Bottom die supporting system of U-shaped section bent cap
Through the combination of wedge-shaped jack and cantilever support components, the existing cover beam bottom form support system has solved the problem of high labor intensity and safety hazards during the removal process, and achieved efficient and safe cover beam construction.
Patent Information
- Application Number
- CN202411300199.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-18
- Publication Date
- 2024-11-22
AI Technical Summary
The existing cover beam bottom form support system has high labor intensity, low work efficiency and safety hazards during the demolition process, making it difficult to carry out cover beam construction efficiently and safely.
Using a combined structure of multiple wedge-shaped jacks, seats and cantilever support components, the bottom mold height is adjusted through the lifting and lowering of the wedge-shaped jack, which simplifies the installation and removal process of the bottom mold, and uses the design of the cantilever support components to improve the stability of the support system. and security.
It significantly improves construction efficiency and safety, simplifies the installation and removal process of the bottom formwork of the cover beam, reduces labor intensity, and ensures high efficiency and safety of construction.
Smart Images

Figure CN118997008A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a support system for a bridge formwork, and in particular to a support system for a prefabricated U-shaped shell of a cap beam, which can smoothly, conveniently and efficiently remove the bottom formwork after the cast-in-place area of a pier top is cast, and belongs to the technical field of bridge construction. Background Art
[0002] After the Y-shaped pier construction at the lower part of the bridge is completed, it is necessary to continue the connection construction of the cast-in-place concrete of the prefabricated + cap beam prefabricated parts at the upper part of the Y-shaped pier. The cap beam construction includes the reinforced concrete splicing construction of several sections of prefabricated U-shaped shells and the cast-in-place concrete construction of the pier top area. Before the concrete pouring construction of the cap beam in the pier top area, it is necessary to set up the truss and work platform first. Then the cap beam bottom formwork (hereinafter referred to as the bottom formwork) used in the cast-in-place area of the cap beam pier top is installed on the support platform. After the installation of the bottom formwork, the steel bars in the pier top area are tied. The steel bars in the pier top area need to be connected with the transverse steel bars reserved in the prefabricated U-shaped shell. After the steel bars are tied, the cap beam side formwork in the cast-in-place area of the pier top is installed, and then the steel bars inside the prefabricated U-shaped shell and the overall concrete pouring of the cap beam are gradually completed. After the pouring is completed, it is necessary to safely, conveniently and efficiently remove the bottom formwork, truss and work platform in the cast-in-place area of the pier top, and put it into the construction of the next span cap beam.
[0003] The existing cap beam bottom formwork support system mainly adopts pads and wooden wedges for support. The wooden wedges are hammered to remove the support of the bottom formwork, which requires multiple people to swing hammers at the same time, resulting in high labor intensity, low work efficiency and safety hazards. Summary of the invention
[0004] The purpose of the present invention is to provide a bottom formwork support system for a U-section cap beam, which is convenient for efficient and safe cap beam construction.
[0005] The present invention is achieved through the following technical solutions:
[0006] A bottom formwork support system for a U-section cap beam, the U-section cap beam comprising three sections of prefabricated U-shaped shells connected in sequence through cast-in-place areas on pier tops, the two sides of the cast-in-place areas on pier tops are respectively clamped and fixed by side forms of the cap beam, the lower ends of the side forms are respectively supported on the bottom formwork on the upper side of the middle of the main truss, the middle truss is supported in the trapezoidal recess in the middle of the lower side of the rectangular prefabricated U-shaped shell in the middle of the cap beam, and the lower side of the middle truss is supported on the main truss through the bottom formwork; the lower side of the inclined surface of the lower side of the trapezoidal prefabricated U-shaped shell at both ends of the cap beam is supported on both ends of the main truss from top to bottom in sequence through the bottom formwork, the platform beam and the wedge-shaped truss; the bottom formwork support system comprises a plurality of wedge-shaped jacks, a plurality of hangers and an array of cantilever support assemblies, two of which are The cantilever support components arranged side by side respectively cross the forked upper ends on both sides of the top of the Y-shaped pier body; the cantilever support components include 2 thick-walled steel pipes and 1 precision-rolled threaded steel through-rod, the inner ends of the thick-walled steel pipes are respectively inserted into the two ends of the PVC pipes that pass through the forked upper ends side by side from both sides of the forked upper ends, the outer ends of the thick-walled steel pipes extend out of both sides of the forked upper ends respectively, the precision-rolled threaded steel through-rods respectively cross the 2 thick-walled steel pipes and the embedded PVC pipes, and the ends of the precision-rolled threaded steel through-rods respectively pass through the corresponding outer ends of the thick-walled steel pipes; the upper parts of the hanging seats respectively cross the outer ends of the thick-walled steel pipes, and are respectively limited by steel nut; the bottoms of the wedge-shaped jacks are fixed side by side on the tops of the hanging seats, and the tops of the wedge-shaped jacks are respectively supported on both sides of the middle part of the main truss.
[0007] The purpose of the present invention can be further achieved by the following technical measures.
[0008] Furthermore, the wedge jack comprises an upper V-shaped block, a lower fixed wedge block, a lower movable wedge block, a precision-rolled threaded steel rod and two steel bar locking nuts. The upper inclined surface of the lower fixed wedge block and the upper inclined surface of the lower movable wedge block are symmetrical on the left and right, and respectively match the inclinations of the inclined surfaces on both sides of the upper V-shaped block. The inclined surfaces on both sides of the upper V-shaped block respectively abut against the upper inclined surface of the lower fixed wedge block and the upper inclined surface of the lower movable wedge block; the lower parts of the two sides of the lower fixed wedge block are respectively welded to the inner sides of one end of a pair of angle steels, the lower sides of the lower movable wedge block are embedded in the inner sides of the other ends of a pair of angle steels, and the inner sides of the middle of the pair of angle steels are fixedly connected by connecting cross plates; the precision-rolled threaded steel rod crosses the lower fixed wedge block The middle part of the block and the middle part of the lower movable wedge block are respectively screwed on the steel bar locking nuts on the two ends of the fine-rolled threaded steel rod to make the lower movable wedge block move toward the lower fixed wedge block, thereby moving the upper V-shaped block upward; or the lower movable wedge block is moved in the direction away from the lower fixed wedge block, thereby moving the upper V-shaped block downward; the two ends of the bottom edge of a pair of angle steels are respectively fixed side by side on the top of the hanger by screw and nut groups, the top surfaces of the upper V-shaped block are respectively supported on the middle parts of both sides of the main truss, and the wedge jack is fixed between the lower side of the main truss and the upper side of the hanger by double-headed screw and nut groups that respectively pass vertically through the top of the upper V-shaped block and the corresponding main truss channel steel beam.
[0009] Furthermore, the locking screw passes through the connecting cross plate and the upper V-block bottom plate in sequence from bottom to top, and the wedge jack is locked at a desired lifting height by a nut screwed on the upper end of the locking screw.
[0010] Furthermore, the hanger is a welded box with its lower part inclined toward the side of the forked upper end, and the outer end of the thick-walled steel pipe passes horizontally through the upper through hole of the welded box and is welded and fixed to the upper side plate of the welded box; the steel bar nuts screwed on the ends of the fine-rolled threaded steel through rods limit the hanger, and the vertical inner plates of the hanger respectively rest against the side of the forked upper end.
[0011] Furthermore, the ratio of the distance L from the outer side surface of the upper side plate of the hanging box to the corresponding fork side surface to the fork thickness B is: L / B=0.26~0.28.
[0012] The present invention adopts a bracket hanging on the end of a thick-walled steel pipe, and the thick-walled steel pipe is supported on both ends of a precision-rolled threaded steel through-rod, and a wedge-shaped jack fixed on the upper side of the bracket is used to support the structure between the lower side of the main truss and the bracket. The wedge-shaped jack has a simple structure, is easy to use, and has a low manufacturing cost. It only needs to screw the steel bar locking nuts at both ends of the wedge-shaped jack to make the upper V-shaped block of the wedge-shaped jack rise and fall, thereby adjusting the height of the wedge-shaped jack, and conveniently and efficiently realizing the vertical adjustment of the rectangular cap beam body in the middle of the prefabricated U-shaped shell in the middle of the cap beam. When disassembling the support system, it is only necessary to lower the height of the wedge-shaped jack so that the main truss and the bottom mold are lowered and separated from the lower side of the cap beam, and then the bottom mold, working platform, wedge-shaped truss, main truss, wedge-shaped jack and bracket can be removed in sequence using lifting equipment, which significantly improves the construction efficiency and construction safety.
[0013] Advantages and features of the present invention will be illustrated and explained by the following non-limiting description of preferred embodiments thereof, which are given by way of example only with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a structural diagram of the prefabricated U-shaped shell and the cast-in-place area of the pier top using the support cap beam of the present invention;
[0015] Figure 2 yes Figure 1 Left-view enlarged image of ;
[0016] Figure 3 It is the front view of the wedge jack;
[0017] Figure 4 yes Figure 3 Left view of . DETAILED DESCRIPTION
[0018] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0019] like Figure 1 and Figure 2 As shown, the cap beam 20 of this embodiment is fixed on the fork 101 of the Y-shaped pier body 10. The cap beam 20 includes a rectangular prefabricated U-shaped shell 201 in the middle and trapezoidal prefabricated U-shaped shells 202 at both ends. The three sections of prefabricated parts are connected into an integrated cap beam 20 through multiple steel bars in adjacent areas and concrete pouring.
[0020] This embodiment includes an intermediate truss 1 welded from steel, a main truss 2 at the lower side of the intermediate truss 1, 16 wedge-shaped jacks 3, 8 hangers 4 and 4 groups of cantilever support assemblies 5. The rectangular prefabricated U-shaped shell 201 and the trapezoidal prefabricated U-shaped shells 202 at both ends are connected to the top cast-in-place area of the Y-shaped pier 10 through transverse steel bars, the lower ends of the cap beam side molds 6 are respectively supported on the bottom mold 7 on the upper side of the middle part of the main truss 2, the intermediate truss 1 is supported in the trapezoidal recess 2011 in the middle of the lower side of the rectangular prefabricated U-shaped shell 201, and the lower side of the intermediate truss 1 is supported on the main truss 2 through the bottom mold 7. The lower side of the inclined surface of the lower side of the trapezoidal prefabricated U-shaped shells 102 at both ends is supported on the two ends of the main truss 2 from top to bottom respectively through the bottom mold 7, the platform beam 8 and the wedge-shaped truss 9.
[0021] In this embodiment, when the Y-shaped pier body 10 is undergoing pier body reinforcement construction, it is necessary to first pre-embed two PVC pipes 102 with a diameter of 120 mm and running across the fork 101 at the upper ends of both sides of the top of the Y-shaped pier body 10, and then complete the pouring of the Y-shaped pier body 20.
[0022] The cantilever support components 5 are arranged in groups of two and cross the PVC pipes 102 at the upper ends of the forks 101 on both sides of the top of the Y-shaped pier body 10. The cantilever support components 5 include two thick-walled steel pipes 51 with an outer diameter of 110 mm and an inner diameter of 52 mm, with an outer diameter to inner diameter ratio greater than 2, and one fine-rolled threaded steel mandrel rod 52 with an outer diameter of 48 mm. The inner ends of the thick-walled steel pipes 51 are respectively inserted into the two ends of the PVC pipes 102 that pass through the upper ends of the forks in parallel from both sides of the upper ends of the forks, and the outer ends of the thick-walled steel pipes 51 extend out of both sides of the upper ends of the forks 101, respectively. The fine-rolled threaded steel mandrel rod 52 crosses the two thick-walled steel pipes 51 and the PVC pipe 102, and the ends of the fine-rolled threaded steel mandrel rod 52 pass through the corresponding outer ends of the thick-walled steel pipes 51.
[0023] The hanger 4 is a welded box with the lower part inclined toward the upper side of the fork 102. The outer end of the thick-walled steel pipe 51 crosses through the upper through hole 411 of the welded box and is welded and fixed on the upper side plate 41 of the welded box. The vertical inner side plates 42 of the hanger 4 are respectively against the upper side of the fork 102, and the steel bar nuts 53 respectively screwed on the ends of the precision-rolled threaded steel through rods 52 limit the hanger 4.
[0024] The ratio of the distance L from the outer side surface of the upper side plate 41 of the hanging box 4 of this embodiment to the corresponding forked side surface to the forked thickness B is: L / B = 0.27. The distance L is the cantilever length, and the forked thickness B is the support length. Since the cantilever length is much smaller than the support length, the bending moment of the cantilever of the cantilever support assembly 5 is significantly reduced, thereby reducing the bending stress of the cantilever support assembly 5, and significantly improving the safety of the support system of the present invention.
[0025] like Figure 3 and Figure 4 As shown, the wedge jack 3 includes an upper V-shaped block 31, a lower fixed wedge block 32 and a lower movable wedge block 33 of a steel plate welded structure, a precision-rolled threaded steel rod 34 and two steel bar locking nuts 35. The upper inclined surface of the lower fixed wedge block 32 and the upper inclined surface of the lower movable wedge block are symmetrical and match the inclination of the inclined surfaces on both sides of the upper V-shaped block 31. The inclined surfaces on both sides of the upper V-shaped block 31 are respectively against the upper inclined surface of the lower fixed wedge block 32 and the upper inclined surface of the lower movable wedge block 33. The lower parts of the two sides of the lower fixed wedge block 32 are respectively welded to the inner side of the left end of a pair of angle steels 36, the lower parts of the two sides of the lower movable wedge block 33 are embedded in the inner side of the right end of the pair of angle steels 36, and the inner side of the middle part of the pair of angle steels 36 is respectively welded to the two ends of the connecting cross plate 35. In this way, the pair of angle steels 36 serve as the guide rails of the lower movable wedge block 33, which improves the moving accuracy of the lower movable wedge block 33. The finely rolled threaded steel rod 34 crosses the middle of the lower fixed wedge block 32 and the middle of the lower movable wedge block 33. The lower movable wedge block 33 is moved toward the lower fixed wedge block 32 by the steel bar locking nuts 35 screwed on both ends of the finely rolled threaded steel rod 4, thereby moving the upper V-shaped block 31 upward; or the lower movable wedge block 33 is moved away from the lower fixed wedge block 32, thereby moving the upper V-shaped block 31 downward. The locking screw 37 passes through the connecting cross plate 38 and the upper V-shaped block bottom plate 311 from bottom to top in sequence, and the wedge jack 3 is locked at the required lifting height by the nut 371 screwed on the upper end of the locking screw 37.
[0026] Compared with the hydraulic jack, the wedge jack 3 of the present invention has a simple structure, low manufacturing cost and long service life. The hydraulic jack needs to maintain pressure for a long time to keep it in the energized lifting state. After long-term use, the hydraulic oil is prone to leakage, causing the hydraulic jack to suddenly fail due to pressure loss, which brings huge safety hazards to the construction of the cap beam 20. The wedge jack 3 of the present invention generates a vertical component of the normal force when the upper inclined surface of the lower fixed wedge block 32 and the upper inclined surface of the lower movable wedge block 33 are in contact through the inclined surfaces on both sides of the upper V-shaped block 31, pushing the upper V-shaped block 31 to move up to support the main truss 2 and the bottom mold 7, so that the support system of the present invention is stable and reliable, which is conducive to the integrated construction of the U-section cap beam 20. In this embodiment, the moving stroke of the upper V-shaped block 31 is 6 cm.
[0027] The two ends of a pair of angle steel bottom edges 361 are fixed side by side on the top of the bracket 4 through screw and nut groups 39, and the double-headed screw and nut groups 310 vertically pass through the four corners of the top of the upper V-block 31 and the corresponding main truss channel steel crossbeam 21 to fix the wedge jack 3 between the lower side of the main truss 2 and the upper side of the bracket 4.
[0028] After the concrete pouring and curing of the cap beam 20 composed of cast-in-place + prefabrication is completed, the steel bar locking nuts 35 on both sides of the wedge jack 3 are loosened respectively, and the upper V-shaped block 31 is moved down. The entire support system is separated from the bottom of the cap beam 20, and then the bottom mold 7, the upper working platform 30, the lower working platform 40, the wedge truss 8, the middle truss 1, the main truss 2, the 16 wedge jacks 3 and the 8 hangers 4 are removed. The whole process is safe, fast and convenient.
[0029] In addition to the above embodiments, the present invention may also have other implementation modes. Any technical solutions formed by equivalent replacement or equivalent transformation shall fall within the protection scope required by the present invention.
Claims
1. A cap beam bottom formwork support system, the cap beam comprises three sections of prefabricated U-shaped shells connected in sequence through the cast-in-place area of the pier top, the two sides of the cast-in-place area of the pier top are clamped and fixed by the cap beam side formwork, the lower ends of the cap beam side formworks are respectively supported on the bottom formwork on the upper side of the middle part of the main truss, the middle truss is supported in the trapezoidal recess in the middle part of the lower side of the rectangular prefabricated U-shaped shell in the middle of the cap beam, and the lower side of the middle truss is supported on the main truss through the bottom formwork; the lower side of the inclined surface of the lower side of the prefabricated U-shaped shell at both ends of the cap beam is supported on both ends of the main truss from top to bottom through the bottom formwork, the platform beam and the wedge-shaped truss in sequence; it is characterized in that: It includes multiple wedge jacks, several mounts and array cantilever support components. A group of two cantilever support components are arranged side by side and respectively cross the forked upper ends on both sides of the top of the Y-shaped pier body; the cantilever support components include two thick-walled steel pipes and one precision-rolled threaded steel through-rod. The inner ends of the thick-walled steel pipes are respectively inserted into the two ends of the PVC pipes that pass through the forked upper ends side by side from both sides of the forked upper ends, and the outer ends of the thick-walled steel pipes extend out of both sides of the forked upper ends respectively. The precision-rolled threaded steel through-rods cross the two thick-walled steel pipes and the embedded PVC pipes respectively, and the ends of the precision-rolled threaded steel through-rods pass through the corresponding outer ends of the thick-walled steel pipes respectively; the upper parts of the mounts cross the outer ends of the thick-walled steel pipes respectively, and are respectively limited by steel nut; the bottoms of the wedge jacks are fixed side by side on the tops of the mounts, and the tops of the wedge jacks are respectively supported on both sides of the middle of the main truss.
2. The cap beam bottom formwork support system according to claim 1, characterized in that: The wedge jack comprises an upper V-shaped block, a lower fixed wedge block, a lower movable wedge block, a precision-rolled threaded steel rod and two steel bar locking nuts. The upper inclined surface of the lower fixed wedge block and the upper inclined surface of the lower movable wedge block are symmetrical on the left and right, and respectively match the inclinations of the inclined surfaces on both sides of the upper V-shaped block. The inclined surfaces on both sides of the upper V-shaped block respectively abut against the upper inclined surface of the lower fixed wedge block and the upper inclined surface of the lower movable wedge block; the lower parts of the two sides of the lower fixed wedge block are respectively welded to the inner sides of one end of a pair of angle steels, the lower sides of the lower movable wedge block are embedded in the inner sides of the other ends of a pair of angle steels, and the inner sides of the middle of the pair of angle steels are fixedly connected by connecting cross plates; the precision-rolled threaded steel rod crosses the middle of the lower fixed wedge block and the lower movable wedge In the middle of the block, by tightening the steel bar locking nuts on the two ends of the fine-rolled threaded steel rod respectively, the lower moving wedge block moves toward the lower fixed wedge block, thereby moving the upper V-shaped block upward; or loosening the steel bar locking nuts respectively, so that the lower moving wedge block moves away from the lower fixed wedge block, thereby moving the upper V-shaped block downward; the two ends of the bottom edge of a pair of angle steels are fixed to the top of the bracket by screw and nut groups respectively, and the top surfaces of the upper V-shaped blocks are supported on the middle parts of both sides of the main truss respectively, and the wedge jack is fixed between the lower side of the main truss and the upper side of the bracket by double-headed screw and nut groups that vertically pass through the four corners of the top of the upper V-shaped block and the corresponding main truss channel steel beams.
3. The cap beam bottom formwork support system according to claim 2, characterized in that: The locking screw passes through the connecting cross plate and the upper V-block bottom plate from bottom to top in sequence, and the wedge jack is locked at the required lifting height by tightening the nut on the upper end of the locking screw.
4. The cap beam bottom formwork support system according to claim 1, characterized in that: The hanger is a welded box with its lower part inclined toward the side of the forked upper end. The outer end of the thick-walled steel pipe passes horizontally through the upper through hole of the welded box and is welded and fixed to the upper side plate of the welded box. The steel bar nuts tightened on the ends of the fine-rolled threaded steel through-rods limit the hanger, and the vertical inner plates of the hanger respectively rest against the side of the forked upper end.
5. The cap beam bottom formwork support system according to claim 1, characterized in that: The ratio of the distance L from the outer side surface of the upper side plate of the hanging box to the corresponding fork side surface to the fork thickness B is: L / B=0.26~0.28.
