Method for assembling seabed data center of steel shell concrete pipe gallery and data square cabin

Through the section connection between the steel shell concrete pipe corridor and the data cabin and the anchor layer measures, the problems of interruption in maintenance of submarine data centers and low resource utilization are solved, and convenient maintenance and high-security data transmission of submarine data centers are achieved.

CN118997225AActive Publication Date: 2024-11-22CCCC FOURTH HARBOR ENG INST CO LTD

Patent Information

Application Number
CN202411250340.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-11-22
Estimated Expiration
2044-09-06

AI Technical Summary

Technical Problem

During maintenance, existing submarine data centers require professionals to dive into the water or lift it, resulting in interruption of data services, low resource utilization during installation, and low safety guarantees of submarine composite cables in complex environments.

Method used

The steel-shell concrete pipe gallery and the data cabin are assembled under the sea data center. Through the sectional connection between the prefabricated pipe gallery and the data cabin, the adjustable maintenance doors and brackets are used for rapid docking, and the anchor layer and waterproofing measures are set. Achieve stable installation and maintenance of subsea data centers.

Benefits of technology

Real-time monitoring and convenient maintenance of subsea data centers are realized, resource utilization and data transmission security are improved, waterproofness, tidal and seismic capabilities of the structure are enhanced, and maintenance costs are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997225A_ABST
    Figure CN118997225A_ABST
Patent Text Reader

Abstract

The invention provides an assembling method for a seabed data center of a steel shell concrete pipe gallery and a data square cabin, and belongs to the field of ocean engineering. Comprising the steps of a preparation stage, pipe gallery prefabrication, pipe gallery post-treatment, pipe gallery transportation to a structure assembly area, structure assembly, structure assembly inspection and installation of a seabed data center. Due to the fact that the outer portion of the structure of the pipe gallery is completely covered with the steel shell, the water tightness is higher, and stronger tide and earthquake influences can be resisted; the bracket on the steel shell and the steel shell are poured together, so that the integrality is higher; the pipe gallery is connected with the data square cabin to form a seabed data center, so that a maintainer can directly enter the data square cabin for maintenance through the seabed pipe gallery; two to three groups of data shelters are symmetrically arranged on two sides of the pipe gallery, so that reasonable arrangement of the data shelters of the seabed data center is realized; and an assembling method of independently prefabricating and assembling the pipe section prefabricating area and the structure assembling area is adopted, so that the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of marine engineering, and in particular to an assembly method of a submarine data center of a steel shell concrete pipe gallery and a data cabin. Background Art

[0002] The submarine data center is a solution that deploys data storage and processing facilities on the seabed. It uses flowing seawater for heat dissipation and submarine composite cables for power supply and data transmission back to the Internet.

[0003] The existing submarine data center is composed of an entire cabin structure that is sunk to the seabed and has no connection with the outside world. When repairing and maintaining the cabin, only professionals can dive underwater or lift the entire cabin ashore to inspect and repair it, which leads to data service interruption in the data center and increases maintenance costs. Secondly, this type of submarine data cabin needs to be laid out one by one during installation, which has a low utilization rate of marine resources. Finally, the submarine composite cable needs to face a relatively complex submarine environment such as tides and scouring when transmitting data, and its safety is not high. Summary of the invention

[0004] The purpose of the present invention is to provide an assembly method for a submarine data center of a steel shell concrete pipe gallery and a data cabin, so as to solve the problems proposed in the above-mentioned background technology that the cabin can only be repaired by professionals diving underwater or lifting the cabin for maintenance, resulting in data service interruption; it needs to be laid out in sequence during installation, and the utilization rate of sea resources is low; the submarine composite cable needs to face the problem of complex submarine environment such as tides and scouring when transmitting data.

[0005] To achieve the above object, the present invention provides the following technical solution: an assembly method of a submarine data center of a steel shell concrete pipe gallery and a data cabin, comprising the following steps:

[0006] S100, preparation stage: Determine the structure of the submarine data center according to the design requirements, the submarine data center includes a plurality of pipe corridors and a plurality of data cabins, the plurality of pipe corridors are connected one by one, each pipe corridor is composed of a rectangular parallelepiped steel shell with a hollow inner cavity and concrete poured in the steel shell, at least one set of inspection doors are symmetrically opened on both sides of each pipe corridor, a set of inspection doors is two inspection doors, each inspection door is connected to a corresponding data cabin, the pipe corridor is connected to the data cabin through the inspection door to form a submarine data center; a bracket is respectively provided under the inspection door on both sides of the pipe corridor, a pipe support is provided on the bracket, the pipe support is an adjustable structure adapted to the shape of the data cabin, and the position of the data cabin can be fine-tuned;

[0007] Selecting a site and constructing a dry dock site, the dry dock site includes a pipe gallery prefabrication area and a structure assembly area, a first gate is provided between the pipe gallery prefabrication area and the structure assembly area, and a second gate is provided between the structure assembly area and the sea area;

[0008] S200, prefabrication of the pipe gallery: close the first gate, and prefabricate the pipe gallery in sections in the pipe gallery prefabrication area, wherein the length of each section of the pipe gallery is 2 to 3 lengths of the data cubes;

[0009] S300, post-processing of the pipe gallery: after prefabrication is completed, water is poured into the prefabrication area of ​​the pipe gallery to conduct a leak test on the pipe gallery to ensure that there is no leakage; after the leak test is qualified, the pipe gallery is pumped out of the water, an anti-anchor layer is set on the outer wall of the pipe gallery, and outfitting construction is carried out;

[0010] S400, transporting the pipe gallery to the structural assembly area: opening the first gate, closing the second gate, transporting the post-processed pipe gallery one by one along the floating channel to the structural assembly area, and after arriving at the structural assembly area, closing the first gate to prevent water backflow, and evacuating the water in the pipe gallery prefabrication area to prepare for the prefabrication of the next section of the pipe gallery;

[0011] S500, structural assembly: in the structural assembly area, the pipe gallery is fixed with a cable to ensure its stability, the data cabin is hoisted to the inspection door corresponding to the pipe gallery for docking, and the closed inspection door is opened after the docking is completed; after completing the assembly of one group of data cabins, the pipe gallery is moved forward to the next group of data cabins, and the above assembly steps are repeated until all the pipe galleries and data cabins are assembled to form the submarine data center;

[0012] S600, structural assembly inspection: conduct a comprehensive inspection of the entire assembled submarine data center, including pressure test, air tightness test, and water tightness test, to ensure that all indicators are qualified.

[0013] S700, installation of the submarine data center: after all indicators of the submarine data center are qualified, the second gate is opened, and the data center is transported by barge to the designed location in the sea area and then installed on the seabed.

[0014] Furthermore, the bottom of the steel shell is a bottom plate, the two sides are side plates, and the top is a top plate; the steel shell is composed of an inner panel and an outer panel connected by a plurality of transverse partitions and a longitudinal partition, and the transverse partitions and the longitudinal partitions divide the inner cavity of the steel shell into a plurality of independent compartments, and the compartments are used for pouring concrete, and each of the compartments is reserved with pouring holes and exhaust holes; the transverse partitions are provided with transverse flat ribs, and the longitudinal partitions are provided with longitudinal stiffening ribs, and the longitudinal stiffening ribs are also provided with welding nails.

[0015] Furthermore, the compartment in the steel shell is cast using self-compacting concrete.

[0016] Furthermore, in step S200, the prefabrication of the pipe gallery includes the following steps:

[0017] S201, steel shell and bracket production: according to the design requirements, cut the plate and produce the inner panel and the outer panel; produce the transverse partition, and set the transverse flat ribs at the designed position to increase the strength of the transverse partition; produce the longitudinal partition, and set the longitudinal stiffening ribs thereon to enhance the longitudinal strength and rigidity of the longitudinal partition; at the same time, set the welding nails on the longitudinal stiffening ribs; and reserve the inspection door at the designed position of the two side panels; then, cut the plate and produce the bracket and the pipe bracket;

[0018] S202, welding assembly: first, assemble the inner panel, the outer panel, the transverse partition and the longitudinal partition together by welding to form a complete steel shell structure; use the transverse partition and the longitudinal partition to divide the inner cavity of the steel shell into a plurality of independent compartments; reserve a casting hole and an exhaust hole on each compartment; and close the inspection door; then, weld the bracket under the inspection door and weld it to the inner cavity of the steel shell as a whole, and install the pipe bracket on the bracket;

[0019] S203, concrete pouring: using a drag pump and a pouring machine, pouring the steel shell in the order of the bottom plate, the side plate, the bracket on the side plate and the top plate until the entire compartment is filled; after the concrete is initially set, the pouring holes are closed to prevent moisture and debris from entering the compartment. After the concrete is completely solidified, the prefabrication of the pipe gallery is completed.

[0020] Furthermore, the docking part between the pipe gallery and the data cabin adopts a flexible connection and is wrapped with a water stop to complete the waterproof setting.

[0021] Furthermore, 2 to 3 groups of the data cubes are symmetrically arranged on both sides of the pipe gallery, and a distance of 30 to 50 cm is reserved between the data cubes on the lower layer and the brackets on the upper layer.

[0022] Preferably, the pipeline gallery installed on the seabed is provided with a tunnel connected to the land on the side close to the coastline.

[0023] Preferably, the pipeline gallery installed on the seabed is provided with an entrance above the sea level not far from the coastline.

[0024] Furthermore, in step S300 of the submarine data center assembly method, the anti-anchor layer is a protective barrier layer formed by coating a special protective coating; the outfitting construction includes the installation of the lighting system, ventilation system, and drainage system inside the corridor and the installation of the ballast water tank, ballast water pipe system, and temporary ventilation auxiliary facilities outside the corridor.

[0025] Furthermore, in step S500 of the submarine data center assembly method, the sinking and floating of the pipe gallery is controlled by adjusting the amount of water in the pipe gallery to meet the assembly requirements of the data cubes at different heights.

[0026] The beneficial effects of the present invention are:

[0027] (1) The submarine corridor is connected to the data cabin, so that maintenance personnel can directly enter the data cabin through the submarine corridor for maintenance, which will not cause data service interruption in the data center, and realize real-time monitoring of submarine data. At the same time, a tunnel connecting to the land is set on the side of the corridor close to the coastline, or an entrance above sea level is set on the corridor not far from the coastline, making the daily maintenance and overhaul of the submarine data center more convenient.

[0028] (2) By symmetrically arranging 2 to 3 groups of the data cube structures on both sides of the pipe gallery and flexibly connecting the pipe gallery and the data cubes, space is saved and a reasonable arrangement of the data cubes of the submarine data center is achieved.

[0029] (3) The outer layer is a steel shell with concrete poured inside. Since the exterior of the structure is completely covered by the steel shell, it is more watertight, making the submarine corridor more waterproof. At the same time, it can also withstand stronger tides and earthquakes. The bracket on the steel shell is cast together with the steel shell, which has a stronger integrity and higher overall strength. The data transmission line is laid in the corridor, which reduces the erosion and damage of seawater to the data transmission line.

[0030] (4) When pouring concrete in the steel shell, self-compacting concrete can flow and compact under the action of its own gravity. Even if there is a dense structure inside the steel shell, it can be completely filled and homogeneous. Concrete that does not require additional vibration can form a dense structure inside the compartment. Ordinary concrete is difficult to fill and compact because it cannot be vibrated and is prone to voids. Therefore, the use of self-compacting concrete and steel shell complement each other, has good mechanical properties, reduces construction time and avoids wear of the steel shell by vibration.

[0031] (5) The combination of the steel shell concrete pipe gallery and the internal and external structures of the submarine data center of the data cabin has jointly improved the reliability, maintainability and safety of the submarine data center. At the same time, the assembly method of independent prefabrication and assembly of pipe section prefabrication area and structure assembly area has been adopted to improve the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is a schematic diagram of the elevation structure of the present invention;

[0033] Figure 2 It is a schematic diagram of the planar structure of the present invention;

[0034] Figure 3 It is a schematic diagram of the assembly method of the present invention;

[0035] Among them: 100-pipeline corridor, 110-steel shell, 111-bracket, 1111-pipe support, 120-concrete, 130-inspection door, 200-data cabin, 310-first gate, 320-second gate, 410-cable, 420-gantry crane, A-pipeline corridor prefabrication area, B-structure assembly area, C-sea area. DETAILED DESCRIPTION

[0036] The specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings; it should be understood that the specific embodiments given here are only used to illustrate and explain the present invention and cannot be used to limit the present invention.

[0037] It should be noted that many specific details are set forth in the following description to facilitate a full understanding of the present invention. However, the present invention may also have other implementations and variations thereof. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.

[0038] like Figure 1-3 As shown, the assembly method of the submarine data center of the steel shell concrete pipe gallery and the data cabin includes the following steps:

[0039] S100, preparation stage: Determine the structure of the submarine data center according to the design requirements. The submarine data center includes a plurality of pipe corridors 100 and a plurality of data cabins 200. The plurality of pipe corridors 100 are connected one by one. Each pipe corridor 100 is in the shape of a rectangular parallelepiped with a hollow inner cavity of a steel shell 110 and concrete 120 poured in the steel shell 110. At least one set of inspection doors 130 is symmetrically opened on both sides of each pipe corridor 100. A set of inspection doors 130 is composed of two Inspection doors 130, each of which is connected to a corresponding data cabin 200, and the pipe gallery 100 is connected to the data cabin 200 through the inspection doors 130 to form a submarine data center; a bracket 111 is provided under each of the inspection doors 130 on both sides of the pipe gallery 100, and a pipe support 1111 is provided on the bracket 111, and the pipe support 1111 is an adjustable structure adapted to the shape of the data cabin 200, and can fine-tune the position of the data cabin 200;

[0040] A dry dock site is selected and constructed, wherein the dry dock site includes a pipe gallery prefabrication area A and a structure assembly area B, a first gate 310 is provided between the pipe gallery prefabrication area A and the structure assembly area B, and a second gate 320 is provided between the structure assembly area B and the sea area C;

[0041] S200, prefabrication of the pipe gallery: close the first gate 310, and prefabricate the pipe gallery 100 in sections in the pipe gallery prefabrication area A, wherein the length of each section of the pipe gallery 100 is 2 to 3 times the length of the data cubes 200;

[0042] S300, post-processing of the pipe gallery: after prefabrication is completed, water is poured into the pipe gallery prefabrication area A, and a leak test is performed on the pipe gallery 100 to ensure that there is no leakage; if the leak test is qualified, the pipe gallery 100 is pumped out of the water, an anti-anchor layer is set on the outer wall of the pipe gallery 100, and outfitting construction is performed;

[0043] S400, transporting the pipe gallery to the structural assembly area: opening the first gate 310, closing the second gate 320, transporting the post-processed pipe gallery 100 one by one along the floating channel to the structural assembly area B, and after arriving at the structural assembly area B, closing the first gate 310 to prevent water backflow, and evacuating the water in the pipe gallery prefabrication area A to prepare for the prefabrication of the next section of the pipe gallery 100;

[0044] S500, structural assembly: in the structural assembly area B, the pipe gallery 100 is fixed with a cable 410 to ensure its stability, and the data cube 200 is lifted to the inspection door 130 corresponding to the pipe gallery 100 by a gantry crane 420 for docking. The gantry crane 420 can simultaneously lift the two data cubes 200 on both sides of the pipe gallery 100, and after docking, the inspection door 130 closed before pouring is opened; after completing the assembly of one group of the data cubes 200, the pipe gallery 100 is moved forward to the assembly of the next group of the data cubes 200, and the above assembly steps are repeated until all the pipe galleries 100 and the data cubes 200 are assembled to form the submarine data center;

[0045] S600, structural assembly inspection: conduct a comprehensive inspection of the entire assembled submarine data center, including pressure test, air tightness test, and water tightness test, to ensure that all indicators are qualified.

[0046] S700, installation of the submarine data center: after all indicators of the submarine data center are qualified, the second gate 320 is opened, and the data center is transported by barge to the designed location in the sea area C and installed on the seabed.

[0047] In actual implementation, the bottom of the steel shell 110 is a bottom plate, the two sides are side plates, and the top is a top plate; the steel shell 110 is composed of an inner panel and an outer panel connected by a plurality of transverse partitions and a longitudinal partition, the inner and outer panels are main bending components, the transverse and longitudinal partitions are main shear components, and they together form a force-bearing whole, the transverse partitions and the longitudinal partitions divide the inner cavity of the steel shell 110 into a plurality of independent compartments, the compartments are used for pouring concrete 120, and each of the compartments is reserved with pouring holes and exhaust holes; the transverse partitions are provided with transverse flat ribs, and the longitudinal partitions are provided with longitudinal stiffening ribs, the longitudinal stiffening ribs are made of T-shaped steel and angle steel, and the longitudinal stiffening ribs are also provided with welds, the longitudinal stiffening ribs and the welds are used as shear-resistant connectors to ensure the connection between the inner and outer panels and the concrete 120, and at the same time, the longitudinal stiffening ribs and the transverse flat ribs work together to enhance the rigidity of the inner and outer panels.

[0048] The steel shell 110 concrete 120 combined submarine pipeline gallery 100 of the present invention adopts a structure in which a steel shell 110 wraps a plain concrete 120. The steel shell 110 and the concrete 120 are combined into a whole through the transverse partitions, the longitudinal partitions, the transverse flat ribs, the longitudinal stiffening ribs and the welding nails welded inside the steel shell 110, so that the steel shell 110 and the concrete 120 are subjected to force together. The steel shell 110 has the advantages of flexible prefabrication site, good waterproof performance, strong seismic performance and good adaptability to uneven settlement. Bolts, channel steels and steel bars can be added inside the steel shell 110 to further increase the strength.

[0049] In actual implementation, the compartment in the steel shell 110 is poured with self-compacting concrete 120. The working performance of the self-compacting concrete 120 is mainly fluidity, filling, cohesion, gap permeability and anti-segregation, which can realize its flow and automatic filling and compaction in the steel shell 110.

[0050] In actual implementation, in step S200, the prefabrication of the pipe gallery 100 includes the following steps:

[0051] S201, steel shell 110 and bracket 111 production: according to the design requirements, cut the plate and produce the inner panel and the outer panel; produce the transverse partition, and set the transverse flat rib at the designed position to increase the strength of the transverse partition; produce the longitudinal partition, and set the longitudinal stiffening rib thereon to enhance the longitudinal strength and rigidity of the longitudinal partition; at the same time, set the welding nails on the longitudinal stiffening rib to form a better combination with the concrete 120; reserve the inspection door 130 at the designed position of the two side panels; cut the plate and produce the bracket 111 and the pipe bracket 1111;

[0052] S202, welding assembly: first, assemble the inner panel, the outer panel, the transverse partition and the longitudinal partition together by welding to form a complete structure of the steel shell 110; use the transverse partition and the longitudinal partition to divide the inner cavity of the steel shell 110 into a plurality of independent compartments; reserve pouring holes and exhaust holes on each compartment; the pouring holes are used for pouring concrete 120 in the later stage, and the exhaust holes are used to discharge the gas generated during the pouring of concrete 120 to ensure the quality of concrete 120; and the inspection door 130 is closed; then, the bracket 111 is welded under the inspection door 130 and welded to the inner cavity of the steel shell 110 as a whole, and the pipe bracket 1111 is installed on the bracket 111;

[0053] S203, pouring of concrete 120: using a drag pump and a pouring machine to pour the steel shell 110 in the order of the bottom plate, the side plate, the bracket 111 on the side plate and the top plate; during the pouring process, the concrete 120 is poured symmetrically and evenly into the compartment through the reserved pouring holes until the entire compartment is filled; at the same time, when the liquid level of the concrete 120 is close to the upper part of the bottom plate, the pouring speed is reduced to reduce the generation of bubbles; after the concrete 120 is initially solidified, the pouring holes are closed to prevent moisture and debris from entering the compartment; after the concrete 120 is completely solidified, the prefabrication of the pipe gallery 100 is completed.

[0054] In actual implementation, the docking part of the pipe gallery 100 and the data cube 200 is flexibly connected and wrapped with GINA waterstop to complete the waterproof setting.

[0055] In actual implementation, 2 to 3 groups of the data cubes 200 are symmetrically arranged on both sides of the pipe gallery 100, and a distance of 30 to 50 cm is reserved between the data cubes 200 on the lower layer and the brackets 111 on the upper layer.

[0056] In the first embodiment of the present invention, the pipeline gallery 100 installed on the seabed is provided with a tunnel connected to the land on the side close to the coastline.

[0057] In the second embodiment of the present invention, the pipeline gallery 100 installed on the seabed is provided with an entrance above the sea level not far from the coastline, and a warning sign is set at the entrance.

[0058] In actual implementation, in step S300 of the submarine data center assembly method, the anti-anchor layer is a protective barrier layer formed by coating a special protective coating; the outfitting construction includes the installation of the lighting system, ventilation system, and drainage system inside the corridor 100 and the installation of the ballast water tank, ballast water pipe system, and temporary ventilation auxiliary facilities outside the corridor 100.

[0059] During actual implementation, in step S500 of the submarine data center assembly method, the sinking and floating of the pipe gallery 100 is controlled by adjusting the amount of water in the pipe gallery 100 to meet the assembly requirements of the data cube 200 at different heights.

Claims

1. The assembly method of the submarine data center of the steel shell concrete pipe gallery and the data cabin is characterized in that: The following steps are involved: S100, preparation stage: Determine the structure of the submarine data center according to the design requirements, the submarine data center includes a plurality of pipe corridors and a plurality of data cabins, the plurality of pipe corridors are connected one by one, each pipe corridor is composed of a rectangular parallelepiped steel shell with a hollow inner cavity and concrete poured in the steel shell, at least one set of inspection doors are symmetrically opened on both sides of each pipe corridor, a set of inspection doors is two inspection doors, each inspection door is connected to a corresponding data cabin, the pipe corridor is connected to the data cabin through the inspection door to form a submarine data center; a bracket is respectively provided under the inspection door on both sides of the pipe corridor, a pipe support is provided on the bracket, the pipe support is an adjustable structure adapted to the shape of the data cabin, and the position of the data cabin can be fine-tuned; Selecting a site and constructing a dry dock site, the dry dock site includes a pipe gallery prefabrication area and a structure assembly area, a first gate is provided between the pipe gallery prefabrication area and the structure assembly area, and a second gate is provided between the structure assembly area and the sea area; S200, prefabrication of the pipe gallery: close the first gate, and prefabricate the pipe gallery in sections in the pipe gallery prefabrication area, wherein the length of each section of the pipe gallery is 2 to 3 lengths of the data cubes; S300, post-processing of the pipe gallery: after prefabrication is completed, water is poured into the prefabrication area of ​​the pipe gallery to conduct a leak test on the pipe gallery to ensure that there is no leakage; after the leak test is qualified, the pipe gallery is pumped out of the water, an anti-anchor layer is set on the outer wall of the pipe gallery, and outfitting construction is carried out; S400, transporting the pipe gallery to the structural assembly area: opening the first gate, closing the second gate, transporting the post-processed pipe gallery one by one along the floating channel to the structural assembly area, and after arriving at the structural assembly area, closing the first gate to prevent water backflow, and evacuating the water in the pipe gallery prefabrication area to prepare for the prefabrication of the next section of the pipe gallery; S500, structural assembly: in the structural assembly area, the pipe gallery is fixed with a cable to ensure its stability, the data cube is hoisted to the inspection door corresponding to the pipe gallery for docking, and the closed inspection door is opened after the docking is completed; after completing the assembly of one group of data cubes, the pipe gallery is moved forward to the next group of data cubes for assembly, and the above assembly steps are repeated until all the pipe galleries and data cubes are assembled to form the submarine data center; S600, structural assembly inspection: conduct a comprehensive inspection of the entire assembled submarine data center, including pressure test, air tightness test, and water tightness test, to ensure that all indicators are qualified; S700, installation of the submarine data center: after all indicators of the submarine data center are qualified, the second gate is opened, and the submarine data center is transported by barge to the designed location in the sea area and then installed on the seabed.

2. The method for assembling a submarine data center of a steel shell concrete pipe gallery and a data shelter according to claim 1, characterized in that: The bottom of the steel shell is a bottom plate, the two sides are side plates, and the top is a top plate; the steel shell is composed of an inner panel and an outer panel connected by a plurality of transverse partitions and a longitudinal partition, and the transverse partitions and the longitudinal partitions divide the inner cavity of the steel shell into a plurality of independent compartments, and the compartments are used for pouring concrete, and each of the compartments is reserved with pouring holes and exhaust holes; the transverse partitions are provided with transverse flat ribs, and the longitudinal partitions are provided with longitudinal stiffening ribs, and the longitudinal stiffening ribs are also provided with welding nails.

3. The method for assembling a submarine data center of a steel shell concrete pipe gallery and a data shelter according to claim 2 is characterized by: The compartments within the steel shell are cast using self-compacting concrete.

4. The method for assembling a submarine data center of a steel shell concrete pipe gallery and a data shelter according to claim 2 is characterized by: In step S200, the prefabrication of the pipe gallery includes the following steps: S201, steel shell and bracket production: according to the design requirements, cut the plate and produce the inner panel and the outer panel; produce the transverse partition, and set the transverse flat ribs at the designed position to increase the strength of the transverse partition; produce the longitudinal partition, and set the longitudinal stiffening ribs thereon to enhance the longitudinal strength and rigidity of the longitudinal partition; at the same time, set the welding nails on the longitudinal stiffening ribs; and reserve the inspection door at the designed position of the two side panels; then, cut the plate and produce the bracket and the pipe bracket; S202, welding assembly: first, assemble the inner panel, the outer panel, the transverse partition and the longitudinal partition together by welding to form a complete steel shell structure; use the transverse partition and the longitudinal partition to divide the inner cavity of the steel shell into a plurality of independent compartments; reserve a casting hole and an exhaust hole on each compartment; and close the inspection door; then, weld the bracket under the inspection door and weld it to the inner cavity of the steel shell as a whole, and install the pipe bracket on the bracket; S203, concrete pouring: using a drag pump and a pouring machine, pouring the steel shell in the order of the bottom plate, the side plate, the bracket on the side plate and the top plate until the entire compartment is filled; after the concrete is initially set, the pouring holes are closed to prevent moisture and debris from entering the compartment. After the concrete is completely solidified, the prefabrication of the pipe gallery is completed.

5. The method for assembling a submarine data center of a steel shell concrete pipe gallery and a data shelter according to claim 1, characterized in that: The butt joint between the pipe gallery and the data cabin is flexibly connected and is wrapped with a water stop to complete the waterproof setting.

6. The method for assembling a submarine data center of a steel shell concrete pipe gallery and a data shelter according to claim 1, characterized in that: Two to three groups of data cubes are symmetrically arranged on both sides of the pipe gallery, and a distance of 30 to 50 cm is reserved between the data cubes on the lower layer and the brackets on the upper layer.

7. The method for assembling a submarine data center of a steel shell concrete pipe gallery and a data shelter according to claim 1, characterized in that: The pipeline gallery installed on the seabed is provided with a tunnel connected to the land on the side close to the coastline.

8. The method for assembling a submarine data center of a steel shell concrete pipe gallery and a data shelter according to claim 1, characterized in that: The pipeline gallery installed on the seabed is provided with an entrance above the sea level not far from the coastline.

9. The method for assembling a submarine data center of a steel shell concrete pipe gallery and a data shelter according to claim 1, characterized in that: In step S300 of the submarine data center assembly method, the anti-anchor layer is a protective barrier layer formed by coating a special protective coating; the outfitting construction includes the installation of the lighting system, ventilation system, and drainage system inside the corridor and the installation of the ballast water tank, ballast water pipe system, and temporary ventilation auxiliary facilities outside the corridor.

10. The method for assembling a submarine data center of a steel shell concrete pipe gallery and a data shelter according to claim 1, characterized in that: In step S500 of the method for assembling a submarine data center, the sinking and floating of the pipe gallery is controlled by adjusting the amount of water in the pipe gallery to meet the assembly requirements of the data cubes at different heights.

Citation Information

Patent Citations

  • Sandwich sinking pipe connector and production method thereof

    CN107620321A

  • Structural foundation for factory-method immersed tube prefabrication and arrangement method

    CN114856271A

  • Underwater data center installation method

    CN116657651A

  • Installation method of submarine immersed tube underwater data center

    CN118390581A

  • Apparatus and the method for continuously connecting precast concrete blocks on the sea

    KR1020100070632A

Cited By

  • Submarine data center and construction method thereof

    CN121593614A

  • Method for designing and constructing data center using trestle-subsea pipe gallery connection

    WO2026199825A1