Local supporting structure for emergency protection of ancient city wall and construction method
By adopting rammed earth bricks and support components consistent with the composition of the rammed earth wall, combined with the filling gap and grouting technology, the gap problems caused by material differences in city wall restoration are solved, and the long-term stability and weather resistance are improved, and the long-term stability and weather resistance are extended. The service life of the city wall.
Patent Information
- Application Number
- CN202411277384.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2024-11-22
AI Technical Summary
The existing technology uses rigid material support in the restoration of ancient city walls, which leads to gaps that are not compatible for a long time, further aggravated the damage to the city walls.
Support construction is carried out using rammed earth bricks that are consistent with the composition of rammed earth walls, combining connecting bricks and support components, and filling gaps with special rammed earth bricks and grouting in batches to ensure that the connection is tight and free of gaps, and a flexible isolation layer and saturation are set up. Lime water for improved compatibility and stability.
It significantly improves the compatibility and stability of the support structure and the city wall, reduces the risk of secondary damage, extends the service life of the city wall, and enhances the stability and weather resistance of the overall structure.
Smart Images

Figure CN118997538A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of building construction, and in particular to a local support structure and construction method for emergency protection of an ancient city wall. Background Art
[0002] As an important cultural heritage, the protection and restoration of the ancient city wall has always attracted much attention. However, due to its age, the city wall is easily affected by multiple factors such as weathering, stress, and environment. In particular, the lower part of the city wall is more likely to be lost due to weathering, forming an unstable structure that is "wide at the top and narrow at the bottom". Support is a measure of support, reinforcement and protection for the side walls and the surrounding environment to ensure the safety of underground structure construction and the surrounding environment of the foundation pit. Support structures are usually required when repairing ancient city walls.
[0003] At present, the conventional repair method usually uses rigid materials to support the top of the city wall. Although this method can play a supporting role in the short term, after long-term use, due to the material difference between the rigid material and the ancient city wall, it may lead to a low fit between the plane and the wall, so that the supporting structure and the ancient city wall are not fully compatible, resulting in gaps with the city wall body, further aggravating the damage to the city wall. Summary of the invention
[0004] In order to ensure the stability and durability of the repaired city wall, the present application provides a local support structure and construction method for emergency protection of an ancient city wall.
[0005] On the one hand, the present application provides a local support structure for emergency protection of ancient city walls, which adopts the following technical solutions: A local support structure for emergency protection of an ancient city wall, comprising: A connecting component, comprising a rammed earth brick and a slurry arranged between the rammed earth brick and the rammed earth wall ruins, wherein the material of the rammed earth brick is set to have a composition similarity of greater than 95% with the material of the rammed earth wall ruins; Connecting bricks are arranged on the side of the rammed earth bricks away from the rammed earth wall ruins and on the outside of the rammed earth wall ruins, and the connecting bricks are arranged on both sides of the wall; The support assembly is arranged on the outside of each of the connecting bricks and can fix the support structure to the ground.
[0006] By adopting the above technical solution, the compatibility between the support structure and the city wall body is significantly improved by using rammed earth bricks with the same composition as the rammed earth wall ruins for support construction, ensuring the long-term stability of the support effect. At the same time, the connection of bricks and support components uses special rammed earth bricks for rough masonry and filling gaps, which improves the integrity and stability of the wall. In the grouting process, by pouring slurry in batches multiple times, it is ensured that the connection between the rammed earth wall ruins and the rammed earth bricks is tight and gapless. The operation is simple and the risk of secondary damage to the city wall is extremely low, which ensures the stability and durability of the repaired city wall and provides strong support for the protection and restoration of the rammed earth wall ruins.
[0007] Optionally, the support assembly includes a snap-in block arranged on the outside of each connecting brick and an abutment plate arranged on the ground, the abutment plate abuts against the snap-in block, and the snap-in block is embedded in the ground and abuts against the inner wall of the ground.
[0008] By adopting the above technical solution, the support assembly can greatly enhance the stability of the overall structure. The clamping block is embedded in the ground and closely abuts against the inner wall of the ground, forming a stable support foundation. At the same time, the mutual abutment between the abutment plate and the clamping block further strengthens the firmness of the entire support system and effectively prevents the shaking and tilting of the structure. Due to the close abutment between the clamping block and the inner wall of the ground, and the mutual support between the abutment plate and the clamping block, the entire support assembly can withstand greater external force impact.
[0009] Optionally, the abutment plate and the clamping block are arranged perpendicularly to each other, and more than half of the area of the side wall of the clamping block is in abutment with the rammed earth brick.
[0010] By adopting the above technical solution, this arrangement greatly enhances the stability and load-bearing capacity of the structure. The vertical layout of the abutment plate and the clamping block forms a strong support frame that can effectively disperse and transfer the load, making the overall structure more stable. The large area of the abutment between the side wall of the clamping block and the rammed earth brick provides better interface bonding and increases the friction between the two.
[0011] Optionally, the outer sides of the connecting bricks are arranged to be inclined.
[0012] By adopting the above technical solution, the inclined setting enhances the stability of the connected bricks. Vertical bricks are easily affected by wind and other external forces and cause shaking or displacement. The inclined design allows the bricks to have closer mutual support, effectively reducing this instability, thereby improving the safety of the overall structure.
[0013] Optionally, a flexible isolation layer is provided between the rammed earth wall ruins and the connecting bricks or the rammed earth bricks.
[0014] By adopting the above technical solution, the flexible isolation layer can play a role in buffering and shock absorption. The setting of the flexible isolation layer can effectively relieve the stress caused by deformation, prevent cracks and damage caused by material differences, and thus protect the integrity of the rammed earth wall site. Secondly, the flexible isolation layer also has good air permeability and waterproof properties. This means that it can prevent moisture from penetrating into the interior of the rammed earth wall site through the joints, avoiding damage caused by moisture erosion.
[0015] Optionally, saturated lime water is sprayed between the flexible isolation layer and the rammed earth wall ruins.
[0016] By adopting the above technical solution, saturated lime water can act as an adhesive to enhance the bonding force between the flexible isolation layer and the rammed earth wall ruins, so that the isolation layer is more firmly attached to the wall surface and is not easy to fall off or shift. Saturated lime water has good moisture-proof properties and can effectively block the erosion of external moisture on the rammed earth wall, thereby protecting the wall from moisture damage and improving the durability of the wall. Saturated lime water can also play a certain degree of protective role, preventing insects and microorganisms from damaging the wall, further extending the service life of the rammed earth wall.
[0017] Optionally, the slurry is set to peach blossom slurry, and the slurry connects the rammed earth bricks and the rammed earth wall ruins.
[0018] By adopting the above technical solution, peach blossom slurry enhances the aesthetic consistency between the repaired part and the original wall. Peach blossom slurry has good adhesion and durability, and can effectively connect rammed earth bricks and rammed earth wall ruins, improving the stability of the overall structure. Its unique bonding properties ensure the close combination between the slurry and the rammed earth material, thereby increasing the service life of the wall.
[0019] On the other hand, the present application provides a construction method for a local support structure for emergency protection of an ancient city wall, which adopts the following technical solution: Optional, include the following steps: S1. Pre-construction testing: Before construction, the composition of the rammed earth wall ruins is tested first, and the rammed earth bricks are manufactured according to the composition ratio to ensure that the rammed earth bricks and the rammed earth wall ruins are highly consistent in material; S2. Preliminary reinforcement: preliminary reinforcement of the rammed earth wall ruins; S3. Setting an isolation layer: spraying saturated lime water on the surface of the rammed earth wall ruins and attaching a flexible isolation layer to enhance the weathering resistance of the rammed earth wall ruins; S4, filling the gap: for the part of the rammed earth wall ruins that is "wide at the top and narrow at the bottom", use the specially made rammed earth bricks for rough laying to fill the gap between the rammed earth wall ruins and the rammed earth brick body; S5, batch grouting: grouting the rammed earth wall ruins and the rammed earth brick body in batches for multiple times to ensure that the rammed earth wall ruins and the rammed earth brick body are tightly connected; S6. Building a support structure: Building the support components on the outside of the rammed earth brick wall to form a stable support structure.
[0020] By adopting the above technical scheme, the repair materials and the original wall materials are highly consistent through pre-construction testing and rammed earth bricks are made according to the composition ratio of the rammed earth wall ruins, which improves the overall structural stability. The initial reinforcement treatment effectively improves the stability of the rammed earth wall ruins and provides safety for subsequent construction. By spraying saturated lime water on the surface of the rammed earth wall ruins and attaching a flexible isolation layer, the weathering resistance of the wall is significantly enhanced. The use of special rammed earth bricks for rough masonry and filling gaps improves the integrity and stability of the wall. In the grouting process, the slurry is poured in batches multiple times to ensure that the connection between the rammed earth wall ruins and the rammed earth brick body is tight and gapless. Finally, a stable support structure is set up on the outside of the rammed earth brick wall to provide additional support and protection for the wall.
[0021] Optionally, the rammed earth wall ruins are subjected to preliminary reinforcement treatment, including the steps of cleaning the dust at the base of the wall and repairing cracks.
[0022] By adopting the above technical solution, cleaning the dirt at the base of the wall can significantly improve the appearance of the site and prevent the dirt from further eroding the wall. This step not only helps to protect the original appearance of the site, but also creates more favorable conditions for subsequent reinforcement work. By filling the cracks, it can prevent moisture and air from further eroding the wall, thereby extending its service life. At the same time, the repair of the cracks also helps to improve the overall aesthetics of the wall.
[0023] Optionally, the supporting assembly is set up on the outside of the rammed earth brick wall, comprising the steps of first setting up the clamping block on the bottom of the connecting brick, and then using the abutment plate to abut the clamping block.
[0024] By adopting the above technical solution, by setting the clamping block at the bottom of the connecting bricks and using the abutment plate to firmly support the clamping block, this design significantly improves the overall stability of the rammed earth brick wall. The close fit between the clamping block and the abutment plate can effectively prevent the brick wall from slipping and tilting, ensuring that the building structure remains stable when subjected to external forces. The simple and easy-to-build characteristics of the support assembly greatly save construction time.
[0025] In summary, the present application includes at least one of the following beneficial technical effects: 1. By setting up connection components, rammed earth bricks, slurry, connection bricks and support components, and using rammed earth bricks with the same composition as the rammed earth wall ruins for support construction, the compatibility between the support structure and the city wall body is significantly improved, ensuring the long-term stability of the support effect. At the same time, the setting of connection bricks and support components uses special rammed earth bricks for rough masonry and filling gaps to improve the integrity and stability of the wall. In the grouting process, the slurry is poured in batches multiple times to ensure that the connection between the rammed earth wall ruins and the rammed earth brick body is tight and gapless. The operation is simple and the risk of secondary damage to the city wall is extremely low, ensuring the stability and durability of the repaired city wall, and providing strong support for the protection and restoration of the rammed earth wall ruins; 2. By setting up the clamping block and the abutment plate, the support assembly can greatly enhance the stability of the overall structure. The clamping block is embedded in the ground and tightly abuts against the inner wall of the ground, forming a stable support foundation. At the same time, the mutual abutment between the abutment plate and the clamping block further strengthens the firmness of the entire support system and effectively prevents the shaking and tilting of the structure. Due to the tight abutment between the clamping block and the inner wall of the ground, and the mutual support between the abutment plate and the clamping block, the entire support assembly can withstand greater external force impact; 3. By setting up a flexible isolation layer, the flexible isolation layer can play a role in buffering and shock absorption. The setting of the flexible isolation layer can effectively relieve the stress caused by deformation, prevent cracks and damage caused by material differences, and thus protect the integrity of the rammed earth wall site. Secondly, the flexible isolation layer also has good air permeability and waterproof properties. This means that it can prevent moisture from penetrating into the interior of the rammed earth wall site through the joints, avoiding damage caused by moisture erosion. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the overall structure of this application.
[0027] Explanation of the reference numerals: 1. connection assembly; 11. rammed earth brick; 12. slurry; 2. connection brick; 3. support assembly; 31. snap-in block; 32. abutment plate; 4. flexible isolation layer; 5. rammed earth wall ruins. DETAILED DESCRIPTION
[0028] The following is combined with Figure 1 This application is described in further detail.
[0029] The embodiment of the present application discloses a local support structure and a construction method for emergency protection of an ancient city wall.
[0030] Example 1 Reference Figure 1 A local support structure for emergency protection of an ancient city wall includes a connecting component 1, connecting bricks 2 and a supporting component 3.
[0031] The connection assembly 1 includes a rammed earth brick 11 and a slurry 12 disposed between the rammed earth brick 11 and the rammed earth wall ruins 5. The material of the rammed earth brick 11 is set to have a composition consistency greater than 95% with that of the rammed earth wall ruins 5. The connection bricks 2 are disposed on the side of the rammed earth brick 11 away from the rammed earth wall ruins 5 and on the outside of the rammed earth wall ruins 5. The connection bricks 2 are disposed on both sides of the wall. The support assembly 3 is disposed on the outside of each connection brick 2, and can fix the support structure to the ground.
[0032] By using rammed earth bricks 11 with the same composition as the rammed earth wall ruins 5 for support construction, the compatibility of the support structure with the city wall body is significantly improved, ensuring the long-term stability of the support effect. At the same time, the connection bricks 2 and the support assembly 3 are set up, and special rammed earth bricks 11 are used for rough masonry and filling of gaps, which improves the integrity and stability of the wall. In the grouting process, by pouring the slurry 12 in batches multiple times, it is ensured that the connection between the rammed earth wall ruins 5 and the rammed earth bricks 11 is tight and gapless. The operation is simple and the risk of secondary damage to the city wall is extremely low, which ensures the stability and durability of the repaired city wall, and provides strong support for the protection and restoration of the rammed earth wall ruins 5.
[0033] Reference Figure 1 The support assembly 3 includes a clamping block 31 arranged on the outside of each connecting brick 2 and an abutment plate 32 arranged on the ground, the abutment plate 32 abuts against the clamping block 31, and the clamping block 31 is embedded in the ground and abuts against the inner wall of the ground.
[0034] The support assembly 3 can greatly enhance the stability of the overall structure. The clamping block 31 is embedded in the ground and closely abuts against the inner wall of the ground, forming a stable support foundation. At the same time, the mutual abutment between the abutment plate 32 and the clamping block 31 further strengthens the firmness of the entire support system and effectively prevents the shaking and tilting of the structure. Due to the close abutment between the clamping block 31 and the inner wall of the ground, and the mutual support between the abutment plate 32 and the clamping block 31, the entire support assembly 3 can withstand greater external force impact.
[0035] The abutment plate 32 is arranged perpendicularly to the clamping block 31, and more than half of the area of the side wall of the clamping block 31 is in contact with the rammed earth brick 11. This arrangement greatly enhances the stability and load-bearing capacity of the structure. The vertical layout of the abutment plate 32 and the clamping block 31 forms a strong support frame that can effectively disperse and transfer the load, making the overall structure more stable. The large area of the side wall of the clamping block 31 abutting against the rammed earth brick 11 provides better interface bonding and increases the friction between the two.
[0036] Reference Figure 1, the outer side of the connecting brick 2 is inclined. The inclined setting enhances the stability of the connecting brick 2. Vertical bricks are easily affected by wind and other external forces and cause shaking or displacement. The inclined design allows the bricks to have closer mutual support, effectively reducing this instability, thereby improving the safety of the overall structure.
[0037] A flexible isolation layer 4 is provided between the rammed earth wall ruins 5 and the connecting bricks 2 or rammed earth bricks 11. The flexible isolation layer 4 can play a role in buffering and shock absorption. The provision of the flexible isolation layer 4 can effectively alleviate the stress caused by deformation, prevent cracks and damage caused by material differences, and thus protect the integrity of the rammed earth wall ruins 5. Secondly, the flexible isolation layer 4 also has good air permeability and waterproof properties. This means that it can prevent moisture from penetrating into the interior of the rammed earth wall ruins 5 through the joints, avoiding damage caused by moisture erosion.
[0038] Saturated lime water is sprayed between the flexible isolation layer 4 and the rammed earth wall ruins 5. Saturated lime water can act as an adhesive to enhance the bonding force between the flexible isolation layer 4 and the rammed earth wall ruins 5, so that the isolation layer is more firmly attached to the wall surface and is not easy to fall off or shift. Saturated lime water has good moisture-proof properties and can effectively block the erosion of the rammed earth wall by external moisture, thereby protecting the wall from moisture damage and improving the durability of the wall. Saturated lime water can also play a certain degree of protective role, preventing insects and microorganisms from damaging the wall, further extending the service life of the rammed earth wall.
[0039] Reference Figure 1 The slurry 12 is set to peach blossom slurry, and the slurry 12 connects the rammed earth bricks 11 and the rammed earth wall ruins 5. The peach blossom slurry enhances the aesthetic consistency between the repaired part and the original wall. The peach blossom slurry has good adhesion and durability, and can effectively connect the rammed earth bricks 11 and the rammed earth wall ruins 5, thereby improving the stability of the overall structure. Its unique bonding performance ensures a close bond between the slurry 12 and the rammed earth material, thereby increasing the service life of the wall.
[0040] The implementation principle of Example 1 is as follows: by using rammed earth bricks 11 with the same composition as the rammed earth wall ruins 5 for support construction, the compatibility of the support structure with the city wall body is significantly improved, ensuring the long-term stability of the support effect. At the same time, the setting of the connecting bricks 2 and the support assembly 3 uses special rammed earth bricks 11 for rough masonry and filling the gaps, which improves the integrity and stability of the wall. In the grouting process, by pouring the slurry 12 in batches multiple times, it is ensured that the connection between the rammed earth wall ruins 5 and the rammed earth bricks 11 is tight and gapless, the operation is simple and the risk of secondary damage to the city wall is extremely low, which ensures the stability and durability of the repaired city wall, and provides strong support for the protection and restoration of the rammed earth wall ruins 5.
[0041] Example 2 Reference Figure 1 The present application provides a construction method for a local support structure for emergency protection of an ancient city wall, which adopts the following technical solution: Includes steps: S1. Testing before construction: Before construction, the composition of the rammed earth wall ruins 5 is tested first, and the rammed earth bricks 11 are made according to the composition ratio to ensure that the rammed earth bricks 11 and the rammed earth wall ruins 5 are highly consistent in material; S2. Preliminary reinforcement: preliminary reinforcement of the rammed earth wall site 5; S21. Clean the dirt at the base of the wall and repair the cracks.
[0042] Cleaning the dirt at the base of the wall can significantly improve the appearance of the site and prevent further erosion of the wall. This step not only helps to preserve the original appearance of the site, but also creates more favorable conditions for subsequent reinforcement work. By filling the cracks, it can prevent moisture and air from further eroding the wall, thus extending its service life. At the same time, repairing the cracks also helps to improve the overall aesthetics of the wall.
[0043] S3, setting an isolation layer: spraying saturated lime water on the surface of the rammed earth wall ruins 5 and attaching a flexible isolation layer 4 to enhance the weathering resistance of the rammed earth wall ruins 5; S4, filling the gap: For the part of the rammed earth wall ruins 5 that is "wide at the top and narrow at the bottom", use specially made rammed earth bricks 11 for rough laying to fill the gap between the rammed earth wall ruins 5 and the rammed earth bricks 11; S5, batch grouting: grouting the slurry 12 between the rammed earth wall site 5 and the rammed earth brick 11 in batches for multiple times to ensure that the rammed earth wall site 5 and the rammed earth brick 11 are tightly connected; S6. Build a support structure: build a support assembly 3 outside the rammed earth brick 11 wall to form a stable support structure.
[0044] S61, setting up the support assembly 3 on the outside of the rammed earth brick 11 wall, including the steps of: first setting up the clamping block 31 on the bottom of the connecting brick 2, and then using the abutment plate 32 to abut the clamping block 31.
[0045] By placing the clamping block 31 at the bottom of the connecting brick 2 and firmly holding the clamping block 31 with the abutment plate 32, this design significantly improves the overall stability of the rammed earth brick 11 wall. The tight fit between the clamping block 31 and the abutment plate 32 can effectively prevent the brick wall from slipping and tilting, ensuring that the building structure remains stable when subjected to external forces. The simple and easy-to-build characteristics of the support assembly 3 greatly save construction time.
[0046] By testing before construction and making rammed earth bricks 11 according to the composition ratio of the rammed earth wall ruins 5, it is ensured that the repair materials are highly consistent with the materials of the original wall, and the overall structural stability is improved. The preliminary reinforcement treatment effectively improves the stability of the rammed earth wall ruins 5 and provides safety for subsequent construction. By spraying saturated lime water on the surface of the rammed earth wall ruins 5 and attaching a flexible isolation layer 4, the weathering resistance of the wall is significantly enhanced. The use of special rammed earth bricks 11 for rough masonry and filling gaps improves the integrity and stability of the wall. In the grouting stage, by pouring the slurry 12 in batches multiple times, it is ensured that the connection between the rammed earth wall ruins 5 and the rammed earth bricks 11 is tight and gapless. Finally, a stable support structure is set up on the outside of the rammed earth brick 11 wall to provide additional support and protection for the wall.
[0047] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A local support structure for emergency protection of an ancient city wall, arranged on both sides of a rammed earth wall site (5), characterized in that: include: A connecting assembly (1) comprises a rammed earth brick (11) and a slurry (12) arranged between the rammed earth brick (11) and the rammed earth wall ruins (5), wherein the material of the rammed earth brick (11) is set to have a composition consistency of greater than 95% with the material of the rammed earth wall ruins (5); Connecting bricks (2) are arranged on a side of the rammed earth bricks (11) away from the rammed earth wall ruins (5) and on the outside of the rammed earth wall ruins (5), and the connecting bricks (2) are arranged on both sides of the wall; A support assembly (3) is arranged on the outside of each of the connecting bricks (2) and is capable of fixing the support structure to the ground.
2. The local support structure for emergency protection of ancient city walls according to claim 1 is characterized by: The support assembly (3) comprises a clamping block (31) arranged on the outside of each connecting brick (2) and an abutment plate (32) arranged on the ground, wherein the abutment plate (32) abuts against the clamping block (31), and the clamping block (31) is embedded in the ground and abuts against the inner wall of the ground.
3. The local support structure for emergency protection of ancient city walls according to claim 2 is characterized by: The abutment plate (32) is arranged perpendicularly to the clamping block (31), and more than half of the area of the side wall of the clamping block (31) is in abutment with the rammed earth brick (11).
4. The local support structure for emergency protection of ancient city walls according to claim 1 is characterized by: The outer sides of the connecting bricks (2) are arranged inclined.
5. The local support structure for emergency protection of ancient city walls according to claim 1 is characterized by: The slurry (12) is set to be peach blossom slurry, and the slurry (12) connects the rammed earth bricks (11) and the rammed earth wall ruins (5).
6. The local support structure for emergency protection of ancient city walls according to claim 1 is characterized by: A flexible isolation layer (4) is provided between the rammed earth wall ruins (5) and the connecting bricks (2) or the rammed earth bricks (11).
7. The local support structure for emergency protection of ancient city walls according to claim 6 is characterized by: Saturated lime water is sprayed between the flexible isolation layer (4) and the rammed earth wall ruins (5).
8. A construction method for a local support structure for emergency protection of an ancient city wall according to any one of claims 1 to 7, characterized in that: Includes steps: S1. Pre-construction inspection: Before construction, the composition of the rammed earth wall ruins (5) is first inspected, and the rammed earth bricks (11) are manufactured according to the composition ratio, so as to ensure that the rammed earth bricks (11) and the rammed earth wall ruins (5) are highly consistent in material; S2, preliminary reinforcement: performing preliminary reinforcement treatment on the rammed earth wall ruins (5); S3, providing an isolation layer: spraying saturated lime water on the surface of the rammed earth wall ruins (5) and providing a flexible isolation layer (4) to enhance the weathering resistance of the rammed earth wall ruins (5); S4, filling the gap: for the part of the rammed earth wall ruins (5) that is "wide at the top and narrow at the bottom", the specially made rammed earth bricks (11) are used for rough masonry to fill the gap between the rammed earth wall ruins (5) and the rammed earth bricks (11); S5, batch grouting: grouting (12) between the rammed earth wall ruins (5) and the rammed earth bricks (11) in batches for multiple times to ensure that the rammed earth wall ruins (5) and the rammed earth bricks (11) are tightly connected; S6. Building a support structure: Building the support assembly (3) outside the rammed earth brick (11) wall to form a stable support structure.
9. The construction method of a local support structure for emergency protection of an ancient city wall according to claim 8, characterized in that: The rammed earth wall ruins (5) are subjected to preliminary reinforcement treatment, including the steps of: cleaning the ash and soil at the base of the wall and repairing cracks.
10. The construction method of the local support structure for emergency protection of the ancient city wall according to claim 8, characterized in that: The support assembly (3) is set up on the outside of the rammed earth brick (11) wall, comprising the steps of: firstly setting up the clamping block (31) on the bottom of the connecting brick (2), and then using the abutment plate (32) to abut the clamping block (31).