Ballast tank strength test device and test method

By installing a detachable ballast tank strength test device at the stern end of the LNG cargo hold section, the problems of high cost, tight resources and low efficiency of the ballast tank strength test equipment in the prior art are solved, and the cargo hold section is realized after the cargo hold section is launched Efficient experiments have improved construction efficiency and resource utilization.

CN118992045APending Publication Date: 2024-11-22JIANGNAN SHIPYARD (GRP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411325366.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The strength test of existing LNG ship ballast tanks requires the use of a special large water refueling device fixed by the dock, resulting in high construction costs, tight resources, low water refueling efficiency, which cannot meet the needs of batch construction, and is subject to site restrictions and needs to be moved and berthed multiple times. Increased engineering cycle and cost.

Method used

Design a removable ballast tank strength test device, installed on the transverse bulkhead at the stern end of the LNG cargo tank section, including the strength test platform, platform end cardboard, bulkhead end cardboard and closed pipe system, through the platform pipe system It is connected to the ballast pipe system in the cargo hold section to realize the injection and discharge of water, and can conduct efficient strength tests.

Benefits of technology

After the LNG cargo hold section is launched, the intensity test can be carried out efficiently, the construction site can be flexibly selected, time and resources can be saved, construction costs can be reduced, shipbuilding efficiency can be improved, and the device structure is simple and reusable.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118992045A_ABST
    Figure CN118992045A_ABST
Patent Text Reader

Abstract

The invention provides a ballast tank strength test device and method, the ballast tank strength test device is detachably arranged on a transverse bulkhead of a stern end face of a cargo hold section of an LNG ship, and the ballast tank strength test device comprises a strength test platform, a plurality of platform end clamping plates, a plurality of bulkhead end clamping plates, a platform pipe system and a closure pipe system. The strength test platform is arranged on a transverse bulkhead at the stern end of a cargo hold section of a ship and used for bearing a pump and a piping system for strength test and a load of water when the ballast tank strength test device operates. And the plurality of platform end clamping plates are arranged above and below the front end surface of the front wall of the strength test platform. The bulkhead end clamping plates are arranged on the stern end transverse bulkhead of the cargo hold section, correspond to the platform end clamping plates one to one, are matched with the platform end clamping plates and are used for being connected with the platform end clamping plates. One end of the folding pipe system is connected with the platform pipe system of the strength test platform, and the other end is connected with the ballast pipe system in the cargo compartment section, so that test water smoothly enters the ballast compartment. The strength test can be efficiently carried out after the LNG ship cargo hold section is launched.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of shipbuilding, and in particular to a ballast tank strength test device and a test method. Background Art

[0002] At present, the strength test of the ballast tank of domestic LNG ships requires the use of a dedicated large-scale water-adding device fixed at the dock to add water and conduct strength tests on the ballast tank structure. This is greatly affected by the construction site and production facility capacity, and the strength test lacks flexibility.

[0003] Especially for large LNG ships, which have large ballast tank capacity and large ballast tank water filling volume, there are the following shortcomings: 1. Water needs to be added at a dedicated large-scale water-filling device fixed near the dock. However, due to the high construction and maintenance costs of dedicated water-filling devices, the number of configuration requirements will increase the construction cost and site; 2. Since the number of dedicated water-filling devices at the dock is limited and they are usually close to fixed dock locations, the resources of water-filling devices will be tight, which cannot meet the needs of mass construction of ships; 3. When using fixed dock water-filling devices for water filling, due to site restrictions, the ship needs to be shifted and berthed multiple times, which increases the additional ship shifting and berthing costs and engineering period; 4. When using fixed dock water-filling devices for water filling, the water-filling efficiency is low, which restricts the efficient construction of LNG ships. Summary of the invention

[0004] In view of the above-mentioned problems existing in the prior art, the present invention provides a ballast tank strength test device and method, which is convenient for efficiently performing strength tests on the cargo hold section of an LNG ship after it is launched into water.

[0005] In order to achieve the above-mentioned object and other related objects, the present invention provides a ballast tank strength test device on one hand, which is detachably arranged on the transverse bulkhead of the stern end face of the cargo tank section of the LNG ship, comprising:

[0006] The strength test platform is installed on the transverse bulkhead at the stern end of the cargo hold section of the ship, and is used to bear the load of water when the strength test pump and piping system and the ballast tank strength test device are in operation;

[0007] A plurality of platform end clamps are arranged above and below the front end surface of the strength test platform;

[0008] A plurality of bulkhead end clamps are arranged on the transverse bulkhead, are arranged one-to-one corresponding to the platform end clamps, and cooperate with each other to fix the strength test platform to the transverse bulkhead;

[0009] The platform piping system is installed on the strength test platform;

[0010] The piping system is closed, with one end connected to the platform piping system and the other end connected to the ballast piping system in the cargo hold section.

[0011] Optionally, the strength test platform is a rectangular frame structure, including a bottom platform and a top platform arranged in parallel, and a front wall, a rear wall, a left wall and a right wall located between the bottom platform and the top platform, the front wall and the rear wall are arranged in parallel, and the left wall and the right wall are arranged in parallel.

[0012] Optionally, the ballast tank strength test device further includes:

[0013] The platform end hanging horse is set on the top platform where the rear wall and the right wall meet;

[0014] The bulkhead end hoist is installed on the transverse bulkhead near the top of the strength test platform.

[0015] Optionally, the ballast tank strength test device further includes:

[0016] Cable-stayed reinforcement, one end connected to the platform end hoisting horse, the other end connected to the bulkhead end hoisting horse;

[0017] At least two shackles, at least one shackle is arranged on the strength test platform, adjacent to the platform end lifting horse, to fix the platform end lifting horse and the diagonal reinforcement, and at least one shackle is arranged on the cargo hold section, adjacent to the bulkhead end lifting horse, to fix the bulkhead end lifting horse and the diagonal reinforcement.

[0018] Optionally, the bottom platform includes a bottom platform cross beam and a bottom platform longitudinal beam which are arranged perpendicularly to each other in the plane where the bottom platform is located, and the top platform includes a top platform cross beam and a top platform longitudinal beam which are arranged perpendicularly to each other in the plane where the top platform is located.

[0019] Optionally, the ballast tank strength test device further comprises:

[0020] A plurality of front wall pillars are arranged on the front wall of the strength test platform, each of the front wall pillars is arranged in a plane where the front wall is located in a direction perpendicular to the bottom platform and the top platform, one end of each front wall pillar is connected to the top platform, and the other end is connected to the bottom platform;

[0021] A plurality of front wall reinforcements are arranged on the front wall of the strength test platform, each front wall reinforcement is connected to the intersection of the front wall support and the top platform at one end in the plane where the front wall is located, and is connected to the intersection of the front wall support and the bottom platform at the other end, and the front wall reinforcement forms an angle with the bottom platform or the top platform in the plane where the front wall is located;

[0022] A plurality of rear wall supports are arranged on the rear wall of the strength test platform, each rear wall support is arranged in a plane where the rear wall is located in a direction perpendicular to the bottom platform and the top platform, one end of each rear wall support is connected to the top platform, and the other end is connected to the bottom platform;

[0023] A plurality of rear wall reinforcements are arranged on the rear wall of the strength test platform, each rear wall reinforcement is connected to the intersection of the rear wall support and the top platform at one end in the plane where the rear wall is located, and is connected to the intersection of the rear wall support and the bottom platform at the other end, and the rear wall reinforcement forms an angle with the bottom platform or the top platform in the plane where the rear wall is located;

[0024] At least two left wall reinforcements are arranged on the left wall of the strength test platform, and are respectively arranged on two diagonal lines of the left wall in the plane where the left wall is located;

[0025] At least two right wall reinforcements are arranged on the right wall of the strength test platform, and are respectively arranged on two diagonal lines of the right wall in the plane where the right wall is located.

[0026] Optionally, the platform end clamp is connected to the front end of the strength test platform, including:

[0027] Platform-side card board mainboard;

[0028] The top web of the platform end cardboard is arranged on the top of the main board of the platform end cardboard;

[0029] The bottom web of the platform end cardboard is arranged at the bottom of the main board of the platform end cardboard;

[0030] The platform end pallet anti-tilt toggle plate is arranged in the middle position of the platform end pallet main board.

[0031] Optionally, the bulkhead end bracket is connected to the transverse bulkhead, including:

[0032] Bulkhead end cardboard main board;

[0033] The bulkhead end bracket top web is arranged on the top of the bulkhead end bracket main board;

[0034] The bulkhead end bracket bottom web is arranged at the bottom of the bulkhead end bracket main board;

[0035] The bulkhead end bracket anti-tilt bracket is arranged in the middle position of the bulkhead end bracket main board;

[0036] At least two bulkhead end card guide plates are arranged at the contact part between the platform end card main board and the bulkhead end card. The bulkhead end card guide plates are located on both sides of the bulkhead end card main board and are used to connect the platform end card and the bulkhead end card.

[0037] Another aspect of the present invention provides a ballast tank strength test method, comprising the following steps:

[0038] Install the strength test platform on the transverse bulkhead at the stern end of the cargo tank section of the LNG ship;

[0039] Connect the platform piping system of the strength test platform with the ballast piping system of the cargo hold section;

[0040] The cargo hold section with the strength test platform is put into water as a whole, and water is pumped into the ballast tank of the cargo hold section through the strength test platform through the platform piping system, the combined piping system between the platform piping system and the ballast piping system, and the ballast piping system until the water head height required for the strength test is reached;

[0041] The ballast tanks are mutually transferred with water to reach the head height required for the strength test. According to the loading of the cargo hold section, the inspection process of the strength test of the compartments of each ballast tank is completed crosswise;

[0042] After the strength test is completed, the water in the ballast tank of the cargo hold section is drained through the strength test platform, and the strength test platform is dismantled.

[0043] Optionally, after the platform piping system is connected to the ballast piping system, a sealing test is performed on the connection.

[0044] Optionally, the ballast tank structure deformation inspection is carried out after the water head height required for the strength test is reached.

[0045] As described above, the ballast tank strength test device and test method provided by the present invention have at least the following beneficial technical effects:

[0046] In the ballast tank strength test device of the present invention, the ballast tank strength test device is detachably arranged on the transverse bulkhead of the stern end face of the cargo hold section of the LNG ship, and includes a strength test platform, a plurality of platform end clamps, a plurality of bulkhead end clamps and a closing pipe system. The strength test platform is arranged on the transverse bulkhead of the stern end of the cargo hold section of the ship, and is used to bear the load of the pump, pipe system and water when the ballast tank strength test device is in operation. A plurality of platform end clamps are arranged above and below the front end face of the front wall of the strength test platform. A plurality of bulkhead end clamps are arranged on the transverse bulkhead of the stern end of the cargo hold section of the ship, and are arranged one by one with the platform end clamps and cooperate with each other, and are used to connect with the platform end clamps to fix the strength test platform to the transverse bulkhead. The closing pipe system has one end connected to the strength test platform and the other end connected to the ballast pipe system in the cargo hold section, so that the test water can smoothly enter the ballast tank. After the strength test is completed, the water in the ballast tank of the cargo hold section is discharged through the strength test platform, and the strength test platform is dismantled. It is possible to efficiently carry out strength tests on the cargo hold section of the LNG ship after it is launched. The mode of carrying out strength tests on the LNG ship after the entire ship is completed is improved to a new construction mode in which strength tests can be carried out after the cargo hold section is completed, thereby achieving the purpose of flexible selection of LNG ship construction sites and optimal allocation of shipyard resources, improving the construction efficiency of LNG ships in shipyards, and reducing the construction cost of LNG ships in shipyards. At the same time, the ballast tank strength test device of the present invention has a relatively simple structure and can adopt plasma CNC cutting, which can improve the construction efficiency of the strength test platform. In addition, the ballast tank strength test device is detachable and can be reused.

[0047] This ballast tank strength test device and method based on the LNG ship cargo hold section construction method breaks through the traditional thinking mode that conventional LNG ships can only be tested for strength after the entire ship is completed and launched. It can flexibly select the construction site and does not require multiple shifts and berthings, saving time, not occupying the company's key resources, and can significantly improve shipbuilding efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Figure 1 Shown is a side view of the installation of the ballast tank strength test platform in an embodiment of the present invention.

[0049] Figure 2 Shown is the front view of the installation of the ballast tank strength test platform in the embodiment of the present invention.

[0050] Figure 3 Shown is a top view of the installation of the ballast tank strength test platform in an embodiment of the present invention.

[0051] Figure 4 Shown is a detailed view of the left wall of the ballast tank strength test platform in an embodiment of the present invention.

[0052] Figure 5 Shown is a detailed view of the top platform of the ballast tank strength test platform in an embodiment of the present invention.

[0053] Figure 6 Shown is a detailed view of the bottom platform of the ballast tank strength test platform in an embodiment of the present invention.

[0054] Figure 7 Shown is a detailed view of the front wall of the ballast tank strength test platform in an embodiment of the present invention.

[0055] Figure 8 Shown is a detailed view of the rear wall of the ballast tank strength test platform in an embodiment of the present invention.

[0056] Figures 9a to 9d Shown is a detailed view of the platform end bracket of the ballast tank strength test platform in an embodiment of the present invention.

[0057] Figures 10a to 10e Shown is a detailed view of the bulkhead end bracket of the ballast tank strength test platform in an embodiment of the present invention.

[0058] Fig.11 Shown is a detailed view of the pipe sealing plate in an embodiment of the present invention.

[0059] Fig.12 Shown is a schematic flow chart of the ballast tank strength test method in Example 2 of the present invention.

[0060] Fig.13 Shown is a schematic diagram of the lifting and removal of the ballast tank strength test platform in Example 2 of the present invention.

[0061] Fig.14 Shown is the flow chart of the ballast tank strength test in Example 2 of the present invention.

[0062] Reference numerals

[0063] 1. Strength test platform; 10. Platform piping; 11. Bottom platform; 111. Bottom platform cross beam; 112. Bottom platform longitudinal beam; 113. Bottom platform bracket; 12. Top platform; 121. Top platform cross beam; 122. Top platform longitudinal beam; 123. Top platform bracket; 13. Front wall; 131. Front wall support; 132. Front wall reinforcement; 14. Rear wall; 141. Rear wall support; 142. Rear wall reinforcement; 15. Left wall; 151. Left wall reinforcement; 16. Right wall; 161. Right wall reinforcement; 17. Platform end plate; 171. Platform end plate main plate; 172. Platform end plate top web; 173. Bottom web of platform end cardboard; 174, anti-tilt bracket of platform end cardboard; 18, platform foot; 181, platform foot support; 19, platform end hoisting horse; 110, pump; 2, cargo hold section; 20, transverse bulkhead; 21, bulkhead end cardboard; 211, bulkhead end cardboard main board; 212, top web of bulkhead end cardboard; 213, bottom web of bulkhead end cardboard; 214, anti-tilt bracket of bulkhead end cardboard; 215, guide plate of bulkhead end cardboard; 22, bulkhead end hoisting horse; 23, pipe end sealing plate; 231, sealing plate reinforcement rib; 232, opening area; 24, ballast piping system; 25, ballast tank; 3, inclined reinforcement; 4, shackle; 5, closing piping system; DETAILED DESCRIPTION

[0064] The following describes the embodiments of the present invention through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention.

[0065] It should be noted that the illustrations provided in this embodiment only illustrate the basic concept of the present invention in a schematic manner. Although the illustrations only show components related to the present invention rather than being drawn according to the number, shape and size of components in actual implementation, the form, quantity, positional relationship and proportion of each component in actual implementation can be changed at will under the premise of realizing the technical solution of this party, and the component layout form may also be more complicated.

[0066] Embodiment 1

[0067] This embodiment provides a ballast tank strength test device, which is detachably arranged on the transverse bulkhead 20 of the stern end face of the cargo tank section of the LNG ship. Figure 1As shown, the ballast tank strength test device of this embodiment includes a strength test platform 1, a plurality of platform end clamps 17, a plurality of bulkhead end clamps 21 and a closing pipe system 5.

[0068] Specifically, Figure 1 As shown, the strength test platform 1 is arranged on the transverse bulkhead 20 at the stern end of the cargo hold section 2 of the ship, and is used to bear the load of water when the strength test pump, piping system and ballast tank strength test device are in operation. Figure 4 The strength test platform 1 is a rectangular parallelepiped frame structure, including a bottom platform 11 and a top platform 12 arranged in parallel, and a front wall 13, a rear wall 14, a left wall 15 and a right wall 16 located between the bottom platform 11 and the top platform 12. The front wall 13 and the rear wall 14 are arranged in parallel, and the left wall 15 and the right wall 16 are arranged in parallel. In order to further improve the load bearing capacity of the strength test platform 1, as Figure 5 As shown, the bottom platform 11 includes a bottom platform cross beam 111 and a bottom platform longitudinal beam 112 which are arranged perpendicular to each other in the plane where the bottom platform 11 is located. Figure 6 As shown, the top platform 12 includes a top platform cross beam 121 and a top platform longitudinal beam 122 which are arranged perpendicular to each other in the plane where the top platform 12 is located. Figure 7 As shown, the front wall 13 includes a plurality of front wall pillars 131 and a plurality of front wall reinforcements 132. The front wall pillars 131 are arranged on the front wall 13 of the strength test platform 1, and each of the front wall pillars 131 is arranged in a direction perpendicular to the bottom platform 11 and the top platform 12 in the plane where the front wall 13 is located, with one end connected to the top platform 12 and the other end connected to the bottom platform 11. The front wall reinforcements 132 are arranged on the front wall 13 of the strength test platform 1, and each of the front wall reinforcements 132 is connected to the intersection of the front wall pillars 131 and the top platform 12 at one end in the plane where the front wall 13 is located, and the other end is connected to the intersection of the front wall pillars 131 and the bottom platform 11. The front wall reinforcements 132 form an angle with the bottom platform 11 or the top platform 12 in the plane where the front wall 13 is located. As shown Figure 8 As shown, the rear wall 14 includes a plurality of rear wall pillars 141 and a plurality of rear wall reinforcements 142. The rear wall pillars 141 are arranged on the rear wall 14 of the strength test platform 1, and each rear wall pillar 141 is arranged in a direction perpendicular to the bottom platform 11 and the top platform 12 in the plane where the rear wall 14 is located, with one end connected to the top platform 12 and the other end connected to the bottom platform 11. The rear wall reinforcements 142 are arranged on the rear wall 14 of the strength test platform 1, and each rear wall reinforcement 142 is connected to the intersection of the rear wall pillar 141 and the top platform 12 at one end in the plane where the rear wall 14 is located, and the other end is connected to the intersection of the rear wall pillar 141 and the bottom platform 11. The rear wall reinforcements 142 form an angle with the bottom platform 11 or the top platform 12 in the plane where the rear wall 14 is located. As shown Figure 4As shown, the left wall 15 includes at least two left wall reinforcements 151, which are arranged on the left wall 15 of the strength test platform 1, and at least two left wall reinforcements 151 are respectively arranged on two diagonals of the left wall 15 in the plane where the left wall 15 is located. The right wall 16 includes at least two right wall reinforcements 161, which are arranged on the right wall of the strength test platform, and at least two right wall reinforcements 161 are respectively arranged on two diagonals of the right wall 16 in the plane where the right wall 16 is located.

[0069] like Figure 4 As shown, the strength test platform 1 also includes a platform foot 18, which includes a platform foot support 181, and the platform foot support 181 is arranged below the rear wall 14 of the platform. To ensure that the entire strength test platform 1 is in a horizontal state during installation, the height of the platform foot support 181 is the same as the height of the platform end bracket 17.

[0070] like Figure 1 As shown, a plurality of platform end clamps 17 are arranged above and below the front end surface of the strength test platform 1. Specifically, as Figures 9a to 9d As shown, each platform end cardboard 17 includes a platform end cardboard main board 171, a platform end cardboard top web 172, a platform end cardboard bottom web 173 and a platform end cardboard anti-tilt toggle plate 174. The platform end cardboard main board 171 is an L-shaped structure, and the extension length of the shorter side of the L-shaped structure along the longer side of the L-shaped structure is 300mm to 500mm. Except for the part that is in direct contact with the bottom platform 11 and the top platform 12, the remaining edges of the platform end cardboard main board 171 are designed to be R arc shapes, and the radius of the R arc is greater than or equal to 50mm. The platform end cardboard top web 172 is arranged at the top of the platform end cardboard main board 171, the platform end cardboard bottom web 173 is arranged at the bottom of the platform end cardboard main board 171, and the platform end cardboard anti-tilt toggle plate 174 is arranged in the middle position of the platform end cardboard main board 171.

[0071] like Figure 1 As shown, a plurality of bulkhead end clamps 21 are arranged on the transverse bulkhead 20, and are arranged one by one with the platform end clamps 17 and cooperate with each other, and are used to connect with the platform end clamps 17 to fix the strength test platform 1 to the transverse bulkhead 20. The strength test device is easy to install, disassemble and reuse, and the strength and sealing of the connection are guaranteed. Specifically, as Figures 10a to 10eAs shown, each bulkhead end cardboard 21 includes a bulkhead end cardboard main board 211, a bulkhead end cardboard top web 212, a bulkhead end cardboard bottom web 213, a bulkhead end cardboard anti-tilt toggle plate 214 and at least two bulkhead end cardboard guide plates 215. The positioning dimensions of the bulkhead end cardboard 21 installed are consistent with the positioning dimensions of the platform end cardboard 17, ensuring that the strength test platform 1 can be smoothly inserted during installation. The bulkhead end cardboard main board 211 is L-shaped, and the extension length of the shorter side of the L-shaped structure along the longer side of the L-shaped structure is the same as the extension length of the platform end cardboard main board 171. Except for the part that is in direct contact with the bottom platform 11 and the top platform 12, the remaining edges of the bulkhead end cardboard main board 211 are designed to be R arc shapes, and the radius of the R arc is greater than or equal to 50 mm. The distance between the bulkhead end cardboard main board 211 and the transverse bulkhead 20 is about 10 mm greater than the width of the platform end cardboard 17. It should not be too large or too small. If it is too large, the strength test platform 1 will be tilted and point-stressed, resulting in damage to the bulkhead strength of the cargo hold section 2. If it is too small, the strength test platform 1 may get stuck during installation. The top web plate 212 of the bulkhead end cardboard is arranged at the top of the bulkhead end cardboard main board 211; the bottom web plate 213 of the bulkhead end cardboard is arranged at the bottom of the bulkhead end cardboard main board 211; the anti-tilt bracket 214 of the bulkhead end cardboard is arranged at the middle position of the bulkhead end cardboard main board 211; at least two bulkhead end cardboard guide plates 215 are arranged at the contact part between the platform end cardboard main board 171 and the bulkhead end cardboard 21, and each bulkhead end cardboard guide plate 215 is located on both sides of the bulkhead end cardboard main board 211, and forms an angle of 5° to 10° with the bulkhead end cardboard main board 211. It is used to limit the position when the strength test platform 1 is hoisted, so that the platform end clamping plate 17 is connected with the bulkhead end clamping plate 21, ensuring that the docking deviation meets the requirements and improving the efficiency of hoisting. A circular arc with a radius of 10 to 15 mm is provided on the bulkhead end clamping plate guide plate 215 at the connection point with the bulkhead end clamping plate main plate 211 in the direction of the strength test platform 1.

[0072] like Figure 1 and Fig.11 As shown, a pipe seal plate 23 is provided on the pipe end face of the cargo hold section 2, and an opening area 232 and a seal plate reinforcement rib 231 are provided on the pipe seal plate 23 to enhance the bearing capacity of the pipe seal plate 23. To ensure that the test water can smoothly enter the ballast tank 2 and carry out the subsequent strength test, as shown in FIG. Figure 1 As shown, one end of the closing pipe system 5 passes through the pipe cover plate 23 to connect to the platform pipe system 10 of the strength test platform 1, and the other end is connected to the ballast pipe system 24 in the cargo hold section 2. The pump 110 is arranged on the strength test platform 1 and connected to the closing pipe system 5.

[0073] Specifically, Figure 2 As shown, the ballast tank strength test device also includes a platform end lifting horse 19 and a bulkhead end lifting horse 22. Figure 4The platform end hoisting horse 19 is arranged on the top platform 12 at the junction of the rear wall 14 and the right wall 16, and is used for the overall hoisting of the strength test platform 1 and the installation of the inclined reinforcement 3. Figure 2 The bulkhead end lifting horse 22 is arranged on the transverse bulkhead 20 at a position close to the top of the strength test platform 1, and is used for the installation of the diagonal reinforcement 3. In order to ensure the stability and safety of the strength test platform 1, the diagonal reinforcement 3 is arranged, and one end of the diagonal reinforcement 3 is connected to the platform end lifting horse 19, and the other end is connected to the bulkhead end lifting horse 22. In order to fix the diagonal reinforcement 3, a shackle 4 is arranged, and the shackle 4 is used to fix the platform end lifting horse 19 and the diagonal reinforcement 3 and the bulkhead end lifting horse 22 and the diagonal reinforcement 3. At least one shackle 4 is arranged on the strength test platform 1, adjacent to the platform end lifting horse 19, to fix the platform end lifting horse 19 and the diagonal reinforcement 3. At least one shackle 4 is arranged on the cargo hold section 2, adjacent to the bulkhead end lifting horse 22, to fix the bulkhead end lifting horse 22 and the diagonal reinforcement 3.

[0074] Embodiment 2

[0075] This embodiment provides a ballast tank strength test method, which uses the ballast tank strength test device in Embodiment 1. Before conducting the ballast tank strength test, the main structure of the strength test platform is manufactured and assembled, and the bulkhead end bracket is installed on the transverse bulkhead at the stern end of the cargo hold section. Fig.12 As shown, the ballast tank strength test method includes the following steps:

[0076] S100: installing the strength test platform on the transverse bulkhead of the stern end face of the cargo hold section of the LNG ship;

[0077] S200: connecting the platform piping system of the strength test platform to the ballast piping system of the cargo hold section;

[0078] S300: launching the cargo hold section with the strength test platform as a whole, pumping water into the ballast tank of the cargo hold section through the strength test platform through the platform piping system, the combined piping system between the platform piping system and the ballast piping system, and the ballast piping system, until the water head height required for the strength test is reached;

[0079] S400: The ballast tanks are mutually watered to reach the head height required for the strength test, and the strength test inspection process of the compartments of the ballast tanks is completed crosswise according to the loading of the cargo hold section.

[0080] S500: After the strength test is completed, the water in the ballast tank of the cargo hold section is removed through the strength test platform, and the strength test platform is dismantled.

[0081] Specifically, first refer to Figure 4According to the design drawings and the requirements of the manufacturing process, the bottom platform 11, the top platform 12, the front wall 13, the rear wall 14, the left wall 15, the right wall 16, the platform end clamping plate 17, the platform foot 18 and the platform end hanging horse 19 are respectively manufactured. The structure of the strength test platform 1 is assembled. Afterwards, Figure 1 As shown, the pump 110, the platform piping system 1 and the closing piping system 5 are installed. Fig.11 As shown, a pipe cover plate 23 is manufactured, an opening area 232 is opened on the pipe cover plate 23, and a cover plate reinforcing rib 231 is manufactured and installed to enhance the bearing capacity of the pipe cover plate 23. Figure 1 As shown, the pipe cover plate 23 is installed to the pipe end face of the cargo hold section 2.

[0082] Then refer to Figure 1 and Figure 2 According to the design drawings and process requirements, the bulkhead end clamp 21 and the bulkhead end hoist 22 are installed to the corresponding positions of the transverse bulkhead 20. The platform end clamp 17, the bulkhead end hoist 22 and the bulkhead end clamp 21 are subjected to non-destructive testing to ensure that the above components have no internal defects.

[0083] Next, refer to Figure 1 and Fig.13 According to the design drawings and process requirements, the strength test platform 1 is hoisted, and the platform end clamping plate 17 is clamped into the bulkhead end clamping plate 21 to connect the strength test platform 1 with the cargo hold section 2. Figure 2 As shown, the inclined reinforcement 3 is connected to the platform end lifting horse 19 and the bulkhead end lifting horse 22 at the top of the strength test platform 1 by using a shackle 4.

[0084] The next step is to install and connect the pipe system. Figure 1 As shown, the platform piping system 10 is installed on the strength test platform 1, one end of the closed piping system 5 is welded to the platform piping system 10, and the other end is welded to the ballast piping system 24 in the pipe channel sealing plate 23. Then, the welds between the closed piping system 5 and the pipe channel sealing plate 23 and the welds between the pipe channel sealing plate 23 and the cargo hold section 2 are subjected to tightness tests to ensure that they are tightly connected.

[0085] After the above steps are completed, the cargo hold section 2 and the strength test platform 1 are lowered into the water as a whole to prepare for the ballast tank strength test. Figure 1 According to the strength test process and requirements, the water injection procedure is started through the strength test platform 1, and water is transported to the closing pipe system 5 through the platform pipe system 10, and then finally injected into the ballast tank 25 of the cargo hold section 2 through the ballast pipe system 24. As the water is continuously injected, the water level in the ballast tank 25 gradually rises until it reaches the specific head height required for the strength test. After reaching the predetermined head height, observe the deformation of the ballast tank 25, and at the same time, check whether there is leakage, water seepage, etc. Specifically, if Fig.14As shown, the ballast tanks 25 are connected with each other by water, and the test sequence and conditions of each compartment are reasonably arranged according to the loading conditions of the cargo hold section 2, so that each ballast tank 25 reaches the water head height, and the inspection process of the strength test of each compartment is completed in a cross manner.

[0086] Finally, refer to Figure 1 , drain the ballast tank 25 of the cargo hold section 2, drain the water in the ballast tank 25 through the strength test platform 1, and restore the cargo hold section 2 to the state before launching. Remove the strength test platform 1, and remove the inclined reinforcement 3 and the shackle 4 and the platform end hoist 19 and the bulkhead end hoist 22, remove and separate the platform piping 10, the closing piping 5 and the ballast piping 24, and lift the strength test platform 1 through the platform end hoist 19 to separate it from the bulkhead end clamp 21. Then maintain and service the strength test platform 1 so that it can be reused many times. After completing the strength test, carry out the maintenance system construction work of the cargo hold section 2.

[0087] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.

Claims

1. A ballast tank strength test device, characterized in that: The ballast tank strength test device is detachably arranged on the transverse bulkhead of the stern end face of the cargo tank section of the LNG ship, and comprises: The strength test platform is installed on the transverse bulkhead at the stern end of the cargo hold section of the ship, and is used to bear the load of water when the strength test pump and piping system and the ballast tank strength test device are in operation; A plurality of platform end clamps, arranged above and below the front end surface of the strength test platform; A plurality of bulkhead end clamps are arranged on the transverse bulkhead, and are arranged one-to-one with the platform end clamps and cooperate with each other to fix the strength test platform to the transverse bulkhead; Platform piping system, arranged on the strength test platform; The piping system is closed, one end of which is connected to the platform piping system, and the other end is connected to the ballast piping system in the cargo hold section.

2. The ballast tank strength test device according to claim 1, characterized in that: The strength test platform is a rectangular frame structure, including a bottom platform and a top platform arranged in parallel, and a front wall, a rear wall, a left wall and a right wall located between the bottom platform and the top platform. The front wall and the rear wall are arranged in parallel, and the left wall and the right wall are arranged in parallel.

3. The ballast tank strength test device according to claim 2, characterized in that: Also includes: A platform end hanging horse is arranged on the top platform at the junction of the rear wall and the right wall; The bulkhead end hoisting horse is arranged on the transverse bulkhead near the top of the strength test platform.

4. The ballast tank strength test device according to claim 3, characterized in that: The ballast tank strength test device also includes: A diagonal reinforcement, one end of which is connected to the platform end hoisting horse, and the other end is connected to the bulkhead end hoisting horse; At least two shackles, at least one of which is arranged on the strength test platform, adjacent to the platform end lifting horse, to fix the platform end lifting horse and the diagonal reinforcement, and at least one of which is arranged on the cargo hold section, adjacent to the bulkhead end lifting horse, to fix the bulkhead end lifting horse and the diagonal reinforcement.

5. The ballast tank strength testing device according to claim 2, characterized in that: The bottom platform includes a bottom platform cross beam and a bottom platform longitudinal beam which are arranged perpendicularly to each other in the plane where the bottom platform is located, and the top platform includes a top platform cross beam and a top platform longitudinal beam which are arranged perpendicularly to each other in the plane where the top platform is located.

6. The ballast tank strength testing device according to claim 2, characterized in that: The ballast tank strength test device also includes: A plurality of front wall pillars are arranged on the front wall of the strength test platform, each of the front wall pillars is arranged in a plane where the front wall is located in a direction perpendicular to the bottom platform and the top platform, one end of each of the front wall pillars is connected to the top platform, and the other end is connected to the bottom platform; A plurality of front wall reinforcements are arranged on the front wall of the strength test platform, each of the front wall reinforcements is connected to the intersection of the front wall support and the top platform at one end in the plane where the front wall is located, and is connected to the intersection of the front wall support and the bottom platform at the other end, and the front wall reinforcement forms an angle with the bottom platform or the top platform in the plane where the front wall is located; A plurality of rear wall pillars are arranged on the rear wall of the strength test platform, each of the rear wall pillars is arranged in a plane where the rear wall is located in a direction perpendicular to the bottom platform and the top platform, one end of each rear wall pillar is connected to the top platform, and the other end is connected to the bottom platform; A plurality of rear wall reinforcements are arranged on the rear wall of the strength test platform, each of the rear wall reinforcements is connected to the intersection of the rear wall support and the top platform at one end in the plane where the rear wall is located, and is connected to the intersection of the rear wall support and the bottom platform at the other end, and the rear wall reinforcement forms an angle with the bottom platform or the top platform in the plane where the rear wall is located; At least two left wall reinforcements are arranged on the left wall of the strength test platform, and are respectively arranged on two diagonal lines of the left wall in the plane where the left wall is located; At least two right wall reinforcements are arranged on the right wall of the strength test platform, and are respectively arranged on two diagonal lines of the right wall in the plane where the right wall is located.

7. The ballast tank strength test device according to claim 1, characterized in that: The platform end clamp is connected to the front end surface of the strength test platform, including: Platform-side card board mainboard; The top web of the platform end cardboard is arranged on the top of the main board of the platform end cardboard; The bottom web of the platform end cardboard is arranged at the bottom of the main board of the platform end cardboard; The platform end cardboard anti-tilt toggle plate is arranged in the middle position of the platform end cardboard main board.

8. The ballast tank strength testing device according to claim 1, characterized in that: The bulkhead end clamp is connected to the transverse bulkhead and includes: Bulkhead end cardboard main board; A bulkhead end cardboard top web, arranged on the top of the bulkhead end cardboard main board; The bulkhead end cardboard bottom web is arranged at the bottom of the bulkhead end cardboard main board; The bulkhead end card plate anti-tilt bracket is arranged in the middle position of the bulkhead end card plate main board; At least two bulkhead end card guide plates are arranged at the contact part between the platform end card main board and the bulkhead end card. The bulkhead end card guide plates are located on both sides of the bulkhead end card main board and are used to connect the platform end card and the bulkhead end card.

9. A ballast tank strength test method, the ballast tank strength test method using the ballast tank strength test device according to any one of claims 1 to 8, characterized in that: The following steps are involved: Installing the strength test platform on the transverse bulkhead at the stern end face of the cargo hold section of the LNG ship; Connecting the platform piping system of the strength test platform to the ballast piping system of the cargo hold section; The cargo hold section and the strength test platform are put into water as a whole, and water is pumped into the ballast tank of the cargo hold section through the strength test platform through the platform piping system, the combined piping system between the platform piping system and the ballast piping system, and the ballast piping system until the water head height required for the strength test is reached; The ballast tanks are mutually refueled with water to reach the head height required for the strength test, and the inspection process of the strength test of the compartments of each ballast tank is completed crosswise according to the loading of the cargo hold section. After the strength test is completed, the water in the ballast tank of the cargo hold section is drained through the strength test platform, and the strength test platform is dismantled.

10. The ballast tank strength test method according to claim 9, characterized in that: After the platform piping system is connected to the ballast piping system, a sealing test is performed on the connection.

11. The ballast tank strength test method according to claim 9, characterized in that: Also includes: After the water head height required for the strength test is reached, the ballast tank structure deformation inspection is carried out.