analysis on the renewable energy power generation related information as follows: processing the wind power equipment information collected by the wind power equipment monitoring device, the cable torsion information collected by the cable monitoring device, and the energy storage equipment information collected by the energy storage battery monitoring device, and obtaining the wind power equipment adjustment information, the cable torsion warning information, and the energy storage battery abnormality information; Wind power equipment information, cable torsion information and energy storage equipment information constitute the new energy power generation related information during wind power generation; The process of obtaining the wind power equipment adjustment information is as follows: extracting the current orientation information of the collected wind power equipment information, then collecting the current wind direction information, calculating the angle between the current orientation information of the wind power equipment information and the current wind direction information, obtaining the wind direction angle, and when the wind direction angle is greater than a preset value, the wind power equipment adjustment information is generated; The specific process of obtaining the cable torsion warning information is as follows: extracting the collected cable torsion information, and when the cable torsion information is greater than a preset value for a preset time, generating the cable torsion warning information; The specific process of obtaining the abnormal information of the energy storage battery is the same as the process of obtaining the abnormal information of the energy storage battery when the new energy power generation type information is solar power generation.

[0014] Furthermore, when the new energy power generation type information is biomass power generation, the data analysis module performs data analysis on the new energy power generation related information as follows: the exhaust gas information collected by the exhaust gas monitoring device is processed to obtain exhaust gas warning information, the image information collected by the image acquisition device is processed to obtain power generation equipment safety warning information, and the energy storage device information collected by the energy storage battery device is processed to obtain energy storage battery abnormality information; Exhaust gas information, image information and energy storage equipment information are related information of new energy power generation during biomass power generation; The specific processing process of the waste gas warning information is as follows: extracting the collected waste gas information, the waste gas information is the abnormal substance concentration information of the waste gas discharged during the bioenergy power generation process, and when the abnormal substance concentration information is greater than the preset value, the waste gas warning information is generated; The specific processing process of the power generation equipment safety warning information is as follows: extract the collected image information, the image information includes the image information of the bioenergy power generation equipment, establish a protection zone in the image information of the bioenergy power generation equipment, perform human body recognition in the protection zone, and monitor the distance between the human body and the bioenergy power generation equipment in real time to obtain the evaluation distance. When the evaluation distance is less than the preset value, the power generation equipment safety warning information is generated; After the human body is identified, protective equipment identification is also required. When the protective equipment is not identified by the human body, a safety warning message for the power generation equipment is generated.

[0015] Furthermore, the specific process of establishing the protection zone is as follows: extracting the collected image information of the bioenergy power generation equipment, extracting the center point of the image information of the bioenergy power generation equipment, then drawing a circle with a preset length as the radius, and then drawing a rectangle tangent to the circle, that is, obtaining the protection zone; When a human body is identified in the protection area, the model of the protective equipment is imported to identify the protective equipment on the human body. When the model similarity of the protective equipment on the human body is greater than the preset value, it means that the protective equipment is on the human body.

[0016] Compared with the prior art, the present invention has the following advantages: the automatic data collection system for renewable energy power generation can select different data collection devices according to different renewable energy power generation modes to collect relevant data in the renewable energy power generation process, so that the system can use different renewable energy power generation equipment, realize a set of system adaptation to a variety of power generation equipment, and meet the different usage needs of users. After the corresponding data collection equipment is set up, the data collection equipment is tested and analyzed to ensure that the number of data collection equipment is sufficient and there are no abnormalities, so that the data related to renewable energy power generation can be collected more accurately and stably, and the collected data related to renewable energy power generation is analyzed in detail, data abnormalities are discovered in time, warnings are issued, and the occurrence of accidents is reduced, thereby realizing more stable and more accurate automated data collection of renewable energy power generation data, making the system more worthy of popularization and use. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a system block diagram of the present invention. DETAILED DESCRIPTION

[0018] The following is a detailed description of an embodiment of the present invention. This embodiment is implemented on the premise of the technical solution of the present invention, and a detailed implementation method and a specific operation process are given, but the protection scope of the present invention is not limited to the following embodiment.

[0019] like Figure 1As shown, this embodiment provides a technical solution: a new energy power generation data automatic collection system, including a power generation information collection module, a hardware preparation module, a data processing and analysis module and an information sending module; The power generation information collection module is used to collect new energy power generation type information; The hardware preparation module is used to prepare and test the data acquisition equipment according to the type information of renewable energy power generation. The test is passed to collect data related to renewable energy power generation and obtain relevant information about renewable energy power generation. If the test is passed or not, the data acquisition equipment for renewable energy power generation is adjusted and tested again. If the continuous collection fails for more than three times, the overall adjustment information is generated, that is, all the data acquisition equipment for renewable energy power generation is checked. The data analysis module is used to perform data analysis on the information related to the new energy power generation and obtain the power generation warning information; The information sending module is used to send the power generation warning information to a preset receiving terminal after the power generation warning information is generated; Different data acquisition devices can be selected according to different renewable energy power generation methods to collect relevant data in the renewable energy power generation process, so that the system can use different renewable energy power generation equipment, realize a set of systems to adapt to a variety of power generation equipment, and meet the different usage needs of users. After the corresponding data acquisition equipment is set up, the data acquisition equipment is tested and analyzed to ensure that the number of data acquisition equipment settings is sufficient and there are no abnormalities, so that the data related to renewable energy power generation can be collected more accurately and stably, and the collected data related to renewable energy power generation is analyzed in detail, data abnormalities are discovered in time, warnings are issued, and accidents are reduced.

[0020] The specific process of the hardware preparation module preparing and testing the data acquisition equipment according to the renewable energy power generation type information is as follows: extracting the collected renewable energy power generation type information, importing the renewable energy power generation type information into a preset database, collecting the type of data acquisition equipment to be set from the preset database, selecting the corresponding type of data acquisition equipment, installing the data acquisition equipment, and performing equipment detection on the data acquisition equipment, and the equipment detection performs data acquisition by controlling its operation; Through the above process, different data acquisition equipment is selected according to the type of renewable energy power generation, and the data acquisition equipment is tested to ensure the accuracy of data acquisition.

[0021] The new energy power generation type information includes solar power generation, wind power generation and biomass power generation; When the renewable energy generation type information is solar power generation, the types of data acquisition equipment retrieved from the preset database include photovoltaic panel monitoring equipment, inverter monitoring equipment, transmission line detection equipment and energy storage battery monitoring equipment; When the renewable energy generation type information is wind power generation, the types of data acquisition equipment retrieved from the preset database include wind power equipment monitoring devices, cable monitoring equipment, and energy storage battery monitoring equipment; When the new energy generation type information is biomass power generation, the types of data acquisition equipment retrieved from the preset database include exhaust gas monitoring equipment, image acquisition equipment and energy storage battery equipment; The above process sets the types of data acquisition equipment that need to be set up in different specific power generation modes.

[0022] When the new energy generation type information is solar power generation, the detection process of the data collection equipment is as follows: Collect relevant information in real time from photovoltaic panel monitoring equipment and determine the status of relevant information in real time; Collect real-time inverter monitoring equipment information from the inverter monitoring equipment, and determine the status of the real-time inverter monitoring equipment information; Collect real-time line detection equipment information from the transmission line detection equipment, and determine the status of the real-time line detection equipment information; Collect real-time information of the energy storage battery monitoring equipment and determine the information status of the real-time energy storage battery monitoring equipment; When the photovoltaic panel monitoring equipment, the inverter monitoring equipment, the transmission line detection equipment, and the energy storage battery monitoring equipment all pass the detection, that is, the data collection equipment passes the detection when the new energy power generation type information is solar power generation; When any one of the photovoltaic panel monitoring equipment, inverter monitoring equipment, transmission line detection equipment, and energy storage battery monitoring equipment fails to pass the test, that is, the data collection equipment fails to pass the test when the new energy power generation type information is solar power generation; The process of determining the state of the real-time related information is as follows: extracting the collected real-time related information, the real-time related information including the quantity information of the photovoltaic panel monitoring equipment and the installation information of the photovoltaic panel monitoring equipment; The process of determining the status of the real-time inverter monitoring device information is as follows: the real-time inverter monitoring device information includes the quantity information of the photovoltaic power generation equipment, and the ratio of the quantity information of the photovoltaic power generation equipment to the quantity information of the photovoltaic panel monitoring equipment is calculated to obtain the evaluation ratio. When the evaluation ratio is less than the preset value, it means that the status of the real-time related information is abnormal and the device monitoring test fails. When the evaluation ratio is greater than or equal to the preset value, it means that the status of the real-time related information is normal and the device monitoring test passes. The specific process of determining the status of the inverter monitoring device information is as follows: extracting the collected inverter monitoring device information, the inverter monitoring device information is the real-time position information of the inverter monitoring device, when the deviation between the real-time position information of the inverter monitoring device and the preset standard position is greater than a preset value, it means that the inverter monitoring device fails the detection, and when the deviation between the real-time position information of the inverter monitoring device and the preset standard position is less than a preset value, it means that the inverter monitoring device passes the detection; The process of determining the status of the real-time line detection device information is as follows: extracting the real-time line detection device information, the real-time line detection device information includes line length information, the number of line detection devices and the position information of the line detection devices, calculating the ratio of the line length information to the number of line detection devices, obtaining a first parameter, processing the line detection device position information, collecting the number information of two adjacent line detection devices, and obtaining i-1 second parameters, where i is the number of line detection devices; When the first parameter is greater than the preset value, and any one of the i-1 second parameters is greater than the preset distance, it means that the line detection device fails the detection; when the first parameter is less than or equal to the preset value, and the i-1 second parameters are all greater than the preset distance, it means that the line detection device passes; The specific process of determining the information status of the real-time energy storage battery monitoring device is as follows: extracting the collected real-time energy storage battery monitoring device information, the real-time energy storage battery monitoring device information includes the number of installed energy storage battery monitoring devices and the number of energy storage batteries, calculating the ratio of the number of energy storage batteries to the number of installed energy storage battery monitoring devices, that is, obtaining the energy storage battery monitoring device parameters, when the energy storage battery monitoring device parameters are greater than or equal to the preset values, it means that the energy storage battery monitoring device has failed the detection, and when the abnormal parameters of the energy storage battery monitoring device are less than the preset values, it means that the energy storage battery monitoring device has passed the detection.

[0023] When the new energy power generation type information is wind power generation, the detection process of the data acquisition equipment is as follows: the wind equipment monitoring device, the cable monitoring device and the energy storage battery monitoring device are detected, and the wind equipment monitoring device parameters, the cable monitoring device parameters and the energy storage battery monitoring device parameters are obtained. When there is no abnormality in the wind equipment monitoring device parameters, the cable monitoring device parameters and the energy storage battery monitoring device parameters, it means that the detection of the data acquisition equipment for the new energy power generation equipment has passed; The process of acquiring the parameters of the wind equipment monitoring device and the process of determining the abnormality are as follows: collecting the relevant information of the wind equipment monitoring device, the relevant information of the wind equipment monitoring device includes the number of wind equipment monitoring devices and the real-time installation height of each wind equipment monitoring device; Calculate the difference between the number of wind power equipment monitoring devices and the standard installation number to obtain the number difference, calculate the difference between the real-time installation height of each wind power equipment monitoring device and the corresponding standard installation height to obtain the height difference; The quantity difference and the height difference constitute the parameters of the wind equipment monitoring device. When the quantity difference is less than the preset value and the height difference is within the preset range, it means that the parameters of the wind equipment monitoring device are normal. Except for the above situation, the parameters of the wind equipment monitoring device are abnormal. The process of obtaining the parameters of the cable monitoring equipment and the process of determining the abnormality are as follows: collecting the quantity information of the cable monitoring equipment and the cable length information, calculating the ratio of the cable length information to the quantity information of the cable monitoring equipment, obtaining the parameters of the cable monitoring equipment, and when the parameters of the cable monitoring equipment are greater than the preset value, it means that the parameters of the cable monitoring equipment are abnormal; The process of acquiring the parameters of the energy storage battery monitoring device is the same as that of acquiring the parameters of the energy storage battery monitoring device during solar power generation. When the parameters of the energy storage battery monitoring device are greater than or equal to the preset values, it means that the energy storage battery monitoring device is abnormal.

[0024] When the new energy power generation type information is biomass power generation, the detection process of the data acquisition equipment is as follows: the exhaust gas monitoring equipment, the image acquisition equipment and the energy storage battery equipment are processed to obtain the exhaust gas monitoring equipment parameters, the image acquisition equipment parameters and the energy storage battery equipment parameters; When the exhaust gas monitoring equipment parameters, image acquisition equipment parameters and energy storage battery equipment parameters are all normal, it means that the new energy power generation equipment has passed the data acquisition equipment test. When any one of the exhaust gas monitoring equipment parameters, image acquisition equipment parameters and energy storage battery equipment parameters is abnormal, it means that the test has failed. The process of obtaining the parameters of the exhaust gas monitoring equipment and the abnormality judgment process are as follows: collect the number of exhaust gas monitoring equipment, then collect the area information of the bioenergy power plant, calculate the ratio of the area information of the bioenergy power plant to the number of exhaust gas monitoring equipment, that is, obtain the exhaust gas monitoring equipment parameters. When the exhaust gas monitoring equipment parameters are greater than the preset value, it means that there is an abnormality; The process of acquiring image acquisition device parameters and judging abnormalities is as follows: collect the number of image acquisition devices, collect the number of bioenergy power generation devices, calculate the ratio of the number of bioenergy power generation devices to the number of image acquisition devices, that is, obtain the image acquisition device parameters. When the image acquisition device parameters are greater than the preset value, it means that there is an abnormality. The process of acquiring the energy storage battery device parameters is the same as that of acquiring the energy storage battery monitoring device parameters during solar power generation. When the energy storage battery monitoring device parameters are greater than or equal to the preset values, it means that the energy storage battery monitoring device is abnormal.

[0025] When the renewable energy power generation type information is solar power generation, the data analysis module performs data analysis on the renewable energy power generation related information as follows: analyze and process the photovoltaic panel monitoring information collected by the photovoltaic panel monitoring device, the inverter monitoring information collected by the inverter monitoring device, the transmission line information collected by the transmission line detection device, and the energy storage device information collected by the energy storage battery monitoring device to generate photovoltaic panel adjustment information, inverter abnormality information, transmission line abnormality information, and energy storage battery abnormality information. The photovoltaic panel monitoring information, inverter monitoring information, transmission line information, and energy storage device information are renewable energy power generation related information when the photovoltaic panel monitoring information, inverter monitoring information, transmission line information, and energy storage device information are solar power generation; The specific processing process of the photovoltaic panel adjustment information is as follows: extract the collected photovoltaic panel monitoring information, the current photovoltaic panel orientation information of the photovoltaic panel monitoring information, then collect the current direct light direction information, calculate the angle between the current photovoltaic panel orientation information and the direct light direction information of the front light, and obtain the evaluation angle. When the evaluation angle is greater than the preset value, the photovoltaic panel adjustment information is generated, that is, the angle between the forward angle of the photovoltaic panel and the direct sunlight angle is too large, and the photovoltaic panel angle needs to be adjusted; The specific processing process of inverter abnormal information is as follows: extract inverter monitoring information, which is the inverter temperature information monitored by the inverter monitoring device installed on the inverter. When the inverter temperature information is greater than the preset value for more than the preset time, inverter abnormal information is generated. At this time, the inverter temperature needs to be adjusted to reduce accidents caused by abnormal inverter temperature; The specific processing process of transmission line abnormal information is as follows: extract the collected transmission line information, which is the transmission line stress information. When the transmission line stress information is greater than the preset value, the transmission line abnormal information is generated. The transmission line abnormal information means that there is a large tensile force in the line that transmits electricity, and there may be a risk of fracture. It is necessary to eliminate the abnormality to avoid the transmission line fracture.

[0026] The specific processing process of energy storage battery abnormal information is as follows: extract the collected energy storage device information, which includes the grounding resistance information of the energy storage device, the pressure bearing information of the energy storage device, the ambient temperature of the energy storage device and the ambient humidity of the energy storage device; When any of the following occurs: the grounding resistance information is greater than the preset value, the pressure bearing information of the energy storage equipment is greater than the preset value, the ambient temperature of the energy storage equipment is not within the preset range, and the ambient humidity of the energy storage equipment is greater than the preset value, energy storage battery abnormality information is generated. The energy storage battery abnormality information indicates that there is an abnormality in the energy storage battery, and the abnormality needs to be eliminated to prevent accidents caused by the abnormality of the energy storage battery.

[0027] When the renewable energy generation type information is wind power generation, the data analysis module performs data analysis on the renewable energy generation related information as follows: processing the wind equipment information collected by the wind equipment monitoring device, the cable torsion information collected by the cable monitoring device, and the energy storage equipment information collected by the energy storage battery monitoring device, and obtaining the wind equipment adjustment information, the cable torsion warning information, and the energy storage battery abnormality information; Wind power equipment information, cable torsion information and energy storage equipment information constitute the new energy power generation related information during wind power generation; The process of obtaining the wind power equipment adjustment information is as follows: extract the current orientation information of the collected wind power equipment information, then collect the current wind direction information, calculate the angle between the current orientation information of the wind power equipment information and the current wind direction information, and obtain the wind direction angle. When the wind direction angle is greater than a preset value, the wind power equipment adjustment information is generated. The specific content of the wind power equipment adjustment information is that the angle of the wind power generation equipment needs to be adjusted to increase the power generation; The specific process of obtaining the cable torsion warning information is as follows: extract the collected cable torsion information, and when the cable torsion information is greater than a preset value for a preset period of time, a cable torsion warning information is generated. The cable torsion warning information indicates that the cable may be torsion, which may cause cable damage and failure. Therefore, it is necessary to monitor the torsion of the cable in real time and take measures to prevent and deal with it; The specific process of obtaining the abnormal information of the energy storage battery is the same as the process of obtaining the abnormal information of the energy storage battery when the new energy power generation type information is solar power generation.

[0028] When the new energy power generation type information is biomass power generation, the data analysis module performs data analysis on the new energy power generation related information as follows: the exhaust gas information collected by the exhaust gas monitoring equipment is processed to obtain exhaust gas warning information, the image information collected by the image acquisition equipment is processed to obtain power generation equipment safety warning information, and the energy storage equipment information collected by the energy storage battery equipment is processed to obtain energy storage battery abnormality information; Exhaust gas information, image information and energy storage equipment information are related information of new energy power generation during biomass power generation; The specific processing process of the waste gas warning information is as follows: extract the collected waste gas information, which is the concentration information of abnormal substances in the waste gas discharged during the bioenergy power generation process. When the concentration information of abnormal substances is greater than the preset value, the waste gas warning information is generated. The waste gas warning information indicates that the waste gas purification equipment of the bioenergy power generation needs to be repaired to ensure that the exhaust gas meets the standards. The abnormal substances include the concentration of harmful substances such as particulate matter, sulfur dioxide, nitrogen oxides and dioxins; The specific processing process of the power generation equipment safety warning information is as follows: extract the collected image information, the image information includes the image information of the bioenergy power generation equipment, establish a protection zone in the image information of the bioenergy power generation equipment, perform human body recognition in the protection zone, and monitor the distance between the human body and the bioenergy power generation equipment in real time to obtain the evaluation distance. When the evaluation distance is less than the preset value, the power generation equipment safety warning information is generated; After the human body is identified, the protective equipment needs to be identified. If the human body fails to identify the protective equipment, a safety warning message for the power generation equipment is generated; The power generation equipment safety warning information means that there are people abnormally close to the biomass power generation equipment or there are people approaching the biomass power generation equipment without wearing protective equipment, and they need to be driven away to avoid accidents.

[0029] The specific process of establishing the protection zone is as follows: extracting the collected image information of the bioenergy power generation equipment, extracting the center point of the image information of the bioenergy power generation equipment, then drawing a circle with a preset length as the radius, and then drawing a rectangle tangent to the circle, so as to obtain the protection zone; When a human body is identified in the protection area, the model of the protective equipment is imported to identify the protective equipment on the human body. When the model similarity of the protective equipment on the human body is greater than the preset value, it means that the protective equipment is on the human body.

[0030] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0031] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0032] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A new energy power generation data automatic collection system, characterized in that: It includes power generation information collection module, hardware preparation module, data processing and analysis module and information sending module; The power generation information collection module is used to collect new energy power generation type information; The hardware preparation module is used to prepare and test the data acquisition equipment according to the type information of renewable energy power generation. If the test is passed, the data acquisition related to renewable energy power generation is collected to obtain the relevant information of renewable energy power generation. If the test is passed or not, the data acquisition equipment for renewable energy power generation is adjusted and tested again. If the continuous collection fails for more than three times, the overall adjustment information is generated. The data analysis module is used to perform data analysis on the information related to the new energy power generation and obtain the power generation warning information; The information sending module is used to send the power generation warning information to a preset receiving terminal after the power generation warning information is generated.

2. The automatic data collection system for renewable energy power generation according to claim 1 is characterized by: The specific process of the hardware preparation module preparing and testing the data acquisition equipment according to the new energy power generation type information is as follows: extracting the collected new energy power generation type information, importing the new energy power generation type information into a preset database, collecting the type of data acquisition equipment that needs to be set from the preset database, selecting the corresponding type of data acquisition equipment, installing the data acquisition equipment, and performing equipment detection on it. The equipment detection performs data collection by controlling its operation.

3. The automatic data collection system for renewable energy power generation according to claim 2 is characterized by: The new energy power generation type information includes solar power generation, wind power generation and biomass power generation; When the renewable energy generation type information is solar power generation, the types of data acquisition equipment retrieved from the preset database include photovoltaic panel monitoring equipment, inverter monitoring equipment, transmission line detection equipment and energy storage battery monitoring equipment; When the renewable energy generation type information is wind power generation, the types of data acquisition equipment retrieved from the preset database include wind power equipment monitoring devices, cable monitoring equipment, and energy storage battery monitoring equipment; When the new energy power generation type information is biomass power generation, the types of data acquisition equipment retrieved from the preset database include exhaust gas monitoring equipment, image acquisition equipment and energy storage battery equipment.

4. The automatic data collection system for renewable energy power generation according to claim 3 is characterized by: When the new energy generation type information is solar power generation, the detection process of the data collection equipment is as follows: Collect relevant information in real time from photovoltaic panel monitoring equipment and determine the status of relevant information in real time; Collect real-time inverter monitoring equipment information from the inverter monitoring equipment, and determine the status of the real-time inverter monitoring equipment information; Collect real-time line detection equipment information from the transmission line detection equipment, and determine the status of the real-time line detection equipment information; Collect real-time information of the energy storage battery monitoring equipment and determine the information status of the real-time energy storage battery monitoring equipment; When the photovoltaic panel monitoring equipment, the inverter monitoring equipment, the transmission line detection equipment, and the energy storage battery monitoring equipment all pass the detection, that is, the data collection equipment passes the detection when the new energy power generation type information is solar power generation; When any one of the photovoltaic panel monitoring equipment, the inverter monitoring equipment, the transmission line detection equipment, and the energy storage battery monitoring equipment fails to pass the test, that is, when the new energy power generation type information is solar power generation, the data collection equipment fails to pass the test.

5. The automatic data collection system for renewable energy power generation according to claim 3 is characterized by: When the new energy power generation type information is wind power generation, the detection process of the data acquisition equipment is as follows: the wind equipment monitoring device, cable monitoring equipment and energy storage battery monitoring equipment are detected, and the wind equipment monitoring device parameters, cable monitoring equipment parameters and energy storage battery monitoring equipment parameters are obtained. When there is no abnormality in the wind equipment monitoring device parameters, cable monitoring equipment parameters and energy storage battery monitoring equipment parameters, it means that the new energy power generation equipment has passed the detection of the data acquisition equipment.

6. The automatic data collection system for renewable energy power generation according to claim 3 is characterized by: When the new energy power generation type information is biomass power generation, the detection process of the data acquisition equipment is as follows: the exhaust gas monitoring equipment, the image acquisition equipment and the energy storage battery equipment are processed to obtain the exhaust gas monitoring equipment parameters, the image acquisition equipment parameters and the energy storage battery equipment parameters; When the parameters of the exhaust gas monitoring equipment, the image acquisition equipment and the energy storage battery equipment are all normal, it means that the data acquisition equipment detection of the new energy power generation equipment has passed. When any one of the parameters of the exhaust gas monitoring equipment, the image acquisition equipment and the energy storage battery equipment is abnormal, it means that the detection has failed.

7. The automatic data collection system for renewable energy power generation according to claim 2 is characterized by: When the renewable energy power generation type information is solar power generation, the data analysis module performs data analysis on the renewable energy power generation related information as follows: analyze and process the photovoltaic panel monitoring information collected by the photovoltaic panel monitoring device, the inverter monitoring information collected by the inverter monitoring device, the transmission line information collected by the transmission line detection device, and the energy storage device information collected by the energy storage battery monitoring device to generate photovoltaic panel adjustment information, inverter abnormality information, transmission line abnormality information, and energy storage battery abnormality information. The photovoltaic panel monitoring information, inverter monitoring information, transmission line information, and energy storage device information are renewable energy power generation related information when the photovoltaic panel monitoring information, inverter monitoring information, transmission line information, and energy storage device information are solar power generation; The specific processing process of the photovoltaic panel adjustment information is as follows: extract the collected photovoltaic panel monitoring information, the current photovoltaic panel orientation information of the photovoltaic panel monitoring information, then collect the current direct light direction information, calculate the angle between the current photovoltaic panel orientation information and the previous direct light direction information, and obtain the evaluation angle. When the evaluation angle is greater than the preset value, the photovoltaic panel adjustment information is generated; The specific processing process of the inverter abnormal information is as follows: extract the inverter monitoring information, which is the inverter temperature information monitored by the inverter monitoring device installed on the inverter. When the inverter temperature information is greater than the preset value for more than the preset time, the inverter abnormal information is generated; The specific processing process of the transmission line abnormal information is as follows: extracting the collected transmission line information, the transmission line information is the transmission line stress information, and when the transmission line stress information is greater than a preset value, the transmission line abnormal information is generated; The specific processing process of energy storage battery abnormal information is as follows: extract the collected energy storage device information, which includes the grounding resistance information of the energy storage device, the pressure bearing information of the energy storage device, the ambient temperature of the energy storage device and the ambient humidity of the energy storage device; When any of the following occurs: the grounding resistance information is greater than the preset value, the pressure bearing information of the energy storage device is greater than the preset value, the ambient temperature of the energy storage device is not within the preset range, and the ambient humidity of the energy storage device is greater than the preset value, energy storage battery abnormality information is generated.

8. The automatic data collection system for renewable energy power generation according to claim 2 is characterized by: When the renewable energy generation type information is wind power generation, the data analysis module performs data analysis on the renewable energy generation related information as follows: processing the wind equipment information collected by the wind equipment monitoring device, the cable torsion information collected by the cable monitoring device, and the energy storage equipment information collected by the energy storage battery monitoring device, and obtaining the wind equipment adjustment information, the cable torsion warning information, and the energy storage battery abnormality information; Wind power equipment information, cable torsion information and energy storage equipment information constitute the new energy power generation related information during wind power generation; The process of obtaining the wind power equipment adjustment information is as follows: extracting the current orientation information of the collected wind power equipment information, then collecting the current wind direction information, calculating the angle between the current orientation information of the wind power equipment information and the current wind direction information, obtaining the wind direction angle, and when the wind direction angle is greater than a preset value, the wind power equipment adjustment information is generated; The specific process of obtaining the cable torsion warning information is as follows: extracting the collected cable torsion information, and when the cable torsion information is greater than a preset value for a preset time, generating the cable torsion warning information; The specific process of obtaining the abnormal information of the energy storage battery is the same as the process of obtaining the abnormal information of the energy storage battery when the new energy power generation type information is solar power generation.

9. The automatic data collection system for renewable energy power generation according to claim 2 is characterized by: When the new energy power generation type information is biomass power generation, the data analysis module performs data analysis on the new energy power generation related information as follows: the exhaust gas information collected by the exhaust gas monitoring equipment is processed to obtain exhaust gas warning information, the image information collected by the image acquisition equipment is processed to obtain power generation equipment safety warning information, and the energy storage equipment information collected by the energy storage battery equipment is processed to obtain energy storage battery abnormality information; Exhaust gas information, image information and energy storage equipment information are related information of new energy power generation during biomass power generation; The specific processing process of the waste gas warning information is as follows: extracting the collected waste gas information, the waste gas information is the abnormal substance concentration information of the waste gas discharged during the bioenergy power generation process, and when the abnormal substance concentration information is greater than the preset value, the waste gas warning information is generated; The specific processing process of the power generation equipment safety warning information is as follows: extract the collected image information, the image information includes the image information of the bioenergy power generation equipment, establish a protection zone in the image information of the bioenergy power generation equipment, perform human body recognition in the protection zone, and monitor the distance between the human body and the bioenergy power generation equipment in real time to obtain the evaluation distance. When the evaluation distance is less than the preset value, the power generation equipment safety warning information is generated; After the human body is identified, protective equipment identification is also required. When the protective equipment is not identified by the human body, a safety warning message for the power generation equipment is generated.

10. The automatic data collection system for renewable energy power generation according to claim 9 is characterized in that: The specific process of establishing the protection zone is as follows: extracting the collected image information of the bioenergy power generation equipment, extracting the center point of the image information of the bioenergy power generation equipment, then drawing a circle with a preset length as the radius, and then drawing a rectangle tangent to the circle, so as to obtain the protection zone; When a human body is identified in the protection area, the model of the protective equipment is imported to identify the protective equipment on the human body. When the model similarity of the protective equipment on the human body is greater than the preset value, it means that the protective equipment is on the human body.

Citation Information

Patent Citations

  • High-proportion new energy power operation analysis system

    CN115860513A

  • Intelligent monitoring system of distributed energy storage equipment

    CN117253347A

  • Intelligent equipment regulation and control system for Internet of Things monitoring terminal

    CN118034160A

  • Complementary operational system in multipotency source