Thermal power generating unit supply guarantee capability evaluation method, system and equipment based on information entropy and medium
The information entropy method is used to evaluate the power supply guarantee capability of thermal power units, which solves the problem that existing technologies cannot effectively evaluate the power supply guarantee capability of units and improves the stability and reliability of power supply.
Patent Information
- Application Number
- CN202411057673.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-11-22
AI Technical Summary
Existing technologies have failed to effectively evaluate the power supply capacity of thermal power units, making it difficult to guarantee the reliability and stability of power supply during peak load periods.
Using an information entropy-based approach, a data matrix is constructed by collecting and calculating minute-level power generation output data of thermal power units, power plant coal inventory, rated capacity of units, and other indicators. The weight of each evaluation indicator is calculated using information entropy to comprehensively assess the unit's power supply capacity.
It provides effective evaluation indicators and rules for the power supply guarantee capacity of thermal power units, improves the accuracy of reliability assessment of units during peak load periods, and ensures the stability of power supply.
Smart Images

Figure CN119005790A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of power supply guarantee of thermal power units, and specifically relates to a method, system, equipment and medium for evaluating power supply guarantee capability of thermal power units based on information entropy. Background Art
[0002] Ensuring reliable power supply is related to national energy security, economic and social development, and people's well-being. With the rapid economic development, there is a large gap in power supply during the winter and summer, and the stable power supply faces severe challenges. Thermal power units, as the "ballast stone" of power supply, play a basic guarantee role in the process of peak supply guarantee. The evaluation of the peak supply guarantee capacity of thermal power units is an urgent problem to be solved.
[0003] The Chinese invention patent application with publication number CN114021975A obtains multiple key parameters of the boiler under the steady combustion state, determines the steady combustion performance of the boiler under the deep peak regulation state of the thermal power unit, and proposes an evaluation method for the steady combustion performance of the boiler under the deep peak regulation state of the thermal power unit; the Chinese invention patent with publication number CN113063599B classifies the safety sections of the important oil system of the steam turbine according to the degree of importance, and describes the method for testing the emergency start reliability test of the important oil system of the thermal power unit; the Chinese invention patent application with publication number CN107194604A describes the method of improving the accuracy of the reliability evaluation results of the thermal power unit from the secondary analysis method and the selective elimination method; the Chinese invention patent application with publication number CN116154867A establishes a dynamic piecewise linear climbing model to accurately simulate the climbing process of the unit, and proposes the economic optimal model of the real supply guarantee capacity of the thermal power unit. The above inventions propose corresponding evaluation methods for the reliability and optimal scheduling of thermal power units, but the evaluation of the supply guarantee capacity of the unit has not yet been involved. Summary of the invention
[0004] In view of the shortcomings of the existing methods, the present invention provides a method, system, equipment and medium for evaluating the power supply capability of a thermal power unit based on information entropy.
[0005] To achieve the above object, the present invention adopts the following technical solution:
[0006] A method for evaluating the power supply capability of a thermal power unit based on information entropy comprises the following steps:
[0007] Collect minute-level power output data of each thermal power unit in the region, daily coal inventory of the power plant, and rated capacity of each unit;
[0008] Based on the minute-level power generation output data of each thermal power unit in the region, the maximum output of each unit during the statistical period, and based on the maximum output of each unit and the rated capacity of each unit, the peak capacity of the computer unit is calculated;
[0009] Based on the daily coal inventory of the power plant, the coal inventory value at the end of the month and the target inventory value at the end of the month within the statistical period are calculated to calculate the target coal inventory completion rate of the power plant;
[0010] The daily coal inventory of the power plant on a certain day during the statistical period, the average coal consumption of the power plant in the previous 30 days, and the number of days of available coal storage of the power plant are calculated;
[0011] Based on the rated capacity of each unit, the unit output at peak time during the statistical period is calculated, and the peak average load rate of the computer unit is calculated;
[0012] The number of hours that the unit is in operation during the statistical period is used to calculate the available hours for guaranteed supply;
[0013] The power generation and installed capacity of thermal power units, the power generation and installed capacity of various types of power sources, and the power generation contribution rate of computer units during the statistical period;
[0014] Based on the peak capacity, power coal inventory target completion rate, available coal storage days, peak average load rate, available supply hours, and power generation contribution rate, the computer group's supply capacity evaluation results are calculated.
[0015] Preferably, the calculation method of the peak capacity of the unit is:
[0016]
[0017] Where D represents peak capability, Indicates output resistance rate, resistance capacity Q z =QP max , P max It indicates the maximum output of each unit during the statistical period, and Q indicates the rated capacity of the unit.
[0018] Preferably, the calculation method of the power plant coal inventory target completion rate is:
[0019]
[0020] Among them, l represents the power plant's coal inventory target completion rate, K represents the coal inventory value at the end of the statistical period, and M represents the inventory target value at the end of the statistical period.
[0021] Preferably, the method for calculating the number of days of available coal storage in the power plant is:
[0022]
[0023] Among them, T represents the number of days of available coal storage in the power plant, U represents the daily coal inventory of the power plant on a certain day during the statistical period, and W represents the average coal consumption of the power plant in the previous 30 days.
[0024] Preferably, the calculation method of the peak average load rate of the unit is:
[0025]
[0026] in, Indicates the peak average load rate of the unit, represents the load rate during a peak period, where It represents the average output during the peak period, and N represents the number of peak moments in the statistical period.
[0027] Preferably, the calculation method of the power generation contribution rate of the unit is:
[0028]
[0029] Among them, λ represents the contribution rate of unit power generation, W represents the power generation of thermal power units during the statistical period, and W a Indicates the power generation of various types of power sources in the area where the unit is located during the statistical period.
[0030] Preferably, based on the peak capacity, coal inventory target completion rate, available coal storage days, peak average load rate, available supply hours, and power generation contribution rate, the supply capacity evaluation results of the computer group include:
[0031] 1) Calculate the peak capacity, inventory target completion rate, available coal storage days, peak average load rate, available supply hours, and power generation contribution rate of m units on a certain day, a total of 6 indicators, and obtain a data matrix X with m rows and 6 columns;
[0032] 2) Calculate the weight of each value in each column of matrix X to obtain the normalized decision matrix R:
[0033] R = {r ij},in z ij Represents each element in the matrix Z, i = 1, 2, ..., m; j = 1, 2, ..., 6;
[0034] 3) Using the definition of information entropy, calculate the information entropy H of the jth evaluation index j :
[0035]
[0036] 4) Calculate the deviation d j :
[0037] d j =1-H j ;
[0038] 5) Calculate the weight α of each evaluation index j :
[0039]
[0040] The objective weight of each evaluation index is obtained as α = {α j};
[0041] 7) Evaluation result of computer group's supply guarantee capability Z:
[0042] Z=Rα T .
[0043] A thermal power unit supply guarantee capability evaluation system based on information entropy, comprising:
[0044] The data collection module is used to collect the minute-level power output data of each thermal power unit in the area, the daily coal inventory of the power plant, and the rated capacity of each unit;
[0045] A peak capacity calculation module, for calculating the peak capacity of each unit based on the minute-level power generation output data of each thermal power unit in the region, the maximum output of each unit within the statistical period, and the maximum output of each unit and the rated capacity of each unit;
[0046] An inventory target completion rate calculation module is used to calculate the power plant's coal inventory target completion rate based on the power plant's daily coal inventory, the month-end coal inventory value within the statistical period, and the month-end inventory target value;
[0047] The available coal storage days calculation module is used to calculate the coal inventory of a power plant on a certain day within a statistical period, the average coal consumption of the power plant in the previous 30 days, and the available coal storage days of the power plant;
[0048] A peak average load rate calculation module is used to calculate the peak average load rate of each unit based on the rated capacity of each unit and the output of the unit at the peak time during the statistical period;
[0049] The module for calculating the available hours for guaranteed supply is used to calculate the available hours for guaranteed supply during the statistical period.
[0050] The power generation contribution rate calculation module is used to calculate the power generation and installed capacity of thermal power units, the power generation and installed capacity of various types of power sources within the statistical period, and the power generation contribution rate of the computer unit;
[0051] The supply guarantee capability evaluation module is used to calculate the supply guarantee capability evaluation result of the computer group based on the peak capacity, power coal inventory target completion rate, available coal storage days, peak average load rate, available supply hours, and power generation contribution rate.
[0052] An electronic device comprises a processor and a memory, wherein the processor is used to execute a computer program stored in the memory to implement the evaluation method.
[0053] A computer-readable storage medium stores computer-executable instructions, wherein the computer-executable instructions are used to enable a computer to execute the evaluation method.
[0054] The positive beneficial effects of the present invention are:
[0055] The present invention proposes six supply guarantee indicators, namely peak capacity, power coal inventory target completion rate, available coal storage days, peak average load rate, available supply hours, and power generation contribution rate, and gives specific calculation methods. It also proposes a supply guarantee capacity evaluation method for thermal power units based on information entropy, provides effective evaluation indicators and rules for power supply guarantee of thermal power units, and verifies the effectiveness of the indicators and evaluation methods of the present invention through data. BRIEF DESCRIPTION OF THE DRAWINGS
[0056] Figure 1 It is a flowchart of a method for evaluating the power supply guarantee capability of a thermal power unit based on information entropy according to the present invention;
[0057] Figure 2 This is a diagram showing the evaluation results of the power supply capability of each unit of the present invention. DETAILED DESCRIPTION
[0058] The present invention is further described below in conjunction with some specific embodiments.
[0059] Example 1
[0060] See also Figure 1 , a method for evaluating the power supply capability of thermal power units based on information entropy, comprising the following steps:
[0061] Step 1: Collect the minute-level power output data of each thermal power unit in the region, the daily coal inventory of the power plant, and the rated capacity of each unit;
[0062] Step 2: Based on the minute-level power output data of each thermal power unit in the region, the maximum output of each unit during the statistical period is calculated. Based on the maximum output of each unit and the rated capacity of each unit, the peak capacity of the unit is:
[0063]
[0064] Where D represents peak capability, Indicates output resistance rate, resistance capacity Q z =QP max , P max It indicates the maximum output of each unit during the statistical period, and Q indicates the rated capacity of the unit;
[0065] Step 3: Based on the daily coal inventory of the power plant, the coal inventory value at the end of the statistical period and the target inventory value at the end of the month, the calculation method for the target coal inventory completion rate of the power plant is:
[0066]
[0067] Among them, l represents the target completion rate of power plant coal inventory, K represents the coal inventory value at the end of the statistical period, and M represents the target inventory value at the end of the statistical period. If a power plant has multiple units, the target completion rate of coal inventory for each unit is the target completion rate of the power plant inventory.
[0068] Step 4: Calculate the coal inventory of the power plant on a certain day during the statistical period and the average coal consumption of the power plant in the previous 30 days. The calculation method for the number of days of coal storage available in the power plant is:
[0069]
[0070] Among them, T represents the number of days of available coal storage in the power plant, U represents the daily coal inventory of the power plant on a certain day during the statistical period, and W represents the average coal consumption of the power plant in the previous 30 days. If a power plant has multiple units, the number of days of available coal storage for each unit is the number of days of available coal storage for the power plant.
[0071] Step 5: Based on the rated capacity of each unit, the unit output at peak time during the statistical period, the calculation method of the unit peak average load rate is:
[0072]
[0073] in, Indicates the peak average load rate of the unit, represents the load rate during a peak period, where represents the average output during peak hours, and N represents the number of peak moments in the statistical period;
[0074] Step 6: Count the number of hours that the unit is in operation during the statistical period. The duration that the unit output is not zero is the available hours for guaranteed supply.
[0075] Step 7: Calculate the power generation and installed capacity of thermal power units in the specified area, the power generation and installed capacity of various types of power sources, and the power generation contribution rate of the units as follows:
[0076]
[0077] Among them, λ represents the contribution rate of unit power generation, W represents the power generation of thermal power units during the statistical period, and W a Indicates the power generation of various types of power sources in the area where the unit is located during the statistical period;
[0078] Step 8, based on the peak capacity, coal inventory target completion rate, available coal storage days, peak average load rate, available supply hours, and power generation contribution rate, the computer group's supply capacity evaluation results are as follows:
[0079] 1) Calculate the peak capacity, inventory target completion rate, available coal storage days, peak average load rate, available supply hours, and power generation contribution rate of 20 units on a certain day, a total of 6 indicators, and obtain the calculation results of each indicator of the unit supply capacity, as shown in Table 1, that is, a data matrix X with 20 rows and 6 columns;
[0080] 2) Calculate the weight of each value in each column of the data matrix X to obtain the normalized decision matrix R:
[0081] R = {r ij},in, z ij represents each element in the data matrix X, i = 1, 2, ..., 20; j = 1, 2, ..., 6, as shown in Table 2;
[0082] 3) Using the definition of information entropy, calculate the information entropy H of the jth evaluation index j :
[0083]
[0084] 4) Calculate the deviation d j :
[0085] d j =1-H j , the calculation results are shown in Table 3;
[0086] 5) Calculate the weight α of each evaluation index j :
[0087] The objective weight of each evaluation index is obtained as α = {αj } , the calculation results are shown in Table 3;
[0088] Table 1 Calculation results of various indicators of unit supply guarantee capability
[0089]
[0090]
[0091] Table 2 Results of the decision matrix for the six performance indicators of the unit
[0092] unit Peak Capacity Inventory target completion rate Available coal storage days Peak average load factor Guaranteed availability hours Power generation contribution rate Unit 1 1.00 0.62 0.22 0.57 0.63 0.84 Unit 2 0.98 0.71 0.39 0.67 0.61 0.90 Unit 3 0.97 0.73 0.26 0.46 0.63 0.69 Unit 4 0.93 0.72 0.91 0.68 0.65 0.67 Unit 5 0.92 0.88 0.91 0.02 0.07 0.80 Unit 6 0.87 0.56 0.17 0.92 0.51 0.76 Unit 7 0.83 0.05 0.96 0.40 0.88 0.49 Unit 8 0.83 0.64 0.17 0.86 0.76 0.22 Unit 9 0.82 1.00 0.78 0.94 0.61 0.69 Unit 10 0.75 0.94 0.65 0.86 0.91 0.20 Unit 11 0.72 0.14 0.78 0.75 0.88 0.67 Unit 12 0.71 0.95 0.91 0.88 0.50 0.76 Unit 13 0.70 0.83 0.30 0.98 0.60 1.00 Unit 14 0.60 0.84 0.78 0.99 0.34 0.43 Unit 15 0.57 0.99 0.83 0.70 0.84 0.39 Unit 16 0.50 0.74 1.00 0.15 0.59 0.98 Unit 17 0.47 0.89 0.74 0.80 0.32 0.53 Unit 18 0.43 0.24 1.00 1.00 0.56 0.80 Unit 19 0.20 0.86 0.96 0.59 0.87 0.96 Unit 20 0.15 0.75 1.00 0.35 0.95 0.35
[0093] Table 3 Deviation and weight of each indicator
[0094] index Peak Capacity Inventory target completion rate Available coal storage days Peak average load factor Guaranteed availability hours Power generation contribution rate Deviation 0.05 0.05 0.05 0.04 0.05 0.03 Weight 0.20 0.18 0.18 0.15 0.18 0.11
[0095] 6) Evaluation results of the computer group's supply guarantee capability, i.e., Z = Rα T The calculation results are as follows Figure 2 As shown;
[0096] from Figure 2 It can be seen that the supply guarantee capability of unit 9 is the largest, while the supply guarantee capability of unit 8 is the smallest. This is because the six performance indicators of unit 9 are relatively prominent, while the corresponding unit 8 is relatively weak in the target completion rate of power coal inventory, available storage days and power generation contribution rate, resulting in the highest comprehensive score for unit 9 and the lowest comprehensive score for unit 8, which proves the effectiveness of the supply guarantee capability evaluation method of the present invention.
[0097] Example 2
[0098] A thermal power unit supply guarantee capability evaluation system based on information entropy, comprising:
[0099] The data collection module is used to collect the minute-level power output data of each thermal power unit in the area, the daily coal inventory of the power plant, and the rated capacity of each unit;
[0100] The peak capacity calculation module is used to calculate the peak capacity of each unit based on the minute-level power generation output data of each thermal power unit in the region, the maximum output of each unit within the statistical period, and the maximum output of each unit and the rated capacity of each unit;
[0101] The inventory target completion rate calculation module is used to calculate the power plant's coal inventory target completion rate based on the power plant's daily coal inventory, the month-end coal inventory value within the statistical period, and the month-end inventory target value;
[0102] The available coal storage days calculation module is used to calculate the coal inventory of a power plant on a certain day within a statistical period, the average coal consumption of the power plant in the previous 30 days, and the available coal storage days of the power plant;
[0103] The peak average load rate calculation module is used to calculate the peak average load rate of each unit based on the rated capacity of each unit and the unit output at the peak time within the statistical period;
[0104] The module for calculating the available hours for guaranteed supply is used to calculate the available hours for guaranteed supply during the statistical period.
[0105] The power generation contribution rate calculation module is used to calculate the power generation and installed capacity of thermal power units in a specified area within a statistical period, the power generation and installed capacity of various types of power sources, and the power generation contribution rate of the computer unit;
[0106] The supply guarantee capability evaluation module is used to calculate the supply guarantee capability evaluation result of the computer group based on the peak capacity, the completion rate of the power coal inventory target, the available coal storage days, the peak average load rate, the available supply hours, and the power generation contribution rate.
[0107] An electronic device comprises a processor and a memory, wherein the processor is used to execute a computer program stored in the memory to implement the evaluation method.
[0108] The processor and the memory may be connected via a bus or other means.
[0109] The memory, as a non-transient computer-readable storage medium, can be used to store non-transient software programs and non-transient computer executable programs. In addition, the memory may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some embodiments, the memory may optionally include a memory remotely disposed relative to the processor, and these remote memories may be connected to the processor via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0110] It should be noted that the power system transient stability assessment system in this embodiment may include a business processing module, an edge database, a server version information register, and a data synchronization module, and the processor implements the above-mentioned assessment method when executing the computer program.
[0111] The device embodiments described above are merely illustrative, and the units described as separate components may or may not be physically separated, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0112] A computer-readable storage medium stores computer-executable instructions, wherein the computer-executable instructions are used to enable a computer to execute the evaluation method.
[0113] It will be appreciated by those skilled in the art that all or some of the steps and systems in the disclosed method above may be implemented as software, firmware, hardware and appropriate combinations thereof. Some physical components or all physical components may be implemented as software executed by a processor, such as a central processing unit, a digital signal processor or a microprocessor, or may be implemented as hardware, or may be implemented as an integrated circuit, such as an application specific integrated circuit. Such software may be distributed on a computer-readable medium, which may include a computer storage medium (or a non-transitory medium) and a communication medium (or a temporary medium). As known to those skilled in the art, the term computer storage medium includes volatile and non-volatile, removable and non-removable media implemented in any method or technology for storing information (such as computer-readable instructions, data structures, program modules or other data). Computer storage media include, but are not limited to, RAM, ROM, EEPROM, flash memory or other memory technologies, CD-ROM, digital versatile disks (DVD) or other optical disk storage, magnetic cassettes, magnetic tapes, disk storage or other magnetic storage devices, or any other medium that may be used to store desired information and may be accessed by a computer. Furthermore, it is well known to those skilled in the art that communication media typically embodies computer readable instructions, data structures, program modules, or other data in a modulated data signal such as a carrier wave or other transport mechanism, and may include any information delivery media.
[0114] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Other modifications or equivalent substitutions made to the technical solution of the present invention by ordinary technicians in the field should be included in the scope of the claims of the present invention as long as they do not depart from the spirit and scope of the technical solution of the present invention.
Claims
1. A method for evaluating the supply guarantee capability of thermal power units based on information entropy, characterized in that: The steps include: Collect minute-level power output data of each thermal power unit in the region, daily coal inventory of the power plant, and rated capacity of each unit; Based on the minute-level power generation output data of each thermal power unit, the maximum output of each unit within the statistical period is calculated, and based on the maximum output of each unit and the rated capacity of each unit, the peak capacity of the computer unit is calculated; Based on the daily coal inventory of the power plant, the coal inventory value at the end of the month and the target inventory value at the end of the month within the statistical period are calculated to calculate the target coal inventory completion rate of the power plant; The daily coal inventory of the power plant on a certain day during the statistical period, the average coal consumption of the power plant in the previous 30 days, and the number of days of available coal storage of the power plant are calculated; Based on the rated capacity of each unit, the unit output at peak time during the statistical period is calculated, and the peak average load rate of the computer unit is calculated; The number of hours that the unit is in operation during the statistical period is used to calculate the available hours for guaranteed supply; The power generation and installed capacity of the units, the power generation and installed capacity of various types of power sources during the statistical period, and the power generation contribution rate of the computer units; Based on the peak capacity, power coal inventory target completion rate, available coal storage days, peak average load rate, available supply hours, and power generation contribution rate, the computer group's supply capacity evaluation results are calculated.
2. The method for evaluating the supply guarantee capability of thermal power units based on information entropy according to claim 1 is characterized in that: The calculation method of the peak capacity of the unit is: Where D represents peak capability, Indicates output resistance rate, resistance capacity Q z =QP max , P max It indicates the maximum output of each unit during the statistical period, and Q indicates the rated capacity of the unit.
3. The method for evaluating the supply guarantee capability of thermal power units based on information entropy according to claim 2 is characterized in that: The calculation method of the power plant coal inventory target completion rate is as follows: Among them, l represents the power plant's coal inventory target completion rate, K represents the coal inventory value at the end of the statistical period, and M represents the inventory target value at the end of the statistical period.
4. The method for evaluating the supply guarantee capability of thermal power units based on information entropy according to claim 3 is characterized in that: The calculation method of the available coal storage days of the power plant is as follows: Among them, T represents the number of days of available coal storage in the power plant, U represents the daily coal inventory of the power plant on a certain day during the statistical period, and W represents the average coal consumption of the power plant in the previous 30 days.
5. The method for evaluating the supply guarantee capability of thermal power units based on information entropy according to claim 4 is characterized in that: The calculation method of the peak average load rate of the unit is: in, Indicates the peak average load rate of the unit, represents the load rate during a peak period, where It represents the average output during the peak period, and N represents the number of peak moments in the statistical period.
6. The method for evaluating the supply guarantee capability of thermal power units based on information entropy according to claim 5 is characterized in that: The calculation method of the power generation contribution rate of the unit is: Among them, λ represents the contribution rate of unit power generation, W represents the power generation of thermal power units during the statistical period, and W a Indicates the power generation of various types of power sources in the area where the unit is located during the statistical period.
7. The method for evaluating the supply guarantee capability of thermal power units based on information entropy according to claim 6 is characterized in that: The evaluation results of the power supply capacity of the computer group based on the peak capacity, the completion rate of the power coal inventory target, the number of days of available coal storage, the peak average load rate, the available hours for power supply, and the power generation contribution rate include: 1) Calculate the peak capacity, inventory target completion rate, available coal storage days, peak average load rate, available supply hours, and power generation contribution rate of m units on a certain day, a total of 6 indicators, and obtain a data matrix X with m rows and 6 columns; 2) Calculate the weight of each value in each column of matrix X to obtain the normalized decision matrix R: R = {r ij },in z ij represents each element in the matrix X, i = 1, 2, ..., m; j = 1, 2, ..., 6; 3) Using the definition of information entropy, calculate the information entropy H of the jth evaluation index j : 4) Calculate the deviation d j : d j =1-H j ; 5) Calculate the weight α of each evaluation index j : The objective weight of each evaluation index is obtained as α = {α j }; 6) Evaluation result of computer group's supply guarantee capability Z: Z=Rα T 。 8. A thermal power unit supply guarantee capability evaluation system based on information entropy, characterized in that: include: The data collection module is used to collect the minute-level power output data of each thermal power unit in the area, the daily coal inventory of the power plant, and the rated capacity of each unit; A peak capacity calculation module, for calculating the peak capacity of each unit based on the minute-level power generation output data of each thermal power unit, the maximum output of each unit within a statistical period, the maximum output of each unit and the rated capacity of each unit; An inventory target completion rate calculation module is used to calculate the power plant's electricity coal inventory target completion rate based on the power plant's daily electricity coal inventory, the month-end electricity coal inventory value within the statistical period, and the month-end inventory target value; The available coal storage days calculation module is used to calculate the coal inventory of a power plant on a certain day within a statistical period, the average coal consumption of the power plant in the previous 30 days, and the available coal storage days of the power plant; A peak average load rate calculation module is used to calculate the peak average load rate of the units during the peak time of the statistical cycle based on the rated capacity of each unit. The module for calculating the available hours for guaranteed supply is used to calculate the available hours for guaranteed supply during the statistical period. The power generation contribution rate calculation module is used to calculate the power generation and installed capacity of thermal power units, the power generation and installed capacity of various types of power sources within the statistical period, and the power generation contribution rate of the computer unit; The supply guarantee capability evaluation module is used to calculate the supply guarantee capability evaluation result of the computer group based on the peak capacity, power coal inventory target completion rate, available coal storage days, peak average load rate, available supply hours, and power generation contribution rate.
9. An electronic device, comprising a processor and a memory, characterized in that: The processor is used to execute the computer program stored in the memory to implement the evaluation method according to any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer-executable instructions, and the computer-executable instructions are used to enable a computer to execute the evaluation method according to any one of claims 1 to 7.