Pit-filling and land-making structure and method by combining sulfur-fixing ash with sulfur-fixing slag
By collecting and controlling the laying order and dosage of solid sulfur ash slag in graded collection and control, the calcium oxide hydration reaction is promoted, and the stability and expansion problems of solid sulfur ash slag in the pit filling and land are solved, and the large-scale of solid sulfur ash slag is achieved Improve the effect of resource utilization and pit filling and land production.
Patent Information
- Application Number
- CN202411119678.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-11-22
AI Technical Summary
During the application process, the products cracked due to unstable components and expansion, which hindered its large-scale resource utilization. The existing technology has not found its application in pit filling and land production.
By collecting and grading sulfur ash and sulfur solid slag respectively, and controlling their laying order and dosage during the pit filling process, the calcium oxide hydration reaction is promoted to form a gel, combining the structure of sulfur solid ash layer and sulfur solid slag layer. Layout to improve compressive strength and acid-base neutrality, and reduce the impact of expansion.
The compressive strength and stability of the solid sulfur ash slag layer are improved, and large-scale resource utilization of solid sulfur ash slag is realized, reducing storage costs and land occupation needs, and improving the effect of filling and land production.
Smart Images

Figure CN118997181A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of sulfur-fixing ash and slag, and in particular to a pit filling and land reclamation structure and method utilizing sulfur-fixing ash and sulfur-fixing slag. Background Art
[0002] Sulfur-fixing ash is a solid waste discharged by mixing sulfur-containing coal with a desulfurizer and sending it into a circulating fluidized bed boiler to burn sulfur-fixing at a certain temperature. The solid waste collected from the flue of the circulating fluidized bed boiler is sulfur-fixing ash, and the solid waste collected from the bottom of the circulating fluidized bed boiler is sulfur-fixing slag. Sulfur-fixing ash has the following characteristics: ① The particles are finer, and the particle size is mostly distributed between 20-50μm; ② The water requirement is twice that of fly ash when it is prepared into a standard consistency slurry; Sulfur-fixing slag has the following characteristics: ① The fineness modulus is about 2.0; ② The water requirement is about 1.5 times that of fly ash when it is prepared into a standard consistency slurry. The overall characteristics of solid sulfur ash are reflected in: ① The sulfur trioxide, calcium oxide and ignition loss are relatively high, and the total content of silicon dioxide, aluminum oxide and iron oxide is relatively low; ② It contains some soluble sulfur, insoluble sulfur and free calcium oxide components, the main types of sulfur minerals are II-CaSO4, and the free calcium oxide is mostly wrapped by II-CaSO4; ③ Aluminum oxide mainly exists in the form of metakaolinite.
[0003] At present, the properties of solid sulfur ash have been fully explored and studied by relevant technical personnel, and it has been found that during the application of solid sulfur ash, the main manifestation of its volume change is expansion, and the expansion rate increases with the increase of solid sulfur ash dosage. Therefore, how to combine the properties of solid sulfur ash itself and utilize it as a resource has become a key research direction for technical personnel in this field. For example: (1) Use solid sulfur ash modified or unmodified as a filler material for cement; (2) Use solid sulfur ash in mineral admixtures to improve concrete performance; (3) Use solid sulfur ash to prepare autoclaved bricks, new building materials or filling cementitious materials, etc.
[0004] However, with the deepening of research on the application of solid sulfur ash, the application defects of solid sulfur ash have gradually emerged, resulting in unsatisfactory application effects of solid sulfur ash; the reason for this application defect is that the solid sulfur ash contains more unstable components, and the inappropriate application method of the solid sulfur ash during the application process will cause cracking of the product under the action of expansion, thereby hindering the large-scale resource utilization of the solid sulfur ash, resulting in a low resource utilization rate of the solid sulfur ash waste and a high post-processing cost of the solid sulfur ash.
[0005] Filling pits to create land belongs to the aspect of ecological restoration, and the use of industrial waste for filling and creating land has been studied. For example, patent No. 201810700263.1 discloses that fly ash is alkali-modified, surface-modified, and mixed to obtain modified fly ash; the modified fly ash is then mixed evenly with furnace ash slag, sodium lignin sulfonate, slaked lime, etc. to obtain a curing agent, and then the curing agent is added to the sludge and mixed evenly, and rolled to form a dense soil structure, which saves soil and reduces land occupation. Another example: Patent application No. 202410567000.3 discloses that after waste residues such as slag and carbide slag are prepared into slag powder, the slag powder is mixed with fly ash, volcanic ash, phosphogypsum, silicate cement, etc. to prepare a cementitious material, and the cementitious material is mixed evenly with sludge, anti-dispersant, etc. to prepare an underwater anti-dispersible fluidized solidification slurry to avoid the sludge with admixtures being easily dispersed underwater, resulting in poor curing effect and affecting the strength of the formed land. It can be seen that the prior art discloses relevant technologies on the application of industrial solid waste to pit filling and land reclamation, but there is no research on how to apply solid sulfur ash to pit filling and land reclamation.
[0006] In view of the above, in order to realize large-scale resource utilization of solid sulfur ash and overcome the defects in the application of solid sulfur ash, the research team of the present invention introduced solid sulfur ash into pit filling and land reclamation. After studying the process steps of using solid sulfur ash in pit filling and land reclamation and the structural layer of pit filling and land reclamation, a new idea was provided for the large-scale resource utilization of solid sulfur ash. Summary of the invention
[0007] Based on the above technical problems, the present invention provides a structure and method for pit filling and land reclamation using solid sulfur ash and solid sulfur slag. During the collection process of solid sulfur ash and slag, the solid sulfur ash and solid sulfur slag are collected separately, and the filling sequence of solid sulfur ash and solid sulfur slag in the pit filling and land reclamation process and the land reclamation construction process are studied, so that the application of solid sulfur ash and solid sulfur slag can be properly controlled and adjusted, ensuring the quality of solid sulfur ash and slag used in pit filling and land reclamation.
[0008] The specific technical solution is:
[0009] One of the purposes of the invention is to provide a method for filling pits and creating land using solid sulfur ash and solid sulfur slag, comprising the following steps:
[0010] S1: Collecting sulfur-fixing ash and slag: Collecting sulfur-fixing ash and sulfur-fixing slag from the circulating fluidized bed boiler respectively, and storing them separately for later use;
[0011] S2: paving sulfur ash: paving the collected sulfur ash in the pit to be filled, and then pouring water accounting for 9.5-16.7% of the mass of the sulfur ash to obtain a sulfur ash layer;
[0012] S3: paving sulfur slag: paving the collected sulfur-fixing slag on the sulfur-fixing ash layer, and then pouring water accounting for 11.4-20% of the mass of the sulfur-fixing slag to obtain a sulfur-fixing slag layer;
[0013] S4: Soil spreading: compact the soil by rolling, and then spread the soil on the sulfur-fixing slag layer to obtain a soil layer;
[0014] Wherein, the mass ratio of the sulfur-fixing ash used in the sulfur-fixing ash layer, the sulfur-fixing slag used in the sulfur-fixing slag layer and the soil used in the soil layer is 36-42:30-35:18-28.
[0015] The solid sulfur ash and solid sulfur slag collected from the circulating fluidized bed boiler are collected and graded to obtain solid sulfur ash and solid sulfur slag, which are then laid separately, and the relative amounts of the solid sulfur ash and solid sulfur slag are controlled. At the same time, the amount of watering during the laying process is controlled to promote the hydration reaction of calcium oxide in the solid sulfur ash and solid sulfur slag at different stages. At the same time, calcium oxide reacts with silicon dioxide, aluminum oxide, etc. contained inside as an alkali activator to form a gel, and finally reacts to generate calcium aluminate. Combined with the structural layout and amount control between the solid sulfur ash layer and the solid sulfur slag layer, it is ensured that the acidity and alkalinity of the solid sulfur ash slag layer after construction tends to be neutral, and the compressive strength is improved, thereby improving the effect of filling pits and creating land, increasing the amount of solid sulfur ash slag used, and reducing the land occupancy rate of solid sulfur ash slag storage.
[0016] In order to ensure the effect of using solid sulfur ash and solid sulfur slag to fill pits and create land, and to improve the strength effect of constructing a solid sulfur ash slag layer during pit filling and creation, it is preferred that a solid sulfur ash slag layer is constructed from the lower surface of the solid sulfur ash layer to the upper surface of the adjacent solid sulfur slag layer, and the number of layers of the solid sulfur ash slag layer is determined according to the depth of the pit to be filled, and the thickness of the solid sulfur ash slag layer is 50-60cm.
[0017] In order to ensure the effect of using solid sulfur ash and solid sulfur slag to fill the pit and improve the strength effect of the solid sulfur ash slag layer constructed by filling the pit, preferably, in step S3, after laying the solid sulfur slag on the solid sulfur ash layer, silica ash is laid on the surface of the solid sulfur slag, and after watering and rolling to compact, a solid sulfur slag layer and a silica ash layer are obtained, and the mass ratio of the silica ash to the solid sulfur ash and the solid sulfur slag is 1-3:36-42:30-35. More preferably, a solid sulfur ash slag layer is constructed from the lower surface of the solid sulfur ash layer to the upper surface of the silica ash layer, the number of layers of the solid sulfur ash slag layer is determined according to the depth of the pit to be filled, and the thickness of the solid sulfur ash slag layer is 50-60cm.
[0018] In order to ensure that the land obtained from land reclamation does not lose its arable land characteristics and meet the demand for arable land, preferably, the thickness of the soil layer is 50-60 cm.
[0019] The pit to be filled created by the present invention includes but is not limited to abandoned mine pits to be repaired or ditches to be repaired.
[0020] The second purpose of the invention is to utilize solid sulfur ash and solid sulfur slag to fill a pit and create a ground structure, including a pit to be filled, the bottom of the pit to be filled is paved with solid sulfur ash and watered to form a solid sulfur ash layer, the upper surface of the solid sulfur ash layer is paved with solid sulfur slag, watered and compacted to form a solid sulfur slag layer; the solid sulfur ash layer and the solid sulfur slag layer are jointly constructed into a solid sulfur ash slag layer, and soil is laid on the upper surface of the solid sulfur ash slag layer to form a soil layer.
[0021] Solid sulfur ash and solid sulfur slag are used to construct a solid sulfur ash slag layer alternately, and solid sulfur ash is laid at the bottom of the pit to be filled to form a solid sulfur ash layer, and a solid sulfur slag layer is laid on the solid sulfur ash layer. The solid sulfur slag layer formed by solid sulfur slag with larger particle size is pressed on the solid sulfur ash layer formed by solid sulfur ash with finer particle size. At the same time, the characteristic that solid sulfur ash requires a higher amount of water than solid sulfur slag to prepare a slurry of standard consistency is utilized, so that the construction strength of the solid sulfur ash slag layer is improved, the land reclamation effect is guaranteed, the large-scale resource utilization of solid sulfur ash slag is realized, and the land occupation cost of solid sulfur ash slag is reduced.
[0022] In order to improve the compressive strength and permeability coefficient, preferably, silica ash is laid on the upper surface of the solid sulfur slag layer to form a silica ash layer, and the silica ash is laid after the solid sulfur slag is laid on the upper surface of the solid sulfur ash layer, and then watering and compacting are performed to form the solid sulfur slag layer and the silica ash layer; the solid sulfur ash layer, the solid sulfur slag layer and the silica ash layer together constitute a solid sulfur ash slag layer.
[0023] Preferably, the number of the sulfur-fixing ash layers is determined according to the depth of the pit to be filled.
[0024] Compared with the prior art, the technical effects created by the present invention are embodied in:
[0025] The invention utilizes the close relationship between the expansion coefficient of the solid sulfur ash and the particle size, temperature, time, dosage, etc., collects the solid sulfur ash and the solid sulfur slag in the solid sulfur ash respectively, and then lays them in layers, so that the solid sulfur ash and the solid sulfur slag are reasonably arranged in the pit to be filled, improves the effect of the solid sulfur ash and solid sulfur slag in filling the pit and forming the land, increases the compressive strength of the solid sulfur ash slag layer, and meets the basic strength requirements for filling the pit and forming the land.
[0026] The invention utilizes the components such as quartz (SiO2), gypsum (CaSO4), limestone, hematite and free calcium oxide contained in the solid sulfur ash and solid sulfur slag, which are very easy to generate calcium aluminate in a water environment, and then form a solid sulfur ash slag layer with a certain strength, which ensures the basic compressive strength requirement of land reclamation and helps to improve the stability of pit filling and land reclamation. At the same time, the expansibility of the solid sulfur ash slag can be utilized to reduce the amount of raw materials used in pit filling and land reclamation, and reduce the cost of soil excavation and pit filling.
[0027] The invention has a simple process flow, is easy to control, does not require mixing of raw materials, ensures the pit filling effect, speeds up the efficiency of pit filling and land reclamation, achieves the purpose of large-scale resource utilization of solid sulfur ash, reduces the amount of land resources occupied by solid sulfur ash storage, and reduces the cost of solid sulfur ash treatment.
[0028] The invention realizes the large-scale comprehensive resource utilization of solid sulfur ash waste in ecological restoration, and effectively reduces the cost of treating industrial waste such as solid sulfur ash. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to facilitate those skilled in the art to fully understand the technical solution of the present invention, the following description is made on the drawings provided in combination with the content of the technical solution and the drawings provided. The description is not a limitation of the technical solution of the present invention.
[0030] Figure 1 Create a process flow chart for the present invention.
[0031] Figure 2 This is a process flow chart of another embodiment of the present invention.
[0032] Figure 3 In accordance with Figure 1 Schematic diagram of the soil structure obtained by the construction process.
[0033] Figure 4 In accordance with Figure 2 Schematic diagram of the soil structure obtained by the construction process.
[0034] Figure 5 This is a schematic diagram of the soil structure obtained by construction of another embodiment of the present invention.
[0035] 1- pit to be filled 2- sulfur-fixed ash layer 3- sulfur-fixed slag layer 4- silica ash layer 5- soil layer.
[0036] A-First floor B-Second floor DETAILED DESCRIPTION
[0037] In order to facilitate those skilled in the art to correctly understand the present invention and enable those skilled in the art to fully understand the technical content of the present invention, the technical solution of the present invention is further explained below in conjunction with specific implementation methods and drawings. However, this explanation does not limit the scope of protection required for the present invention. The scope of protection of the present invention by those skilled in the art cannot be limited to the following explanations. Any equivalent substitutions or changes made by any those skilled in the art or persons familiar with the technology in the art based on the present invention and the technical solution and inventive concept thereof should be covered within the scope of protection of the present invention.
[0038] like Figure 1 As shown, in some embodiments, the method of filling pits and creating land using sulfur-fixing ash and sulfur-fixing slag includes the following steps:
[0039] S1: Collecting solid sulfur ash and slag: Collect solid sulfur ash and solid sulfur slag from the circulating fluidized bed boiler separately and store them separately for use; realize the separate layered laying of solid sulfur ash and solid sulfur slag to meet the needs of pit filling and land reclamation.
[0040] S2: Spreading solid sulfur ash: Spread the collected solid sulfur ash into the pit 1 to be filled, and then pour water accounting for 9.5-16.7% of the mass of the solid sulfur ash, for example: 9.5%, 10%, 12%, 14%, 16%, 16.7%, etc., to obtain a solid sulfur ash layer 2; ensure the water demand of the solid sulfur ash layer 2 to improve and meet the strength requirements of subsequent pit filling and land reclamation.
[0041] S3: Spreading solid sulfur slag: Spread the collected solid sulfur slag on the solid sulfur ash layer 2, and then pour water accounting for 11.4-20% of the mass of the solid sulfur slag, for example: 11%, 11.4%, 15%, 17%, 20%, etc., to obtain a solid sulfur slag layer 3; improve and meet the strength requirements of subsequent pit filling and land reclamation, and at the same time be able to properly fit and tightly construct with the solid sulfur ash layer 2 to form a stable solid sulfur ash slag layer to ensure the stability of the land reclamation foundation.
[0042] S4: soil spreading: rolling and compacting, and then spreading soil on the sulfur-fixing slag layer 3 to obtain a soil layer 5;
[0043] The mass ratio of the sulfur-fixing ash used in the sulfur-fixing ash layer 2, the sulfur-fixing slag used in the sulfur-fixing slag layer 3 and the soil used in the soil layer 5 is 36-42:30-35:18-28, for example: 6:5:3, 36:35:18, 18:15:14, 36:33:19, 7:5:3, 42:35:18, 14:11:6, 6:5:4, 42:35:27 or 37:33:21, etc. The amount of sulfur-fixing ash and sulfur-fixing slag is properly controlled to ensure that a stable structure is constructed at the bottom of the soil layer 5 to ensure the stability of the pit filling and land reclamation. This method can be used to construct a structure such as Figure 3 The pit-filling structure shown.
[0044] In some embodiments, the lower surface of the solid sulfur ash layer 2 to the upper surface of the adjacent solid sulfur slag layer 3 is constructed into a solid sulfur ash slag layer, the number of layers of the solid sulfur ash slag layer is determined according to the depth of the pit to be filled 1, and the thickness of the solid sulfur ash slag layer is 50-60cm, for example: 50cm, 53cm, 55cm, 57cm, 59cm, 60cm, etc. Figure 5 As shown, A is the first layer of sulfur-fixing ash layer, and B is the second layer of sulfur-fixing ash layer.
[0045] like Figure 2As shown, in some embodiments, in step S3, after laying the solid sulfur slag on the solid sulfur ash layer 2, silica ash is laid on the surface of the solid sulfur slag, and after watering and rolling to compact, a solid sulfur slag layer 3 and a silica ash layer 4 are obtained, and the mass ratio of the silica ash to the solid sulfur ash and the solid sulfur slag is 1-3:36-42:30-35, for example: 1:36:30, 1:36:33, 1:36:35, 1:33:30, 1:33:32, 1:33:35, 1:42:30, 1:42:34, 1:42:35, 2:18:15, 3:42:31, etc. Ensure the stability of pit filling and land reclamation. Constructed as Figure 4 The pit-filling structure shown.
[0046] In some embodiments, the lower surface of the solid sulfur ash layer 2 to the upper surface of the silicon ash layer 4 is formed into a solid sulfur ash slag layer, the number of layers of the solid sulfur ash slag layer is determined according to the depth of the pit 1 to be filled, and the thickness of the solid sulfur ash slag layer is 50-60cm, for example: 50cm, 53cm, 55cm, 57cm, 59cm, 60cm, etc. The strength of the solid sulfur ash slag layer is improved to ensure the stability of the pit filling and land reclamation, and improve the effect of the pit filling and land reclamation. Figure 5 As shown, A is the first layer of sulfur-fixing ash layer, and B is the second layer of sulfur-fixing ash layer.
[0047] In some embodiments, the thickness of the soil layer 5 is 50-60 cm, for example: 50 cm, 53 cm, 55 cm, 57 cm, 59 cm, 60 cm, etc.
[0048] The pit to be filled 1 created in the present invention includes but is not limited to an abandoned mine pit to be repaired or a ditch to be repaired.
[0049] like Figure 3 As shown, in some embodiments, a pit filling and land reclamation structure using solid sulfur ash and solid sulfur slag includes a pit 1 to be filled, the bottom of the pit 1 to be filled is paved with solid sulfur ash and watered to form a solid sulfur ash layer 2, the upper surface of the solid sulfur ash layer 2 is paved with solid sulfur slag, watered and compacted to form a solid sulfur slag layer 3; the solid sulfur ash layer 2 and the solid sulfur slag layer 3 are jointly constructed into a solid sulfur ash slag layer, and the upper surface of the solid sulfur ash slag layer is covered with soil to form a soil layer 5. Solid sulfur slag is used to cover the upper surface of the solid sulfur ash, so that the solid sulfur ash layer 2 constructed by the solid sulfur ash is located at the bottom of the pit 1 to be filled, and the solid sulfur slag layer 3 constructed by the solid sulfur slag is located on the upper surface of the solid sulfur ash layer 2. By utilizing the different particle sizes and different water requirements of solid sulfur ash and solid sulfur slag, the solid sulfur slag layer 3 is used to cover the solid sulfur ash layer 2, thereby improving the overall stability of the solid sulfur ash slag layer and improving the overall stability of the pit filling and land reclamation structure.
[0050] like Figure 4As shown, in some embodiments, the upper surface of the solid sulfur slag layer 3 is paved with silica ash to form a silica ash layer 4, and the silica ash is paved after the solid sulfur slag is paved on the upper surface of the solid sulfur ash layer 2, and then watered and compacted to form the solid sulfur slag layer 3 and the silica ash layer 4; the solid sulfur ash layer 2, the solid sulfur slag layer 3, and the silica ash layer 4 together form a solid sulfur ash slag layer. The overall compressive strength of the solid sulfur ash slag layer is enhanced, the overall stability of the pit filling and land reclamation is improved, and the effect of using solid sulfur ash and solid sulfur slag to fill the pit and create land is guaranteed.
[0051] like Figure 5 As shown, in some embodiments, the number of layers of the sulfur-fixing ash slag layer is determined according to the depth of the pit to be filled 1. For example, the sulfur-fixing ash slag layer is set as the first layer A and the second layer B, etc. This helps to fill the pit 1 to be filled while ensuring the stability of the pit filling and land reclamation.
[0052] The invention creates a method of using solid sulfur ash and solid sulfur slag to fill pits and create land. The purpose is mainly to solve the problem that solid sulfur ash contains high CaO, SO3 and loss on ignition, which results in technical defects such as self-hardening and expansion. When used in building materials and cementitious filling materials, the products are very easy to crack or even break, resulting in a small amount of solid sulfur ash used in the field of building materials, and a low resource utilization rate of solid sulfur ash. The solid sulfur ash is applied to the field of filling pits and creating land for research. However, due to the defects of the solid sulfur ash itself, when the solid sulfur ash is applied to filling pits and creating land, it still faces the problem of poor stability of filling pits and creating land due to self-hardening and expansion. Therefore, when the research team established a project to study the use of solid sulfur ash for filling pits and creating land, they started from the technical problem of how to improve the stability of solid sulfur ash for filling pits and creating land, and carried out research on the process and structural layout of solid sulfur ash for filling pits and creating land, and then formed the technical solution created by the invention. In order to better illustrate and verify the technical effects that the invention can bring, the invention research team carried out the following experimental research, which is now described as follows:
[0053] test:
[0054] 1. Raw material preparation and collection
[0055] Collect and reserve the raw materials needed in the test process, and test the main components of the corresponding raw materials. The specific operations are as follows:
[0056] (1) Collecting sulfur-fixed ash from the flue of a circulating fluidized bed boiler and collecting sulfur-fixed slag from the furnace bottom of a circulating fluidized bed boiler, testing the main chemical components of the sulfur-fixed ash and the main chemical components of the sulfur-fixed slag, and recording the test results in the following Tables 1 and 2:
[0057] Table 1 Main chemical components of sulfur-fixing ash
[0058]
[0059] Table 2 Main chemical components of solid sulfur slag
[0060]
[0061] (2) Silica ash was purchased from the market and its main chemical components were tested. The results are shown in Table 3 below.
[0062] Table 3 Main chemical components of silica fume
[0063]
[0064] (3) Soil was excavated around the pit 1 to be filled, and the main chemical components of the soil were tested. The results are shown in Table 4 below.
[0065] Table 4 Main chemical components of soil
[0066]
[0067] 2. Sample preparation and testing
[0068] Example 1
[0069] Use a template to prepare a pit 1 to be filled with a depth of 120 cm, a width of 100 cm, and a length of 200 cm, and use soil to fill 30 cm first, water it, then fill 30 cm, water it again, compact it, and finally fill 55 cm.
[0070] Example 2
[0071] On the basis of Example 1, solid sulfur ash, solid sulfur slag and soil are taken according to the mass ratio of solid sulfur ash to solid sulfur slag and soil of 42:32:18, and the solid sulfur ash is first filled in the pit 1 to be filled, and water is poured, and the ratio of water volume to solid sulfur ash mass is 2:21, and then the solid sulfur slag is filled and compacted with water, and the ratio of water volume to solid sulfur slag mass is 1:8, and the thickness of the solid sulfur slag and the solid sulfur ash after filling in the pit to be filled is 60 cm, and then fill with 55 cm of soil.
[0072] Example 3
[0073] On the basis of Example 1, solid sulfur ash, solid sulfur slag, soil and silica ash are taken in a mass ratio of 36:30:20:3, and the solid sulfur ash is first filled in the pit 1 to be filled, and water is poured, and the ratio of water volume to the mass of the solid sulfur ash is 5:36. Then the solid sulfur slag and silica ash are filled in turn, and water is poured and compacted. The ratio of water volume to the mass of the solid sulfur slag is 6:30. The thickness of the solid sulfur slag, the solid sulfur ash and the silica ash after filling in the pit to be filled is 50 cm, and then fill with 55 cm of soil.
[0074] Example 4
[0075] On the basis of Example 1, solid sulfur ash, solid sulfur slag, soil and silica ash are taken in a mass ratio of 38:31:19:2, and the solid sulfur ash is first filled in the pit 1 to be filled, and water is poured, and the ratio of water volume to the mass of the solid sulfur ash is 5:38. Then the solid sulfur slag and silica ash are filled in turn, and water is poured and compacted. The ratio of water volume to the mass of the solid sulfur slag is 5:31. The thickness of the solid sulfur slag, the solid sulfur ash and the silica ash after filling in the pit to be filled is 56 cm, and then fill with 55 cm of soil.
[0076] Example 5
[0077] On the basis of Example 1, solid sulfur ash, solid sulfur slag, soil and silica ash are taken in a mass ratio of 40:31:18:1, and the solid sulfur ash is first filled in the pit 1 to be filled, and water is poured, and the ratio of the water volume to the mass of the solid sulfur ash is 1:10. Then the solid sulfur slag and silica ash are filled in turn, and water is poured and compacted. The ratio of the water volume to the mass of the solid sulfur slag is 5:31. The thickness of the solid sulfur slag, the solid sulfur ash and the silica ash after filling in the pit to be filled is 58 cm, and then fill with 55 cm of soil.
[0078] Example 6
[0079] On the basis of Example 2, the sulfur slag is filled first, and then the sulfur ash is filled, and the rest is the same as Example 2.
[0080] Example 7
[0081] On the basis of Example 3, the sulfur slag is first filled, and then the sulfur ash and silica ash are filled in sequence. The rest is the same as Example 3.
[0082] Example 8
[0083] On the basis of Example 3, sulfur slag and silica ash are filled in sequence first, and then sulfur ash is filled, and the rest is the same as Example 3.
[0084] The permeability coefficient of the samples prepared in Examples 1-8 was measured according to GB / T 19979.2-2006 "Impermeability of Geosynthetics", and the 28d unconfined compressive strength was measured according to SL 237-020-1999 "Geotechnical Test Procedure - Unconfined Compressive Strength Test". At the same time, the pH value of the samples was measured after being immersed in water, and the average value was taken after measuring 3 samples in each group. The results are shown in Table 5 below:
[0085] Table 5 Sample performance determination
[0086]
[0087] As can be seen from Table 5, the invention appropriately controls the usage ratio of solid sulfur ash and solid sulfur slag, and accurately controls the process of filling pits with solid sulfur ash and solid sulfur slag, which helps to improve the stability of pit filling and land reclamation, improve the effect of pit filling and land reclamation, and provide a new way for large-scale resource utilization of solid sulfur ash and slag, and reduce the cost of stacking and processing of solid sulfur ash and slag. In addition, the introduction of silica ash on the solid sulfur slag will help to improve the compressive strength and improve the stability of pit filling and land reclamation.
[0088] Other matters not covered in the present invention can be realized by conventional technical means with reference to the prior art or common knowledge known to those skilled in the art, such as how to collect solid sulfur ash and solid sulfur slag, how to compact them, etc. In the present invention, when compacting, a roller is used to press the surface back and forth at least 3 times. The roller used is a roller from XCMG Group (with a working mass of 18,000 kg with a cab). During the sample preparation process of the embodiment of the present invention, the pressure equivalent to the mass of the roller is used for compaction 3 times. In the actual construction process, the construction personnel use a roller to compact the solid sulfur slag layer after paving the solid sulfur slag or silica ash.
Claims
1. A method for filling pits and creating land using sulfur-fixing ash and sulfur-fixing slag, characterized in that: The following steps are involved: S1: Collecting sulfur-fixing ash and slag: Collecting sulfur-fixing ash and sulfur-fixing slag from the circulating fluidized bed boiler respectively, and storing them separately for later use; S2: paving the sulfur ash: paving the collected sulfur ash in the pit to be filled (1), and then pouring water accounting for 9.5-16.7% of the mass of the sulfur ash to obtain a sulfur ash layer (2); S3: paving the sulfur slag: paving the collected sulfur-fixing slag on the sulfur-fixing ash layer (2), and then pouring water accounting for 11.4-20% of the mass of the sulfur-fixing slag to obtain a sulfur-fixing slag layer (3); S4: soil spreading: rolling and compacting, and then spreading soil on the sulfur-fixing slag layer (3) to obtain a soil layer (5); The mass ratio of the sulfur-fixing ash used in the sulfur-fixing ash layer (2), the sulfur-fixing slag used in the sulfur-fixing slag layer (3), and the soil used in the soil layer (5) is 36-42:30-35:18-28.
2. The method for filling pits and creating land by using sulfur-fixing ash and sulfur-fixing slag as claimed in claim 1, characterized in that: A solid sulfur ash slag layer is constructed from the lower surface of the solid sulfur ash layer (2) to the upper surface of the adjacent solid sulfur slag layer (3). The number of layers of the solid sulfur ash slag layer is determined according to the depth of the pit to be filled (1), and the thickness of the solid sulfur ash slag layer is 50-60 cm.
3. The method for filling pits and creating land by using sulfur-fixing ash and sulfur-fixing slag as claimed in claim 1, characterized in that: In the step S3, after the solid sulfur slag is laid on the solid sulfur ash layer (2), silicon ash is laid on the surface of the solid sulfur slag, and after watering and rolling to make it dense, a solid sulfur slag layer (3) and a silicon ash layer (4) are obtained, and the mass ratio of the silicon ash to the solid sulfur ash and the solid sulfur slag is 1-3:36-42:30-35.
4. The method for filling pits and creating land by using sulfur-fixing ash and sulfur-fixing slag as claimed in claim 3, characterized in that: The lower surface of the solid sulfur ash layer (2) to the upper surface of the silicon ash layer (4) forms a solid sulfur ash slag layer. The number of layers of the solid sulfur ash slag layer is determined according to the depth of the pit to be filled (1), and the thickness of the solid sulfur ash slag layer is 50-60 cm.
5. The method for filling pits and creating land by using sulfur-fixing ash and sulfur-fixing slag as claimed in claim 1, characterized in that: The thickness of the soil layer (5) is 50-60 cm.
6. The method for land reclamation by using sulfur-fixing ash and sulfur-fixing slag as claimed in claim 1, 2 or 4, characterized in that: The pit to be filled (1) is an abandoned mine pit to be repaired or a ditch to be repaired.
7. A land-filling structure using sulfur-fixing ash and sulfur-fixing slag, characterized in that: The invention comprises a pit to be filled (1), wherein the bottom of the pit to be filled (1) is paved with solid sulfur ash and watered to form a solid sulfur ash layer (2), and the upper surface of the solid sulfur ash layer (2) is paved with solid sulfur slag, watered and compacted to form a solid sulfur slag layer (3); the solid sulfur ash layer (2) and the solid sulfur slag layer (3) are jointly constructed into a solid sulfur ash slag layer, and soil is spread on the upper surface of the solid sulfur ash slag layer to form a soil layer (5).
8. The pit filling and land reclamation structure using sulfur-fixing ash and sulfur-fixing slag as claimed in claim 7, characterized in that: The upper surface of the solid sulfur slag layer (3) is paved with silica ash to form a silica ash layer (4), and the silica ash is paved after the solid sulfur slag is paved on the upper surface of the solid sulfur ash layer (2), and then water is poured and compacted to form the solid sulfur slag layer (3) and the silica ash layer (4); the solid sulfur ash layer (2), the solid sulfur slag layer (3), and the silica ash layer (4) together form a solid sulfur ash slag layer.
9. The pit filling and land reclamation structure using sulfur-fixing ash and sulfur-fixing slag as claimed in claim 7, characterized in that: The number of layers of the sulfur-fixing ash slag is determined according to the depth of the pit (1) to be filled.
10. The pit filling and land reclamation structure using sulfur-fixing ash and sulfur-fixing slag as claimed in claim 7, characterized in that: The thickness of the soil layer (5) is 50-60 cm.