Flood prevention treatment method and system for water conservancy project
By setting up multiple monitoring stations in water conservancy projects for automatic monitoring and analysis of real-time flood data, the problem of manual monitoring cannot be monitored dynamically in real time is solved, the accuracy of flood forecasting and the effect of flood prevention treatment is improved, and timely response measures are taken .
Patent Information
- Application Number
- CN202411004570.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-22
AI Technical Summary
In the flood prevention and treatment of existing water conservancy projects, manual monitoring cannot monitor flood data dynamically in real time, resulting in low accuracy of flood forecasting and inability to take effective measures in a timely manner.
Set up multiple monitoring sites for automatic monitoring of real-time flood situation information, obtain flood situation data at different time points, count and analyze data, form statistical analysis reports, predict flood situation development trends, and issue flood prevention alarms and take corresponding measures when the conditions of early warning or alarm are met. .
Timely and accurate monitoring and prediction of flood situations have been achieved, the effectiveness of flood prevention and treatment has been improved, and effective measures can be taken in a timely manner in an emergency.
Smart Images

Figure CN119005393A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of flood control management technology, and in particular to a method and system for flood control treatment of water conservancy projects. Background Art
[0002] Flood prevention management includes pre-flood inspection, flood season management, post-flood management, disaster management, and plan management. Pre-flood inspection information includes records of dangerous sections of river and sea dikes, dike conditions, dangerous sluice conditions, flood prevention materials, and rescue team information. Flood season management mainly focuses on daily flood conditions and emergency response to disaster weather. Post-flood management mainly includes repair and reinforcement of dangerous sections, engineering renovation, and additional flood prevention materials. Disaster management includes disaster reporting, disaster summary, disaster inquiry, and disaster summary. Plan management includes flood prevention plans and plan level management.
[0003] Current flood control measures for water conservancy projects also include predicting flood conditions through manual monitoring. However, this method cannot dynamically monitor relevant data on flood conditions in real time, and the accuracy of flood predictions is low, resulting in the inability to take effective measures in an emergency.
[0004] Therefore, how to improve the accuracy of flood forecasting and enhance the effectiveness of flood prevention measures has become a problem that needs to be solved.
[0005] The above information disclosed in the background section is only for enhancing understanding of the background of the present application and therefore it may contain information that does not form the prior art known to a person of ordinary skill in the art. Summary of the invention
[0006] The present application provides a flood control treatment method and system for a water conservancy project to solve the problems existing in the prior art.
[0007] In a first aspect, the present application provides a flood control method for a water conservancy project, comprising:
[0008] S1. Set up multiple monitoring sites;
[0009] S2. Automatically monitor the real-time flood information through each monitoring station to obtain flood data at different time points;
[0010] S3, collecting and analyzing the flood data to form a statistical analysis report;
[0011] S4. Predicting the development trend of flood situation based on the statistical analysis report;
[0012] S5. In response to the development trend of the flood situation, when the early warning and alarm conditions are met, a flood prevention alarm will be issued and corresponding flood prevention response measures will be taken.
[0013] In some embodiments, the flood data include: river water level, reservoir water level, dam seepage, dam seepage pressure, dam displacement and rainfall information.
[0014] In some embodiments, the S5 includes:
[0015] S51, setting a preset flood prevention threshold for the flood situation data;
[0016] S52: Determine whether the current flood situation data exceeds the preset flood control threshold, and take corresponding response measures according to the determination result.
[0017] In some embodiments, the S52 includes:
[0018] If the current flood situation data exceeds the preset flood control threshold, a flood control alarm is issued and corresponding flood control response measures are taken;
[0019] If the current flood situation data does not exceed the preset flood control threshold, data monitoring will continue.
[0020] In some embodiments, the flood prevention measures include:
[0021] a. Remotely control the corresponding flood control equipment to start operation;
[0022] b. Mobilize relevant staff to carry out flood prevention operations.
[0023] In a second aspect, the present application provides a water conservancy project flood control treatment system, comprising:
[0024] Setting module, used to set up multiple monitoring sites;
[0025] An automatic monitoring module, used to automatically monitor the real-time flood information through each of the monitoring stations to obtain flood data at different time points;
[0026] A statistical analysis module, used to count and analyze the flood data to form a statistical analysis report;
[0027] A prediction module, used to predict the development trend of flood situation according to the statistical analysis report;
[0028] The flood control processing module is used to issue flood control alarms and take corresponding flood control response measures according to the development trend of the flood situation when the early warning and alarm conditions are met.
[0029] In some embodiments, the flood prevention processing module includes:
[0030] A threshold preset module, used to set a preset flood prevention threshold for the flood situation data;
[0031] The judgment and processing module is used to judge whether the current flood data exceeds the preset flood control threshold and take corresponding response measures according to the judgment result.
[0032] In a third aspect, the present application provides a terminal device, including:
[0033] Memory for storing computer programs;
[0034] A processor is used to read the computer program in the memory and execute the method described.
[0035] In a fourth aspect, the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores computer-executable instructions, and the computer-executable instructions are used to implement the described method when executed by a processor.
[0036] The present application provides a method and system for flood control of water conservancy projects, the method comprising: S1, setting up multiple monitoring sites; S2, automatically monitoring real-time flood information through each of the monitoring sites, and obtaining flood data at different time points; S3, counting and analyzing the flood data to form a statistical analysis report; S4, predicting the development trend of the flood situation based on the statistical analysis report; S5, in response to the development trend of the flood situation, when the early warning and alarm conditions are met, issuing a flood control alarm and taking corresponding flood control response measures. The present application can timely and accurately obtain flood data at different time points by automatically monitoring the real-time flood information of different monitoring sites, and predict the development trend of the flood situation based on the acquired data, and timely take flood control response measures for the early warning and alarm information, thereby improving the effect of flood control treatment. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.
[0038] Figure 1 A flow chart of the flood control treatment method for a water conservancy project provided for this application.
[0039] The above drawings have shown clear embodiments of the present application, which will be described in more detail later. These drawings and text descriptions are not intended to limit the scope of the present application in any way, but to illustrate the concept of the present application to those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION
[0040] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] The terms used in the embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present invention. The singular forms "a", "an" and "the" used in the embodiments of the present application are also intended to include plural forms, unless the context clearly indicates other meanings.
[0042] It should be noted that when an element is referred to as being "fixed on" or "set on" another element, it can be directly on the other element or indirectly set on the other element; when an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0043] It should be understood that the terms "length", "width", "up", "down", "front", "back", "first", "second", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0044] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, "multiple" and "several" mean two or more, unless otherwise clearly and specifically defined.
[0045] It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the conditions under which this application can be implemented. Therefore, they have no substantive technical significance. Any structural modification, change in proportional relationship or adjustment of size should still fall within the scope of the technical content disclosed in this application without affecting the effects and purposes that can be achieved by this application.
[0046] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0047] As used herein, the words "if" and "if" may be interpreted as "at the time of" or "when" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrases "if it is determined" or "if (stated condition or event) is detected" may be interpreted as "when it is determined" or "in response to determining" or "when detecting (stated condition or event)" or "in response to detecting (stated condition or event)", depending on the context.
[0048] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a product or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such a product or system. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the product or system including the elements.
[0049] The technical solution of the present application and how the technical solution of the present application solves the above-mentioned technical problems are described in detail below with specific embodiments. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments. The embodiments of the present application will be described below in conjunction with the accompanying drawings.
[0050] Figure 1 The flow chart of the flood control method for water conservancy projects provided for this application is as follows: Figure 1 As shown, the present application provides a flood control treatment method for a water conservancy project, comprising:
[0051] S1. Set up multiple monitoring sites;
[0052] Specifically, in an embodiment of the present application, the monitoring station is located on a water tank built on a dam.
[0053] More specifically, in the embodiment of the present application, the monitoring site is provided with a data acquisition module for acquiring information such as water level and a wireless communication module for data transmission, and the data acquisition module is communicatively connected with the wireless communication module.
[0054] S2. Automatically monitor the real-time flood information through each monitoring station to obtain flood data at different time points;
[0055] Specifically, in the embodiment of the present application, the flood situation data is data that changes in real time.
[0056] S3, collecting and analyzing the flood data to form a statistical analysis report;
[0057] In some embodiments, the flood data include: river water level, reservoir water level, dam seepage, dam seepage pressure, dam displacement and rainfall information.
[0058] S4. Predicting the development trend of flood situation based on the statistical analysis report;
[0059] Specifically, in the embodiment of the present application, the S4 includes:
[0060] S41, establishing a preset prediction model;
[0061] S42, inputting the data in the statistical analysis report into the prediction model to obtain the predicted value of the flood data changing in a future time period, wherein the predicted value is used to predict the development trend of the flood situation.
[0062] S5. In response to the development trend of the flood situation, when the early warning and alarm conditions are met, a flood prevention alarm will be issued and corresponding flood prevention response measures will be taken.
[0063] In some embodiments, the S5 includes:
[0064] S51, setting a preset flood prevention threshold for the flood situation data;
[0065] S52: Determine whether the current flood situation data exceeds the preset flood control threshold, and take corresponding response measures according to the determination result.
[0066] In some embodiments, the S52 includes:
[0067] If the current flood situation data exceeds the preset flood control threshold, a flood control alarm is issued and corresponding flood control response measures are taken;
[0068] If the current flood situation data does not exceed the preset flood control threshold, data monitoring will continue.
[0069] In some embodiments, the flood prevention measures include:
[0070] a. Remotely control the corresponding flood control equipment to start operation;
[0071] b. Mobilize relevant staff to carry out flood prevention operations.
[0072] This application can automatically monitor the real-time flood information of different monitoring stations, obtain flood data at different time points in a timely and accurate manner, predict the development trend of the flood situation based on the acquired data, and take flood prevention response measures in time according to the early warning and alarm information to improve the effectiveness of flood prevention treatment.
[0073] The present application also provides a water conservancy project flood control treatment system, comprising:
[0074] Setting module, used to set up multiple monitoring sites;
[0075] An automatic monitoring module, used to automatically monitor the real-time flood information through each of the monitoring stations to obtain flood data at different time points;
[0076] A statistical analysis module, used to count and analyze the flood data to form a statistical analysis report;
[0077] A prediction module, used to predict the development trend of flood situation according to the statistical analysis report;
[0078] The flood control processing module is used to issue flood control alarms and take corresponding flood control response measures according to the development trend of the flood situation when the early warning and alarm conditions are met.
[0079] In some embodiments, the flood prevention processing module includes:
[0080] A threshold preset module, used to set a preset flood prevention threshold for the flood situation data;
[0081] The judgment and processing module is used to judge whether the current flood data exceeds the preset flood control threshold and take corresponding response measures according to the judgment result.
[0082] The present application also provides a terminal device, including:
[0083] Memory for storing computer programs;
[0084] A processor is used to read the computer program in the memory and execute the method described.
[0085] The present application also provides a computer-readable storage medium, wherein the computer-readable storage medium stores computer-executable instructions, and the computer-executable instructions are used to implement the method when executed by a processor.
[0086] It should be understood that, although the various steps in the flowcharts in the above-described embodiments are sequentially displayed according to the indications of the arrows, these steps are not necessarily executed sequentially in the order indicated by the arrows. Unless there is a clear description in this article, the execution of these steps is not strictly limited in order, and they can be executed in other orders. Moreover, at least a portion of the steps in the figure may include a plurality of sub-steps or a plurality of stages, and these sub-steps or stages are not necessarily executed at the same time, but can be executed at different times, and their execution order is not necessarily to be carried out sequentially, but can be executed in turn or alternately with other steps or at least a portion of the sub-steps or stages of other steps.
[0087] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing related hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link DRAM (SLDRAM), RAMbus direct RAM (RDRAM), direct RAMbus dynamic RAM (DRDRAM), and RAMbus dynamic RAM (RDRAM), etc.
[0088] Those skilled in the art will readily appreciate other embodiments of the present application after considering the specification and practicing the application disclosed herein. The present application is intended to cover any modification, use or adaptation of the present application, which follows the general principles of the present application and includes common knowledge or customary techniques in the art that are not disclosed in the present application. The specification and examples are intended to be exemplary only, and the true scope and spirit of the present application are indicated by the claims.
[0089] It should be understood that the present application is not limited to the precise structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present application is limited only by the appended claims.
Claims
1. A flood control treatment method for water conservancy projects, It is characterized in that include: S1. Set up multiple monitoring sites; S2. Automatically monitor the real-time flood information through each monitoring station to obtain flood data at different time points; S3, collecting and analyzing the flood data to form a statistical analysis report; S4. Predicting the development trend of flood situation based on the statistical analysis report; S5. In response to the development trend of the flood situation, when the early warning and alarm conditions are met, a flood prevention alarm will be issued and corresponding flood prevention response measures will be taken.
2. The flood control method for water conservancy projects according to claim 1, It is characterized in that The flood data include: river water level, reservoir water level, dam seepage, dam seepage pressure, dam displacement and rainfall information.
3. The flood control method for water conservancy projects according to claim 2, It is characterized in that The S5 comprises: S51, setting a preset flood prevention threshold for the flood situation data; S52: Determine whether the current flood situation data exceeds the preset flood control threshold, and take corresponding response measures according to the determination result.
4. The flood control method for water conservancy projects according to claim 3, It is characterized in that The S52 includes: If the current flood situation data exceeds the preset flood control threshold, a flood control alarm is issued and corresponding flood control response measures are taken; If the current flood situation data does not exceed the preset flood control threshold, data monitoring will continue.
5. The flood control method for water conservancy projects according to claim 4, It is characterized in that The flood prevention measures include: a. Remotely control the corresponding flood control equipment to start operation; b. Mobilize relevant staff to carry out flood prevention operations.
6. A flood control treatment system for water conservancy projects, It is characterized in that include: Setting module, used to set up multiple monitoring sites; An automatic monitoring module, used to automatically monitor the real-time flood information through each of the monitoring stations to obtain flood data at different time points; A statistical analysis module, used to count and analyze the flood data to form a statistical analysis report; A prediction module, used to predict the development trend of flood situation according to the statistical analysis report; The flood control processing module is used to issue flood control alarms and take corresponding flood control response measures according to the development trend of the flood situation when the early warning and alarm conditions are met.
7. The flood control treatment system for water conservancy projects according to claim 6, It is characterized in that The flood prevention processing module comprises: A threshold preset module, used to set a preset flood prevention threshold for the flood situation data; The judgment and processing module is used to judge whether the current flood data exceeds the preset flood control threshold and take corresponding response measures according to the judgment result.
8. A terminal device, It is characterized in that include: Memory for storing computer programs; A processor, configured to read the computer program in the memory and execute the method according to any one of claims 1 to 5.
9. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores computer-executable instructions, which are used to implement the method according to any one of claims 1 to 5 when executed by a processor.
Citation Information
Cited By
Wireless telemetering transmission system for multi-channel monitoring signal time sequence synchronous coding
CN122266146A