Fabricated steel tower fan foundation and construction method thereof
Through the combination of the plug-in structure of prefabricated components and the connection components, the problems of many basic components and complicated installation steps of the fan are solved, and the results of reducing the number of parts, easy installation and fast construction speed are achieved. It is suitable for cold weather conditions. Wind power foundation construction.
Patent Information
- Application Number
- CN202411228432.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2024-11-22
AI Technical Summary
The existing fan base parts are large, the installation steps are cumbersome, and the construction speed is slow, especially in cold weather conditions.
Prefabricated components are connected through plug-in structures to form an installation cavity and combine it with the connecting components to reduce the number of parts, simplify the installation process, and improve construction efficiency.
It has achieved the prefabricated steel tower fan foundation and its construction methods with reduced number of parts, simple and fast installation, fast construction speed and high efficiency. It has adapted to cold weather construction and improved the stability and earthquake resistance of the fan foundation.
Smart Images

Figure CN118997212A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of wind power generation, and in particular to an assembled steel tower wind turbine foundation and a construction method thereof. Background Art
[0002] As a renewable energy, wind power generation has the advantages of low investment cost, short construction period and great commercial development potential compared with the development and utilization of other energy sources. In areas with abundant wind resources and small wind shear, steel tower wind turbines with a hub height of less than 120 meters are generally used. Steel tower wind turbines are wind turbines with steel towers.
[0003] Before installing the steel tower fan, the installation of the fan foundation must be completed first, and then the steel tower can be set on the fan foundation, and then other fan components can be installed. The traditional fan foundation construction method is to cast concrete on site. This construction method has the disadvantages of a long construction period and requires a lot of manpower and material resources. In addition, the weather in the north is cold and the temperature is low in winter, and it is impossible to perform on-site casting operations, which will be restricted by weather factors. Therefore, the fan foundation of the steel tower fan is usually an assembled fan foundation, and each component is prefabricated in the factory and then installed on the construction site. This fan foundation includes a plurality of assembly units arranged in an annular manner on the cushion layer, and the assembly units are provided with grooves and protrusions, and the connectors are provided with matching protrusions and groove plug-in features, and adjacent assembly units are plug-in connected through connectors. This fan foundation has a large number of parts, cumbersome steps during on-site installation, and a slow construction speed. Summary of the invention
[0004] Therefore, the technical problem to be solved by the present invention is to overcome the defects in the prior art that the fan foundation has a large number of components, complicated steps during on-site installation, and slow construction speed, thereby providing an assembled steel tower fan foundation and a construction method thereof with a small number of components, simple and quick on-site installation, fast construction speed, and high construction efficiency.
[0005] In order to solve the above problems, the present invention provides an assembled steel tower fan foundation, comprising:
[0006] A basic assembly, wherein the basic assembly comprises a plurality of prefabricated components arranged in a circumferential direction, and the plurality of prefabricated components enclose a mounting cavity, and two adjacent prefabricated components are connected by a plug-in structure, and the plug-in structure comprises a plug-in block and / or a plug-in slot formed on one of the two adjacent prefabricated components, and the plug-in slot and / or the plug-in block formed on the other one;
[0007] A connecting component is arranged in the installation cavity and connected to the steel tower.
[0008] Optionally, the prefabricated component includes: a base plate, a ring beam, a platform column and a rib beam, the ring beam, the platform column and the rib beam are all arranged on the base plate, and one end of the rib beam is connected to the platform column, and the other end is connected to the ring beam.
[0009] Optionally, the platform column is arranged at one end of the base plate close to the connecting component, and the ring beam is arranged at one end of the base plate away from the connecting component.
[0010] Optionally, the plug-in block is formed on one side of the column of each prefabricated component, and the plug-in groove is formed on the other side; the plug-in block is formed on one side of the ring beam, and the plug-in groove is formed on the other side, and the plug-in block on the ring beam and the plug-in block on the column are located on the same side.
[0011] Optionally, a plurality of first anchor bolt holes are provided at the plug-in block and the plug-in slot, and each of the first anchor bolt holes is provided with a first anchor bolt.
[0012] Optionally, the height of the column is greater than the height of the ring beam.
[0013] Optionally, the top surface of the rib beam is a slope that slopes downward from the column to the ring beam.
[0014] Optionally, a shock-proof buffer is provided in the plug-in slot.
[0015] Optionally, the connecting assembly includes: an anchor member, an anchor ring plate and a second anchor, the anchor member is connected to the prefabricated member, the top and bottom ends of the anchor member are respectively provided with the anchor ring plate, the anchor ring plate is provided with a plurality of second anchor holes, and the second anchor holes are provided with the second anchors.
[0016] A method for constructing a prefabricated steel tower fan foundation, applied to the prefabricated steel tower fan foundation, comprises the following steps:
[0017] Set up the connection components;
[0018] Arrange a plurality of prefabricated components along the connecting assembly in a circular direction, and connect adjacent prefabricated components through a plug-in structure;
[0019] The prefabricated components and the connection components are connected.
[0020] The present invention has the following advantages:
[0021] 1. The assembled steel tower wind turbine foundation provided by the present invention includes: a foundation assembly and a connection assembly. The foundation assembly includes a plurality of prefabricated components arranged in a circumferential direction, and two adjacent prefabricated components are connected by a plug-in structure. The plug-in structure includes a plug-in block and / or a plug-in slot formed on one of the two adjacent prefabricated components, and a plug-in slot and / or a plug-in block formed on the other. The connection of the prefabricated components is achieved by matching and plugging the plug-in slot and the plug-in block, and a plurality of prefabricated components will be enclosed to form an installation cavity after being connected. The connection assembly is arranged in the installation cavity, and the connection assembly is used to connect the steel tower. Since the plug-in block and / or the plug-in slot of the plug-in structure are directly formed on the prefabricated component, when installing the wind turbine foundation, the prefabricated component can be directly plugged in for installation without the need for additional components. Therefore, the number of components of the wind turbine foundation is relatively small, and the installation is simpler and faster, the construction speed is faster, and the construction efficiency is also higher.
[0022] 2. The prefabricated components of the assembled steel tower wind turbine foundation provided by the present invention include: a bottom plate, a ring beam, a platform column and a rib beam, wherein the ring beam, the platform column and the rib beam are all arranged on the bottom plate, and one end of the rib beam is connected to the platform column and the other end is connected to the ring beam. The arranged rib beam can enhance the bearing capacity of the prefabricated components, and the arranged ring beam can increase the integrity of the prefabricated components, so that the wind turbine foundation structure is more stable in force and has stronger earthquake resistance.
[0023] 3. The assembled steel tower fan foundation provided by the present invention has a plurality of first anchor bolt holes at both the plug-in block and the plug-in slot, and each first anchor bolt hole is provided with a first anchor bolt. After the prefabricated component is plugged in the plug-in block and the plug-in slot, it is fastened by the first anchor bolt to ensure that the connection position is tight and reliable.
[0024] 4. In the assembled steel tower fan foundation provided by the present invention, the top surface of the rib beam is a slope that slopes downward from the platform column to the ring beam, which can reduce the material used in processing the rib beam and save production costs.
[0025] 5. The assembled steel tower fan foundation provided by the present invention has a shockproof buffer disposed in the plug-in slot. The shockproof buffer can convert the energy received by the fan foundation into heat energy dissipation, thereby avoiding the accumulation of damage to the fan foundation.
[0026] 6. The construction method of the assembled steel tower wind turbine foundation provided by the present invention comprises the following steps: setting a connection assembly; arranging a plurality of prefabricated components along the connection assembly in a circular direction, and connecting adjacent prefabricated components through a plug-in structure; and connecting the prefabricated components and the connection assembly. This construction method can realize the rapid installation and connection of each prefabricated component of the wind turbine foundation, and the construction is convenient, the construction speed is fast, and the work efficiency is high. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0028] Figure 1 It is a schematic diagram of the foundation of the assembled steel tower fan of the present invention;
[0029] Figure 2 It is a schematic diagram of the foundation components in the assembled steel tower fan foundation of the present invention;
[0030] Figure 3 A schematic diagram of another perspective of the foundation components in the assembled steel tower fan foundation of the present invention;
[0031] Figure 4 It is a schematic diagram of the connection components in the foundation of the assembled steel tower fan of the present invention.
[0032] Description of reference numerals:
[0033] 1. foundation assembly, 11. prefabricated component, 111. bottom plate, 112. ring beam, 113. platform column, 114. rib beam, 121. plug-in block, 122. plug-in groove, 131. first anchor bolt hole;
[0034] 2. Connecting assembly, 21. Anchor bolt member, 22. Anchor bolt ring plate, 23. Second anchor bolt. DETAILED DESCRIPTION
[0035] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0037] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0038] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0039] like Figure 1 The figure shows a preferred embodiment of the assembled steel tower fan foundation of the present invention. The assembled steel tower fan foundation is suitable for installing and connecting the steel tower fan to stably support the operation of the steel tower fan.
[0040] The above-mentioned assembled steel tower wind turbine foundation includes: a foundation component 1 and a connection component 2. The foundation component 1 includes a plurality of prefabricated components 11 arranged in a circumferential direction, and two adjacent prefabricated components 11 are connected by a plug-in structure, and the plug-in structure includes a plug-in block 121 and / or a plug-in slot 122 formed on one of the two adjacent prefabricated components 11, and a plug-in slot 122 and / or a plug-in block 121 formed on the other, and the connection of the prefabricated components 11 is achieved by matching and plugging the plug-in slot 122 and the plug-in block 121. In other words, it is possible that only the plug-in block 121 is formed on one of the two adjacent prefabricated components 11, and only the plug-in slot 122 is formed on the other, or it is possible that both the plug-in block 121 and the plug-in slot 122 are formed on one of the prefabricated components 11, and both the plug-in slot 122 and the plug-in block 121 are formed on the corresponding other prefabricated component 11. In short, the two prefabricated components 11 are connected by matching and plugging the plug-in block 121 and the plug-in slot 122. After multiple prefabricated components 11 are connected, they will enclose the inside to form an installation cavity. The connection component 2 is set in the installation cavity, and the function of the connection component 2 is to connect the steel tower. Since the plug-in block 121 and / or the plug-in slot 122 of the plug-in structure are directly formed on the prefabricated component 11, when installing the wind turbine foundation, each prefabricated component 11 can be directly plugged in for installation without the need for additional parts to connect, so the number of wind turbine foundation parts is relatively small, which makes installation simpler and faster, and the construction speed is faster, and the construction efficiency will also be higher.
[0041] Specifically, Figure 2 , Figure 3As shown, the prefabricated component 11 is a concrete component prefabricated in a factory, and is integrally cast and formed by means of a mold. The prefabricated component 11 includes: a bottom plate 111, a ring beam 112, a column 113 and a rib beam 114. Looking down from the top of the wind turbine foundation, the bottom plate 111 is an isosceles trapezoid, and the side corresponding to its short side is connected to the connecting component 2. The ring beam 112, the column 113 and the rib beam 114 are all arranged on the bottom plate 111, wherein the ring beam 112 and the column 113 also appear as an isosceles trapezoid when looking down from the top of the wind turbine foundation, and are flush with the edge of the bottom plate 111. However, the column 113 is arranged at one end of the bottom plate 111 close to the connecting component 2, and the ring beam 112 is arranged at one end of the bottom plate 111 away from the connecting component 2, and the height of the column 113 is greater than the height of the ring beam 112. After a plurality of prefabricated components 11 are connected, a plurality of columns 113 are correspondingly spliced into a truncated cone, and the cavity is installed in the middle of the truncated cone. One end of the rib beam 114 is connected to the column 113, and the other end is connected to the ring beam 112. The top surface of the rib beam 114 is a slope that slopes downward from the column 113 to the ring beam 112, and the rib beam 114 is rectangular when viewed from above the wind turbine foundation.
[0042] Furthermore, a plug-in block 121 is formed on one side of the pedestal 113 of each prefabricated component 11, and a plug-in groove 122 is formed on the other side; a plug-in block 121 is formed on one side of the ring beam 112, and a plug-in groove 122 is formed on the other side; and the plug-in block 121 on the ring beam 112 is located on the same side as the plug-in block 121 on the pedestal 113. Since the height of the pedestal 113 is greater than the height of the ring beam 112, correspondingly, the depth of the plug-in groove 122 formed on the pedestal 113 is also greater than the depth of the plug-in groove 122 formed on the ring beam 112, and the height of the plug-in block 121 formed on the pedestal 113 is also greater than the height of the plug-in block 121 formed on the ring beam 112. Specifically, in the present embodiment, the plug-in block 121 is a square block, and correspondingly, the plug-in groove 122 is a square groove.
[0043] Of course, in other embodiments, the plug-in block 121 on the ring beam 112 and the plug-in block 121 on the column 113 may not be located on the same side.
[0044] In other embodiments, the plug-in block 121 may be formed only on one side of the column 113, and the plug-in groove 122 may be formed on the other side; or the plug-in block 121 may be formed only on one side of the ring beam 112, and the plug-in groove 122 may be formed on the other side, that is, only one plug-in block 121 or plug-in groove 122 is set on each side of the prefabricated component 11.
[0045] In other embodiments, the shape of the plug-in block 121 may also be other shapes such as a wedge shape, and the shape of the plug-in slot 122 may be other shapes matching the shape of the plug-in block 121 .
[0046] In addition, a plurality of first anchor bolt holes 131 are provided at the plug-in block 121 and the plug-in slot 122, and each first anchor bolt hole 131 is provided with a first anchor bolt. Specifically, in this embodiment, eight rows and two columns of sixteen first anchor bolt holes 131 are provided at the plug-in slot 122 formed on the column 113, and the first anchor bolt holes 131 penetrate the two surfaces of the column 113. Similarly, eight rows and two columns of sixteen first anchor bolt holes 131 are provided at the plug-in block 121 formed on the column 113, and the first anchor bolt holes 131 penetrate the two surfaces of the plug-in block 121. Two rows and two columns of four first anchor bolt holes 131 are provided at the plug-in slot 122 formed on the ring beam 112. Similarly, two rows and two columns of four first anchor bolt holes 131 are provided at the plug-in block 121 formed on the ring beam 112, and the first anchor bolt holes 131 penetrate the two surfaces of the plug-in block 121. A first anchor bolt may be provided in the first anchor bolt hole 131 so as to connect the plug-in block 121 and the plug-in slot 122 connected together in series, so that the connection of the prefabricated component 11 is more stable and reliable.
[0047] In other embodiments, the number of first anchor bolt holes 131 provided at the plug-in block 121 and the plug-in slot 122 can be adaptively adjusted, and this embodiment does not impose any specific limitation thereto.
[0048] Furthermore, a shockproof buffer is provided in the plug slot 122, and the shockproof buffer is preferably a rubber pad. The provided shockproof buffer can convert the energy received by the fan foundation into heat energy dissipation, thereby avoiding the accumulation of damage to the fan foundation.
[0049] The connection assembly 2 is also a prefabricated concrete component 11, which is mainly used to connect the steel tower. Figure 4 As shown, the connection assembly 2 includes: an anchor bolt member 21, an anchor bolt ring plate 22 and a second anchor bolt 23. The outer edge of the anchor bolt member 21 is a regular polygon when viewed from the top and bottom of the wind turbine foundation, and the inner edge is a circle. The side corresponding to each side of the regular polygon is connected to the side of the column 113 in a prefabricated component 11. And a plurality of first anchor bolt holes 131 are arranged on each side, and the first anchor bolt holes 131 here correspond to the first anchor bolt holes 131 at the plug-in block 121 or the plug-in groove 122 on the column 113, so that the anchor bolt member 21 can be connected to the column 113 of each prefabricated component 11 through the first anchor bolt. The top and bottom ends of the anchor bolt member 21 are respectively provided with anchor bolt ring plates 22, which are annular plates, on which a plurality of second anchor bolt holes are arranged in an annular direction, and the second anchor bolt holes on the two anchor bolt ring plates 22 at the top and bottom correspond to each other. The second anchor bolt 23 is arranged in the second anchor bolt hole.
[0050] This embodiment also provides a method for constructing an assembled steel tower fan foundation, which is applied to an assembled steel tower fan foundation. The assembled steel tower fan foundation has the same structure as the assembled steel tower fan foundation in the above embodiment, so it will not be repeated here.
[0051] The construction method of the assembled steel tower fan foundation includes the following steps:
[0052] (1) Setting connection component 2;
[0053] Before setting up the connection component 2, it is necessary to first excavate a foundation pit, then lay cable buried pipes in the foundation pit, and then pour concrete to form a cushion layer of a certain height, and then place the connection component 2 at the center of the foundation pit.
[0054] (2) multiple prefabricated components 11 are arranged in a circumferential direction along the connection assembly 2, and adjacent prefabricated components 11 are connected by a plug-in structure;
[0055] The prefabricated components 11 are prefabricated in the factory and are formed by pouring concrete with the help of a template. The number of prefabricated components 11 required for each wind turbine foundation is determined according to the size of the prefabricated components 11. After the prefabricated components 11 are delivered from the factory to the construction site, they can be directly installed, which is convenient and quick.
[0056] When installing the fan foundation, first install the shock-proof buffer in the plug-in groove 122, and then arrange multiple prefabricated components 11 in a clockwise or counterclockwise direction around the connecting component 2, and sequentially connect the plug-in block 121 and / or the plug-in groove 122 on each prefabricated component 11 with the corresponding plug-in groove 122 and / or the plug-in block 121 on the adjacent prefabricated component 11.
[0057] (3) Connect the prefabricated component 11 and the connection assembly 2.
[0058] The first anchor bolt is inserted into the first anchor bolt channel 131 to connect the insertion groove 122 and the insertion hole. The first anchor bolt disposed at the column 113 also connects the anchor bolt member 21 and the column 113 together. Then, grouting is poured into the first anchor bolt channel 131 .
[0059] After the connection of each prefabricated component 11 is completed, the wind turbine foundation is installed. After the foundation is installed, the soil layer is backfilled, and then the steel tower is connected to the connection assembly 2, and then other components of the steel tower wind turbine are successively installed on the steel tower.
[0060] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. An assembled steel tower fan foundation, characterized in that: include: A basic component (1), the basic component (1) comprising a plurality of prefabricated components (11) arranged in a circumferential direction, wherein the plurality of prefabricated components (11) enclose a mounting cavity, wherein two adjacent prefabricated components (11) are connected via a plug-in structure, wherein the plug-in structure comprises a plug-in block (121) and / or a plug-in slot (122) formed on one of the two adjacent prefabricated components (11), and the plug-in slot (122) and / or the plug-in block (121) formed on the other one; A connecting component (2), wherein the connecting component (2) is arranged in the installation cavity and connected to the steel tower.
2. The assembled steel tower fan foundation according to claim 1, characterized in that: The prefabricated component (11) comprises: a base plate (111), a ring beam (112), a platform column (113) and a rib beam (114); the ring beam (112), the platform column (113) and the rib beam (114) are all arranged on the base plate (111); one end of the rib beam (114) is connected to the platform column (113), and the other end is connected to the ring beam (112).
3. The assembled steel tower fan foundation according to claim 2, characterized in that: The platform column (113) is arranged at one end of the base plate (111) close to the connection component (2), and the ring beam (112) is arranged at one end of the base plate (111) away from the connection component (2).
4. The assembled steel tower fan foundation according to claim 2, characterized in that: The platform column (113) of each prefabricated component (11) has the plug-in block (121) formed on one side and the plug-in groove (122) formed on the other side; the ring beam (112) has the plug-in block (121) formed on one side and the plug-in groove (122) formed on the other side, and the plug-in block (121) on the ring beam (112) and the plug-in block (121) on the platform column (113) are located on the same side.
5. The assembled steel tower fan foundation according to claim 4, characterized in that: A plurality of first anchor bolt holes (131) are provided at both the plug-in block (121) and the plug-in slot (122), and each of the first anchor bolt holes (131) is provided with a first anchor bolt.
6. The assembled steel tower fan foundation according to claim 2, characterized in that: The height of the platform column (113) is greater than the height of the ring beam (112).
7. The assembled steel tower fan foundation according to claim 6, characterized in that: The top surface of the rib beam (114) is a slope that slopes downward from the platform column (113) to the ring beam (112).
8. The assembled steel tower fan foundation according to claim 1, characterized in that: A shock-proof buffer is arranged in the plug-in slot (122).
9. The assembled steel tower fan foundation according to any one of claims 1 to 8, characterized in that: The connection assembly (2) comprises: an anchor member (21), an anchor ring plate (22) and a second anchor (23); the anchor member (21) is connected to the prefabricated member (11); the top end and the bottom end of the anchor member (21) are respectively provided with the anchor ring plate (22); the anchor ring plate (22) is provided with a plurality of second anchor holes; and the second anchor holes are provided with the second anchors (23).
10. A method for constructing an assembled steel tower fan foundation, applied to the assembled steel tower fan foundation according to any one of claims 1 to 9, characterized in that: The following steps are involved: Set the connection component (2); A plurality of prefabricated components (11) are arranged in a circular direction along the connection assembly (2), and adjacent prefabricated components (11) are connected via a plug-in structure; The prefabricated component (11) and the connecting assembly (2) are connected.
Citation Information
Cited By
A fan foundation and a fan foundation monitoring device
CN120556512B
Land wind power full-prefabricated concrete fan foundation and construction method thereof
CN122190290A