Disaster embankment rapid repairing structure and construction method
By using layered filling of foam concrete and backfill soil on the embankment, adding steel mesh and anchor rods, forming a step-like structure, and setting up planting and drainage areas on the slopes, and using automatic watering system, the traditional embankment repair method is solved The problems of long cycles, high cost and regular watering of plants have improved the restoration efficiency and stability and achieved the rational use of water resources.
Patent Information
- Application Number
- CN202411611412.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-12
- Publication Date
- 2025-01-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional embankment restoration methods have problems such as long repair cycle, high project cost and poor project applicability. They also require regular watering after planting, which wastes time and resources.
The rapid repair structure of the disaster-damaged embankment is adopted, including roadbed mechanism, repair components, side protection components, bottom reinforcement components, slope protection components and spray components. By filling foam concrete and backfill soil in layers, reinforcement mesh and anchor rods are added , forming a step-like structure, and a planting area and drainage area are set up on the slope, and automatic watering is achieved using heat absorption layer and sealing shell.
It greatly reduces the project cost and construction cycle, improves the stability and overturn resistance of the restoration section embankment, simplifies the construction process, reduces soil erosion, realizes automatic water replenishment of green plants, and improves post-disaster rescue efficiency.
Smart Images

Figure CN119243538A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of embankment repair, in particular to a rapid repair structure and a construction method for a disaster-damaged embankment. Background Art
[0002] In my country, highway roadbed collapse accidents occur frequently, especially in the rainy season. Continuous rainfall in a short period of time causes a large amount of rainwater to accumulate. Due to poor drainage, some water directly seeps into the embankment, causing the filler and roadbed soil to soften. At the same time, the scouring and erosion of rainwater further reduce the roadbed strength and supporting capacity, thus causing roadbed collapse accidents.
[0003] In order to ensure the normal operation of highway traffic, the damaged embankment structure must be repaired quickly. Traditional repair methods mainly use retaining walls, roadbed backfilling and other methods, but there are problems such as long repair cycle, high project cost, and poor project applicability, which seriously affect the efficiency of post-disaster rescue. In addition, in order to increase the green area and reduce soil erosion, plants are generally planted on the repaired slopes. However, the plants need to be watered regularly after planting. When the sun is directly exposed, the plants are prone to lack of water and die easily without enough water. Therefore, the staff needs to water the plants regularly, which is very inconvenient and wastes time. Therefore, it is of great significance to study a new rapid repair structure and construction method for disaster-damaged embankments to solve the above problems. Summary of the invention
[0004] The purpose of this section is to summarize some aspects of embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.
[0005] In view of the above and / or existing problems in embankment repair, the present invention is proposed.
[0006] Therefore, the technical problem to be solved by the present invention is that traditional repair methods mainly adopt retaining walls, roadbed backfilling and the like, but there are problems such as long repair period, high project cost and poor project applicability, which seriously affect the efficiency of post-disaster rescue. In addition, in order to increase the greening area and reduce soil erosion, plants are generally planted on the repaired slopes. However, the plants need to be watered regularly after planting. When exposed to direct sunlight, the plants are prone to dehydration and death if they do not have enough water replenishment. Therefore, staff are required to water the plants regularly, which is very inconvenient and a waste of time.
[0007] To achieve the above-mentioned object, the present invention provides the following technical solution: a rapid repair structure for a damaged embankment, comprising a roadbed mechanism, wherein a repair mechanism is supplemented at a damaged part on one side of the roadbed mechanism;
[0008] The repair mechanism includes a repair component, a side protection component is arranged above the repair component, a bottom reinforcement component is arranged below the repair component, the bottom reinforcement component passes under the roadbed mechanism, a plurality of side reinforcement components are pre-buried inside the repair component, a slope protection component is arranged on the slope of the repair component, the slope protection component is connected to the plurality of side reinforcement components, a water tank is arranged below the slope protection component, and a spray component is arranged above the water tank.
[0009] As a further solution of the present invention: the roadbed structure includes a roadbed, the water tank is buried at the bottom of the roadbed, and a filter screen is fixedly installed in the water tank;
[0010] A concrete cushion layer is arranged above the roadbed, and a pavement structure is arranged above the concrete cushion layer.
[0011] As a further solution of the present invention: the repair component includes a repair section embankment and foam concrete, the repair section embankment is laid in a step shape, and steel meshes are buried in two sections of the repair section embankment and the gravel cushion layer.
[0012] As a further solution of the present invention: a plurality of anchor rods are buried inside the roadbed, and one end of the plurality of anchor rods extends out of the roadbed and penetrates into the embankment of the repaired section.
[0013] As a further solution of the present invention: a crushed stone cushion layer is provided between the foamed concrete and the roadbed, the crushed stone cushion layer is located below one of the steel meshes, and the foamed concrete is provided below the concrete cushion layer.
[0014] As a further solution of the present invention: the bottom reinforcement component includes a precast concrete slab, which is buried below the embankment of the repair section and contacts the bottom layer of the roadbed. A plurality of embedded steel cylinders are embedded on the precast concrete slab, and steel pipe piles are penetrated through the embedded steel cylinders. The steel pipe piles are inserted downward into the roadbed, and a grouting enlargement head is cast at the bottom of the steel pipe pile, which is buried in the roadbed.
[0015] As a further solution of the present invention: the side protection assembly includes a base, the base is fixedly installed above the foam concrete, a plurality of water channels are preset in the base, and a guardrail is fixedly installed above the base.
[0016] As a further solution of the present invention: the side reinforcement assembly includes a transverse column, the transverse column is buried in the repair section embankment, a plurality of reinforcement rods are fixedly installed outside the transverse column, and one end of the transverse column is a hook end;
[0017] The slope protection component includes multiple rows of planting areas and multiple drainage areas. Each row of planting areas and drainage areas is cast on the slope of the repaired section embankment, and the hook ends of the corresponding transverse columns are cast in the planting areas and drainage areas. The drainage areas correspond to the positions of the water channels.
[0018] As a further solution of the present invention: the spray assembly includes a sealing shell, a heat absorption layer is arranged above the sealing shell, a piston is arranged inside the sealing shell, a spring is fixedly connected below the piston, the bottom end of the spring is fixedly connected to the bottom wall of the sealing shell, two one-way water spray pipes and two one-way water inlet pipes are respectively connected to the two sides of the sealing shell, the one-way water inlet pipes pass through the filter and extend into the water tank, the one-way water spray pipe extends upward and is connected to the top of the slope of the embankment of the repair section, and a plurality of water spray outlets are provided on the one-way water spray pipe.
[0019] The construction method of the rapid repair structure of the damaged embankment includes the following steps:
[0020] S1. According to the design requirements, remove the loose soil and other debris from the damaged embankment layer by layer from top to bottom;
[0021] S2. The excavation surface is in the shape of steps, with a width of 1-2m and a height of 2-3m. Each step is protected by an anchor rod driven into the slope surface of the step, and grouting is carried out according to the designed ratio.
[0022] S3. After excavation to the ground, the site is leveled, precast concrete slabs are laid out according to design requirements, and embedded steel cylinders are installed on the precast concrete slabs;
[0023] S4, vertically driving the steel pipe pile along the embedded steel tube, and completing the grouting enlargement head treatment at the bottom of the steel pipe pile through multiple grouting operations;
[0024] S5. After the foundation treatment is completed, backfill soil is laid layer by layer from bottom to top on the repaired section of the embankment, compacted layer by layer, and steel mesh and side reinforcement components are laid horizontally at the designated position, including a part of the extension at one end of the side reinforcement component.
[0025] S6. When the backfill is 1m below the pavement structure, lay a 0.2m thick gravel cushion layer horizontally and compact it.
[0026] S7. After the compaction process is completed, a formwork is erected on the outside of the step, and a steel mesh is set up again 0.2m above the gravel cushion layer;
[0027] S8. Prepare foam concrete according to the designed mix ratio, pour the foam concrete in layers, and smooth the surface. After the surface of the foam concrete hardens, cover it with geotextile and sprinkle water for maintenance;
[0028] S9. After the foam concrete is cured, a pit is dug below the slope of the embankment of the repair section and a template is laid. Then, concrete is poured. Concrete is poured on the template on the surface of the slope of the embankment of the repair section, so that one end of the side reinforcement component is poured in it. After the concrete hardens, a drainage area and a planting area are formed. A filter is installed in the water tank, and the spray component is laid. Then, soil is filled on the planting area to sow green plants.
[0029] S10. Cast the guardrail base on the foam concrete surface without pavement structure and install the guardrail.
[0030] Compared with the prior art, the present invention has the following beneficial effects:
[0031] 1. The rapid repair structure and construction method of the disaster-damaged embankment, by using foam concrete and backfill soil for filling in the upper and lower layers of the repair section embankment respectively, not only reduces the backfill load, eliminates the settlement difference between the new and old roadbeds, and improves the overall stability of the repair section embankment, but also greatly reduces the project cost and construction period, taking into account both functionality and economy. In addition, the layered filling structure can flexibly adjust the proportion and distribution of foam concrete and backfill soil according to specific project requirements, adapt to various geological conditions and different types of roadbed projects, and expand the application scope of the project. Secondly, the present invention also adopts a step-type excavation and anchor fixing method to connect the roadbed and the repair section embankment, which not only simplifies the construction process and improves the construction efficiency, but also effectively suppresses the cracking of the contact surface between the new and old embankments, improves the anti-overturning ability of the repair section embankment, and reduces the risk of secondary damage to the repair section embankment;
[0032] 2. The rapid repair structure and construction method of the damaged embankment, by adding a steel mesh to the repair section of the roadbed, laying steel pipe piles at the bottom of the roadbed for support, and connecting multiple steel pipe piles through precast concrete slabs to form a whole, and forming a grouting expansion head at the end of the steel pipe piles through grouting construction, not only reduces the on-site construction time and workload, shortens the repair cycle, but also improves the overall bearing capacity, anti-slip and anti-deformation capacity of the repair section of the embankment, reduces the occurrence of cracks and uneven settlement inside the embankment, and ensures construction efficiency and quality;
[0033] 3. The structure and construction method for rapid repair of the damaged embankment are as follows: a template is laid on the slope of the embankment of the repair section, and concrete is poured through the template to form a planting area and a drainage area, and one end of the side reinforcement component is poured in the planting area and the drainage area. The side reinforcement component is buried in the roadbed of the repair section, which can not only effectively improve the overall strength, but also connect the planting area and the drainage area, so that the planting area and the drainage area can be reinforced to prevent them from falling off, so that the drainage area and the planting area can form a protection for the slope of the embankment of the repair section, effectively preventing soil erosion and reducing the risk of slope instability. The drainage area can guide the discharge of road surface water to avoid the problem of soil erosion caused by accumulated water erosion again, and the accumulated water can flow back into the water tank to realize the problem of rational use of water resources. In addition, green plants are planted in the planting area, which can effectively reduce the damage caused by long-term rain erosion in the planting area;
[0034] 4. The structure and construction method for rapid repair of the damaged embankment can quickly absorb solar energy through the heat-absorbing layer, so that the sealed shell can gather heat and heat the internal gas. The gas expands due to the heat and puts pressure on the piston. The piston compresses the spring and presses out the accumulated water in the bottom cavity of the sealed shell, so that the liquid is output through the one-way water spray pipe and sprayed out through the water spray port to automatically water the green plants, which is convenient for the water replenishment of the green plants. When the temperature inside the sealed shell drops, the spring drives the piston to reset, so that the piston can introduce the accumulated water into the sealed shell through the one-way water inlet pipe, so as to facilitate the next water spraying operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:
[0036] Figure 1 This is a structural schematic diagram of a cross-section of a damaged roadbed mechanism in the rapid repair structure and construction method for a damaged embankment described in an embodiment of the present invention.
[0037] Figure 2 A schematic diagram of the repair structure of the cross section of the roadbed structure in the rapid repair structure and construction method for a damaged embankment described in an embodiment of the present invention.
[0038] Figure 3 This is a structural schematic diagram of the cross-section of the repair component in the disaster-damaged embankment rapid repair structure and construction method described in the embodiment provided by the present invention.
[0039] Figure 4 A schematic structural diagram of a precast concrete slab in a rapid repair structure and construction method for a damaged embankment as described in an embodiment of the present invention.
[0040] Figure 5 This is a structural schematic diagram of a cross-section of a repair mechanism in a rapid repair structure and construction method for a damaged embankment as described in an embodiment of the present invention.
[0041] Figure 6 A schematic structural diagram of the side reinforcement assembly in the rapid repair structure and construction method for a damaged embankment described in an embodiment of the present invention.
[0042] Figure 7 A schematic structural diagram of a slope protection component in a rapid repair structure and construction method for a disaster-damaged embankment according to an embodiment of the present invention.
[0043] Figure 8 A schematic structural diagram of a water tank in a disaster-damaged embankment rapid repair structure and construction method according to an embodiment of the present invention.
[0044] Fig. 9 This is a structural schematic diagram of a water tank cross section in the disaster-damaged embankment rapid repair structure and construction method described in an embodiment of the present invention.
[0045] Fig.10 The invention provides a rapid repair structure and construction method for a damaged embankment according to an embodiment of the invention. Fig. 9 Schematic diagram of the enlarged structure at A.
[0046] In the figure: 100, roadbed structure; 101, roadbed; 102, pavement structure; 103, concrete cushion; 200, repair mechanism; 201, repair component; 2011, repair section embankment; 2012, crushed stone cushion; 2013, foam concrete; 2014, steel mesh; 202, bottom reinforcement component; 2021, grouting expansion head; 2022, steel pipe pile; 2023, precast concrete slab; 2024, embedded steel cylinder; 203, side protection component; 2031, Base; 2032, water channel; 2033, guardrail; 204, anchor rod; 205, side reinforcement assembly; 2051, transverse column; 2052, reinforcement rod; 206, spray assembly; 2061, sealing shell; 2062, spring; 2063, piston; 2064, heat absorption layer; 2065, one-way water inlet pipe; 2066, one-way water spray pipe; 207, water tank; 208, filter screen; 209, slope protection assembly; 2091, planting area; 2092, drainage area. DETAILED DESCRIPTION
[0047] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0048] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0049] Secondly, the present invention is described in detail with reference to the schematic diagram. When describing the embodiments of the present invention in detail, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.
[0050] Furthermore, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0051] Example 1
[0052] like Figure 1-3 and Figure 5 and Figure 7 As shown, the present invention provides a technical solution: a disaster-damaged embankment rapid repair structure, comprising a roadbed mechanism 100, the roadbed mechanism 100 comprising a roadbed 101, a concrete cushion layer 103 is arranged above the roadbed 101, a pavement structure 102 is arranged above the concrete cushion layer 103, and a repair mechanism 200 is supplemented at the damaged part of one side of the roadbed mechanism 100;
[0053] The repair mechanism 200 includes a repair component 201, and the repair component 201 includes a repair section embankment 2011 and foam concrete 2013. The repair section embankment 2011 is paved in a step shape. A plurality of anchor rods 204 are buried inside the roadbed 101. The anchor rods 204 are inserted into the repair section embankment 2011 and the roadbed 101, thereby playing a stable connection between the repair section embankment 2011 and the roadbed 101, and playing a good reinforcement role. One end of the plurality of anchor rods 204 extends out of the roadbed 101 and penetrates into the repair section embankment 2011. A crushed stone cushion layer 2012 is provided between the foam concrete 2013 and the roadbed 101, and the crushed stone cushion layer 2012 is located below one of the steel meshes 2014. The foam concrete 2013 is provided below the concrete cushion layer 103. A side protection component 203 is provided above the repair component 201, and the side protection component 203 includes a base 2031 A base 2031 is fixedly installed above the foam concrete 2013. A plurality of water channels 2032 are preset in the base 2031. The water channels 2032 can guide the discharge of accumulated water on the pavement structure 102 to avoid the problem of water accumulation in the pavement structure 102. A guardrail 2033 is fixedly installed above the base 2031. The guardrail 2033 can provide safety protection for pedestrians or vehicles and can also guide traffic. A bottom reinforcement component 202 is provided below the repair component 201. The bottom reinforcement component 202 passes under the roadbed mechanism 100. A plurality of side reinforcement components 205 are pre-buried in the repair component 201. A slope protection component 209 is provided on the slope of the repair component 201. The slope protection component 209 is connected to the plurality of side reinforcement components 205. A water tank 207 is provided below the slope protection component 209, and a spray component 206 is provided above the water tank 207.
[0054] In this embodiment, by using foam concrete 2013 and backfill soil for filling in the upper and lower layers of the repair section embankment 2011 respectively, not only the backfill load is reduced, the settlement difference between the new and old roadbeds 101 is eliminated, and the overall stability of the repair section embankment 2011 is improved, but also the project cost and construction period are greatly reduced, and both functionality and economy are taken into account. In addition, this layered filling structure can flexibly adjust the proportion and distribution of foam concrete 2013 and backfill soil according to specific project requirements, adapt to various geological conditions and different types of roadbed 101 projects, and expand the application scope of the project. Secondly, the present invention also adopts a stepped excavation and anchor rod 204 fixation method to connect the roadbed 101 and the repair section embankment 2011, which not only simplifies the construction process and improves construction efficiency, but also effectively suppresses the cracking of the contact surface between the new and old embankments, improves the anti-overturning ability of the repair section embankment 2011, and reduces the risk of secondary damage to the repair section embankment 2011.
[0055] Example 2
[0056] Combination Figure 3-4, it is concluded that: the bottom reinforcement component 202 includes a precast concrete slab 2023, which is buried under the repair section embankment 2011, and the precast concrete slab 2023 is in contact with the bottom layer of the roadbed 101, and a plurality of precast steel cylinders 2024 are pre-buried on the precast concrete slab 2023, and steel pipe piles 2022 are penetrated in the precast steel cylinders 2024, and the steel pipe piles 2022 are downwardly penetrated into the roadbed 101, and a grouting enlarged head 2021 is cast at the bottom of the steel pipe pile 2022, and the grouting enlarged head 2021 is formed by injecting grouting material at the bottom of the box steel pipe pile 2022, thereby reinforcing the steel pipe pile 2022, thereby greatly improving the repair strength and bearing capacity, and the grouting enlarged head 2021 is buried in the roadbed 101, and steel meshes 2014 are buried in two sections of the repair section embankment 2011 and the gravel cushion layer 2012.
[0057] In this embodiment: by adding a steel mesh 2014 to the repair section roadbed 101, steel pipe piles 2022 are arranged at the bottom of the roadbed 101 for support, and multiple steel pipe piles 2022 are connected to form a whole through precast concrete slabs 2023, and grouting construction is performed at the pile ends of the steel pipe piles 2022 to form a grouting enlarged head 2021, which not only reduces the on-site construction time and workload, shortens the repair period, but also improves the overall bearing capacity, anti-slip and anti-deformation capabilities of the repair section embankment 2011, reduces the occurrence of cracks and uneven settlement inside the embankment, and ensures construction efficiency and quality.
[0058] Example 3
[0059] Combination Figure 6 and Figure 8-10, it is concluded that: the side reinforcement component 205 includes a transverse column 2051, the transverse column 2051 is buried in the repair section embankment 2011, and a plurality of reinforcement rods 2052 are fixedly installed outside the transverse column 2051. The periphery of the transverse column 2051 is provided with reinforcement rods 2052, so that the reinforcement rods 2052 can provide more gripping force, thereby increasing the reliability of the connection between the transverse column 2051 and the repair section roadbed 101, and reinforcing the repair section roadbed 101 at the same time, and one end of the transverse column 2051 is a hook end, and one end of the transverse column 2051 is a hook end, so that it increases the firmness of the connection with the planting area 2091 and the drainage area 2092, and effectively plays a role in preventing detachment. The slope protection component 209 includes multiple rows of planting areas 2091 and a plurality of drainage areas 2092, through which the accumulated water can be guided to be smoothly discharged, each row of planting areas 2091 and drainage areas 2092 are cast on the slope of the repaired section embankment 2011, and the hook ends of the corresponding transverse columns 2051 are cast in the planting areas 2091 and the drainage areas 2092, the planting areas 2091 can be used to plant green plants, thereby protecting the planting areas 2091 and reducing the risk of damage to the planting areas 2091, the drainage areas 2092 correspond to the positions of the water delivery channels 2032, the water tank 207 is buried at the bottom of the roadbed 101, and a filter screen 208 is fixedly installed in the water tank 207, and the accumulated water can be filtered through the filter screen 208;
[0060] The spray assembly 206 includes a sealed shell 2061, and a heat absorption layer 2064 is arranged above the sealed shell 2061. The heat absorption layer 2064 can quickly absorb solar energy, so as to quickly accumulate heat energy, thereby quickly heating the gas inside the sealed shell 2061. A piston 2063 is arranged inside the sealed shell 2061, and a spring 2062 is fixedly connected to the bottom of the piston 2063. The piston 2063 can be driven to reset upward by the reset force of the spring 2062, so that the piston 2063 can drain the accumulated water in the water tank 207 into the sealed shell 2061 through negative pressure. The bottom end of the spring 2062 is connected to the bottom of the sealed shell 2061. The sealing shell 2061 is fixedly connected to the wall, and two one-way water spray pipes 2066 and two one-way water inlet pipes 2065 are respectively connected on both sides of the sealing shell 2061. The one-way water spray pipe 2066 can achieve the purpose of one-way drainage, and a plurality of water spray outlets are provided on the one-way water spray pipe 2066, so that the drainage operation can be diverted. The one-way water inlet pipe 2065 passes through the filter screen 208 and extends into the water tank 207. The one-way water inlet pipe 2065 can maintain one-way water inlet to prevent the accumulated water from flowing back into the water tank 207. The one-way water spray pipe 2066 extends upward and is connected to the top of the slope of the repaired section embankment 2011, and a plurality of water spray outlets are provided on the one-way water spray pipe 2066.
[0061] In this embodiment: by laying a template on the slope of the repair section embankment 2011, and pouring concrete through the template to form a planting area 2091 and a drainage area 2092, and one end of the side reinforcement component 205 is poured in the planting area 2091 and the drainage area, the side reinforcement component 205 is buried in the repair section roadbed 101, which can not only effectively improve the overall strength, but also connect the planting area 2091 and the drainage area 2092, so that the planting area 2091 and the drainage area 2092 can be reinforced to prevent easy Falling off, so that the drainage area 2092 and the planting area 2091 form a protection for the slope of the repaired section embankment 2011, effectively preventing soil erosion and reducing the risk of slope instability. The drainage area 2092 can guide the road surface water to be discharged to avoid the problem of soil erosion caused by accumulated water erosion again. The accumulated water can flow back into the water tank 207 to achieve the problem of rational use of water resources. Green plants are planted in the planting area 2091, which can effectively reduce the damage caused by long-term rain erosion in the planting area 2091.
[0062] The heat absorption layer 2064 can quickly absorb solar energy, so that the sealed shell 2061 can gather heat and heat the internal gas. The gas expands due to the heat and puts pressure on the piston 2063. The piston 2063 compresses the spring 2062, and the piston 2063 presses out the accumulated water in the bottom cavity of the sealed shell 2061, so that the liquid is output through the one-way water spray pipe 2066 and sprayed out through the water spray port to automatically water the green plants, which is convenient for the water replenishment of the green plants. When the internal temperature of the sealed shell 2061 drops, the spring 2062 drives the piston 2063 to reset, so that the piston 2063 can introduce the accumulated water into the sealed shell 2061 through the one-way water inlet pipe 2065, so as to facilitate the next water spraying operation.
[0063] The construction method of the rapid repair structure of the damaged embankment includes the following steps:
[0064] S1. According to the design requirements, remove the loose soil and other debris from the damaged embankment layer by layer from top to bottom;
[0065] S2, the excavation surface is in the shape of steps, with a width of 1-2m and a height of 2-3m. Each step is protected for each step excavated. Anchor rods 204 are driven into the slope surface of the step to fix it, and grouting is carried out according to the designed ratio;
[0066] S3. After excavation to the ground, the site is leveled, precast concrete slabs 2023 are laid out according to design requirements, and embedded steel cylinders 2024 are installed on the precast concrete slabs 2023;
[0067] S4, vertically driving the steel pipe pile 2022 along the embedded steel cylinder 2024, and completing the grouting enlarged head 2021 processing at the bottom of the steel pipe pile 2022 through multiple grouting operations;
[0068] S5. After the foundation treatment is completed, backfill soil is laid layer by layer from bottom to top on the repaired section embankment 2011, compacted layer by layer, and a steel mesh 2014 and a side reinforcement component 205 are horizontally laid at a designated position, including a portion of an extension of one end of the side reinforcement component 205.
[0069] S6. After backfilling to 1 m below the pavement structure 102, a layer of crushed stone cushion 2012 with a thickness of 0.2 m is horizontally laid and compacted.
[0070] S7. After the compaction process is completed, a formwork is erected on the outside of the step, and a steel mesh 2014 is set up again at a distance of 0.2 m above the gravel cushion layer 2012;
[0071] S8, preparing foam concrete 2013 according to the designed mix ratio, pouring foam concrete 2013 in layers, and smoothing the surface. After the surface of foam concrete 2013 is hardened, covering it with geotextile and sprinkling water for curing;
[0072] S9. After the foam concrete 2013 is cured, a pit is dug below the slope of the repaired section embankment 2011 and a template is laid, then concrete is poured, and concrete is poured on the template on the surface of the slope of the repaired section embankment 2011, so that one end of the side reinforcement component 205 is poured in it. After the concrete hardens, a drainage area 2092 and a planting area 2091 are formed, and a filter screen 208 is installed in the water tank 207, and the spray component 206 is laid, and then soil is filled on the planting area 2091 to sow green plants;
[0073] S10, pouring the base 2031 of the guardrail 2033 on the surface of the foam concrete 2013 where the pavement structure 102 is not laid, and installing the guardrail 2033.
[0074] Importantly, it should be noted that the construction and arrangement of the present application shown in a plurality of different exemplary embodiments are only exemplary. Although only a few embodiments are described in detail in this disclosure, it should be readily understood by those who refer to this disclosure that many modifications are possible (e.g., the size, scale, structure, shape and proportion of various elements, and parameter values (e.g., temperature, pressure, etc.), installation arrangement, use of materials, color, directional changes, etc.) without substantially departing from the novel teachings and advantages of the subject matter described in the application. For example, the element shown as integrally formed can be composed of multiple parts or elements, the position of the element can be inverted or otherwise changed, and the nature or number or position of the discrete element can be changed or changed. Therefore, all such modifications are intended to be included in the scope of the present invention. The order or sequence of any process or method steps can be changed or reordered according to alternative embodiments. In the claims, any "device plus function" clause is intended to cover the structure of performing the function described herein, and is not only structurally equivalent but also equivalent structure. Without departing from the scope of the present invention, other replacements, modifications, changes and omissions can be made in the design, operating conditions and arrangement of the exemplary embodiments. Therefore, the invention is not limited to a specific embodiment, but extends to several modifications still falling within the scope of the appended claims.
[0075] Additionally, in order to provide a concise description of exemplary embodiments, all features of an actual embodiment (ie, those features that are not relevant to the best mode presently contemplated for carrying out the invention or those that are not relevant to implementing the invention) may not be described.
[0076] It will be appreciated that in the development of any actual implementation, as in any engineering or design project, numerous implementation-specific decisions may be made. Such a development effort may be complex and time-consuming, but will be a routine task of design, fabrication, and production for those of ordinary skill having the benefit of this disclosure without undue experimentation.
[0077] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. Rapid repair structure for damaged embankments, characterized by: It comprises a roadbed mechanism (100), wherein a damaged portion on one side of the roadbed mechanism (100) is supplemented with a repair mechanism (200); The repair mechanism (200) comprises a repair component (201), a side protection component (203) is arranged above the repair component (201), a bottom reinforcement component (202) is arranged below the repair component (201), the bottom reinforcement component (202) passes under the roadbed mechanism (100), a plurality of side reinforcement components (205) are pre-buried inside the repair component (201), a slope protection component (209) is arranged on the slope of the repair component (201), the slope protection component (209) is connected to the plurality of side reinforcement components (205), a water tank (207) is arranged below the slope protection component (209), and a spray component (206) is arranged above the water tank (207).
2. The rapid repair structure for a damaged embankment as claimed in claim 1, characterized in that: The roadbed structure (100) comprises a roadbed (101), the water tank (207) is buried at the bottom of the roadbed (101), and a filter screen (208) is fixedly installed in the water tank (207); A concrete cushion layer (103) is arranged above the roadbed (101), and a pavement structure (102) is arranged above the concrete cushion layer (103).
3. The rapid repair structure for a damaged embankment as claimed in claim 2, characterized in that: The repair component (201) comprises a repair section embankment (2011) and foam concrete (2013); the repair section embankment (2011) is laid in a step-shaped manner; and steel meshes (2014) are embedded in two sections of the repair section embankment (2011) and a crushed stone cushion layer (2012).
4. The rapid repair structure for a damaged embankment as claimed in claim 3, characterized in that: A plurality of anchor rods (204) are buried inside the roadbed (101), and one end of the plurality of anchor rods (204) extends out of the roadbed (101) and penetrates into the repaired section embankment (2011).
5. The rapid repair structure for a damaged embankment as claimed in claim 4, characterized in that: A crushed stone cushion layer (2012) is provided between the foamed concrete (2013) and the roadbed (101), the crushed stone cushion layer (2012) is located below one of the steel meshes (2014), and the foamed concrete (2013) is provided below the concrete cushion layer (103).
6. The rapid repair structure for a damaged embankment as claimed in claim 5, characterized in that: The bottom reinforcement component (202) comprises a precast concrete slab (2023), the precast concrete slab (2023) is buried below the repair section embankment (2011), and the precast concrete slab (2023) is in contact with the bottom layer of the roadbed (101), a plurality of precast steel cylinders (2024) are precast on the precast concrete slab (2023), a steel pipe pile (2022) penetrates through the precast steel cylinder (2024), the steel pipe pile (2022) penetrates downward into the roadbed (101), and a grouting enlargement head (2021) is cast at the bottom of the steel pipe pile (2022), and the grouting enlargement head (2021) is buried in the roadbed (101).
7. The rapid repair structure for a damaged embankment as claimed in claim 6, characterized in that: The side protection assembly (203) comprises a base (2031), the base (2031) is fixedly installed above the foam concrete (2013), a plurality of water channels (2032) are preset in the base (2031), and a guardrail (2033) is fixedly installed above the base (2031).
8. The rapid repair structure for a damaged embankment as claimed in claim 7, characterized in that: The side reinforcement assembly (205) comprises a transverse column (2051), the transverse column (2051) is buried in the repaired section embankment (2011), a plurality of reinforcement rods (2052) are fixedly installed outside the transverse column (2051), and one end of the transverse column (2051) is a hook end; The slope protection component (209) includes multiple rows of planting areas (2091) and multiple drainage areas (2092), each row of planting areas (2091) and drainage areas (2092) are cast on the slope of the repaired section embankment (2011), and the hook ends of the corresponding transverse columns (2051) are cast in the planting areas (2091) and the drainage areas (2092), and the drainage areas (2092) correspond to the positions of the water channels (2032).
9. The rapid repair structure for a damaged embankment as claimed in claim 8, characterized in that: The spray assembly (206) comprises a sealing shell (2061), a heat absorption layer (2064) is arranged above the sealing shell (2061), a piston (2063) is arranged inside the sealing shell (2061), a spring (2062) is fixedly connected below the piston (2063), the bottom end of the spring (2062) is fixedly connected to the bottom wall of the sealing shell (2061), two one-way water spray pipes (2066) and two one-way water inlet pipes (2065) are respectively connected to the two sides of the sealing shell (2061), the one-way water inlet pipes (2065) penetrate the filter screen (208) and extend into the water tank (207), the one-way water spray pipe (2066) extends upward and is connected to the top of the slope of the repair section embankment (2011), and a plurality of water spray outlets are arranged on the one-way water spray pipe (2066).
10. The construction method of the rapid repair structure of the damaged embankment as claimed in claim 9, characterized in that: The following steps are involved: S1. According to the design requirements, remove the loose soil and other debris from the damaged embankment layer by layer from top to bottom; S2, the excavation surface is in the shape of steps, with a step width of 1-2m and a height of 2-3m. Each step is protected for each step excavated. Anchor rods (204) are driven into the slope surface of the step to fix it, and grouting construction is carried out according to the designed ratio; S3. After excavation to the ground, the site is leveled, precast concrete slabs (2023) are arranged according to design requirements, and embedded steel cylinders (2024) are installed on the precast concrete slabs (2023); S4, vertically driving the steel pipe pile (2022) along the embedded steel cylinder (2024), and completing the grouting enlarged head (221) treatment at the bottom of the steel pipe pile (2022) through multiple grouting operations; S5. After the foundation treatment is completed, backfill soil is laid layer by layer from bottom to top on the repaired section embankment (2011), compacted layer by layer, and a steel mesh (2014) and a side reinforcement component (205) are horizontally laid at a designated position, and a part of the extension of one end of the side reinforcement component (205). S6. After backfilling to 1 m below the pavement structure (102), a layer of crushed stone cushion (2012) with a thickness of 0.2 m is horizontally laid and compacted. S7. After the compaction treatment is completed, a formwork is erected on the outside of the step, and a steel mesh (2014) is set up again at a distance of 0.2 m above the crushed stone cushion layer (2012); S8. Prepare foam concrete (2013) according to the designed mix ratio, pour the foam concrete (2013) in layers, and smooth the surface. After the surface of the foam concrete (2013) is hardened, cover it with geotextile and sprinkle water for maintenance; S9. After the foam concrete (2013) is cured, a pit is dug below the slope of the repaired section embankment (2011) and a template is laid, then concrete is poured, and concrete is poured on the template on the surface of the slope of the repaired section embankment (2011), so that one end of the side reinforcement component (205) is poured in it. After the concrete hardens, a drainage area (2092) and a planting area (2091) are formed, and a filter screen (208) is installed in the water tank (207), and the spray component (206) is laid, and then soil is filled on the planting area (2091) to sow green plants; S10, pouring a guardrail (2033) base (2031) on the surface of the foamed concrete (2013) where the pavement structure (102) is not laid, and installing the guardrail (2033).