Water conservancy construction cofferdam device
Through the combination of lifting and lowering adjustment mechanism and strengthening mechanism, the problem of weakening of support strength after height adjustment of water conservancy construction cofferdam is solved, the compressive strength and safety are improved, and construction safety is ensured through the limit alarm system.
Patent Information
- Application Number
- CN202411082964.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-11-22
AI Technical Summary
After the height adjustment of the existing water conservancy construction cofferdam device, the support strength of each part to the water is weakened, which may reduce the mechanical strength of the overall structure and pose a potential threat to the safety of construction personnel.
The water conservancy construction cofferdam device is adopted, which includes a lifting and lowering adjustment mechanism and a reinforcement mechanism. By combining the airbag and a multi-section small telescopic rod, the cofferdam height is automatically adjusted and the reinforcement mechanism is evenly distributed to improve the compressive strength; at the same time, the limit alarm system is used to Remind construction personnel to stop construction and ensure safety.
It effectively improves the compressive strength and safety of the cofferdam device, ensures the safety of construction personnel, and promptly reminds the stop of construction through the alarm system to avoid potential risks.
Smart Images

Figure CN118997193A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water conservancy construction, in particular to a water conservancy construction cofferdam device. Background Art
[0002] A water conservancy construction cofferdam is a temporary structure used to block water flow, enclose the construction area and drain water during the construction of a water conservancy project. The functions of the cofferdam include: preventing the mixing of water inside and outside the construction site; reducing the flow rate of flowing water in the construction site to reduce its impact; providing a relatively dry working environment to ensure the normal progress of construction; protecting the environment around the construction site and reducing the erosion of the riverbed and bank slopes. Generally speaking, the construction steps of a water conservancy construction cofferdam include: determining the scope and height of the cofferdam construction; arranging cofferdam construction materials, such as baffles, brackets, connectors, etc.; setting up horizontal retaining walls, vertical supports and other components; closing the cofferdam to ensure that it does not leak; setting up a drainage system and controlling water flow, etc. After the basic structure is built, maintenance and monitoring work needs to be carried out to deal with possible problems of the cofferdam in a timely manner to ensure its normal operation. The design and construction of the water conservancy construction cofferdam needs to consider many factors, such as the environment in which the project is located, water flow rate, water level changes, and project types, to ensure construction safety and project quality. At the same time, after the cofferdam construction is completed, it should be dismantled in time and the environment should be restored to protect the surrounding ecological environment.
[0003] The existing patent (publication number CN114319399A) discloses "a water conservancy construction cofferdam device, which includes a cofferdam plate, a base is detachably connected to the cofferdam plate through a connecting mechanism, a water blocking groove is provided on the top of the base, a water blocking ring is slidably arranged in the water blocking groove, a driving spring is fixedly connected to the side of the water blocking ring close to the cofferdam plate, and the side of the driving spring away from the water blocking ring is fixedly connected to the water blocking groove, a storage groove is provided on one side of the water blocking groove, a limiting block is slidably arranged in the storage groove, a limiting groove is provided on the side of the water blocking ring close to the storage groove, the limiting block can be plugged into the inner side wall of the limiting groove, and a driving component for driving the limiting block to move is provided in the storage groove. The present invention can reduce the danger of construction personnel in the cofferdam". In the above-mentioned patent, the limiting block is driven to move by the driving component. When the limiting block is separated from the limiting groove, the water blocking ring can automatically move above the water surface under the elastic force of the driving spring, thereby effectively intercepting the rising water level, thereby significantly reducing the safety risks of construction personnel in the cofferdam. However, during the rising process of the water-blocking ring, the multi-layer cofferdam plates configured inside it will undergo relative displacement. This phenomenon causes the supporting strength of each part on the water to be weakened after the rising, which may in turn reduce the mechanical strength of the overall structure and pose a potential threat to the safety of construction workers. Summary of the invention
[0004] 1. Technical issues to be resolved
[0005] In view of the deficiencies in the prior art, the present invention provides a water conservancy construction cofferdam device, which solves the problem that the supporting strength of each part on water is weakened after height adjustment, which may reduce the mechanical strength of the overall structure and pose a potential threat to the safety of construction workers.
[0006] (II) Technical solution
[0007] To achieve the above purpose, the present invention is implemented through the following technical solutions: a water conservancy construction cofferdam device, including a lower connecting tube, an inner supporting tube is arranged at the upper end of the lower connecting tube, a plurality of reinforcing mechanisms are slidably arranged at the upper end of the inner supporting tube, a lifting and adjusting mechanism is slidably sleeved on the outer upper end of the inner supporting tube, and a waterproof ring is fixedly arranged at the lower end of the lifting and adjusting mechanism;
[0008] The lifting and adjusting mechanism comprises a lifting cylinder, a surrounding airbag is fixedly arranged at the bottom of the lifting cylinder body, a lifting plate is slidably arranged at the top of the lifting cylinder body, a lifting air cushion is fixedly arranged at the lower end of the lifting plate, adjustment blocks are fixedly arranged at both sides of the upper end of the lifting plate, lifting slots are opened at both sides of the lifting cylinder near the upper end, and two adjustment blocks are slidably arranged inside the two lifting slots respectively;
[0009] Air guide grooves are provided on both sides of the lifting cylinder, the lower ends of the two air guide grooves are penetrated to the inside of the surrounding airbag, the middle of the two air guide grooves are fixedly provided with adjustment baffles, the inside of the two adjustment baffles are penetrated with adjustment ejectors, the upper ends of the two adjustment ejectors are fixedly provided with transmission rods, the upper ends of the two transmission rods are fixedly connected to the lower ends of the two adjustment blocks, and the opposite sides of the two air guide grooves are penetrated with output pipes;
[0010] The plurality of reinforcing mechanisms each include an anti-compression ring, a plurality of connecting grooves, a plurality of sliding collars, two multi-section small telescopic rods and two input connecting pipes.
[0011] Preferably, a plurality of fixing bolts are threadedly arranged at the lower end of the inner part of the lower connecting tube, and a plurality of fixing bolts are arranged in the vertical direction of the lower connecting tube, and the plurality of fixing bolts are connected to the lower connecting tube by fixing bolts.
[0012] Preferably, the inner support tube includes an upper support tube, four stabilizing slide bars are fixedly arranged on the upper end of the upper support tube, four sliding openings are penetrated through the upper end of the lifting tube, the four stabilizing slide bars are respectively slidably arranged inside the four sliding openings, and a plurality of lower positioning bolts are threadedly arranged on the lower end of the upper support tube.
[0013] Preferably, the upper ends of the four stabilizing slide bars are threadedly connected to the limit alarms, and spring telescopic rods are fixedly arranged on both sides of the lower ends of the four limit alarms, and lower contact rings are fixedly arranged between the lower ends of the multiple spring telescopic rods, and two connecting rods are fixedly arranged on the upper ends of the four lower contact rings, and conductive strips are fixedly arranged between the upper ends of the multiple connecting rods.
[0014] Preferably, contact nodes are fixedly provided on both sides of the upper ends of the four limit alarms, and a power supply, a resistor and an alarm are respectively connected in series between the plurality of contact nodes.
[0015] Preferably, the plurality of connecting grooves are all opened inside the anti-pressure ring, and the plurality of sliding rings are respectively fixedly arranged inside the connecting grooves.
[0016] Preferably, the two multi-section small telescopic rods are respectively fixedly arranged on both sides of the upper end of the anti-compression ring, the two input connecting pipes are respectively penetrated into the multi-section small telescopic rod, and the multiple input connecting pipes are respectively connected in parallel to the two output pipes.
[0017] Working principle: When using this device, first install a lower connecting tube in the designated area, and then continue to install the required number of lower connecting tubes on the lower connecting tube according to the site requirements, and then install the inner support tube and the lifting and adjusting mechanism at the top. After the installation is completed, the construction personnel can carry out water conservancy construction inside. When the water level rises during the construction process, the water level gradually approaches the lifting air cushion and the lifting plate, and at the same time submerges the surrounding air bag. When the water level continues to rise, the lifting air cushion and the lifting plate will be lifted. At this time, the lifting plate will drive the adjustment blocks on both sides to move upward. During the movement, the transmission rod connected to the bottom will drive the adjustment pin to move upward. When the adjustment pin moves up and separates from the adjustment baffle, the upper and lower spaces inside the air guide groove will be connected. At this time, the surrounding air bag will push the internal gas into the output pipe along the air guide groove due to water pressure, and then the gas pipe will input the gas into each through the input connecting pipe. The interior of a plurality of multi-section small telescopic rods, at this time, the plurality of multi-section small telescopic rods gradually extend, thereby driving the plurality of reinforcing mechanisms to be evenly dispersed, and increasing the height difference between the top of the inner support tube and the inside of the lifting and adjusting mechanism, so that the lifting tube can be raised, thereby increasing the height of the cofferdam device, and the reinforcing mechanisms are evenly distributed inside the inner support tube, ensuring the compressive strength of the cofferdam device and improving safety. When the lifting and adjusting mechanism rises to the highest position, that is, the maximum length of the stable slide rod, the upper end of the lifting tube will contact the limit alarm and push the lower contact ring upward. When the lower contact ring moves upward, it will drive the conductive strip to move upward through the connecting rod, thereby making the conductive strip contact with the contact node, and finally connecting the circuit between the power supply, the resistor and the alarm. At this time, the alarm generates an alarm, prompting the construction personnel to stop construction as soon as possible, thereby further ensuring safety.
[0018] (III) Beneficial effects
[0019] The present invention provides a water conservancy construction cofferdam device, which has the following beneficial effects:
[0020] 1. The present invention provides a water conservancy construction cofferdam device. When the water level rises, the lifting air cushion and the lifting plate will work together under the action of buoyancy, prompting the lifting plate and the adjustment blocks on both sides to move upward synchronously. The transmission rod under the adjustment block will then drive the adjustment pin to move upward until it is separated from the adjustment baffle. Once separated, the upper and lower spaces inside the air guide groove will be connected, and the surrounding air bag will introduce the internal gas into the output pipe through the air guide groove under the action of water pressure. Subsequently, the gas pipeline introduces the gas into each multi-section small telescopic rod through the input connecting pipe, prompting these telescopic rods to gradually extend. This elongation process will drive multiple reinforcement mechanisms to unfold evenly, while increasing the height difference between the top of the inner support tube and the inside of the lifting and adjusting mechanism, thereby increasing the height of the lifting tube, thereby increasing the overall height of the cofferdam device. The uniform distribution of the reinforcement mechanism inside the inner support tube significantly enhances the compressive strength of the cofferdam device and improves its safety. In addition, during the entire process of the lifting and adjusting mechanism rising, there is no need to rely on external buoyancy, which ensures the normal rising and shielding function of the lifting and adjusting mechanism, and further guarantees the safety of the internal construction personnel.
[0021] 2. The present invention provides a water conservancy construction cofferdam device. When the lifting and adjusting mechanism reaches its highest rising position, that is, when the stabilizing slide bar is extended to its maximum length, the upper end of the lifting cylinder will trigger the limit alarm and push the lower contact ring to move upward. Subsequently, the rise of the lower contact ring will transmit force through the connecting rod, driving the conductive strip to move upward accordingly. In this process, the conductive strip will achieve physical contact with the contact node, and then establish an electrical circuit between the power supply, the resistor and the alarm, causing the alarm to send an alarm signal. This realizes reminding construction personnel to immediately stop construction operations, ensuring the safety of the work site. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is an explosion schematic diagram of the present invention;
[0023] Figure 2 It is a schematic diagram of the axial side of the present invention;
[0024] Figure 3 It is a schematic diagram of the axial side of the lifting and lowering adjustment mechanism of the present invention;
[0025] Figure 4 It is a cross-sectional schematic diagram of the lifting and lowering adjustment mechanism of the present invention;
[0026] Figure 5 It is a schematic axial view of the reinforcing mechanism of the present invention;
[0027] Figure 6 It is a schematic diagram of the structural principle of the limit alarm of the present invention;
[0028] Figure 7 For the present invention Figure 4 An enlarged schematic diagram of point A.
[0029] Among them, 1. lifting and adjusting mechanism; 2. waterproof collar; 3. strengthening mechanism; 4. inner support tube; 5. lower connecting tube; 6. fixing bolt; 101. lifting tube; 102. surrounding airbag; 103. lifting plate; 104. lifting slot; 105. lifting air cushion; 106. adjusting block; 107. sliding mouth; 108. air guide slot; 109. transmission rod; 110. adjusting baffle; 111. adjusting ejector pin; 112. output tube; 301. connecting slot; 302. sliding collar; 303. anti-pressure ring; 304. multi-section small telescopic rod; 305. input connecting tube; 401. upper support tube; 402. lower positioning bolt; 403. stabilizing slide rod; 404. limit alarm; 405. spring telescopic rod; 406. lower contact ring; 407. connecting rod; 408. conductive strip; 409. contact node. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] Example:
[0032] like Figure 1-7 As shown, the embodiment of the present invention provides a water conservancy construction cofferdam device, including a lower connecting tube 5, an inner supporting tube 4 is arranged at the upper end of the lower connecting tube 5, a plurality of reinforcing mechanisms 3 are slidably arranged at the upper end of the inner supporting tube 4, a lifting and adjusting mechanism 1 is slidably sleeved on the outer upper end of the inner supporting tube 4, a waterproof collar 2 is fixedly arranged at the lower end of the lifting and adjusting mechanism 1, a plurality of fixing bolts 6 are threadedly arranged at the lower end of the lower connecting tube 5, a plurality of fixing bolts 6 are arranged in the vertical direction of the lower connecting tube 5, and the plurality of fixing bolts 6 are connected to the lower connecting tube 5, and a plurality of lower positioning bolts 402 are threadedly arranged at the lower end of the upper supporting tube 401;
[0033] Specifically, in the above-mentioned specific embodiment, in actual application, the present device first needs to firmly install a lower connecting tube 5 in a predetermined area. Subsequently, according to the actual situation on site, a corresponding number of lower connecting tubes 5 can be added in sequence on top of the first lower connecting tube 5 to meet specific construction requirements, and the structural stability of the overall device is improved by connecting the lower positioning bolt 402 with the fixing bolt 6. After all the lower connecting tubes 5 are installed, the inner support tube 4 and the lifting and adjusting mechanism 1 need to be assembled at the top. After the installation work is completed, the construction personnel can safely enter the interior to perform water conservancy construction work. If the water level rises during the construction process, the built-in lifting and adjusting mechanism 1 will automatically rise, thereby ensuring the safety of the construction personnel and effectively preventing potential safety risks.
[0034] The lifting and adjusting mechanism 1 comprises a lifting cylinder 101, a surrounding airbag 102 is fixedly arranged at the bottom of the lifting cylinder 101, a lifting plate 103 is slidably arranged at the top of the lifting cylinder 101, a lifting air cushion 105 is fixedly arranged at the lower end of the lifting plate 103, and adjustment blocks 106 are fixedly arranged on both sides of the upper end of the lifting plate 103. Lifting grooves 104 are opened at both sides of the lifting cylinder 101, and two adjustment blocks 106 are respectively slidably arranged inside the two lifting grooves 104. An air guide groove 108 is provided, the lower ends of the two air guide grooves 108 are both set to penetrate into the surrounding airbag 102, the middle of the two air guide grooves 108 are fixedly provided with an adjustment baffle 110, the inside of the two adjustment baffles 110 are both set to penetrate an adjustment ejector pin 111, the upper ends of the two adjustment ejector pins 111 are both fixedly provided with a transmission rod 109, the upper ends of the two transmission rods 109 are both fixedly connected to the lower ends of the two adjustment blocks 106, and the opposite sides of the two air guide grooves 108 are both set to penetrate an output pipe 112;
[0035] Specifically, in the above-mentioned specific embodiment, during the construction process, if the water level rises, the water level will cause the lifting air cushion 105 and the lifting plate 103 to rise through the buoyancy mechanism. During the rising process, the lifting plate 103 will drive the adjustment blocks 106 on both sides to move upward synchronously. This movement will further push the adjustment ejector pin 111 to move upward through the linkage action of the transmission rod 109. Once the adjustment ejector pin 111 moves up to a state of being out of contact with the adjustment baffle 110, the internal space of the air guide groove 108 will be connected up and down. Subsequently, under the action of water pressure, the surrounding airbag 102 smoothly guides its internal gas into the output pipe 112 through the air guide groove 108.
[0036] The inner support cylinder 4 includes an upper support cylinder 401, and four stabilizing slide bars 403 are fixedly arranged at the upper end of the upper support cylinder 401. Four sliding openings 107 are penetrated through the upper end of the lifting cylinder 101, and the four stabilizing slide bars 403 are respectively penetrated and slidably arranged inside the four sliding openings 107;
[0037] Specifically, in the above-mentioned specific embodiment, through the four stabilizing slide bars 403 above the upper support tube 401, the lifting tube 101 can stably slide vertically above the upper support tube 401, thereby improving the stability during the automatic adjustment process.
[0038] The upper ends of the four stable slide bars 403 are threadedly connected to the limit alarm 404, and spring telescopic rods 405 are fixedly arranged on both sides of the lower ends of the four limit alarms 404, and lower contact rings 406 are fixedly arranged between the lower ends of the multiple spring telescopic rods 405, and two connecting rods 407 are fixedly arranged on the upper ends of the four lower contact rings 406, and conductive strips 408 are fixedly arranged between the upper ends of the multiple connecting rods 407, and contact nodes 409 are fixedly arranged on both sides of the upper ends of the four limit alarms 404, and power supplies, resistors and alarms are respectively arranged in series between the multiple contact nodes 409;
[0039] Specifically, in the above-mentioned specific embodiment, when the lifting and adjusting mechanism 1 reaches its highest rising position, that is, when the stabilizing slide bar 403 is extended to the maximum length, the top of the lifting cylinder 101 will touch the limit alarm 404, causing the lower contact ring 406 to move upward. As the lower contact ring 406 moves upward, the conductive strip 408 will be driven to move upward synchronously through the precisely designed connecting rod 407 mechanism until the conductive strip 408 is in full contact with the contact node 409. This contact will trigger the circuit between the power supply, the resistor and the alarm to close, so that the alarm will send an alarm signal to remind the construction personnel to stop the construction operation immediately. This design is intended to ensure safety during the construction process and further reduce potential risks.
[0040] The plurality of reinforcing mechanisms 3 each include an anti-compression ring 303, a plurality of connecting grooves 301, a plurality of sliding collars 302, two multi-section small telescopic rods 304 and two input connecting pipes 305. The plurality of connecting grooves 301 are each provided inside the anti-compression ring 303. The plurality of sliding collars 302 are respectively fixedly arranged inside the connecting grooves 301. The two multi-section small telescopic rods 304 are respectively fixedly arranged on both sides of the upper end of the anti-compression ring 303. The two input connecting pipes 305 are respectively penetrated inside the multi-section small telescopic rods 304. The plurality of input connecting pipes 305 are respectively connected in parallel to the two output pipes 112.
[0041] Specifically, in the above-mentioned specific embodiment, as the water level gradually rises, the surrounding airbag 102 accurately delivers gas to the interior of each multi-section small telescopic rod 304 via the gas pipe. As the gas is injected, these multi-section small telescopic rods 304 will extend in sequence, thereby driving the reinforcement mechanism 3 to be evenly distributed and expand outward. In this process, the height difference between the top of the inner support tube 4 and the inside of the lifting and adjusting mechanism 1 gradually increases, thereby promoting the lifting tube 101 to rise smoothly and effectively increasing the height of the cofferdam device. At the same time, the uniform distribution of the reinforcement mechanism 3 inside the inner support tube 4 ensures that the cofferdam device has sufficient compressive strength and significantly improves its overall safety.
[0042] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A water conservancy construction cofferdam device, comprising a lower connecting tube (5), characterized in that: An inner support tube (4) is arranged at the upper end of the lower connection tube (5), a plurality of reinforcing mechanisms (3) are slidably arranged at the upper end of the inner support tube (4), a lifting and adjusting mechanism (1) is slidably sleeved on the outer upper end of the inner support tube (4), and a waterproof ring (2) is fixedly arranged at the lower end of the lifting and adjusting mechanism (1); The lifting and adjusting mechanism (1) comprises a lifting cylinder (101), a surrounding air bag (102) is fixedly arranged at the bottom of the lifting cylinder (101), a lifting plate (103) is slidably arranged at the top of the lifting cylinder (101), a lifting air cushion (105) is fixedly arranged at the lower end of the lifting plate (103), adjustment blocks (106) are fixedly arranged on both sides of the upper end of the lifting plate (103), lifting grooves (104) are opened at both sides of the upper end of the lifting cylinder (101), and two adjustment blocks (106) are respectively slidably arranged inside the two lifting grooves (104); Both sides of the lifting cylinder (101) are provided with air guide grooves (108), the lower ends of the two air guide grooves (108) are both penetrated into the surrounding airbag (102), the middle of the two air guide grooves (108) are fixedly provided with an adjustment baffle (110), the inside of the two adjustment baffles (110) are penetrated with an adjustment ejector pin (111), the upper ends of the two adjustment ejector pins (111) are fixedly provided with a transmission rod (109), the upper ends of the two transmission rods (109) are both fixedly connected to the lower ends of the two adjustment blocks (106), and the opposite side of the two air guide grooves (108) is penetrated with an output pipe (112); The plurality of reinforcing mechanisms (3) each comprise a compression-resistant ring (303), a plurality of connection grooves (301), a plurality of sliding collars (302), two multi-section small telescopic rods (304) and two input connection pipes (305).
2. A water conservancy construction cofferdam device according to claim 1, characterized in that: The lower end of the lower connecting tube (5) is threadedly provided with a plurality of fixing bolts (6), and the lower connecting tube (5) is vertically provided with a plurality of fixing bolts (6), which are connected to the lower connecting tube (5) via the fixing bolts (6).
3. A water conservancy construction cofferdam device according to claim 1, characterized in that: The inner support tube (4) includes an upper support tube (401), and four stabilizing slide bars (403) are fixedly arranged at the upper end of the upper support tube (401). Four sliding openings (107) are penetrated through the upper end of the lifting tube (101), and the four stabilizing slide bars (403) are respectively penetrated and slidably arranged inside the four sliding openings (107). The lower end of the upper support tube (401) is threadedly arranged with a plurality of lower positioning bolts (402).
4. A water conservancy construction cofferdam device according to claim 3, characterized in that: The upper ends of the four stabilizing slide bars (403) are threadedly connected to the limit alarm (404), and spring telescopic rods (405) are fixedly arranged on both sides of the lower ends of the four limit alarms (404), and lower contact rings (406) are fixedly arranged between the lower ends of the plurality of spring telescopic rods (405), and two connecting rods (407) are fixedly arranged on the upper ends of the four lower contact rings (406), and conductive strips (408) are fixedly arranged between the upper ends of the plurality of connecting rods (407).
5. A water conservancy construction cofferdam device according to claim 4, characterized in that: Contact nodes (409) are fixedly arranged on both sides of the upper ends of the four limit alarms (404), and a power source, a resistor and an alarm are respectively connected in series between the plurality of contact nodes (409).
6. A water conservancy construction cofferdam device according to claim 1, characterized in that: The plurality of connection grooves (301) are all provided inside the anti-pressure ring (303), and the plurality of sliding collars (302) are respectively fixedly arranged inside the connection grooves (301).
7. A water conservancy construction cofferdam device according to claim 1, characterized in that: The two multi-section small telescopic rods (304) are respectively fixedly arranged on both sides of the upper end of the anti-pressure ring (303), the two input connecting pipes (305) are respectively penetrated into the multi-section small telescopic rod (304), and the plurality of input connecting pipes (305) are respectively connected in parallel to the two output pipes (112).