Multi-stage purification device for industrial wastewater
By using a partition frame and mesh structure, combined with positioning components and airbags to expand the flow area, the problem of sediment being pumped along with sewage is solved, thus achieving stable operation and efficient purification of the multi-stage industrial wastewater purification device.
Patent Information
- Application Number
- CN202411250971.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-09-06
AI Technical Summary
In existing industrial wastewater treatment devices, sediments are easily pumped away with the wastewater, resulting in poor subsequent purification effects and easy clogging of the filter screen.
The system employs a partition frame and mesh structure to separate the suction equipment from the water tank. The opening and closing of the mesh are controlled by the lower partition sleeve and the upper partition component. Combined with the positioning component and airbag structure, it ensures that sediment does not enter the suction equipment, and expands the flow area through the positioning plate and airbag to avoid blockage.
This effectively prevents sediment from entering the suction equipment, maintains the stability and smooth flow of the purification device, reduces membrane clogging, and improves purification efficiency and equipment stability.
Smart Images

Figure CN118993270A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of wastewater purification devices, and in particular to a multi-stage purification device for industrial wastewater. Background Art
[0002] The multi-stage industrial wastewater purification device is a complex equipment system used to treat wastewater generated in the industrial production process to meet the discharge standard or reuse standard; this device usually includes multiple treatment stages, each stage has specific functions and roles, including: pretreatment stage, chemical treatment stage, physical treatment stage, biological treatment stage.
[0003] The advantages of industrial wastewater multi-stage purification equipment are numerous. It can effectively remove pollutants of various types and concentrations, and improve the efficiency and quality of wastewater treatment. Moreover, through multi-stage treatment, different pollutants can be treated in a targeted manner, thus achieving a more accurate and efficient purification effect.
[0004] In the patent application with the publication number CN115594327A, an environmentally friendly sewage purification treatment device with a detection function is disclosed, including a primary purification device, a secondary purification device and a tertiary purification device, a first drainage pipe is installed at the lower end of one side of the primary purification device, the secondary purification device is installed on the side close to the first drainage pipe, and a second drainage pipe is installed at the lower end of one side of the secondary purification device, and a third drainage pipe is installed on the other side of the secondary purification device, the tertiary purification device is installed on the side close to the third drainage pipe, and a detection box is installed at the lower end of one side of the tertiary purification device. The environmentally friendly sewage purification treatment device with a detection function is provided with a primary purification device, a secondary purification device, a tertiary purification device and a detection box, so that after the sewage is purified by multi-stage circulation, harmful substances and toxic substances in the sewage are removed, and then the purification degree is detected by the detection box, so that the discharged sewage will not cause damage to the environment and soil, and the purification effect is effectively improved.
[0005] The prior art has the following defects: The principle of industrial wastewater treatment is to separate the toxic and harmful substances in the wastewater through physical or chemical means. Therefore, most processes include sedimentation separation. After the solid matter is completely precipitated, the sewage is pumped into the next process. In order to fully pump the sewage, the water pump is often placed at the bottom of the purification tank. This will cause a large amount of sediment to be pumped into the next process along with the sewage, affecting the subsequent purification treatment. Some equipment will install a filter on the outside of the water pump, but when there is a lot of sediment, the filter will be blocked in a short time, affecting the normal progress of the sewage treatment. Summary of the invention
[0006] In view of the problem in the prior art that sediments are easily pumped out together with sewage by a water pump, a multi-stage purification device for industrial wastewater is proposed.
[0007] The present application provides a multi-stage purification device for industrial wastewater, the purpose of which is to prevent sediment from being pumped out by a water pump.
[0008] The technical scheme of the present invention is: a multi-stage purification device for industrial wastewater, comprising a water pool, a water injection pipe and a water extraction pipe respectively arranged on the left and right sides of the inner wall of the water pool, a base arranged inside the water pool, a suction device arranged above the base, and a partition device, the partition device comprising a mounting groove arranged on the top of the base, a mounting groove arranged in the mounting groove, a mesh arranged on the outside of the partition frame, a lower partition sleeve and an upper partition member arranged on the outside of the mesh, a positioning member arranged on the production of the upper partition member, a connecting plate arranged on the top of the upper partition member, a mounting seat arranged on the top of the partition frame, a driving motor arranged on the top of the mounting seat, and a screw arranged on the top of the driving motor; The water injection pipe and the water suction pipe are connected at the inner wall of the water pool, the suction equipment is installed in the installation groove, the partition frame covers the outside of the suction equipment, the water suction pipe passes through the partition equipment and is connected with the suction equipment, the lower partition sleeve is clamped on the bottom of the upper partition piece, the connecting plate is in an inverted "L" shape, the top of the connecting plate is sleeved on the outside of the screw, and a slider extending into the screw thread is fixedly installed on the surface of the connecting plate.
[0009] Furthermore, a sealing sleeve is threadedly connected to the outer side of the water pumping pipe, and the sealing sleeve is buckled and covered on the connection between the water pumping pipe and the installation groove.
[0010] Further, the positioning member includes an assembly groove arranged on the outside of the upper partition member, an assembly sleeve arranged inside the assembly groove, a push rod arranged inside the assembly sleeve, an installation box arranged on the outside of the installation sleeve, a connecting groove arranged on one end of the installation box close to the assembly sleeve, and a positioning plate arranged on the side of the installation box away from the assembly sleeve. The assembly thread is installed in the connecting groove. A vertical groove is opened on the surface of the screw rod. The groove runs through the thread on the outside of the screw rod. Both ends of the screw rod are connected to the groove. The depth of the groove is less than the depth of the thread on the outside of the screw rod.
[0011] Furthermore, the positioning member also includes a control groove arranged inside the installation box, a rotation groove arranged on the inner wall of the control groove, a rotation gear arranged inside the rotation groove, a sliding rack arranged inside the control groove, a trapezoidal block arranged on the side of the sliding rack close to the push rod, a return spring arranged between the sliding rack and the inner wall of the control groove, a top pressure block arranged on the outer side of the partition frame, and an avoidance notch arranged on the inner side of the upper partition member; The push rod is pressed on the inclined surface of the trapezoidal block, the positioning plate passes through the rotating groove, the rotating gear is clamped on the outer side of the positioning plate, the sliding rack is meshed with the rotating gear, the pressing block extends into the assembly groove and contacts with the push rod, and the avoidance notch is connected to the assembly groove.
[0012] Furthermore, the positioning plates are distributed in a linear array on the surface of the installation box, and the distribution intervals thereof are greater than the width of the positioning plates.
[0013] Furthermore, the positioning plate adopts a hollow design, and a water injection valve is installed on the outer side of the positioning plate.
[0014] Furthermore, the upper partition member includes an inner lining frame arranged on the top of the lower partition sleeve, a fixing ring, a wrapping sleeve, and an annular airbag arranged outside the inner lining frame, an air cylinder arranged on the top of the mounting seat, a telescopic rod arranged inside the air cylinder, and an air pipe arranged between the air cylinder and the annular airbag; The wrapping sleeve is fixedly connected between the fixing ring and the annular airbag, a piston plate which is slidably inserted in the air cylinder is arranged at the bottom of the telescopic rod, and the top of the telescopic rod is connected with the connecting plate.
[0015] Furthermore, the lining frame is wrapped around the outer surface of the partition frame, and an annular scraper is arranged on the top of the lining frame.
[0016] Furthermore, an embedded groove is provided on the outer side of the fixing ring, an elastic traction rope is installed inside the embedded groove, and the elastic traction rope extends out of the embedded groove and is connected to the annular airbag.
[0017] Beneficial effects of the present invention: 1. By setting up a partition frame and a mesh, the partition frame and the mesh separate the suction equipment and the pool, so as to prevent the sediment from being sucked into the suction equipment and affecting the subsequent purification process. At the same time, the lower partition sleeve and the upper partition piece wrap the mesh, and the mesh is opened only after the reaction and precipitation are completed, so as to prevent part of the sewage from being hidden in the suction equipment and entering the next process without being purified. In addition, the up and down movement of the upper partition piece can clean the surface of the mesh to prevent the mesh from being blocked.
[0018] 2. By setting the positioning parts, when the sewage reacts and settles, the screw will lift the upper partition to the top, and then the upper partition will descend under the action of gravity. When the positioning plate reaches the upper surface of the sedimentation layer, it stops moving, and the mesh corresponds to the open part area. At this time, the open area of the mesh is always located above the sedimentation layer, preventing the sediment from flowing to the suction equipment along with the sewage, so that the mesh can maintain smooth flow for a long time, thereby improving the stability of the equipment operation.
[0019] 3. By rotating the gear to control the positioning plate, the positioning plate remains upright during the reaction and sedimentation process. When pumping sewage, the positioning plate is adjusted to a horizontal state, which can prevent the sediment from falling on the surface of the positioning plate, keep the sediment away from the membrane, and further reduce the possibility of the sediment approaching the membrane.
[0020] 4. By setting an upper partition, when the upper partition moves down to open the mesh, the air in the air cylinder is filled into the annular air bag. After the annular air bag is inflated, its diameter increases, and the top of the wrapping sleeve is expanded to become a funnel shape. The wrapping sleeve and the annular air bag are separated from the mesh, thereby increasing the flow area of the mesh, which is conducive to maintaining smooth water flow. At the same time, water flows in from above the funnel formed by the wrapping sleeve, further reducing the possibility of sediment flowing to the surface of the mesh. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a three-dimensional diagram of the multi-stage purification device for industrial wastewater of the present invention; Figure 2 It is a schematic diagram of the interior of the water pool of the present invention; Figure 3 This is a schematic diagram of the disassembly of the partition device of the present invention; Figure 4 This is a schematic diagram of the interior of the partition frame of the present invention; Figure 5 This is a schematic diagram of the outer side of the partition frame of the present invention; Figure 6 This is a schematic diagram of disassembling the lower partition sleeve and the upper partition member of the present invention; Figure 7 This is a schematic diagram of disassembling the upper partition member of the present invention; Figure 8 This is a schematic diagram of disassembling the positioning member of the present invention; Fig. 9 This is a schematic diagram of the interior of the installation box of the present invention; Fig.10 It is a cross-sectional view of the partition frame of the present invention; Fig.11 For the present invention Fig.10 Enlarged view of point A in the middle; Fig.12 It is a schematic diagram of the upper partition member of the present invention; Fig.13 For the present invention Fig.10 Enlarged view of point B in the middle.
[0022] In the figure: 1. Pool; 2. Water filling pipe; 3. Water extraction pipe; 31. Sealing sleeve; 4. Base; 5. Suction device; 6. Partition device; 61. Mounting groove; 62. Partition frame; 63. Membrane; 64. Lower partition sleeve; 65. Upper partition piece; 651. Lining frame; 652. Fixing ring; 653. Wrapping sleeve; 654. Annular airbag; 655. Air pipe; 66. Positioning piece; 661. Assembly groove; 662. Assembly set; 663. Push rod; 664 , installation box; 665, connecting groove; 666, control groove; 667, rotating groove; 668, rotating gear; 669, positioning plate; 6610, sliding rack; 6611, trapezoidal block; 6612, return spring; 6613, top pressure block; 6614, avoidance notch; 67, connecting plate; 68, mounting seat; 69, driving motor; 610, screw; 611, air cylinder; 612, telescopic rod; 613, embedded groove; 614, elastic traction rope. DETAILED DESCRIPTION
[0023] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0024] Example 1, reference Figure 1-11 , which is the first embodiment of the present invention, provides a multi-stage purification device for industrial wastewater, including a water pool 1, a water injection pipe 2 and a water suction pipe 3 respectively arranged on the left and right sides of the inner wall of the water pool 1, a base 4 arranged inside the water pool 1, a suction device 5 arranged above the base 4, and also includes a partition device 6, the partition device 6 includes a mounting groove 61 arranged at the top of the base 4, a mounting groove 61 arranged in the mounting groove 61, a mesh 63 arranged on the outside of a partition frame 62, a lower partition sleeve 64 and an upper partition member 65 arranged on the outside of the mesh 63, a positioning member 66 arranged on the upper partition member 65, a connecting plate 67 arranged at the top of the upper partition member 65, a mounting seat 68 arranged at the top of the partition frame 62, a drive motor 69 arranged at the top of the mounting seat 68, and a screw 610 arranged at the top of the drive motor 69.
[0025] Specifically, the water pool 1 is provided with a plurality of sedimentation and reaction pools, the water injection pipe 2 and the water extraction pipe 3 are connected at the inner wall of the water pool 1, the suction device 5 is fixedly installed in the installation groove 61 through a mounting frame, a plurality of inflow ports are arranged on the outside of the partition frame 62, the partition frame 62 covers the outside of the suction device 5, the mesh 63 covers the outside of the inflow port, the lower partition sleeve 64 and the upper partition member 65 are slidably sleeved on the outside of the mesh 63, the lower end of the lower partition sleeve 64 is inserted into the installation groove 61, the lower partition sleeve 64 and the upper partition member 65 completely cover the part of the mesh 63 exposed from the installation groove 61, the water extraction pipe 3 passes through the partition device 6 and is connected to the suction device 5, the lower partition sleeve 6 4 is clamped on the bottom of the upper partition member 65, the positioning members 66 are distributed in a ring array on the outer side of the upper partition member 65, the connecting plate 67 is fixedly connected to the upper partition member 65, the connecting plate 67 is in an inverted "L" shape, the top of the connecting plate 67 is sleeved on the outer side of the screw rod 610, a slider extending into the thread of the screw rod 610 is fixedly installed on the surface of the connecting plate 67, the mounting seat 68 is connected to the partition frame 62 by threads, and the driving motor 69 is clamped in the mounting seat 68; the outer side of the water suction pipe 3 is threadedly connected with a sealing sleeve 31, and the sealing sleeve 31 is buckled and covered on the connection between the water suction pipe 3 and the mounting groove 61 to seal this place and prevent sewage from entering the partition frame 62 from this place.
[0026] By setting the partition frame 62 and the mesh 63, the partition frame 62 and the mesh 63 separate the suction device 5 and the pool 1, so as to prevent the sediment from being sucked into the suction device 5 and affecting the subsequent purification process. At the same time, the lower partition sleeve 64 and the upper partition member 65 wrap the mesh 63, and the mesh 63 is opened only after the reaction and precipitation are completed, so as to prevent some unreacted sewage from being hidden in the suction device 5 and entering the next process without being purified. In addition, the upper partition member 65 can move up and down to clean the surface of the mesh 63 to prevent the mesh 63 from being blocked.
[0027] Furthermore, the positioning member 66 includes an assembly groove 661 arranged on the outside of the upper partition member 65, an assembly sleeve 662 arranged inside the assembly groove 661, a push rod 663 arranged inside the assembly sleeve 662, an installation box 664 arranged on the outside of the installation sleeve 662, a connecting groove 665 arranged on one end of the installation box 664 close to the assembly sleeve 662, and a positioning plate 669 arranged on the side of the installation box 664 away from the assembly sleeve 662.
[0028] Specifically, one end of the assembly sleeve 662 is clamped in the assembly groove 661, and the other end of the assembly sleeve 662 is threadedly installed in the connecting groove 665. The push rod 663 is slidably installed in the assembly sleeve 662. The installation box 664 is divided into two parts, upper and lower parts, and is connected by screws. The positioning plate 669 is placed horizontally. A vertical groove is opened on the surface of the screw rod 610, and the groove runs through the thread on the outside of the screw rod 610. Both ends of the screw rod 610 are connected to the groove. The depth of the groove is less than the depth of the thread on the outside of the screw rod 610, and the slider is elastically set.
[0029] By setting the positioning piece 66, when the sewage reacts and settles, the screw 610 lifts the upper partition piece 65 to the top, and then the upper partition piece 65 descends under the action of gravity. When the positioning plate 669 reaches the upper surface of the sedimentation layer, it stops moving, and the mesh 63 corresponds to the open part area. At this time, the open area of the mesh 63 is always located above the sedimentation layer, preventing the sediment from flowing to the suction device 5 along with the sewage, so that the mesh 63 can maintain smooth circulation for a long time, thereby improving the stability of the equipment operation.
[0030] The positioning member 66 also includes a control groove 666 arranged inside the mounting box 664, a rotating groove 667 arranged on the inner wall of the control groove 666, a rotating gear 668 arranged inside the rotating groove 667, a sliding rack 6610 arranged inside the control groove 666, a trapezoidal block 6611 arranged on the side of the sliding rack 6610 close to the push rod 663, a return spring 6612 arranged between the sliding rack 6610 and the inner wall of the control groove 666, a top pressure block 6613 arranged on the outer side of the partition frame 62, and an avoidance groove 6614 arranged on the inner side of the upper partition member 65.
[0031] Specifically, the rotating gear 668 is rotatably installed in the rotating groove 667, the positioning plate 669 is rotatably connected to the installation box 664, the sliding rack 6610 is slidably connected to the control groove 666, one end of the return spring 6612 is fixedly connected to the sliding rack 6610, and the other end is fixedly connected to the inner wall of the control groove 666, the trapezoidal block 6611 is fixedly connected to the sliding rack 6610, the pushing rod 663 is pressed on the inclined surface of the trapezoidal block 6611, the positioning plate 669 penetrates into the rotating groove 667, the rotating gear 668 is clamped on the outer side of the positioning plate 669, the sliding rack 6610 is meshed with the rotating gear 668, the pressing block 6613 extends into the assembly groove 661 and contacts the pushing rod 663, the avoidance notch 6614 is connected to the assembly groove 661, and the positioning plates 669 are distributed in a linear array on the surface of the installation box 664, and the distribution interval is greater than the width of the positioning plate 669.
[0032] By rotating the gear 668 to control the positioning plate 669, the positioning plate 669 remains in an upright state during the reaction and sedimentation process. When sucking sewage, the positioning plate 669 is adjusted to a horizontal state, which can prevent the sediment from falling on the surface of the positioning plate 669, keep the sediment away from the mesh 63, and further reduce the possibility of the sediment approaching the mesh 63.
[0033] Specifically, the positioning plate 669 adopts a hollow design, and a water injection valve is installed on the outside of the positioning plate 669. By injecting different amounts of water into the positioning plate 669 and adjusting the ratio of air and water, the weight of the positioning plate 669 is changed, so that the buoyancy of the positioning plate 669 is slightly smaller than the gravity, and the positioning plate 669 can fall stably on the surface of the sedimentation layer.
[0034] Example 2, reference Figure 3-13 , which is the second embodiment of the present invention. This embodiment is different from the first embodiment in that the upper partition member 65 includes an inner lining frame 651 arranged on the top of the lower partition sleeve 64, a fixing ring 652, a wrapping sleeve 653, and an annular airbag 654 arranged on the outside of the inner lining frame 651, an air cylinder 611 arranged on the top of the mounting seat 68, a telescopic rod 612 arranged inside the air cylinder 611, and an air pipe 655 arranged between the air cylinder 611 and the annular airbag 654.
[0035] Specifically, the wrapping sleeve 653 is fixedly connected between the fixing ring 652 and the annular airbag 654 by glue, the fixing ring 652 is fixed to the outside of the lining frame 651 by glue, the fixing ring 652 is made of hard rubber, the wrapping sleeve 653 and the annular airbag 654 are made of flexible rubber, the annular airbag 654 expands after being inflated, and its diameter becomes larger, a piston plate slidably inserted into the air cylinder 611 is provided at the bottom of the telescopic rod 612, and the top of the telescopic rod 612 is connected to the connecting plate 67 by bolts, the lining frame 651 is wrapped around the outer surface of the partition frame 62, and an annular scraper is provided on the top of the lining frame 651.
[0036] By providing the upper partition 65, when the upper partition 65 moves downward to open the omentum 63, the air in the air cylinder 611 is filled into the annular airbag 654. After the annular airbag 654 is inflated, its diameter increases, and the top of the wrapping sleeve 653 is expanded to become a funnel shape. The wrapping sleeve 653 and the annular airbag 654 are separated from the omentum 63, thereby increasing the flow area of the omentum 63, which is conducive to maintaining smooth water flow. At the same time, water flows in from above the funnel formed by the wrapping sleeve 653, further reducing the possibility of sediment flowing to the surface of the omentum 63.
[0037] Specifically, an embedded groove 613 is opened on the outer side of the fixing ring 652, and an elastic traction rope 614 is installed inside the embedded groove 613. The elastic traction rope 614 extends out of the embedded groove 613 and is connected to the annular airbag 654. The elastic traction rope 614 is distributed in a circular array on the outer side of the lining frame 651, and the number is not less than sixteen. In this way, when the annular airbag 654 is inflated and deformed, an inclined upward traction force is applied to the periphery of the annular airbag 654, so that the annular airbag 654 and the annular airbag 654 can maintain a funnel state with a larger top and a smaller bottom.
[0038] Based on Examples 1-2, the working principle of a multi-stage industrial wastewater purification device of the present invention is as follows: During installation: first fix the mesh 63 to the outside of the partition frame 62, then fix the mounting base 68 to the top of the partition frame 62, then install the drive motor 69 and the air cylinder 611 in the mounting base 68, install the screw 610 at the power output end of the drive motor 69, and insert the telescopic rod 612 into the air cylinder 611.
[0039] Sleeve the fixing ring 652, the wrapping sleeve 653 and the annular airbag 654 onto the outside of the inner lining frame 651, and use glue to fix the fixing ring 652 to the inner lining frame 651, insert the lower partition sleeve 64 from the bottom of the partition frame 62, and then insert the inner lining frame 651 from the top of the partition frame 62, and keep debugging so that the connecting plate 67 is sleeved on the outside of the screw rod 610, and the top pressure block 6613 is stuck in the avoidance groove 6614, and then use bolts to fix the telescopic rod 612 and the connecting plate 67, connect one end of the air pipe 655 to the air cylinder 611, and finally assemble the lower partition sleeve 64 and the inner lining frame 651 together.
[0040] Separate the installation box 664 up and down, then put the rotating gears 668 into the rotating groove 667 one by one, place the sliding rack 6610 and the return spring 6612 into the control groove 666, keep the trapezoidal block 6611 facing the connecting groove 665, and the surface teeth facing the rotating gear 668, then close the installation box 664, insert the positioning plate 669 into the rotating gear 668 from the outside of the installation box 664; insert the push rod 663 into the assembly sleeve 662, and then screw the push rod 663 into the connecting groove 665, and finally insert the assembly sleeve 662 into the assembly groove 661, so that the installation box 664 fits with the liner frame 651, and completes the installation of the accessories.
[0041] Install the suction device 5 in the installation groove 61, and then insert the partition frame 62 into the installation groove 61, so that the partition frame 62 covers the outside of the suction device 5, and then insert the water suction pipe 3 from above the partition frame 62 to make it snap into the suction device 5, and finally rotate the sealing sleeve 31 to press the sealing sleeve 31 on the top of the partition frame 62.
[0042] During sedimentation and reaction, sewage is injected into the pool 1 through the water injection pipe 2, and then the purified material is sprinkled in to precipitate the harmful substances and impurities in the sewage. The sediment in the sewage continues to settle downward to form a sedimentation layer; at this time, the lower partition sleeve 64 and the upper partition member 65 completely wrap the mesh 63, and the sewage will not enter the inner side of the partition frame 62 in large quantities. At the same time, the positioning member 66 remains in an upright state, and the sediment is partially attached to it.
[0043] When draining, the drive motor 69 is started to make the screw 610 rotate accordingly, the connecting plate 67 is sent to the top by the thread, and the slider enters the groove. At this time, the screw 610 and the connecting plate 67 are both stationary, and the thread no longer restricts the connecting plate 67. Under the action of gravity, the lower partition sleeve 64 and the upper partition member 65 begin to slide downward.
[0044] During the sliding of the upper partition member 65, the top pressure block 6613 leaves the assembly groove 661, and the push rod 663 loses its bearing point and no longer restricts the sliding rack 6610. In this way, the reset spring 6612 resets the push sliding rack 6610, and the sliding rack 6610 drives the rotating gear 668 to rotate ninety degrees. The rotating gear 668 drives the positioning plate 669 to rotate from an upright state to a horizontal state. At the same time, the trapezoidal block 6611 pushes the push rod 663 through the inclined surface to lose its movement in the direction close to the partition frame 62, and the connecting plate 67 and the upper partition member 65 move at the same time. The telescopic rod 612 is inserted into the air cylinder 611, and the air in the air cylinder 611 flows into the annular airbag 654 through the trachea 655. After the annular airbag 654 is inflated, its diameter becomes larger, and the top of the wrapping sleeve 653 is expanded to become a funnel shape, and the wrapping sleeve 653 and the annular airbag 654 are separated from the mesh 63.
[0045] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A multi-stage purification device for industrial wastewater, comprising a water pool (1), a water injection pipe (2) and a water extraction pipe (3) respectively arranged on the left and right sides of the inner wall of the water pool (1), a base (4) arranged inside the water pool (1), and a suction device (5) arranged above the base (4), characterized in that: The device also includes a partition device (6), the partition device (6) including a mounting groove (61) disposed at the top of the base (4), a mounting groove (61) disposed in the mounting groove (61), a mesh (63) disposed on the outside of the partition frame (62), a lower partition sleeve (64) and an upper partition member (65) disposed on the outside of the mesh (63), a positioning member (66) disposed on the upper partition member (65), a connecting plate (67) disposed on the top of the upper partition member (65), a mounting seat (68) disposed on the top of the partition frame (62), a driving motor (69) disposed on the top of the mounting seat (68), and a screw (610) disposed on the top of the driving motor (69); The water injection pipe (2) and the water extraction pipe (3) are connected at the inner wall of the pool (1); the suction device (5) is installed in the installation groove (61); the partition frame (62) covers the outside of the suction device (5); the water extraction pipe (3) passes through the partition device (6) and is connected to the suction device (5); the lower partition sleeve (64) is clamped on the bottom of the upper partition member (65); the connecting plate (67) is in an inverted "L" shape; the top of the connecting plate (67) is sleeved on the outside of the screw rod (610); and a sliding block extending into the thread of the screw rod (610) is fixedly installed on the surface of the connecting plate (67).
2. The multi-stage industrial wastewater purification device according to claim 1, characterized in that: The outer side of the water pumping pipe (3) is threadedly connected to a sealing sleeve (31), and the sealing sleeve (31) is buckled and covers the connection between the water pumping pipe (3) and the installation groove (61).
3. The multi-stage industrial wastewater purification device according to claim 2 is characterized in that: The positioning member (66) comprises an assembly groove (661) arranged on the outside of the upper partition member (65), an assembly sleeve (662) arranged inside the assembly groove (661), a push rod (663) arranged inside the assembly sleeve (662), an installation box (664) arranged on the outside of the assembly sleeve (662), a connecting groove (665) arranged on one end of the installation box (664) close to the assembly sleeve (662), and a positioning plate (669) arranged on a side of the installation box (664) away from the assembly sleeve (662). The assembly sleeve (662) is threadedly installed in the connection groove (665), and a vertical groove is provided on the surface of the screw rod (610). The groove passes through the threads on the outside of the screw rod (610), and both ends of the screw rod (610) are connected to the groove. The depth of the groove is less than the depth of the threads on the outside of the screw rod (610).
4. The multi-stage industrial wastewater purification device according to claim 3 is characterized in that: The positioning member (66) further comprises a control groove (666) disposed inside the mounting box (664), a rotation groove (667) disposed on the inner wall of the control groove (666), a rotation gear (668) disposed inside the rotation groove (667), a sliding rack (6610) disposed inside the control groove (666), a trapezoidal block (6611) disposed on the side of the sliding rack (6610) close to the push rod (663), a return spring (6612) disposed between the sliding rack (6610) and the inner wall of the control groove (666), a top pressure block (6613) disposed on the outer side of the partition frame (62), and an avoidance notch (6614) disposed on the inner side of the upper partition member (65); The push rod (663) is pressed against the inclined surface of the trapezoidal block (6611), the positioning plate (669) penetrates into the rotating groove (667), the rotating gear (668) is clamped on the outer side of the positioning plate (669), the sliding rack (6610) is meshed with the rotating gear (668), the pressing block (6613) extends into the assembly groove (661) and contacts the push rod (663), and the avoidance notch (6614) is connected to the assembly groove (661).
5. The multi-stage industrial wastewater purification device according to claim 4 is characterized in that: The positioning plates (669) are distributed in a linear array on the surface of the installation box (664), and the distribution intervals are greater than the width of the positioning plates (669).
6. The multi-stage industrial wastewater purification device according to claim 5, characterized in that: The positioning plate (669) is of hollow design, and a water injection valve is installed outside the positioning plate (669).
7. The multi-stage industrial wastewater purification device according to claim 6, characterized in that: The upper partition member (65) comprises an inner lining frame (651) arranged on the top of the lower partition sleeve (64), a fixing ring (652), a wrapping sleeve (653), and an annular airbag (654) arranged outside the inner lining frame (651), an air cylinder (611) arranged on the top of the mounting seat (68), a telescopic rod (612) arranged inside the air cylinder (611), and an air pipe (655) arranged between the air cylinder (611) and the annular airbag (654); The wrapping sleeve (653) is fixedly connected between the fixing ring (652) and the annular airbag (654); a piston plate slidably inserted into the air cylinder (611) is provided at the bottom of the telescopic rod (612); and the top of the telescopic rod (612) is connected to the connecting plate (67).
8. The multi-stage industrial wastewater purification device according to claim 7, characterized in that: The lining frame (651) is wrapped around the outer surface of the partition frame (62), and an annular scraper is provided on the top of the lining frame (651).
9. The multi-stage industrial wastewater purification device according to claim 8, characterized in that: An embedded groove (613) is provided on the outer side of the fixing ring (652), an elastic traction rope (614) is installed inside the embedded groove (613), and the elastic traction rope (614) extends out of the embedded groove (613) and is connected to the annular airbag (654).
Citation Information
Patent Citations
Environment-friendly sewage purification treatment device with detection function
CN115594327A
Sewage circulating treatment positive displacement pump for petrochemical industry production
CN116292265A
MBR membrane buried integrated sewage treatment system and process thereof
CN116675380A
Wastewater collecting tank for production of hydrogen fluoride
WO2024152552A1
