Complex geological rotary digging hole-forming cast-in-place pile and construction method

By employing sheet pile pre-reinforcement, cross-shaped pipe wrench positioning, wedge-shaped rock-breaking steel block core sampling, and down-the-hole hammer protective cover device under complex geological conditions, the positioning and construction difficulties of traditional bored piles under complex geological conditions have been solved, achieving efficient and stable rotary drilling bored pile construction.

CN118997124APending Publication Date: 2024-11-22河南交投大别山明鸡高速公路有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411181249.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

Under complex geological conditions, traditional bored pile construction suffers from problems such as difficulty in ensuring the accuracy of steel casing positioning, easy collapse of pile holes, low construction efficiency, and difficulty in core extraction, resulting in high construction difficulty and difficulty in quality control.

Method used

The terrain was pre-reinforced by driving sheet piles near the shore, the steel casing was precisely positioned using a cross-shaped pipe screwdriver, wedge-shaped rock-breaking steel blocks were installed to extract the rock core, a down-the-hole hammer was used in conjunction with a protective cover for rock breaking operations, and protective steel pads were installed on the reinforcing cage to ensure positioning accuracy.

Benefits of technology

It improved construction efficiency and quality, ensured accurate positioning of the steel casing, reduced the difficulty of core extraction, reduced noise and dust pollution, and enhanced the stability and positioning accuracy of the construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997124A_ABST
    Figure CN118997124A_ABST
Patent Text Reader

Abstract

The invention relates to a rotary drilling cast-in-place pile for complex geology and a construction method, which adopt a steep terrain riverbed pre-reinforcement technology, and utilize the characteristic of high reliability of a PLC (Programmable Logic Controller) pile cofferdam on a side slope not close to a river bank side to resist the slippage of a soil body at the steep side slope; on the side slope close to the river bank side, the construction speed is increased by utilizing the construction convenience of the steel sheet piles, so that the overall construction efficiency is improved on the basis of ensuring the stability of the soil body of the side slope; a steel casing accurate positioning and sinking technology is used, a plurality of monitoring and deviation rectifying points are arranged on the steel casing, displacement observation and adjustment are carried out on the casing through different observation and deviation rectifying points in the casing sinking construction process, the steel casing construction efficiency on site is improved, and the construction casing installation and positioning accuracy is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of rotary bored cast-in-place pile construction, and in particular relates to a rotary bored cast-in-place pile in complex geology and a construction method. Background Art

[0002] In recent years, with the vigorous development of engineering construction, bored cast-in-place piles have been widely used in foundation construction, and the engineering geological conditions they face have become increasingly complex. When constructing under complex geological conditions such as steep riverbeds and thick rock formations, the traditional bored cast-in-place pile construction method has problems such as difficulty in ensuring the positioning accuracy of the steel casing and easy collapse of the pile hole during drilling. In addition, the drilling efficiency in thick rock formations is low and it is difficult to remove the rock core from the pile hole, which makes the overall construction of bored cast-in-place piles difficult and the construction quality difficult to control. Therefore, it is of great significance to study the complex geological rotary drilling and bored cast-in-place piles and construction methods. Summary of the invention

[0003] The purpose of the present invention is to overcome the deficiencies in the prior art and provide a cast-in-place pile for rotary drilling in complex geology and a construction method.

[0004] This complex geological rotary drilling and bored pile construction method includes the following construction steps:

[0005] S1. Drive steel sheet piles near the shore, and arrange supporting steel sheet piles and PLC pile cofferdams around the designed position of the steel casing for support;

[0006] S2. Use a cross frame pipe twister to apply vibration to the steel casing for sinking;

[0007] S3. Install a wedge-shaped rock-breaking steel block on the drill auger, perform primary drilling on the rock formation, and twist off and remove the rock core;

[0008] S4. When constructing in deep hard rock formations, install the bottom device of the protective cover and use a down-the-hole hammer to break the rock on the drill rod;

[0009] S5. Install protective layer steel pads on the cast-in-place pile reinforcement cage and lower the pile foundation reinforcement cage.

[0010] Preferably, in step S1, a row of near-shore steel sheet piles is set along the river bank for preliminary reinforcement. When bored pile drilling is carried out at the steep slope, a row of supporting steel sheet piles is used in advance on the near-river bank side according to the position of the steel casing for enclosure, and the remaining three sides of the steel casing are protected by a PLC pile cofferdam structure; the PLC pile cofferdam comprises a steel pipe and a Larsen steel sheet pile, and the steel pipe and the Larsen steel sheet pile are connected by a lock, wherein the lock is welded at symmetrical positions on both sides of the steel pipe.

[0011] Preferably, in step S2, control points are set on the steel casing of the bored pile for monitoring and deviation correction. During the process of burying the steel casing in the soil, a cross-frame pipe twister is used to perform cyclic vibration at intervals along the clockwise direction at the control points to apply vibration force to the steel casing, and the steel casing is sunk to the designed position with the help of the control points.

[0012] Preferably, in step S3, a wedge-shaped rock-breaking steel block is installed at the top of the barrel drill. When the machine continuously applies a torsional force, the barrel drill and the rock core are engaged with the help of the wedge-shaped rock-breaking steel block, and the rock core is broken and removed as a whole by applying a torsional force through the rotary drilling machine.

[0013] Preferably, in step S3, the rock formation geology is expanded, a wedge-shaped rock-breaking steel block is installed at the bottom of the drill tube, and the rock in the hole is broken into small-volume fragments by using the wedge-shaped rock-breaking steel block at the bottom.

[0014] Preferably, in step S4, when construction reaches a deep hard rock formation, a down-the-hole hammer is used at the bottom of the drill rod to perform rock breaking operations, and a safety shield device is arranged on the outside of the drill rod for construction protection, the safety shield device includes side steel plates, a top steel plate and a bottom steel plate for enclosure; a bottom steel enclosure is arranged around the bottom steel plate for enclosure, and limit blocks are welded on the bottom steel plate for enclosure; the side steel plates are surrounded on all sides to form a structure with an open top, which is fixed between the limit blocks; a slide groove is provided on the top of the side steel plate for the installation and removal of the top steel plate, and a sound insulation felt is pasted on the outside of the side steel plate; a hole is opened in the center of the top steel plate for the drill rod to pass through.

[0015] Preferably, in step S5, protective layer steel pads are installed at intervals on the outer surface of the cast-in-place pile reinforcement cage. During the construction process of sinking the reinforcement cage into the pile hole, the protective layer steel pads play a role in preventing the reinforcement cage from bumping and positioning; the height of the protective layer steel pads is equal to the protective layer thickness of the main reinforcement.

[0016] The rotary bored cast-in-place piles in complex geological conditions are obtained by any of the above-mentioned methods.

[0017] The beneficial effects of the present invention are:

[0018] 1) The present invention uses the steep riverbed pre-reinforcement technology. On the slopes not close to the river bank, the high reliability of the PLC pile cofferdam is used to resist the soil sliding on the steep slopes. On the slopes close to the river bank, the convenience of the construction of steel sheet piles is used to speed up the construction speed, thereby improving the overall construction efficiency while ensuring the stability of the slope soil.

[0019] 2) The present invention uses the steel casing precise positioning and sinking technology, and sets a number of monitoring and correction points on the steel casing. During the casing sinking construction process, the casing displacement is observed and adjusted through different observation and correction points, which improves the on-site steel casing construction efficiency and ensures the installation and positioning accuracy of the construction casing.

[0020] 3) The present invention uses an efficient drilling technology for rock breaking and coring. During the first-level drilling, a wedge-shaped rock-breaking steel block is used to allow the drill tube and the core to fit tightly together, and then the core is completely twisted off and taken out, reducing the difficulty of drilling and coring. When expanding the hole, a wedge-shaped rock-breaking steel block is used to enhance the concavity of the inner wall of the end of the drill tube, making the volume of the core broken smaller, facilitating slag cleaning operations, and improving the overall construction efficiency of the rock formation hole-forming operation.

[0021] 4) The present invention uses a down-the-hole hammer hard rock drilling hole mouth safety protection cover device, which effectively reduces noise pollution. The bottom steel enclosure cooperates with the upper enclosure steel bottom plate to collect dust and water on site, avoiding splashing and flowing around the construction site, thereby realizing green and civilized construction on site.

[0022] 5) The present invention uses a new type of steel cage protective layer pad technology to ensure that the steel pad is not easily damaged or shaken during the steel cage sinking construction process. On the premise of ensuring that the protective layer thickness meets the design requirements, the positioning accuracy of the steel cage lowering construction is enhanced. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 Schematic diagram of riverbed pre-reinforcement in steep terrain;

[0024] Figure 2 Schematic diagram of PLC pile cofferdam structure;

[0025] Figure 3 Schematic diagram of the arrangement of monitoring and correction points;

[0026] Figure 4 Schematic diagram of the steel casing precise positioning and sinking technology;

[0027] Figure 5 Schematic diagram of the complete coring construction barrel drill structure;

[0028] Figure 6 Schematic diagram of the structure of the barrel drill for crushing and coring construction;

[0029] Figure 7 Schematic diagram of the safety shield for down-the-hole hammer hard rock drilling;

[0030] Figure 8 Schematic diagram of the structure of the orifice safety protection cover;

[0031] Fig. 9 Schematic diagram of installation of top steel plate of orifice safety protection cover;

[0032] Fig.10 Schematic diagram of the new steel cage protective layer pad technology;

[0033] Fig.11 Schematic diagram of the new steel cage protective layer pad structure.

[0034] Explanation of the accompanying drawings: 1-steep slope, 2-river bank, 3-nearshore steel sheet piles, 4-steel casing, 5-PLC pile cofferdam, 6-support steel sheet piles, 7-steel pipe, 8-locking mouth, 9-Larsen steel sheet pile, 10-soil, 11-cross fork frame pipe twister, 12-point one, 13-point two, 14-point three, 15-point four, 16-point five, 17-point six, 18-barrel drill, 19-wedge-shaped rock-breaking steel block, 20-drill rod, 21-side steel plate, 22-bottom steel enclosure, 23-sound insulation felt, 24-limiting block, 25-top steel plate, 26-enclosure bottom steel plate, 27-pile hole wall, 28-down-the-hole hammer, 29-chute, 30-protective layer steel pad, 31-rebar cage. DETAILED DESCRIPTION

[0035] The present invention is further described below in conjunction with embodiments. The description of the following embodiments is only used to help understand the present invention. It should be noted that for ordinary persons in the art, without departing from the principle of the present invention, the present invention can also be modified in some ways, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.

[0036] Embodiment 1

[0037] As an example, Figures 1 to 11 As shown, the construction method of this complex geological rotary drilling and bored pile includes the following construction steps:

[0038] S1. When bored piles are constructed on the steep slope 1 on the river bank 2, a row of near-shore steel sheet piles 3 are first driven into the river bank 2 to reinforce the loose slope surface of the river bank 2. Then, the design construction position of the steel casing 4 is determined. The side close to the river bank 2 is supported by Larsen steel sheet piles 6, while the other three sides are supported by PLC pile cofferdams 5 with stronger support performance. After the support construction is completed, a series of construction such as bored pile drilling and bored pile body is carried out. The support structure improves the stability of bored pile construction in the steep riverbed and improves the overall construction quality.

[0039] S2. In order to ensure the accurate positioning and sinking of the steel casing 4, monitoring and correction points are set on the steel casing 4. During the casing burial process, a cross-fork frame pipe twister 11 is used to apply vibration force to the steel casing 4, and clockwise cyclic vibration is performed in the order of point one 12 → point two 13 → point three 14 → point four 15 → point five 16 → point six 17 → point 112. During the construction process, displacement observations are carried out at these six points. When correction is needed, the most effective vibration point among the six points is selected to implement correction until the position and verticality of the steel casing meet the construction design requirements.

[0040] S3. When performing primary drilling operations on rock strata, an old barrel drill 18 with a longer length is selected and four wedge-shaped rock-breaking steel blocks 19 are installed on its top. When the machine continuously applies torsional force, the barrel drill 18 and the rock core are tightly engaged with the help of the wedge-shaped rock-breaking steel blocks 19, and then the rock core is completely twisted off and taken out. The use of a longer barrel drill 18 can reduce the torque of the mechanical drill rod and reduce the number of times of taking rock cores on site. When expanding the hole in the rock strata, the rock core in the pile hole is ring-shaped and cannot be completely taken out. Therefore, the old barrel drill 18 is modified to install four wedge-shaped rock-breaking steel blocks 19 at its end, thereby enhancing the concavity and convexity of the inner wall of the end of the barrel drill 18, making the volume of the broken rock core smaller and facilitating the slag cleaning operation.

[0041] S4. When constructing to deep hard rock formations, the use of down-the-hole hammer 28 for rock breaking operations can make the hole construction more efficient and reliable. During the rock breaking operations, a hole mouth safety protection cover device is used for construction protection during the pile hole operation. First, the bottom device of the protection cover is installed at the designated location on site, which includes the bottom steel enclosure 22, the enclosure bottom steel plate 26 and the limit block 24; then when the down-the-hole hammer 28 is lowered to the construction position, the two pieces of the top steel plates 25 of the protection cover are installed to the designated position through the slide 29, and holes are reserved in advance for the normal operation of the drill rod 20. In order to reduce noise, sound insulation felt 23 is pasted on the surface of the side steel plate 21 and it is waterproofed and protected, which effectively reduces noise and dust pollution.

[0042] S5. After the bored pile drilling operation is completed, the pile foundation reinforcement cage 31 is lowered. Protective layer steel pads 30 are installed on the bored pile reinforcement cage 31 in advance with a spacing of 6m. During the construction process of sinking the reinforcement cage 31 into the pile hole, the arranged protective layer steel pads 30 are not easily damaged or shaken. On the premise of ensuring that the thickness of the protective layer meets the design requirements, the positioning accuracy of the reinforcement cage 31 lowering construction is also enhanced.

[0043] Embodiment 2

[0044] As another embodiment, this embodiment 2 is proposed on the basis of embodiment 1. Figure 1-2 As shown, firstly, a row of near-shore steel sheet piles 3 are set near the river bank 2 to pre-reinforce the loose soil of the riverbed cover layer. Then, when bored piles are constructed at the steep slope 1, a row of supporting steel sheet piles 6 are used in advance on the near-river bank side according to the position of the steel casing 4 for enclosure, and the PLC pile cofferdam 5 structure is used for enclosure on the other three sides.

[0045] like Figure 3 , Figure 4As shown, six monitoring and deviation correction control points are set in advance on the bored pile steel casing 4, and the control points are arranged in sequence in a clockwise direction on the top of the steel casing. During the construction process of sinking the steel casing 4 into the soil 10, a cross-fork frame pipe twister 11 is used for construction, and the displacement of the steel casing 4 is measured and corrected in real time with the help of the monitoring and deviation correction control points until the steel casing 4 is accurately sunk to the designed position.

[0046] like Figure 5-6 As shown, when the first-level drilling construction is carried out on the rock stratum geology, a wedge-shaped rock-breaking steel block 19 is installed at the top position of the cone drill 18, so that the drill derrick is in close contact with the core section, and when drilling, a torque is applied by the mechanical drill rod 20 to break the core as a whole and remove it. Subsequently, when the pile hole is expanded in the rock stratum, a wedge-shaped rock-breaking steel block 19 is installed at the bottom of the cone drill derrick 18, and the wedge-shaped rock-breaking steel block 19 at the bottom is used to break the rock in the hole into small-volume fragments, which is convenient for cleaning and salvaging the broken rock fragments.

[0047] like Figure 7 to Figure 9 As shown, when the construction reaches deep hard rock geology, a down-the-hole hammer 28 is used to perform rock breaking operations in the rock strata. During construction, the side steel plates 21, the bottom steel enclosure 22, and the enclosure bottom steel plate 26 are first installed to the specified positions, and then the down-the-hole drill 29 is drilled to the construction position in the pile hole. Then, the top steel plate 25 is installed around the drill rod 20 through the slide 29. After the installation of the hole protection cover device is completed, the rock breaking operation is carried out.

[0048] like Fig.10 , Fig.11 As shown, when the steel cage is manufactured, the protective layer steel pads 30 are cross-symmetrically installed on the cast-in-place pile steel cage 31, and are arranged at intervals of 6m along the length direction of the cast-in-place pile steel cage 31. When the steel cage 31 is sunk into the pile hole, the protective layer steel pads 30 are not easily damaged when in contact with the steel casing 4 and the wall of the cast-in-place pile hole, thereby ensuring that the steel cage is safely and accurately lowered to the designated position.

[0049] It should be noted that the parts in this embodiment that are the same or similar to those in the first embodiment can be referenced to each other and will not be described in detail in this application.

[0050] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

Claims

1. A construction method for rotary bored piles in complex geology, characterized in that: The construction steps include: S1. Drive steel sheet piles near the shore, and arrange supporting steel sheet piles and PLC pile cofferdams around the designed position of the steel casing for support; S2. Use a cross frame pipe twister to apply vibration to the steel casing for sinking; S3. Install a wedge-shaped rock-breaking steel block on the drill auger, perform primary drilling on the rock formation, and twist off and remove the rock core; S4. When constructing in deep hard rock formations, install the bottom device of the protective cover and use a down-the-hole hammer to break the rock on the drill rod; S5. Install protective layer steel pads on the cast-in-place pile reinforcement cage and lower the pile foundation reinforcement cage.

2. The construction method of rotary bored piles in complex geology according to claim 1 is characterized in that: In step S1, a row of near-shore steel sheet piles is set along the river bank for pre-reinforcement. When bored pile drilling is carried out at the steep slope, a row of supporting steel sheet piles is used in advance on the near-river bank side according to the position of the steel casing for enclosure, and the remaining three sides of the steel casing are protected by a PLC pile cofferdam structure; the PLC pile cofferdam includes a steel pipe and a Larsen steel sheet pile, and the steel pipe and the Larsen steel sheet pile are connected by a lock, wherein the lock is welded at symmetrical positions on both sides of the steel pipe.

3. The construction method of rotary bored piles in complex geology according to claim 1 is characterized in that: In step S2, control points are set on the steel casing of the bored pile for monitoring and deviation correction. During the process of burying the steel casing in the soil, a cross-frame pipe twister is used to perform cyclic vibration at intervals along the clockwise direction at the control points to apply vibration force to the steel casing, and the steel casing is sunk to the designed position with the help of the control points.

4. The construction method of rotary bored piles in complex geology according to claim 1 is characterized in that: In step S3, a wedge-shaped rock-breaking steel block is installed at the top of the barrel drill. When the machine continues to apply a torsional force, the barrel drill and the rock core are engaged with the help of the wedge-shaped rock-breaking steel block, and the rock core is broken and removed as a whole by applying a torsional force through the rotary drilling machine.

5. The construction method of rotary bored piles in complex geology according to claim 1 is characterized in that: In step S3, the rock formation geology is investigated to carry out hole expansion construction, a wedge-shaped rock-breaking steel block is installed at the bottom of the drill tube, and the rock in the hole is broken into small-volume fragments by using the wedge-shaped rock-breaking steel block at the bottom.

6. The construction method of rotary bored piles in complex geology according to claim 1 is characterized in that: In step S4, when the construction reaches a deep hard rock formation, a down-the-hole hammer is used at the bottom of the drill rod to perform rock breaking operations, and a safety shield device is arranged on the outside of the drill rod for construction protection. The safety shield device includes side steel plates, a top steel plate and a bottom steel plate for enclosure; a bottom steel enclosure is arranged around the bottom steel plate for enclosure, and a limiting block is welded on the bottom steel plate for enclosure; the side steel plates are surrounded on all sides to form a structure with an open top, which is fixed between the limiting blocks; a slide groove is provided on the top of the side steel plate for the installation and removal of the top steel plate, and a sound insulation felt is pasted on the outside of the side steel plate; a hole is opened in the center of the top steel plate for the drill rod to pass through.

7. The construction method of rotary bored piles in complex geology according to claim 1 is characterized in that: In step S5, protective layer steel pads are installed at intervals on the outer surface of the cast-in-place pile reinforcement cage. During the construction process of sinking the reinforcement cage into the pile hole, the protective layer steel pads play a role in preventing the reinforcement cage from bumping and positioning; the height of the protective layer steel pads is equal to the protective layer thickness of the main reinforcement.

8. Rotary bored piles in complex geology, characterized by: Obtained by the method of claims 1 to 7.