Pre-stressed anchor cable broken line pre-tensioning method pedestal and construction method

Through the combination of concrete frame foundation and recyclable prestressed anchor cable, the high-strength demand of reaction walls and pile foundations in Bulb-T beam tensioning construction is solved, and efficient and environmentally friendly construction methods are realized, reducing the amount of steel and The construction cycle improves construction economy and durability.

CN118996980APending Publication Date: 2024-11-22CCCC SECOND HIGHWAY ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310557800.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-18
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

During the construction of existing Bulb-T beams, the high strength and high stiffness of the reaction wall and pile foundation lead to large steel usage and high cost, and the rock foundation is not suitable for PHC pipe piles, resulting in poor construction economy and reaction wall Fatigue cracking is prone to occur, affecting durability.

Method used

The concrete frame-type foundation is combined with the recyclable prestressed anchor cable to form a whole with the foundation, providing resistance to pulling force, and as the prestress of the concrete reaction wall, reducing the amount of reinforcement of the reaction wall, and using recyclable prestressed anchor cable to reduce the Steel remains, frame structure and gravel filling are used to improve bearing capacity and compactness.

Benefits of technology

The bearing capacity of the concrete reaction wall has been improved, the steel usage and construction cycle have been reduced, environmentally friendly and green construction has been achieved, the impact of steel on the underground environment has been reduced, and the use of concrete and construction equipment has been saved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118996980A_ABST
    Figure CN118996980A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of bridge superstructure construction, and particularly relates to a pre-stressed anchor cable broken line pre-tensioning method pedestal and a construction method. The pedestal comprises a frame type foundation, anti-shearing short piles are arranged below the frame type foundation, a tensioning end reaction wall is arranged on the left side of the upper portion of the frame type foundation, a Bulb-T beam module is arranged on the right side of the upper portion of the frame type foundation, an anchoring trolley and a steel beam bogie are arranged between the tensioning end reaction wall and the Bulb-T beam module, and the Bulb-T beam module is connected with a plurality of prestressed steel strands. The prestressed steel strand penetrates through the steel beam bogie to be fixedly connected with the anchoring trolley, a plurality of jacks are arranged on the tensioning end reaction wall, the movable ends of the jacks are connected with tensioning rods, and the tensioning rods are fixedly connected with the anchoring trolley. The concrete frame type foundation is matched with the recoverable pre-stressed anchor cables to form a whole with the foundation, pulling resistance meeting Bulb-T beam tensioning construction can be provided, meanwhile, the pulling resistance serves as pre-stress of the concrete reaction wall, the bearing capacity of the concrete reaction wall is improved, and the reinforcement amount of the concrete reaction wall is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge superstructure construction, and particularly relates to a prestressed anchor cable broken line pre-tensioning method pedestal and a construction method. Background Art

[0002] Bulb-T beams are widely used due to their large span, high bearing capacity, good durability, high construction efficiency, and wide range of applications. They are designed as a prestressed structure using a broken line pre-tensioning method. Compared with traditional linear pre-tensioning prestressed structures, the use of broken line bundles can make the prestressed line shape close to the envelope diagram distribution under the action of external load and bending moment, so that the span of the beam body is increased. At the same time, the bent steel bundles can enhance the shear resistance of the web, avoid cracking of the web, and improve the durability of the beam body. Compared with traditional post-tensioned prestressed structures, there are no quality problems caused by loose grouting, which improves the durability of the structure and reduces the subsequent maintenance costs. No bellows and special anchors are required during production, which reduces the construction process. When the production scale reaches a certain quantity, it has obvious cost advantages.

[0003] The overall idea of ​​the fold line pre-tensioning method for Bulb-T beams is to use the steering device to convert the fold line bundle into a straight line bundle, and then tension the steel bundle as a whole, using the reaction wall (reinforced concrete or steel structure), pedestal, pile foundation (reinforced concrete or PHC pipe pile) as the anchor end of the tensioning, and the steel structure trolley as the movable crossbeam.

[0004] During the tensioning construction of the existing Bulb-T beam, the reaction end needs to provide a large reaction force (taking the standard span of 40 meters as an example, the tensioning force is controlled to reach 1200t), which places extremely high requirements on the strength, stiffness, foundation stability of the reaction wall, and the pull-out bearing capacity and shear bearing capacity of the pile foundation. Although the steel structure reaction wall has high strength, it needs steel box struts as support, which requires a large amount of steel and is expensive. In order to obtain sufficient bearing capacity, the reinforced concrete reaction wall requires a large amount of ear wall to assist in force, and the reaction wall itself needs to be equipped with more steel bars and a large amount of concrete. Under long-term cyclic loads, fatigue cracking is prone to occur. As the main source of pull-out resistance, the pile foundation requires sufficient anchoring depth and a large pile diameter. Rock foundations are not suitable for PHC pipe piles, and only reinforced concrete piles can be used. The pile foundation reinforcement ratio is high, and construction requires large drilling rigs, and the construction period is long, so the overall economic efficiency is poor. Summary of the invention

[0005] In view of the above problems, the purpose of the present invention is to provide a prestressed anchor cable folded line pre-tensioning pedestal and construction method. By adopting a concrete frame foundation with recyclable prestressed anchor cables and the foundation to form a whole, it can provide the pull-out resistance required for the Bulb-T beam tensioning construction, and at the same time serve as the prestress of the concrete reaction wall to improve the bearing capacity of the concrete reaction wall and reduce its reinforcement amount. By using recyclable prestressed anchor cables, the prestressed anchor cables can be recycled after the construction is completed, thereby minimizing the impact of the remaining steel on the underground environment and achieving environmental protection and green construction.

[0006] The technical solution of the present invention is: a prestressed anchor cable fold line pre-tensioning pedestal, comprising a frame foundation, a shear-resistant short pile is arranged below the frame foundation, a tensioning end reaction wall is arranged on the left side of the upper part of the frame foundation, a Bulb-T beam module is arranged on the right side of the upper part of the frame foundation, an anchor trolley and a steel bundle bogie are arranged between the tensioning end reaction wall and the Bulb-T beam module, a plurality of prestressed steel strands are arranged inside the Bulb-T beam module, the prestressed steel strands pass through the steel bundle bogie and are fixedly connected to the anchor trolley, a plurality of jacks are arranged on the tensioning end reaction wall, the movable ends of the jacks are connected to tension rods, the tension rods are fixedly connected to the anchor trolley, and a plurality of recyclable prestressed anchor cables are respectively arranged on the frame foundation and the tensioning end reaction wall.

[0007] The Bulb-T beam module includes a Bulb-T beam, a pedestal bottom mold is provided below the Bulb-T beam, an I-beam is provided below the pedestal bottom mold, an I-beam foundation is provided below the I-beam, and the left side of the I-beam foundation is fixedly connected to the frame foundation.

[0008] The prestressed steel strand is connected to a beam bottom diverter on one side away from the frame foundation, a beam bottom diverter crossbeam is fixedly connected below the beam bottom diverter, recyclable prestressed anchor cables are respectively provided at both ends of the beam bottom diverter crossbeam, and the beam bottom diverter crossbeam is fixedly connected to the Bulb-T beam module through the recyclable prestressed anchor cables.

[0009] A beam stiffening plate is provided at the contact point between the upper surface of the bottom steering beam and the recyclable prestressed anchor cable, and a beam pad is provided between the lower surface of the bottom steering beam and the I-beam foundation. The recyclable prestressed anchor cable passes through the beam stiffening plate, the bottom steering beam, the beam pad and the I-beam foundation and is fixedly connected to the ground.

[0010] A screw is provided at the lower end of the beam bottom steering device, and the beam bottom steering device is fixedly connected to the middle part of the beam bottom steering beam through the screw.

[0011] The recyclable prestressed anchor cable includes an anchor, a corrugated pipe is provided on the outside of the anchor, the corrugated pipe is buried inside the frame foundation and the tensioning end reaction wall, a recyclable device is provided at the bottom of the anchor, and the anchor passes through the frame foundation or the tensioning end reaction wall and is fixedly connected to the ground through the recyclable device.

[0012] The recyclable prestressed anchor cable is a steel strand with a diameter ranging from 15.24 mm to 21.6 mm.

[0013] The frame type foundation is a concrete frame structure with a hollow interior. The side wall of the frame type foundation is provided with a plurality of filling holes. The hollow interior of the frame type foundation is filled with a filler, which is sand or gravel.

[0014] A construction method for a prestressed anchor cable fold line pre-tensioning pedestal, the construction of the prestressed anchor cable fold line pre-tensioning pedestal as described above, comprises the following steps: S1: According to the requirements of the site layout, determine the installation position of the recyclable prestressed anchor cable. The drilling depth of the installation hole of the recyclable prestressed anchor cable should exceed the design length of the recyclable prestressed anchor cable by 0.2-0.5m, and the hole position deviation should not exceed ±20mm. Before installing the recyclable prestressed anchor cable, the drilling hole should be temporarily blocked to prevent debris and debris from entering; S2: Make recyclable prestressed anchor cables. When lowering the anchor, first put the bottom end of the anchor cable body into the hole, and then manually push it into the hole slowly and evenly. After lowering, grouting of the anchor cable is carried out, and the grouting is completed by the bottom pressure grouting method. S3: After the anchor cable construction is completed, the foundation rock surface is cleaned, and the frame foundation, shear short piles and tension end reaction wall are constructed by pouring concrete. The anchor is protected by pre-embedded corrugated pipes in the construction frame foundation and tension end reaction wall; S4: After the concrete strength of the frame foundation reaches the design requirements, fill the filler with crushed stone and soil. During construction, the compaction degree should be controlled to ensure that the filling is dense; S5: The recyclable prestressed anchor cables shall be tensioned in stages; at the same time, the construction of the anchor cables of the bottom beam turning beam shall be completed; S6: After the construction of the frame foundation is completed, continue the installation of the I-beam foundation, I-beam, pedestal bottom formwork, steel beam bogie and anchor trolley. One end of the prestressed steel strand passes through the steel beam bogie and is fixedly connected to the anchor trolley, and the other end is connected to the steering beam at the bottom of the beam. Multiple jacks are installed on the reaction wall at the tensioning end. The movable end of the jack is connected to a tension rod, which is fixedly connected to the anchor trolley to complete the construction of the pedestal.

[0015] The technical effects of the present invention are as follows: 1. The present invention adopts a concrete frame foundation with recyclable prestressed anchor cables to form an integral body with the foundation, which can provide the pull-out resistance required for the tensioning construction of the Bulb-T beam, and at the same time, as the prestress of the concrete reaction wall, improve the bearing capacity of the concrete reaction wall and reduce its reinforcement amount. Compared with reinforced concrete piles or PHC pipe piles, the recyclable prestressed anchor cables have a fast construction speed, do not require large-scale construction equipment, and use less materials; 2. The present invention adopts recyclable prestressed anchor cables, which can be recycled after the construction is completed, which can minimize the The impact of steel residue on the underground environment is reduced, achieving environmental protection and green construction; 3. The concrete frame foundation of the present invention adopts a frame structure, and the interior is filled with dense crushed stone soil, which can not only save the amount of concrete, but also ensure close integration with the foundation; 4. The present invention completes the bending of the prestressed beam in the beam by arranging a beam bottom turning beam, prestressed anchor cables, and a steel beam bogie. The arrangement of the beam bottom turning beam makes the deployment of the beam bottom steering device more convenient and safe, and the deployment construction space is no longer affected by the height of the pedestal. It is used in conjunction with the recyclable prestressed anchor cables to avoid the construction of large-volume concrete.

[0016] The following is a further description with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a structural schematic diagram of a prestressed anchor cable fold line pre-tensioning method pedestal according to an embodiment of the present invention.

[0018] Figure 2 A top view of a frame foundation of a prestressed anchor cable fold line pre-tensioning pedestal according to an embodiment of the present invention.

[0019] Figure 3 It is a side view of a prestressed anchor cable fold line pre-tensioning method pedestal according to an embodiment of the present invention.

[0020] Figure 4 It is a plan view schematically showing the arrangement of the beam bottom steering device and the steering cross beam according to an embodiment of the present invention.

[0021] Figure 5 A side view of the arrangement of the bottom beam steering device and the steering beam according to an embodiment of the present invention Figure 6 It is a schematic diagram of a standard cross section of an I-beam pedestal according to an embodiment of the present invention.

[0022] Figure 7 It is a schematic diagram of the three-dimensional structure of the tensioning end reaction wall and foundation of an embodiment of the present invention.

[0023] Figure numerals: 1—frame foundation; 101—filler; 102—filling hole; 2—recoverable prestressed anchor cable; 201—anchor; 202—corrugated pipe; 203—recoverable device; 3—tensioning end reaction wall; 4—jack; 5—tensioning rod; 6—anchor trolley; 7—steel bundle bogie; 8—Bulb-T beam; 9—beam bottom steering beam; 901—beam stiffening plate; 902—beam pad; 10—beam bottom steering device; 11—I-beam; 12—I-beam foundation; 13—pedestal bottom formwork; 14—shear short pile. Implementation

[0024] Example 1 Figure 1~Figure 3 , Figure 7 As shown, a prestressed anchor cable fold line pre-tensioning pedestal comprises a frame foundation 1, a shear-resistant short pile 14 is arranged below the frame foundation 1, a tensioning end reaction wall 3 is arranged on the upper left side of the frame foundation 1, a Bulb-T beam module is arranged on the upper right side of the frame foundation 1, an anchor trolley 6 and a steel bundle bogie 7 are arranged between the tensioning end reaction wall 3 and the Bulb-T beam module, a plurality of prestressed steel strands are arranged inside the Bulb-T beam module, the prestressed steel strands pass through the steel bundle bogie 7 and are fixedly connected to the anchor trolley 6, a plurality of jacks 4 are arranged on the tensioning end reaction wall 3, a tensioning rod 5 is connected to the movable end of the jack 4, and the tensioning rod is fixedly connected to the anchor trolley 6, and a plurality of recyclable prestressed anchor cables 2 are respectively arranged on the frame foundation 1 and the tensioning end reaction wall 3.

[0025] During actual use, after the construction of the frame foundation 1 of the present invention is completed, the installation of the steel bundle bogie 7 and the anchor trolley 6 is continued, one end of the prestressed steel strand passes through the steel bundle bogie 7 and is fixedly connected to the anchor trolley 6, and the other end is connected to the steering beam 9 at the bottom of the beam, and multiple jacks 4 are installed on the tensioning end reaction wall 3, and the movable end of the jack 4 is connected with a tensioning rod 5, and the tensioning rod is fixedly connected to the anchor trolley 6 to complete the construction of the pedestal. The present invention adopts a concrete frame foundation 1 and a recyclable prestressed anchor cable 2 to form a whole with the foundation, which can provide the pull-out resistance that meets the tensioning construction of the Bulb-T beam, and at the same time serve as the prestress of the concrete reaction wall, thereby improving the bearing capacity of the concrete reaction wall and reducing its reinforcement amount; the recyclable prestressed anchor cable 2 is adopted, and the prestressed anchor cable can be recycled after the construction is completed, thereby minimizing the impact of the remaining steel on the underground environment and achieving environmental protection and green construction. A shear-resistant short pile 14 is provided below the frame foundation 1 and is close to the side of the Bulb-T beam module to resist the strong tension force of the prestressed beam of the Bulb-T beam module and meet the anti-slip stability requirements.

[0026] Embodiment 2 Preferably, on the basis of Embodiment 1, Figure 6As shown, in this embodiment, the Bulb-T beam module includes a Bulb-T beam 8, a pedestal bottom mold 13 is provided below the Bulb-T beam 8, an I-beam 11 is provided below the pedestal bottom mold 13, an I-beam foundation 12 is provided below the I-beam 11, and the left side of the I-beam foundation 12 is fixedly connected to the frame foundation 1.

[0027] During actual use, the Bulb-T beam module of the present invention includes a Bulb-T beam 8, a pedestal bottom mold 13 is provided below the Bulb-T beam 8, an I-beam 11 is provided below the pedestal bottom mold 13, an I-beam foundation 12 is provided below the I-beam 11, and the left side of the I-beam foundation 12 is fixedly connected to the frame foundation 1, thereby ensuring that the Bulb-T beam 8 has a stable bottom support when installed.

[0028] Embodiment 3 Preferably, on the basis of Embodiment 1, Figure 4 , Figure 5 As shown, in this embodiment, the prestressed steel strand is connected to a beam bottom diverter 10 on the side away from the frame foundation 1, and a beam bottom diverter crossbeam 9 is fixedly connected below the beam bottom diverter 10. Recyclable prestressed anchor cables 2 are respectively provided at both ends of the beam bottom diverter crossbeam 9, and the beam bottom diverter crossbeam 9 is fixedly connected to the Bulb-T beam module through the recyclable prestressed anchor cables 2.

[0029] In actual use, the present invention makes the deployment of the bottom beam deflector 10 more convenient and safer by setting the bottom beam deflector crossbeam 9, and the deployment construction space is no longer affected by the height of the pedestal. When used in conjunction with the recyclable prestressed anchor cable 2, the construction of large-volume concrete is avoided. The anchoring point of the recyclable prestressed anchor cable 2 and the bottom beam deflector crossbeam 9 is outside the Bulb-T beam 8, and the prestressed bundle can be quickly unloaded during the later stage of deployment, and is no longer limited by the pedestal height, which is convenient for construction.

[0030] Embodiment 4 Preferably, on the basis of Embodiment 1, in this embodiment, a beam stiffening plate 901 is provided at the contact point between the upper surface of the beam bottom steering beam 9 and the recyclable prestressed anchor cable 2, and a beam pad 902 is provided between the lower surface of the beam bottom steering beam 9 and the I-beam foundation 12, and the recyclable prestressed anchor cable 2 passes through the beam stiffening plate 901, the beam bottom steering beam 9, the beam pad 902 and the I-beam foundation 12 and is fixedly connected to the ground.

[0031] During actual use, a beam stiffening plate 901 is provided at the contact point between the upper surface of the beam bottom steering beam 9 and the recyclable prestressed anchor cable 2, and a beam pad 902 is provided between the lower surface of the beam bottom steering beam 9 and the I-beam foundation 12 to ensure that the beam bottom steering beam 9 is firmly connected to the I-beam foundation 12.

[0032] Embodiment 5 Preferably, on the basis of Embodiment 1, in this embodiment, a screw is provided at the lower end of the beam bottom diverter 10, and the beam bottom diverter 10 is fixedly connected to the middle part of the beam bottom diverter cross beam 9 through the screw.

[0033] During actual use, the beam bottom steering device 10 of the present invention is fixedly connected to the middle part of the beam bottom steering beam 9 through a screw, and the bending of the steel bundle in the beam is achieved by anchoring the screw and the beam bottom steering beam 9.

[0034] Embodiment 6 Preferably, on the basis of Embodiment 1, in this embodiment, the recyclable prestressed anchor cable 2 includes an anchor 201, a corrugated tube 202 is provided on the outer side of the anchor 201, the corrugated tube 202 is buried inside the frame foundation 1 and the tensioning end reaction wall 3, a recyclable device 203 is provided at the bottom of the anchor 201, and the anchor 201 passes through the frame foundation 1 or the tensioning end reaction wall 3 and is fixedly connected to the ground through the recyclable device 203.

[0035] In actual use, the main body of the frame foundation 1 and the tensioning end reaction wall 3 adopts a reinforced concrete structure. The prestressed anchor cable is anchored at the top of the reaction wall by pre-buried corrugated pipe 202 at the recyclable prestressed anchor cable 2, providing sufficient prestress for the reaction wall, which can reduce the reinforcement ratio of the reaction wall. The corrugated pipe 202 should be grouting treated after the recyclable prestressed anchor cable 2 is tensioned and stress tested, and the tensioning end reaction wall 3 and the frame foundation 1 are filled tightly to ensure the safety of the structure.

[0036] Embodiment 7 Preferably, on the basis of Embodiment 1, in this embodiment, the recyclable prestressed anchor cable 2 is a steel strand with a diameter ranging from 15.24 mm to 21.6 mm.

[0037] In actual use, the recyclable prestressed anchor cable 2 of the present invention is a steel strand with a diameter ranging from 15.24 mm to 21.6 mm, which ensures that the recyclable prestressed anchor cable 2 has sufficient strength.

[0038] Embodiment 8 Preferably, on the basis of Embodiment 1, in this embodiment, the frame foundation 1 is a concrete frame structure with a hollow interior, the side wall of the frame foundation 1 is provided with a plurality of filling holes 102, the hollow interior of the frame foundation 1 is filled with a filler 101, and the filler 101 is sand or gravel.

[0039] In actual use, the frame foundation 1 of the present invention is a hollow concrete frame structure, the hollow interior of the frame foundation 1 is filled with filler 101, the filler 101 is sand or gravel, the concrete frame structure ensures the bearing capacity and can form a whole with the foundation, making full use of the bearing capacity of the foundation itself. At the same time, the use of concrete is reduced, the construction cost of the pedestal is saved, and the construction speed is accelerated.

[0040] Embodiment 9 A construction method of a prestressed anchor cable fold line pre-tensioning pedestal, the construction of a prestressed anchor cable fold line pre-tensioning pedestal as described above, comprises the following steps: S1: According to the requirements of the on-site layout, determine the installation position of the recyclable prestressed anchor cable 2. The drilling depth of the installation hole of the recyclable prestressed anchor cable 2 should exceed the design length of the recyclable prestressed anchor cable 2 by 0.2-0.5m, and the hole position deviation should not exceed ±20mm. Before installing the recyclable prestressed anchor cable 2, the drilling hole should be temporarily blocked to prevent debris and debris from entering; S2: Making a recyclable prestressed anchor cable 2, when lowering the anchor 201, first put the bottom end of the anchor cable 201 into the hole, and manually push it into the hole slowly and evenly; after the lowering is completed, the anchor cable is grouted, and the grouting is completed by the bottom pressure grouting method; S3: After the anchor cable construction is completed, the foundation rock surface is cleaned, and the frame foundation 1, the shear short piles 14 and the tension end reaction wall 3 are constructed by pouring concrete, and the corrugated pipe 202 is pre-buried in the construction frame foundation 1 and the tension end reaction wall 3 to protect the anchor 201; S4: After the concrete strength of the frame foundation 1 reaches the design requirements, fill the filler 101 with gravel and soil. During construction, the compaction degree should be controlled to ensure that the filling is dense. S5: tensioning the recyclable prestressed anchor cable 2, which should be tensioned in stages; at the same time, the construction of the anchor cable of the bottom beam turning beam 9 is completed; S6: After the construction of the frame foundation 1 is completed, continue the installation of the I-beam foundation 12, the I-beam 11, the pedestal bottom formwork 13, the steel bundle bogie 7 and the anchor trolley 6. One end of the prestressed steel strand passes through the steel bundle bogie 7 and is fixedly connected to the anchor trolley 6, and the other end is connected to the steering beam 9 at the bottom of the beam. A plurality of jacks 4 are installed on the tensioning end reaction wall 3. The movable end of the jack 4 is connected to a tension rod 5, and the tension rod is fixedly connected to the anchor trolley 6 to complete the construction of the pedestal.

[0041] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technical field within the technical scope disclosed by the present invention should be covered within the protection scope of the present invention.

Claims

1. A prestressed anchor cable folding line pre-tensioning method pedestal, characterized in that: The invention comprises a frame foundation (1), wherein a shear-resistant short pile (14) is arranged below the frame foundation (1), a tensioning end reaction wall (3) is arranged on the left side of the upper part of the frame foundation (1), a Bulb-T beam module is arranged on the right side of the upper part of the frame foundation (1), an anchoring trolley (6) and a steel bundle bogie (7) are arranged between the tensioning end reaction wall (3) and the Bulb-T beam module, a plurality of prestressed steel strands are arranged inside the Bulb-T beam module, the prestressed steel strands pass through the steel bundle bogie (7) and are fixedly connected to the anchoring trolley (6), a plurality of jacks (4) are arranged on the tensioning end reaction wall (3), the movable ends of the jacks (4) are connected to tension rods (5), the tension rods are fixedly connected to the anchoring trolley (6), and a plurality of recyclable prestressed anchor cables (2) are respectively arranged on the frame foundation (1) and the tensioning end reaction wall (3).

2. According to claim 1, a prestressed anchor cable folding line pre-tensioning method pedestal, characterized in that: The Bulb-T beam module comprises a Bulb-T beam (8), a pedestal bottom formwork (13) is provided below the Bulb-T beam (8), an I-beam (11) is provided below the pedestal bottom formwork (13), an I-beam foundation (12) is provided below the I-beam (11), and the left side of the I-beam foundation (12) is fixedly connected to the frame foundation (1).

3. According to claim 2, a prestressed anchor cable fold line pre-tensioning method pedestal, characterized in that: A beam bottom diverter (10) is connected to the side of the prestressed steel strand away from the frame-type foundation (1), a beam bottom diverter crossbeam (9) is fixedly connected below the beam bottom diverter (10), and recyclable prestressed anchor cables (2) are respectively provided at both ends of the beam bottom diverter crossbeam (9), and the beam bottom diverter crossbeam (9) is fixedly connected to the Bulb-T beam module via the recyclable prestressed anchor cables (2).

4. According to claim 3, a prestressed anchor cable folding line pre-tensioning method pedestal, characterized in that: A beam stiffening plate (901) is provided at the contact point between the upper surface of the beam bottom steering beam (9) and the recyclable prestressed anchor cable (2), and a beam pad (902) is provided between the lower surface of the beam bottom steering beam (9) and the I-beam foundation (12). The recyclable prestressed anchor cable (2) passes through the beam stiffening plate (901), the beam bottom steering beam (9), the beam pad (902) and the I-beam foundation (12) and is fixedly connected to the ground.

5. According to claim 3, a prestressed anchor cable folding line pre-tensioning pedestal is characterized by: A screw is provided at the lower end of the beam bottom steering device (10), and the beam bottom steering device (10) is fixedly connected to the middle part of the beam bottom steering crossbeam (9) via the screw.

6. The prestressed anchor cable fold line pre-tensioning pedestal according to claim 1, characterized in that: The recyclable prestressed anchor cable (2) comprises an anchor (201), a corrugated pipe (202) is provided on the outside of the anchor (201), the corrugated pipe (202) is buried inside the frame foundation (1) and the tension end reaction wall (3), a recyclable device (203) is provided at the bottom of the anchor (201), and the anchor (201) passes through the frame foundation (1) or the tension end reaction wall (3) and is fixedly connected to the ground through the recyclable device (203).

7. The prestressed anchor cable fold line pre-tensioning pedestal according to claim 6, characterized in that: The recyclable prestressed anchor cable (2) is a steel strand with a diameter ranging from 15.24 mm to 21.6 mm.

8. The prestressed anchor cable fold line pre-tensioning pedestal according to claim 1, characterized in that: The frame-type foundation (1) is a concrete frame structure with a hollow interior. The side wall of the frame-type foundation (1) is provided with a plurality of filling holes (102). The hollow interior of the frame-type foundation (1) is filled with a filler (101), and the filler (101) is sand or gravel.

9. A method for constructing a prestressed anchor cable fold line pre-tensioning pedestal, comprising constructing a prestressed anchor cable fold line pre-tensioning pedestal as claimed in claims 1 to 8, characterized in that: The following steps are involved: S1: According to the requirements of the on-site layout, the installation position of the recyclable prestressed anchor cable (2) is determined. The drilling depth of the installation hole of the recyclable prestressed anchor cable (2) shall exceed the design length of the recyclable prestressed anchor cable (2) by 0.2 to 0.5 m, and the hole position deviation shall not exceed ±20 mm. Before the installation of the recyclable prestressed anchor cable (2), the drilling hole shall be temporarily blocked to prevent debris and foreign matter from entering; S2: Making a recyclable prestressed anchor cable (2), when lowering the anchor (201), first put the bottom end of the anchor cable body (201) into the hole, and manually push it into the hole slowly and evenly; after the lowering is completed, grouting the anchor cable is performed, and the grouting is completed by using a bottom pressure grouting method; S3: After the anchor cable construction is completed, the foundation rock surface is cleaned, and the frame foundation (1), the shear short piles (14) and the tension end reaction wall (3) are constructed by pouring concrete, and the corrugated pipe (202) is pre-buried in the construction frame foundation (1) and the tension end reaction wall (3) to protect the anchor (201); S4: After the concrete strength of the frame foundation (1) reaches the design requirement, the filling material (101) is filled with crushed stone and soil. During construction, the compaction degree should be controlled to ensure that the filling is dense. S5: tensioning the recyclable prestressed anchor cable (2), which should be tensioned in stages; and at the same time, the construction of the anchor cable of the bottom beam turning beam (9) is completed; S6: After the construction of the frame foundation (1) is completed, the installation of the I-beam foundation (12), the I-beam (11), the pedestal bottom formwork (13), the steel beam bogie (7) and the anchor trolley (6) is continued. One end of the prestressed steel strand passes through the steel beam bogie (7) and is fixedly connected to the anchor trolley (6), and the other end is connected to the bottom steering beam (9). A plurality of jacks (4) are installed on the tensioning end reaction wall (3). The movable end of the jack (4) is connected to a tension rod (5), and the tension rod is fixedly connected to the anchor trolley (6), thereby completing the construction of the pedestal.