Transverse moving ferry vehicle with gantry crane track, working method of transverse moving ferry vehicle, precast beam production line and precast beam transferring method
By adding door crane track components to the longitudinal beam lifting door crane track on the transverse swing truck, efficient transportation of prefabricated beams is achieved, and the problems of high equipment costs and low beam storage efficiency in the existing technology are solved, and beam storage efficiency is improved. Reduced the procurement cost of lifting equipment.
Patent Information
- Application Number
- CN202411346607.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-25
- Publication Date
- 2024-11-22
AI Technical Summary
The existing prefabricated beam transfer method requires the configuration of two beam lifting door cranes, which have high equipment costs, cumbersome processes, and inconvenient track cross-tracking in the transverse ferry area and production area, resulting in low beam storage efficiency and high equipment procurement costs.
Design a transverse shuttle bus with door crane track, add the first door crane track assembly to connect with the longitudinal beam lifting door crane track, use the transverse shuttle bus to transfer the prefabricated beam to the area close to the beam storage area, and then directly from the longitudinal beam lifting door crane When lifting the beam to the beam storage area, there is no need to transfer the horizontal beam lifting door crane, and avoid the intersection of the horizontal door crane track and the longitudinally shifted track.
It reduces equipment procurement costs, optimizes construction processes, improves beam storage efficiency, and reduces lifting times and equipment configuration requirements.
Smart Images

Figure CN118992438A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of precast beam transportation, and in particular to a transversely shifting ferry vehicle with a door crane track and a working method thereof, a precast beam production line and a precast beam transportation method. Background Art
[0002] Prefabricated beams are prefabricated in factories and then transported to the construction site for installation and fixation according to the design requirements. Therefore, prefabricated beams have obvious advantages in improving construction efficiency, quality control, resource utilization and environmental protection. Figure 1 As shown, due to site limitations, the first beam storage area 101 and the second beam storage area 102 of some precast beam projects need to be arranged side by side with the production area 400. In the prior art, the method for transporting precast beams is to set a transverse beam-lifting gantry crane 500 in the transverse shifting and ferrying area 300, and use the transverse beam-lifting gantry crane 500 to lift the precast beams from the transverse shifting and ferrying area 300 to the beam storage station of the first beam storage area 101, and then use the longitudinal beam-lifting gantry crane 600 to transport the precast beams to the beam storage station of the second beam storage area 102.
[0003] The existing method for transferring precast beams requires two beam-lifting gantry cranes for transferring precast beams between the production area 400 and the first beam storage area 101 and between the first beam storage area 101 and the second beam storage area 102. When the precast beams are transferred to the second beam storage area 102, they need to be lifted twice. Therefore, the existing method for transferring precast beams has the following problems: high equipment cost, complicated beam storage and transfer procedures, and the horizontal beam-lifting gantry crane track 700 of the transverse ferry area 300 intersects with the longitudinal track 401 of the production area 400, requiring a cross-track, which makes travel inconvenient. Summary of the invention
[0004] In view of this, the present invention provides a transverse shuttle bus with a gantry crane track and a working method thereof, a precast beam production line and a precast beam transfer method. A first gantry crane track assembly is added on the first side of the transverse shuttle bus to connect with the first longitudinal beam-lifting gantry crane track. The transverse shuttle bus is used to transfer the precast beam to a position close to the first beam storage area, and then the longitudinal beam-lifting gantry crane is used to directly lift the beam to the first beam storage area or the second beam storage area without the need for a transverse beam-lifting gantry crane. Therefore, there is no need to set a transverse gantry crane track in the transverse ferry area, thereby avoiding the intersection of the transverse gantry crane track in the transverse ferry area and the longitudinal track in the production area. For a beam factory where the beam storage area and the production area are arranged side by side due to site limitations, the beam storage efficiency is greatly improved and the procurement cost of the lifting equipment is reduced.
[0005] To achieve the above objectives:
[0006] The present application provides a transverse ferry car with a gantry crane track, wherein a first gantry crane track assembly is provided on a first side of the transverse ferry car; when the transverse ferry car moves laterally to a position close to a first beam storage area, the first gantry crane track assembly docks with the first longitudinal beam lifting gantry crane track along the direction in which the first longitudinal beam lifting gantry crane track extends.
[0007] In one embodiment, the first gantry crane rail assembly includes a first connecting member, a first gantry crane rail and a slider; wherein, one end of the first connecting member is rotatably connected to the side of the transverse shuttle bus, the first gantry crane rail is arranged at the top of the first connecting member, and the slider is arranged at the bottom of the first connecting member.
[0008] In one embodiment, a first gantry rail assembly is liftably provided on the first side of the transverse shuttle bus; wherein, when the transverse shuttle bus is in a running state, the first gantry rail assembly is off the ground; when the transverse shuttle bus is in a non-running state, the first gantry rail assembly can be lowered to a ground-touching state, so as to achieve that when the transverse shuttle bus is transversely moved to a position close to the first beam storage area, the first gantry rail assembly can be docked with the first longitudinal beam lifting gantry rail along the direction in which the first longitudinal beam lifting gantry rail extends.
[0009] In one embodiment, the first gantry crane track assembly includes a first connecting member, a first gantry crane track and a telescopic driving member; wherein, one end of the first connecting member is rotatably connected to the side of the transverse shuttle bus, and the first gantry crane track is arranged on the top of the first connecting member; the two ends of the telescopic driving member are respectively rotatably connected to the transverse shuttle bus and the first connecting member to drive the first connecting member to rotate relative to the transverse shuttle bus to realize the lifting and lowering of the first gantry crane track assembly.
[0010] In one embodiment, the first gantry crane track assembly includes a first connecting member, a first gantry crane track and a telescopic driving member; wherein, one end of the first connecting member is movably connected to the side of the transverse moving shuttle bus along the height direction of the transverse moving shuttle bus, and the first gantry crane track is arranged on the top of the first connecting member; the two ends of the telescopic driving member are respectively connected to the transverse moving shuttle bus and the first connecting member to drive the first connecting member to move relative to the transverse moving shuttle bus along the height direction of the transverse moving shuttle bus to realize the lifting and lowering of the first gantry crane track assembly.
[0011] In one embodiment, the first gantry crane track assembly includes a first connecting member, a wheel group and a first gantry crane track; wherein, the first connecting member is connected to the side of the transverse shuttle bus, the wheel group is arranged at the bottom of the first connecting member, and the first gantry crane track is arranged at the top of the first connecting member.
[0012] In one embodiment, a second gantry crane rail assembly is provided on the second side of the transverse shuttle vehicle relative to the first side; when the transverse shuttle vehicle moves transversely in a direction away from the first beam storage area, the second gantry crane rail assembly can move transversely to a position where it docks with the first longitudinal beam lifting gantry crane rail in the direction in which the first longitudinal gantry crane rail extends.
[0013] Based on the same concept as the aforementioned invention, the present invention also provides a working method of a transverse ferry car with a gantry crane track, which is implemented using the aforementioned transverse ferry car with a gantry crane track, including: the transverse ferry car moves transversely to a position close to the first beam storage area, and the first gantry crane track assembly is docked with the first longitudinal beam lifting gantry crane track along the direction in which the first longitudinal beam lifting gantry crane track extends.
[0014] In one embodiment, the working method of the transverse shuttle vehicle with door crane track further includes:
[0015] The transverse shuttle vehicle moves transversely toward the first beam storage area or the production area, and the first gantry crane track assembly is off the ground; the transverse shuttle vehicle moves transversely to a position close to the first beam storage area, and the first gantry crane track assembly descends to a ground-touching state and docks with the first longitudinal beam lifting gantry crane track.
[0016] In one embodiment, the working method of the transverse shuttle vehicle with door crane track further includes:
[0017] The transverse shuttle vehicle moves transversely in the direction approaching the production area; the second gantry crane track assembly is connected to the first longitudinal beam gantry crane track; the second gantry crane track assembly is in a disengaged state from the transverse shuttle vehicle.
[0018] Based on the same concept as the aforementioned invention, the present invention also provides a precast beam production line, comprising: a first beam storage area, a second beam storage area, a transverse ferry area and a production area; wherein, the first beam storage area and the second beam storage area are arranged in sequence along a first direction, the first beam storage area and the transverse ferry area are arranged in sequence along a second direction perpendicular to the first direction, the width of the first beam storage area along the second direction is smaller than the width of the second beam storage area along the second direction, and the transverse ferry area and the production area are arranged in sequence along the first direction; a first longitudinal beam lifting gantry crane track is provided on the side of the second beam storage area close to the production area, and a second longitudinal beam lifting gantry crane track is provided on the outer sides of the first beam storage area and the second beam storage area; the transverse ferry area is provided with a transverse ferry vehicle with a gantry crane track as mentioned above, and the transverse ferry area extends along the second direction to the area adjacent to the first beam storage area and the second beam storage area, so that when the transverse ferry vehicle moves along the second direction to the lifting position of the longitudinal beam lifting gantry crane, the first gantry crane track assembly is docked with the first longitudinal beam lifting gantry crane track.
[0019] Based on the same concept as the aforementioned invention, the present invention also provides a method for transferring precast beams, which is implemented using the aforementioned precast beam production line, including: the aforementioned transverse shuttle car carries precast beams at a position close to the production area; the transverse shuttle car moves transversely to the lifting position of the longitudinal beam-lifting gantry crane to achieve docking of the first gantry crane track assembly with the first longitudinal beam-lifting gantry crane track; the longitudinal beam-lifting gantry crane moves to the first gantry crane track assembly to extract the precast beams to the beam storage station in the first beam storage area; the longitudinal beam-lifting gantry crane moves to the second beam storage area, and the transverse shuttle car moves transversely to a position close to the production area.
[0020] In one embodiment, the precast beam transfer method further includes: the aforementioned transverse shuttle vehicle moves transversely in a direction close to the production area; the second gantry crane track assembly is docked with the first longitudinal beam lifting gantry crane track; the second gantry crane track assembly is in a disengaged state from the transverse shuttle vehicle.
[0021] The present application provides a shuttle bus with a gantry crane track and its working method, a precast beam production line and a precast beam transfer method, wherein a first gantry crane track assembly is added to the first side of the transversely moving shuttle bus, and the precast beam is transferred to a position close to the first beam storage area by means of the transversely moving shuttle bus, and the first gantry crane track assembly is docked with the first longitudinal beam-lifting gantry crane track. When the longitudinal beam-lifting gantry crane transfers the precast beam carried by the transversely moving shuttle bus or the precast beam in the first beam storage area, one side of the longitudinal beam-lifting gantry crane runs on the second longitudinal beam-lifting gantry crane track on the ground, and the other side runs to the first beam-lifting gantry crane track. The prefabricated beams on the transverse ferry car are directly transferred to the beam storage station of the first beam storage area or the beam storage station of the second beam storage area on the lifting track assembly. There is no need for the transverse beam lifting gantry crane to transfer, and only one lifting is required. Therefore, there is no need to set up a transverse gantry crane track in the transverse ferry area to avoid the intersection of the transverse gantry crane track in the transverse ferry area and the longitudinal track in the production area. This not only reduces the equipment cost, but also optimizes the construction process. For beam factories where the beam storage area and the production area are arranged side by side due to site restrictions, the efficiency of beam storage is greatly improved and the procurement cost of lifting equipment is reduced. Secondly, when the transverse ferry car leaves the first beam storage area, the transverse ferry car is used to move the second gantry crane track assembly to dock with the first longitudinal beam lifting gantry crane track as the running track of the longitudinal beam lifting gantry crane, ensuring that the longitudinal beam lifting gantry crane can travel to the first beam storage area to lift the beam at any time. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0023] Figure 1 The layout of the precast beam production site in the prior art is schematically shown;
[0024] Figure 2 The layout of the prefabricated beam production line in Example 1 and Example 6 of the present application is schematically shown;
[0025] Figure 3 The overall structure of the transverse shuttle vehicle with door crane track of Example 1 of the present application is schematically shown;
[0026] Figure 4 The working state of the transverse shuttle vehicle with door crane track of Example 2 of the present application is schematically shown;
[0027] Figure 5 The overall structure of the transverse shuttle vehicle with door crane track of Example 2 of the present application is schematically shown;
[0028] Figure 6 The overall structure of the transverse shuttle vehicle with door crane track of Example 3 of the present application is schematically shown;
[0029] Figure 7 The layout of the prefabricated beam production line in Embodiment 4 and Embodiment 6 of the present application is schematically shown;
[0030] Figure 8 and Fig. 9 The working states of the transverse shuttle vehicle with door crane track of Example 4 of the present application are schematically shown respectively;
[0031] Fig.10 The overall structure of the transverse shuttle vehicle with door crane track of Example 4 of the present application is schematically shown;
[0032] Fig.11 The schematic diagram shows the working process of the transverse transfer shuttle with door crane track of Example 5 of the present application;
[0033] Fig.12 The precast beam transfer method of Example 7 of the present application is schematically shown. DETAILED DESCRIPTION
[0034] The specific embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the description of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0035] In the description of the present invention, unless otherwise clearly specified and limited, the terms "disposed", "provided with", "provided on", "installed", "connected" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, a direct connection, or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0036] The orientation or position relationship indicated by the terms "upper", "side", "bottom", "top", "side", etc. is based on the orientation or position relationship shown in the drawings, or is the orientation or position relationship in which the product of the invention is usually placed when used. It is only for the convenience of description and simplified description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0037] In the description of the present invention, unless otherwise expressly specified and limited, the terms "first", "second", etc. are merely used to distinguish elements with similar properties, rather than to indicate or imply relative importance or a specific order. Descriptions of "S11" to "S26", etc., are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or indicating the order of execution of the method, etc.
[0038] The term "comprise", "comprising", or any other variation thereof, is intended to cover a non-exclusive inclusion of elements other than those listed and may also include other elements not expressly listed.
[0039] Example 1
[0040] like Figure 2 and Figure 3 As shown, in the transverse shuttle bus with gantry crane track of the embodiment of the present application, the first side 801 of the transverse shuttle bus 800 is provided with a first gantry crane track assembly 30; wherein, when the transverse shuttle bus 800 moves horizontally to a position close to the first beam storage area 101, the first gantry crane track assembly 30 docks with the first longitudinal beam lifting gantry crane track 201 along the direction in which the first longitudinal beam lifting gantry crane track 201 extends.
[0041] In one embodiment, the first door hanging track assembly 30 includes a first connecting member 31, a first door hanging track 33 and a slider 36; wherein one end of the first connecting member 31 is rotatably connected to the side of the transverse shuttle bus 800, that is, the side of the body 10 of the transverse shuttle bus 800, the first door hanging track 33 is arranged at the top of the first connecting member 31, and the slider 36 is arranged at the bottom of the first connecting member 31. Specifically, a connecting rod is arranged at the bottom of the first connecting member 31, and the slider 36 is arranged at the bottom of the connecting rod. The slider 36 is provided with a flange structure along the opposite sides of the horizontal direction to ensure that the sliding process of the slider 36 is stable and smooth.
[0042] The transverse shuttle bus with gantry crane track provided in the embodiment of the present application has a first gantry crane track assembly 30 added to one side of the transverse shuttle bus 800. After the transverse shuttle bus 800 transfers the precast beam to the first beam storage area 101, the first gantry crane track assembly 30 is docked with the first longitudinal beam gantry crane track 201. When the longitudinal beam gantry crane 600 transfers the precast beam of the transverse shuttle bus 800 or the first beam storage area 101, one side of the longitudinal beam gantry crane 600 runs on the second longitudinal beam gantry crane track 202 on the ground, and the other side runs to the first gantry crane track assembly 30 of the transverse shuttle bus 800 and directly transfers the precast beam to the first beam storage area 101. The precast beams on the transverse ferry car 800 are transferred to the beam storage station of the first beam storage area 101 or the beam storage station of the second beam storage area 102. There is no need for the transverse beam lifting gantry crane 500 to transfer, and only one lifting is required. Therefore, the transverse ferry area 300 does not need to be equipped with a transverse gantry crane track 700 to avoid the intersection of the transverse gantry crane track 700 of the transverse ferry area 300 and the longitudinal track 401 of the production area 400. This not only reduces the equipment cost, but also optimizes the construction process. For beam factories where the beam storage area and the production area are arranged side by side due to site limitations, the beam storage efficiency is greatly improved and the procurement cost of lifting equipment is reduced. Secondly, when the transverse shuttle bus 800 leaves the first beam storage area 101, the transverse shuttle bus 800 is used to move the second gantry crane track assembly 40 to dock with the first longitudinal beam lifting gantry crane track 201, serving as the running track of the longitudinal beam lifting gantry crane 600, ensuring that the longitudinal beam lifting gantry crane 600 can run to the first beam storage area 101 to lift the beam at any time.
[0043] Example 2
[0044] like Figure 2 , Figures 4 to 6As shown, the transverse shuttle bus with gantry rail in the embodiment of the present application is different from the aforementioned embodiment in that a first side 801 of the transverse shuttle bus 800 is provided with a first gantry rail assembly 30 which can be raised and lowered; wherein, when the transverse shuttle bus 800 is in a running state, the first gantry rail assembly 30 is in a ground-lifting state; when the transverse shuttle bus 800 is in a non-running state, the first gantry rail assembly 30 can be lowered to a ground-touching state, so as to realize that when the transverse shuttle bus 800 is transversely moved to a position close to the first beam storage area 101, the first gantry rail assembly 30 is connected with the first longitudinal beam gantry rail 201 along the direction in which the first longitudinal beam gantry rail 201 extends. The transverse shuttle bus with gantry crane track provided in the embodiment of the present application has a first liftable gantry crane track assembly 30 added to the first side 801 of the transverse shuttle bus 800. When the transverse shuttle bus 800 is in the running state, the first gantry crane track assembly 30 is lifted off the ground to avoid interference with the transverse ferry area 300. After the transverse shuttle bus 800 transfers the precast beam to a position close to the first beam storage area 101, the first gantry crane track assembly 30 descends to the ground contacting state and docks with the first longitudinal beam gantry crane track 201. When the longitudinal beam gantry crane 600 transfers the precast beam on the transverse shuttle bus 800 or the first beam storage area 101, one side of the longitudinal beam gantry crane 600 runs on the second longitudinal The beam lifting gantry crane track 202 moves to the other side and moves to the first gantry crane track assembly 30 of the transverse shuttle car 800, and moves to the first beam storage area 101 to transfer the precast beams on the transverse shuttle car 800 to the beam storage station of the first beam storage area 101 or the second beam storage area 102. There is no need for a transverse beam lifting gantry crane, and the beam lifting storage only needs to be lifted once. There is no need to set up a transverse gantry crane track 700, so as to avoid the intersection of the transverse gantry crane track 700 of the transverse ferry area 300 and the longitudinal track 401 of the production area 400. This not only reduces the equipment cost, but also optimizes the construction process. For beam factories where the beam storage area and the production area are arranged side by side due to site limitations, the beam storage efficiency is greatly improved and the procurement cost of lifting equipment is reduced.
[0045] like Figure 5As shown, the transverse shuttle bus 800 of the embodiment of the present application includes a car body 10 and a running mechanism 20 arranged at the bottom of the car body 10, and the first gantry rail assembly 30 includes a first connecting member 31, a supporting assembly 32, a first gantry rail 33 and a telescopic driving member 34; wherein, one end of the first connecting member 31 is rotatably connected to the side of the car body 10 by a hinged manner using a hinge pin, one side of the supporting assembly 32 is fixedly connected to one end of the first connecting member 31, and the first gantry rail 33 is arranged at the top of the supporting assembly 32; the two ends of the telescopic driving member 34 are rotatably connected to the running mechanism 20 and the first connecting member 31 respectively, so as to drive the first connecting member 31 to rotate relative to the car body 10 to realize the lifting and lowering of the first gantry rail assembly 30. Specifically, by setting the first connecting member 31 and the supporting assembly 32 to connect and support the first gantry rail 33, the stability and reliability of the first gantry rail 33 in the transfer state and the working state can be achieved. Under the driving action of the telescopic driving member 34, the first gantry rail assembly 30 can be easily switched between the off-the-ground and on-the-ground states according to the working needs during the operation of the transverse shuttle 800. Specifically, the telescopic driving member 34 can be any one of an oil cylinder, an air cylinder, an electric cylinder, and an automatic telescopic rod, with a simple and compact structure, easy installation and arrangement, and stable, reliable, simple and convenient operation.
[0046] In one embodiment, the support assembly 32 includes a support beam 321 and a first leg 323, wherein the support beam 321 is fixedly connected to the first connecting member 31, and the first leg 323 is movably connected to the bottom of the support beam 321 along the height direction of the vehicle body 10. Specifically, the support beam 321 has a simple structure, is easy to process and manufacture, and is convenient for installing and arranging the first door hanging track 33. By further arranging the first leg 323, the first door hanging track 33 can be touched to the ground when it is in a working state, which plays a good supporting role for the first door hanging track 33, thereby further improving the stability and reliability of the first door hanging track 33 in a working state. Specifically, the top of the first leg 323 is a screw structure, which can be fastened to the bottom of the support beam 321 by a fastening nut. When the first door hanging track assembly 30 is in a state off the ground, the first leg 323 can be in a state off the ground by adjusting and increasing the matching length of the screw structure and the support beam 311, thereby effectively avoiding the interference between the first leg 323 and the transverse ferry area 300 during the transverse movement of the transverse ferry vehicle 800.
[0047] In an embodiment not shown, the transverse shuttle bus 800 includes a vehicle body 10 and a running mechanism 20 arranged at the bottom of the vehicle body 10, and the first gantry rail assembly 30 includes a first connecting member 31, a supporting assembly 32, a first gantry rail 33 and a telescopic driving member 34; wherein, one end of the first connecting member 31 is movably connected to the side of the vehicle body 10 along the height direction of the vehicle body 10, one side of the supporting assembly 32 is fixedly connected to one end of the first connecting member 31, and the first gantry rail 33 is arranged at the top of the supporting assembly 32; the two ends of the telescopic driving member 34 are respectively rotatably or fixedly connected to the running mechanism 20 and the first connecting member 31 through an additional transition connecting portion, so as to drive the first connecting member 31 to move relative to the vehicle body 10 along the height direction of the vehicle body 10 to realize the lifting and lowering of the first gantry rail assembly 30. Specifically, a sliding groove can be set on the side of the vehicle body 10 along the height direction of the vehicle body 10, and one end of the first connecting member 31 is slidably connected to the sliding groove, so that the telescopic driving member 34 can drive the first gantry crane rail assembly 30 arranged on the top of the supporting assembly 32 to rise and fall. Similarly, during the operation of the transverse shuttle bus 800, the first gantry crane rail assembly 30 can be extremely conveniently lifted off the ground or touched the ground according to work needs.
[0048] Example 3
[0049] like Figure 6 As shown, the transverse shuttle bus with a door crane track in the embodiment of the present application is different from the above-mentioned embodiment in that the transverse shuttle bus 800 includes a car body 10, and the first door crane track assembly 30 includes a first connecting member 31, a wheel group 35 and a first door crane track 33; wherein the first connecting member 31 is connected to the side of the car body 10, the wheel group 35 is arranged at the bottom of the first connecting member 31, and the first door crane track 33 is arranged at the top of the first connecting member 31. Specifically, the first connecting member 31 is a bracket, and the bottom of the bracket is provided with a wheel group 35 such as a roller. The bracket has a simple structure, is easy to process and manufacture, and is convenient for installing and arranging the first door crane track 33. The bracket is connected to the side of the car body 10 through a pin shaft and can be disassembled. The bracket is driven to move by the transverse shuttle bus 800. When the transverse shuttle bus 800 moves transversely to the first beam storage area 101, the bracket moves to the position of the first longitudinal beam lifting door crane track 201 and docks with it. The structure is simple, easy to process and manufacture, and the working process is stable and reliable.
[0050] In one embodiment, a first leg 323 is provided at the bottom of the first connecting member 31, and the first leg 323 is movably connected to the bottom of the first connecting member 31 along the height direction of the vehicle body 10. Specifically, by further providing the first leg 323, the first gantry track 33 can be touched to the ground when the first gantry track 33 is in a working state, which can provide good support for the first gantry track 33, thereby further improving the stability and reliability of the first gantry track 33 in a working state. Specifically, the top of the first leg 323 is a screw structure, which can be fastened to the bottom of the bracket by a fastening nut, and the first leg 323 can be placed off the ground by adjusting and increasing the matching length of the screw structure and the first connecting member 31, thereby effectively avoiding interference between the first leg 323 and the transverse ferry area 300 during the transverse movement of the transverse ferry vehicle 800.
[0051] Example 4
[0052] like Figures 7 to 9 As shown, the transverse shuttle bus with a door crane track in the embodiment of the present application is different from the previous embodiment in that the second side 802 of the transverse shuttle bus 800 relative to the first side 801 is provided with a second door crane track assembly 40; when the transverse shuttle bus 800 transversely moves in a direction away from the first beam storage area 101, the second door crane track assembly 40 can be transversely moved to a position that is connected to the first longitudinal handle door crane track 201 in the direction in which the first longitudinal handle door crane track 201 extends. Specifically, in the present embodiment, the second door crane track assembly 40 is in a non-connected state or a detachably connected state with the second side 802 of the transverse shuttle bus 800.
[0053] The transverse shuttle with gantry crane track of the embodiment of the present application has a second gantry crane track assembly 40 separately arranged on the second side 802 of the transverse shuttle 800, and the second gantry crane track assembly 40 is driven to move by automatic control or the transverse shuttle 800. When the transverse shuttle moves away from the first beam storage area 101, the second gantry crane track assembly 40 is automatically controlled or driven by the transverse shuttle 800 to move to a position corresponding to the first longitudinal beam lifting gantry crane track 201 and dock with the first longitudinal beam lifting gantry crane track 201, serving as the running track of the longitudinal beam lifting gantry crane 600, ensuring that the longitudinal beam lifting gantry crane 600 can move to the first beam storage area 101 to lift the beam at any time, and when the transverse shuttle is needed When the vehicle 800 moves the newly cast precast beam to the first beam storage area 101, it automatically controls or uses the transverse shuttle vehicle 800 to push the second gantry track assembly 40 into the first beam storage area 101, and uses the first gantry track assembly 30 on the first side 801 of the transverse shuttle vehicle 800 as the gantry track of the longitudinal beam gantry crane 600 to dock with the first longitudinal beam gantry crane track 201 to provide the longitudinal beam gantry crane 600 with movement. Therefore, it can ensure that the longitudinal beam gantry crane 600 can work freely in the first beam storage area 101 most of the time, and the longitudinal beam gantry crane 600 needs to retreat to the second beam storage area 102 only when the first gantry track assembly 30 and the second gantry track assembly 40 are replaced with each other. Fig.10 As shown, in one embodiment, the second gantry track assembly 40 includes a second connecting member 41, a wheel set 42 and a second gantry track 43; wherein the second connecting member 41 is detachably connected to the side of the vehicle body 10, the wheel set 42 is arranged at the bottom of the second connecting member 41, and the second gantry track 43 is arranged at the top of the second connecting member 41. Specifically, the second gantry track assembly 40 adopts a structure similar to the first gantry track assembly 30 in the aforementioned embodiment 2, which can be used interchangeably to save costs. The second connecting member 41 is a bracket, and a wheel set 42 such as rollers is arranged at the bottom of the bracket. The bracket has a simple structure, is easy to process and manufacture, and is convenient for installing and arranging the second gantry track 43. The bracket is connected to the side of the vehicle body 10 by a pin shaft and can be disassembled and assembled. The bracket is driven to move by the transverse shuttle 800. When the transverse shuttle 800 deviates from the first beam storage area 101, the transverse shuttle 800 is used to move the bracket to the position of the first longitudinal beam lifting gantry track 201 to dock with it. The structure is simple, easy to process and manufacture, and the working process is stable and reliable.
[0054] In one embodiment, a second leg 44 is provided at the bottom of the second connecting member 41, and the second leg 44 is movably connected to the bottom of the second connecting member 41 along the height direction of the vehicle body 10. Specifically, by further providing the second leg 44, the second gantry track 43 can be touched to the ground when it is in the working state, which plays a good supporting role for the second gantry track 43, thereby further improving the stability and reliability of the second gantry track 43 in the working state. Specifically, the top of the second leg 44 is a screw structure, which can be fastened to the bottom of the bracket by a fastening nut, and the second leg 44 can be placed off the ground by adjusting and increasing the matching length of the screw structure and the second connecting member 41, effectively avoiding the interference between the second leg 44 and the transverse ferry area 300 during the transverse movement of the transverse ferry vehicle 800. Specifically, when the transverse shuttle 800 is in a running state, the second leg 44 is off the ground and the wheel group 42 is in contact with the track. When the transverse shuttle 800 is in a non-running state, in an embodiment not shown, the second side 802 of the transverse shuttle 800 relative to the first side 801 is detachably and liftably provided with a second gantry rail assembly 40; wherein, when the transverse shuttle 800 is in a running state, the second gantry rail assembly 40 is off the ground; when the transverse shuttle 800 is in a non-running state, the second gantry rail assembly 40 is in a ground contacting state, so that when the transverse shuttle 800 moves laterally away from the first beam storage area 101, the second gantry rail assembly 40 is connected to the first longitudinal beam gantry rail 201 along the direction in which the first longitudinal beam gantry rail 201 extends. Specifically, the second gantry crane track assembly 40 can also adopt a structure similar to the first gantry crane track assembly 30 through a transition connector, such as a transition connector flange, a transition connector plate, etc., which can be detachably connected to the side of the vehicle body 10 by a pin hinge, a threaded connection, etc. The first connector 31 and the telescopic drive member 34 can be fixedly connected to the transition connector. When the second gantry crane track assembly 40 needs to be separated from the transverse shuttle bus 800, the transition connector connected to the side of the vehicle body 10 can be directly removed. Similarly, it can ensure that the longitudinal beam lifting gantry crane 600 can work freely in the first beam storage area 101 most of the time. Only when the first gantry crane track assembly 30 and the second gantry crane track assembly 40 are replaced with each other, the longitudinal beam lifting gantry crane 600 needs to retreat to the second beam storage area 102.
[0055] Example 5
[0056] like Fig.11As shown, based on the same concept as the aforementioned embodiment, the embodiment of the present application also provides a working method of a transverse shuttle bus with a gantry crane track, which is implemented using the aforementioned transverse shuttle bus with a gantry crane track, including: S11, when the transverse shuttle bus 800 moves horizontally to a position close to the first beam storage area 101, the first gantry crane track assembly 30 is docked with the first longitudinal beam lifting gantry crane track 201 along the direction in which the first longitudinal beam lifting gantry crane track 201 extends. In one embodiment, the working method of the transverse shuttle bus with a gantry crane track also includes: S12, the transverse shuttle bus 800 moves transversely toward the first beam storage area 101 or the production area 400, and the telescopic drive component 34 controls the first gantry crane track assembly 30 to be lifted off the ground; S13, the transverse shuttle bus 800 moves transversely to a position close to the first beam storage area 101, and the first gantry crane track assembly 30 extends along the direction corresponding to the first longitudinal beam lifting gantry crane track 201, and the telescopic drive component 34 controls the first gantry crane track assembly 30 to descend to a ground-touching state and dock with the longitudinal beam lifting gantry crane track 200.
[0057] Obviously, the working method of the transverse ferry with gantry crane track in the embodiment of the present application has all the advantages and technical effects of the aforementioned embodiments because it is implemented by the transverse ferry with gantry crane track in the aforementioned embodiments. When the transverse ferry 800 is close to the first beam storage area 101, the longitudinal beam lifting gantry crane 600 can work normally in all areas of the first beam storage area 101. When the transverse ferry 800 is working in the transverse ferry area 300, the longitudinal beam lifting gantry crane 600 can work normally in places except the first beam storage area 100.
[0058] In one embodiment, the working method of the transverse shuttle with the gantry rail also includes: S14, the transverse shuttle 800 moves transversely in the direction close to the production area 400; S15, the second gantry rail assembly 40 is docked with the first longitudinal beam gantry rail 201; S16, the second gantry rail assembly 40 is in a disengaged state from the transverse shuttle 800; or, S17, when the transverse shuttle 800 moves transversely toward or away from the first beam storage area 101, the telescopic drive member 34 controls The second gantry crane track assembly 40 is lifted up and is off the ground; S18, when the transverse shuttle bus 800 moves away from the first beam storage area 101 and transversely moves to the position of the second gantry crane track assembly 40 corresponding to the first longitudinal beam gantry crane track 201, the telescopic drive member 34 controls the second gantry crane track assembly 40 to descend to the ground contact state and dock with the first longitudinal beam gantry crane track 201; S19, the connection between the second gantry crane track assembly 40 and the transverse shuttle bus 800 is disassembled and separated from the transverse shuttle bus 800. Furthermore, by adding the second gantry crane track assembly 40, it can be ensured that when the transverse shuttle bus 800 is working in the transverse shuttle area 300, the longitudinal beam gantry crane 600 can operate normally in all areas of the first beam storage area 101 and the second beam storage area.
[0059] Example 6
[0060] like Figure 2 and Figure 7 As shown, based on the same concept as the aforementioned embodiment, the embodiment of the present application further provides a precast beam production line, comprising: a first beam storage area 101, a second beam storage area 102, a transverse ferry area 300 and a production area 400; wherein the first beam storage area 101 and the second beam storage area 102 are arranged in sequence along a first direction, the first beam storage area 101 and the transverse ferry area 300 are arranged in sequence along a second direction perpendicular to the first direction, the width of the first beam storage area 101 along the second direction is smaller than the width of the second beam storage area 102 along the second direction, the transverse ferry area 300 and the production area 400 are arranged in sequence along the first direction; A first longitudinal beam-lifting gantry crane track 201 is provided on the side of the beam area 102 close to the production area 400, and a second longitudinal beam-lifting gantry crane track 202 is provided on the outer sides of the first beam storage area 101 and the second beam storage area 102; the transverse ferry area 300 is provided with a transverse ferry vehicle 800 with a gantry crane track as described above, and the transverse ferry area 300 extends along the second direction to the area adjacent to the first beam storage area 101 and the second beam storage area 102, so that when the transverse ferry vehicle 800 moves along the second direction to the lifting position of the longitudinal beam-lifting gantry crane 600, the first gantry crane track assembly 30 docks with the first longitudinal beam-lifting gantry crane track 201. Specifically, the transverse ferry area 300 is provided with a transverse track 301 along the second direction, and the production area 400 is provided with a longitudinal track 401.
[0061] Example 7
[0062] like Fig.12 As shown, based on the same concept as the aforementioned embodiment, the embodiment of the present application further provides a method for transferring precast beams, which is implemented using the aforementioned precast beam production line, including: S20, the aforementioned transverse shuttle bus 800 carries the precast beams at a position close to the production area 400; S21, the transverse shuttle bus 800 moves transversely to the lifting position of the longitudinal beam-lifting gantry crane 600 to achieve docking of the first gantry crane track assembly 30 with the first longitudinal beam-lifting gantry crane track 201; S22, the longitudinal beam-lifting gantry crane 600 moves to the beam storage station on the first gantry crane track assembly 30 to extract the precast beams to the first beam storage area 101); S23, the longitudinal beam-lifting gantry crane 600 moves to the second beam storage area 102, and the transverse shuttle bus 800 moves transversely to a position close to the production area 400 to start the transfer of the next precast beam.
[0063] In one embodiment, the precast beam transfer method further includes: S24, the transverse shuttle vehicle 800 as mentioned above moves transversely toward the production area 400 to start the transfer of the next precast beam; S25, the second gantry crane rail assembly 40 is docked with the first longitudinal beam lifting gantry crane rail 201; S26, the second gantry crane rail assembly 40 and the transverse shuttle vehicle 800 are in a disengaged state.
[0064] According to the above embodiments, it can be seen that the present application involves a transverse shuttle bus with a gantry crane track and its working method, a precast beam production line and a precast beam transfer method, in which a first gantry crane track assembly is added on the first side of the transverse shuttle bus to connect with the first longitudinal beam-lifting gantry crane track, and the precast beam is transferred to a position close to the first beam storage area by using the transverse shuttle bus, and then the longitudinal beam-lifting gantry crane is used to directly lift the beam to the first beam storage area or the second beam storage area without the need for transverse beam-lifting gantry crane transfer. Therefore, there is no need to set a transverse gantry crane track in the transverse ferry area to avoid the intersection of the transverse gantry crane track in the transverse ferry area and the longitudinal track in the production area. For beam factories where the beam storage area and the production area are arranged side by side due to site limitations, the beam storage efficiency is greatly improved and the procurement cost of lifting equipment is reduced.
[0065] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited to this. Any changes or substitutions that can be easily obtained by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the attached claims.
Claims
1. A transverse shuttle vehicle with a door crane track, characterized in that: A first door crane track assembly (30) is provided on the first side (801) of the transverse shuttle vehicle (800); When the transverse shuttle vehicle (800) is transversely moved close to the first beam storage area (101), the first gantry crane track assembly (30) is docked with the first longitudinal beam lifting gantry crane track (201) along the direction in which the first longitudinal beam lifting gantry crane track (201) extends.
2. The transverse shuttle vehicle with door crane track according to claim 1, characterized in that: The first door hanging track assembly (30) comprises a first connecting member (31), a first door hanging track (33) and a sliding block (36); wherein, One end of the first connecting member (31) is rotatably connected to the side of the transverse shuttle vehicle (800), the first door hanging track (33) is arranged on the top of the first connecting member (31), and the sliding block (36) is arranged on the bottom of the first connecting member (31).
3. The transverse shuttle vehicle with door crane track according to claim 1, characterized in that: The first side (801) of the transverse shuttle vehicle (800) is provided with a first door crane track assembly (30) in a liftable manner; wherein: When the transverse shuttle bus (800) is in a moving state, the first gantry crane track assembly (30) is in a ground-lift state; when the transverse shuttle bus (800) is in a non-moving state, the first gantry crane track assembly (30) can be lowered to a ground-lift state, so that when the transverse shuttle bus (800) moves transversely to the first beam storage area (101), the first gantry crane track assembly (30) can be docked with the first longitudinal beam lifting gantry crane track (201) along the direction in which the first longitudinal beam lifting gantry crane track (201) extends.
4. The transverse shuttle vehicle with door crane track according to claim 3 is characterized in that: The first door hanging track assembly (30) comprises a first connecting member (31), a first door hanging track (33) and a telescopic driving member (34); wherein: One end of the first connecting member (31) is rotatably connected to the side of the transverse shuttle vehicle (800), and the first door hanging track (33) is arranged on the top of the first connecting member (31); The two ends of the telescopic driving member (34) are rotatably connected to the transverse shuttle vehicle (800) and the first connecting member (31) respectively, so as to drive the first connecting member (31) to rotate relative to the transverse shuttle vehicle (800) to realize the lifting and lowering of the first door crane track assembly (30).
5. The transverse shuttle vehicle with door crane track according to claim 3, characterized in that: The first door hanging track assembly (30) comprises a first connecting member (31), a first door hanging track (33) and a telescopic driving member (34); wherein: One end of the first connecting member (31) is movably connected to the side of the transverse shuttle vehicle (800) along the height direction of the transverse shuttle vehicle (800), and the first door hanging track (33) is arranged on the top of the first connecting member (31); The two ends of the telescopic driving member (34) are respectively connected to the transverse shuttle vehicle (800) and the first connecting member (31) to drive the first connecting member (31) to move relative to the transverse shuttle vehicle (800) along the height direction of the transverse shuttle vehicle (800) to realize the lifting and lowering of the first door crane track assembly (30).
6. The transverse transfer shuttle with door crane track according to claim 1, characterized in that: The first door hanging track assembly (30) comprises a first connecting member (31), a wheel set (35) and a first door hanging track (33); wherein, The first connecting member (31) is connected to the side of the transverse shuttle vehicle (800), the wheel set (35) is arranged at the bottom of the first connecting member (31), and the first door hanging track (33) is arranged at the top of the first connecting member (31).
7. The transverse shuttle vehicle with door crane track according to any one of claims 1 to 6, characterized in that: The second side (802) of the transverse shuttle bus (800) relative to the first side (801) is provided with a second gantry crane rail assembly (40); when the transverse shuttle bus (800) moves transversely in a direction away from the first beam storage area (101), the second gantry crane rail assembly (40) can move transversely to a position where it docks with the first longitudinal beam-carrying gantry crane rail (201) in the direction extending along the first longitudinal gantry crane rail (201).
8. A method for operating a transversely moving shuttle vehicle with a door crane track, implemented by using the transversely moving shuttle vehicle with a door crane track according to claim 1, characterized in that: include: The transverse shuttle vehicle (800) is transversely moved to a position close to the first beam storage area (101), and the first gantry crane track assembly (30) is docked with the first longitudinal beam lifting gantry crane track (201) along the direction in which the first longitudinal beam lifting gantry crane track (201) extends.
9. The working method of the transversely shifting shuttle vehicle with a door crane track according to claim 8 is implemented by using the transversely shifting shuttle vehicle with a door crane track according to claim 3, characterized in that: include: The transverse shuttle vehicle (800) moves transversely toward the first beam storage area (101) or the production area (400), and the first door crane track assembly (30) is in a state of being off the ground; The transverse shuttle vehicle (800) is transversely moved to a position close to the first beam storage area (101), and the first gantry crane track assembly (30) is lowered to a ground-contacting state and docked with the first longitudinal beam-carrying gantry crane track (201).
10. The working method of the transversely shifting shuttle vehicle with a door crane track according to claim 8 is implemented by using the transversely shifting shuttle vehicle with a door crane track according to claim 7, characterized in that: include: The transverse shuttle vehicle (800) moves transversely in a direction close to the production area (400); The second door hanging track assembly (40) is butted against the first longitudinal handle door hanging track (201); The second door crane track assembly (40) and the transverse shuttle vehicle (800) are in a disengaged state.
11. A prefabricated beam production line, characterized in that: include: A first beam storage area (101), a second beam storage area (102), a transverse ferry area (300) and a production area (400); wherein, The first beam storage area (101) and the second beam storage area (102) are arranged in sequence along a first direction, the first beam storage area (101) and the transverse shifting and ferrying area (300) are arranged in sequence along a second direction perpendicular to the first direction, the width of the first beam storage area (101) along the second direction is smaller than the width of the second beam storage area (102) along the second direction, and the transverse shifting and ferrying area (300) and the production area (400) are arranged in sequence along the first direction; A first longitudinal beam-carrying door crane track (201) is provided on one side of the second beam-carrying area (102) close to the production area (400), and a second longitudinal beam-carrying door crane track (202) is provided on the outer sides of the first beam-carrying area (101) and the second beam-carrying area (102); The transverse ferry area (300) is provided with a transverse ferry vehicle (800) with a gantry crane track as described in claim 1 or claim 7, and the transverse ferry area (300) extends along the second direction to the area adjacent to the first beam storage area (101) and the second beam storage area (102), so that when the transverse ferry vehicle (800) moves along the second direction to the lifting position of the longitudinal beam gantry crane (600), the first gantry crane track assembly (30) is docked with the first longitudinal beam gantry crane track (201).
12. A method for transporting precast beams, implemented by the precast beam production line according to claim 11, characterized in that: include: The transverse shuttle vehicle (800) as claimed in claim 1 carries the precast beams at a position close to the production area (400); The transverse shuttle vehicle (800) is transversely moved to the lifting position of the longitudinal beam gantry crane (600) to achieve docking of the first gantry crane track assembly (30) with the first longitudinal beam gantry crane track (201); The longitudinal beam-lifting gantry crane (600) moves to the first gantry crane track assembly (30) to extract the prefabricated beam to the beam storage station of the first beam storage area (101); The longitudinal beam-lifting gantry crane (600) moves to the second beam storage area (102), and the transverse shuttle vehicle (800) moves transversely to a position close to the production area (400).
13. The method for transporting precast beams according to claim 12, characterized in that: include: The transverse shuttle vehicle (800) as claimed in claim 7 moves transversely in a direction close to the production area (400); The second door hanging track assembly (40) is butted against the first longitudinal handle door hanging track (201); The second door crane track assembly (40) and the transverse shuttle vehicle (800) are in a disengaged state.
Citation Information
Patent Citations
Transverse moving walking track of railway beam moving trolley
CN113389093A
Automatic transverse moving and steering storage method for precast beams in beam yard
CN116280833A
Multi-track variable load traversing turnout system and method
CN118723458A
Self-traveling type transverse moving bogie
CN204097880U
Multifunctional precast beam machining site structure
CN208814239U