High-rise building construction garbage cleaning and transporting device

By introducing barrier and rolling devices into the construction waste removal device, the problems of blockage and low efficiency of traditional devices are solved, and the rapid, safe and effective treatment and transportation of garbage are achieved.

CN118997425APending Publication Date: 2024-11-22THE CONSTR DECORATION OF CHINA CONSTR NO 7 ENG BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411041234.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

Traditional construction waste removal devices are prone to blockage and low transportation efficiency, and occupy a large space, which cannot guarantee timeliness and efficiency.

Method used

A high-rise building construction waste removal device is designed, including a fixing device and a plurality of unit cylinders installed vertically along the building, and a barrier device and a rolling device are provided inside. The barrier device slows down the drop speed of garbage through baffles and springs, and the kneading device uses grinding heads and pressure plates to break garbage, reducing volume and impact force.

Benefits of technology

It effectively avoids clogging and noise problems, improves garbage disposal efficiency, reduces the number of dump trucks, and improves the utilization rate and construction efficiency of the collection bin.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997425A_ABST
    Figure CN118997425A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of construction waste clearing and transporting, in particular to a high-rise building construction waste clearing and transporting device which comprises a fixing device connected with a building body, the fixing device is connected with a plurality of downward conveying unit barrels, and the unit barrels are vertically installed along the building body. A blocking device used for reducing the falling speed of solids is arranged in each unit barrel, a rolling device used for reducing the volume of the solids is arranged at the bottom after the multiple unit barrels are connected, the rolling device comprises a bottom plate arranged at the bottom, and a plurality of rotating grinding heads are arranged on the stress surface of the bottom plate; and a pressure plate facing the grinding head is arranged on the opposite side of the bottom plate, so that the treatment effect on the construction waste is improved, the volume of the construction waste is reduced, and the conditions of blockage and noise are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction waste removal, and in particular to a high-rise building construction waste removal device. Background Art

[0002] Construction units or individuals generate slag, abandoned soil, abandoned materials, silt and other wastes during the construction of various buildings and structures. In other words, a large amount of construction waste will be generated during the general construction process. Due to the temporary storage and transportation of construction waste, my country's "Regulations on Urban Construction Waste Management" has clear provisions. Therefore, for construction units, the construction waste generated during the construction process needs to be actively and promptly cleaned, temporarily stored and transported.

[0003] The traditional method of cleaning garbage from construction floors is to use a trolley to transport the construction garbage to a construction elevator and stack it at a designated site. Construction garbage mainly includes various bricks and concrete blocks. Since metals such as steel bars have a high recycling value, they are generally stored separately and processed centrally. However, the construction garbage from each floor can only be transported down when the construction elevator is installed to the stacking floor. It cannot be cleaned up in time and timeliness cannot be guaranteed. Secondly, the amount of construction garbage is large, and transporting it down through the construction elevator greatly occupies the use of the construction elevator, reducing the effective efficiency of the construction elevator transportation. Therefore, some high-rise construction waste vertical transportation systems have emerged. However, due to the irregular volume of construction waste and the different heights, the construction waste has a certain impact force. The existing treatment method is to install a curved part inside the vertical transportation system to achieve the purpose of deceleration by impacting the curved part. However, when the construction waste is being transported, the noise generated is relatively large, and due to the setting of the curved part, the construction waste will collide and accumulate in the curved part. If accumulation occurs, it will cause blockage inside. After the blockage occurs, it will be cleared by manually knocking on the outside to produce vibration, or the curved part will be removed for clearing, which is time-consuming and labor-intensive. In addition, due to the large volume of construction waste, a small amount of construction waste will be able to block the exit, which is very inconvenient during use. Summary of the invention

[0004] The purpose of the present invention is to overcome the shortcomings of the prior art construction waste removal device that is prone to blockage and occupies a large volume during transportation, and to provide a high-rise building construction waste removal device.

[0005] In order to achieve the above-mentioned purpose, the embodiment of the present invention specifically adopts the following technical scheme: a high-rise building construction waste removal device, including a fixing device connected to the building body, the fixing device is connected to a unit cylinder for downward transportation, a plurality of the unit cylinders are vertically installed along the building body, a blocking device for reducing the falling speed of solid matter is arranged inside the unit cylinder, a kneading device for reducing the volume of solid matter is arranged at the bottom after the plurality of the unit cylinders are connected, the kneading device includes a bottom plate arranged at the bottom, a plurality of rotating grinding heads are arranged on the force-bearing surface of the bottom plate, and a pressure plate facing the grinding head is arranged on the opposite side of the bottom plate.

[0006] Furthermore, the cross section of the unit cylinder is rectangular, a feed port is provided on one side of the unit cylinder, the fixing device is a bracket provided at the bottom of the feed port, and a mounting hole connected to the building body is provided on the bracket.

[0007] Furthermore, the blocking device comprises a baffle plate arranged on the side of the unit cylinder, the top of the baffle plate is hinged to the side of the unit cylinder, and the lower part of the baffle plate is inclined toward the axial position of the unit cylinder.

[0008] Furthermore, a movable opening is provided on the side of the unit cylinder, the top of the baffle is hinged to the outer side of the unit cylinder, and the lower part of the baffle extends into the interior of the unit cylinder.

[0009] Furthermore, a spring is arranged on the back side of the baffle, and the bottom of the spring is connected to an adjusting bolt arranged on the unit cylinder.

[0010] Furthermore, the distance from the bottom of the baffle to the inner wall of the unit cylinder is one third to one half of the width of the unit cylinder.

[0011] Furthermore, the upper portion of the bottom plate is hinged to the bottom of the unit cylinder, a hydraulic cylinder is provided on the upper portion of the bottom plate, and the bottom of the hydraulic cylinder is connected to the side wall of the unit cylinder.

[0012] Furthermore, a driving device is arranged on the back side of the base plate, and the driving device is a driving motor. The bottom of the grinding head is rotatably arranged on the base plate, and the output part of the driving motor is connected to the grinding head through a reduction device.

[0013] Furthermore, the grinding heads are arranged in at least two rows along the length direction of the bottom plate, and the rotation direction of the grinding heads is toward the middle position.

[0014] Furthermore, the upper portion of the grinding head is conical, and a plurality of raised protrusions are provided on the upper portion of the grinding head.

[0015] The beneficial effects of the embodiments of the present invention are as follows: a baffle is arranged inside the unit cylinder to reduce the falling speed of solid construction waste; the baffle can be hinged inside the unit cylinder or outside the unit cylinder; a spring is installed on the back side of each baffle; by adjusting the length of the adjusting bolt, the distance the baffle extends to the center is changed; for construction waste of different diameters, appropriate adjustments can be made according to usage needs to achieve the purpose of collision deceleration, which can effectively slow down its falling speed and reduce the impact force, thereby avoiding blockage and noise problems caused by excessive speed.

[0016] A plurality of rotating grinding heads are installed on the bottom plate, and a pressure plate facing the grinding head is installed on the opposite side of the bottom plate. A spring is installed on the back side of the pressure plate installed on the opposite side of the grinding head, and an adjusting bolt is installed on the other end of the spring. The pressure plate is tilted from top to bottom so that the distance between the bottom of the pressure plate and the bottom plate is small, so that the downward pressure of the construction waste is guaranteed when the grinding head is transporting it. The pressure plate is fixed in position by a spring so that it can shake when squeezed or vibrated, which produces a kneading effect on the construction waste, improves the treatment effect of the construction waste, reduces the volume of the construction waste, reduces the number of dump trucks used, and improves the utilization rate of the collection bin. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0018] Figure 2 It is a schematic cross-sectional structural diagram of the unit cylinder of the present invention after installation;

[0019] Figure 3 It is a schematic diagram of the enlarged structure of point A of the present invention;

[0020] Figure 4 It is a schematic diagram of the connection structure between the spring and the adjusting bolt of the present invention;

[0021] Figure 5 It is a schematic diagram of the enlarged structure of point B of the present invention;

[0022] Figure 6 It is a schematic diagram of the grinding head structure of the present invention;

[0023] Figure 7 It is a schematic diagram of the back side structure of the bottom plate of the present invention;

[0024] Figure 8 It is a schematic diagram of the front structure of the bottom plate of the present invention;

[0025] In the figure: 1. unit cylinder; 101. feed port; 2. baffle; 201. spring; 202. adjusting bolt; 203. spherical head; 204. pad; 3. bottom plate; 301. grinding head; 3011. spur; 3012. pulley; 302. drive motor; 303. hydraulic cylinder; 304. tensioning wheel; 3041. adjusting rod; 4. collecting bin. DETAILED DESCRIPTION

[0026] Preferred embodiments of the present invention are described below with reference to the accompanying drawings. Those skilled in the art should understand that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.

[0027] See also Figures 1 to 8 The embodiment of the present invention discloses a novel high-rise building construction waste removal device, which mainly includes a fixing device connected to the building body and a unit cylinder 1 for downward transportation. The unit cylinder 1 is vertically installed along the building body, and multiple unit cylinders 1 can be continuously arranged to form a construction waste transportation channel. The design can ensure that the garbage is directly transported from the high-rise to the designated site, especially on the newly built building body. The unit cylinder 1 has a discharge port and a rectangular connecting cylinder. Each unit cylinder 1 is connected by bolts for easy disassembly and assembly. At the same time, it can be freely assembled according to the use requirements of different positions. A hanger is installed at the lower part of the discharge port. The hanger is a rectangular frame welded to the bottom of the discharge port. The bottom of the discharge port is flat. There is a gap between the hanger and the unit cylinder 1, which is convenient for the unit cylinder 1 to be installed on the wall of the outer balcony or window sill. A plurality of mounting holes are opened on the hanger, and the hanger is fixed by expansion bolts to ensure safe use. It can also be installed inside the pipe well and connected to each floor through a fixing device to ensure stability. The construction waste is transported through the formed pipeline, which greatly improves the cleaning efficiency. At the same time, the entire pipeline is divided into multiple unit cylinders 1 for installation, which reduces the difficulty of installation and improves the use effect.

[0028] Since the unit cylinder 1 is installed vertically, if the impact force caused by the direct fall of construction waste is too great, it is dangerous. Therefore, a blocking device is set inside the unit cylinder 1 to reduce the falling speed of the solid construction waste. The blocking device is in the form of a baffle 2, the top of which is hinged to the side of the unit cylinder 1, and the lower part is inclined toward the axial position of the unit cylinder 1. The baffle 2 can be hinged inside the unit cylinder 1 or outside the unit cylinder 1. When it is hinged to the outside, a movable opening needs to be opened on the side of the unit cylinder 1. The top of the baffle 2 is hinged to the outer side of the upper part of the movable opening of the unit cylinder 1, and the lower part of the baffle 2 extends into the unit cylinder 1. The movable opening provides a range of motion for the baffle 2. The baffle 2 adopts The metal plate improves the structural strength, and the baffle 2 is installed inside an independent unit cylinder 1. By changing the installation direction of the unit cylinder 1, the baffles 2 at different positions are on different sides, so that within a certain height, the baffle 2 has a single plate on the four sides inside the unit cylinder 1. After experiments, four baffles 2 in different directions can be installed on the 3rd, 4th, 5th, and 6th floors of the building. Four baffles 2 in different directions can be installed at intervals of 3-4 floors upward, and the lower part of each baffle 2 is inclined to the middle position, so that the four baffles 2 can form a deceleration effect on the construction waste in all directions. For construction waste below 6 floors, 3 layers of baffles 2 are installed at the feed inlet 101. The side facing each baffle 2 is provided with a spring 201 on the back side of each baffle 2, a pad 204 is provided at the tail end of the spring 201, and the pad 204 is connected to the adjusting bolt 202 screwed on the side wall of the unit cylinder 1 through a spherical head 203. By adjusting the length of the adjusting bolt 202, the distance that the baffle 2 extends toward the center is changed. The adjustment range of the adjusting bolt 202 is that the distance from the bottom of the baffle 2 to the inner wall of the unit cylinder 1 is one-third to one-half of the width of the unit cylinder 1. For construction waste of different diameters, appropriate adjustments can be made according to the needs of use to achieve the purpose of collision deceleration. It is known through experiments that the baffle 2 on the side near the discharge port and the opposite side of the discharge port can be adjusted to nearly half. The distance between the baffle 2 and the opposite side unit cylinder 1 is 1 / 3 of the distance. Construction waste will often collide with the baffles 2 on both sides during the process of going downstairs. The baffles 2 on the left and right sides can be adjusted by nearly one-third of the distance to assist in slowing down the construction waste. If blockage occurs, it is only necessary to adjust the adjusting bolt 202 to increase the distance between the baffle 2 and the side wall of the opposite unit cylinder 1 to ensure the use effect. The operator uses a shovel to put the construction waste into the feed port 101, which reduces the labor intensity. At the same time, the spring 201 at the bottom of the baffle 2 is hit by the construction waste, which will make the construction waste have an upward component force, which can effectively slow down its falling speed and reduce the impact force, thereby avoiding blockage and noise problems caused by excessive speed.

[0029] A kneading device is set at the bottom of the building after multiple unit cylinders 1 are connected and installed on the building. A collecting bin 4 is placed below the kneading device. The construction waste falling from the unit cylinder 1 will fall into the collecting bin 4 for temporary storage. The collecting bin 4 has a certain height, and the dump truck can drive under the collecting bin 4. The loading of the dump truck is controlled by opening and closing the gate at the bottom of the collecting bin 4, which is convenient for transporting construction waste downstairs.

[0030] The kneading device includes a bottom plate 3 obliquely arranged at the bottom, a plurality of rotating grinding heads 301 are installed on the bottom plate 3, and a pressure plate facing the grinding head 301 is installed on the opposite side of the bottom plate 3. The grinding head 301 is designed with a conical structure. The top of the grinding head 301 can be disassembled, and a spiral groove is opened, and the top is pointed. When the volume of construction waste is large, especially when there are many bricks and concrete blocks, the top of the grinding head 301 can act on the inside of the construction waste when rotating under the action of impact force, forming a drilling effect on the construction waste. Since the grinding head 301 is conical, the construction waste will be broken during the action process, achieving a certain crushing effect, crushing the larger construction waste, reducing the gap between the construction waste when falling into the collection bin 4, so that the collection bin 4 can temporarily store more construction waste, meet the needs of simultaneous operation of multiple floors, and greatly improve work efficiency.

[0031] A plurality of raised spikes 3011 are arranged on the surface of the grinding head 301, which can increase the squeezing force between the grinding head 301 and the construction waste, so as to quickly destroy the whole piece of construction waste and improve the kneading effect. According to actual needs, at least two rows of grinding heads 301 are arranged on the bottom plate 3, and their rotation direction is toward the middle position, and the side plates on both sides are inclined toward the middle position to prevent the construction waste from being stuck between the grinding head 301 and the side plates. When the garbage falls, the crushed construction waste will be kneaded by the grinding heads 301 on both sides at the same time, so as to improve the processing efficiency. At the same time, the construction waste will be further squeezed when it moves downward between the two rows of grinding heads 301, which can also achieve the crushing effect, reduce the volume of the construction waste and improve the processing effect.

[0032] A pressure plate is installed on the opposite side of the grinding head 301, and a spring 201 is installed on the back side of the pressure plate. An adjusting bolt 202 is installed on the other end of the spring 201. A spherical head 203 is installed between the adjusting bolt 202 and the spring 201. The other end of the spherical head 203 is fixedly connected to the spring 201 through two pads 204. The adjusting bolt 202 is screwed and installed on the fixed plate. The fixed plate is installed parallel to the bottom plate 3. By changing the insertion length of the adjusting bolt 202, the distance between the pressure plate and the grinding head 301 can be changed. When in use, the pressure plate is tilted from top to bottom, so that the distance between the bottom of the pressure plate and the bottom plate 3 is small, so that the downward pressure is guaranteed when the grinding head 301 is transported. The pressure plate is fixed in position by the spring 201, so that it can shake when squeezed or vibrated, so that a kneading effect is produced on the construction waste, thereby improving the treatment effect of the construction waste, and further prompting the grinding head 301 to form a crushing effect on the construction waste, preventing a small amount of construction waste from clogging the discharge port inside the collection bin 4, thereby improving the collection capacity of the collection bin 4.

[0033] When the garbage falls to the bottom, the grinding head 301 will rotate under the drive of the driving device, and work together with the pressure plate to knead and crush the garbage. The driving device is a driving motor 302, and the output part of the driving motor 302 is connected to the grinding head 301 through a reduction device. The reduction device can be driven by a gear reducer or a pulley 3012. In this technical solution, a graded pulley 3012 is used to drive, and two grinding heads 301 are driven by one driving motor 302 to ensure the torque of the grinding head 301 and the force of each grinding head 301 on the construction garbage, thereby improving the use effect. A tensioning wheel 304 is installed between the pulleys 3012 of the two grinding heads 301 to ensure the driving effect. The tensioning wheel 304 is slidably set on the adjustment table, and an adjustment rod 3041 is installed on the side. The position of the tensioning wheel 304 is adjusted by rotating the adjustment rod 3041 to ensure the torque, improve the use effect of the grinding head 301, reduce the volume of the construction garbage, and facilitate subsequent cleaning and transportation.

[0034] In order to ensure the efficient operation of the kneading device and prevent the construction waste from getting stuck in the grinding head 301, the upper part of the bottom plate 3 is hinged to the bottom of the unit cylinder 1, so that the bottom plate 3 can flexibly adjust its angle. A hydraulic cylinder 303 is arranged on the back side of the bottom plate 3, and a pressure sensor is installed at the connection between the hydraulic cylinder 303 and the bottom plate 3. The pressure sensor transmits the pressure between the bottom plate 3 and the pressure plate to the controller. The start of the hydraulic cylinder 303 can be controlled by setting the pressure threshold. In the ready position, the hydraulic cylinder 303 supports the bottom plate 3 to be set at 60 degrees with the vertical plane. During use, if the volume of the construction waste is large, the pressure on the bottom plate 3 during the kneading process exceeds the set pressure sensor. When the threshold value set by the sensor is reached, the hydraulic cylinder 303 contracts, so that the bottom plate 3 opens outward, so that this part of the construction waste is directly placed in the collection bin 4. The distance between the bottom plate 3 and the pressure plate can be adjusted by the extension and retraction of the hydraulic cylinder 303, so as to control the kneading force, and can also adapt to garbage of different volumes. At the same time, it can also prevent the grinding head 301 from getting stuck due to the large volume of construction waste, ensure that the drive motor 302 is not burned out, and improve economic benefits. It has the advantages of simple structure, easy operation, high efficiency, etc., and can effectively solve the problems of easy clogging and large space occupation in traditional cleaning methods, improve transportation efficiency, reduce the number of dump trucks used, and reduce construction costs.

[0035] It should be noted that in the description of the present invention, the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" and the like indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings, which are only for the convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0036] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0037] The term "comprise" or any other similar term is intended to cover a non-exclusive inclusion, such that a process, article, or apparatus / device that includes a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, article, or apparatus / device.

[0038] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.

Claims

1. A high-rise building construction waste removal device, comprising a fixing device connected to a building body, wherein the fixing device is connected to a unit cylinder (1) for downward transportation, characterized in that: A plurality of the unit cylinders (1) are vertically installed along the building body, a blocking device for reducing the falling speed of solid matter is arranged inside the unit cylinder (1), a kneading device for reducing the volume of solid matter is arranged at the bottom of the plurality of the unit cylinders (1) after being connected, the kneading device comprises a bottom plate (3) arranged at the bottom, a plurality of rotating grinding heads (301) are arranged on the force-bearing surface of the bottom plate (3), and a pressure plate facing the grinding head (301) is arranged on the opposite side of the bottom plate (3).

2. The high-rise building construction waste removal device according to claim 1 is characterized in that: The cross section of the unit cylinder (1) is rectangular, a feed port (101) is provided on one side of the unit cylinder (1), the fixing device is a hanging bracket provided at the bottom of the feed port (101), and a mounting hole connected to the building body is provided on the hanging bracket.

3. The high-rise building construction waste removal device according to claim 1 is characterized by: The blocking device comprises a baffle (2) arranged on the side of the unit cylinder (1), the top of the baffle (2) is hinged to the side of the unit cylinder (1), and the lower part of the baffle (2) is inclined toward the axial position of the unit cylinder (1).

4. The high-rise building construction waste removal device according to claim 3 is characterized by: A movable opening is provided on the side of the unit cylinder (1); the top of the baffle (2) is hinged to the outside of the unit cylinder (1); and the lower part of the baffle (2) extends into the interior of the unit cylinder (1).

5. The high-rise building construction waste removal device according to claim 4 is characterized in that: A spring (201) is arranged on the back side of the baffle (2), and the bottom of the spring (201) is connected to an adjusting bolt (202) arranged on the unit cylinder (1).

6. The high-rise building construction waste removal device according to claim 3 is characterized by: The distance between the bottom of the baffle (2) and the inner wall of the unit cylinder (1) is one third to one half of the width of the unit cylinder (1).

7. The high-rise building construction waste removal device according to claim 1 is characterized by: The upper part of the bottom plate (3) is hinged to the bottom of the unit cylinder (1), and a hydraulic cylinder (303) is provided on the upper part of the bottom plate (3), and the bottom of the hydraulic cylinder (303) is connected to the side wall of the unit cylinder (1).

8. The high-rise building construction waste removal device according to claim 1 is characterized by: A driving device is arranged on the back side of the base plate (3), the driving device being a driving motor (302), the bottom of the grinding head (301) being rotatably arranged on the base plate (3), and the output part of the driving motor (302) being connected to the grinding head (301) via a reduction device.

9. The high-rise building construction waste removal device according to claim 8 is characterized by: The grinding heads (301) are arranged in at least two rows along the length direction of the bottom plate (3), and the grinding heads (301) rotate towards a middle position.

10. The high-rise building construction waste removal device according to claim 1 is characterized by: The upper portion of the grinding head (301) is conical, and a plurality of protruding spikes (3011) are provided on the upper portion of the grinding head (301).