Loading control method for pebble-bed modular high-temperature gas cooled reactor

Through logic control and real-time monitoring, the automatic blocking of the ball bed modular high-temperature gas-cooled reactor pipeline solves the risk of negative pressure rate protection caused by improper operation during the loading process, ensuring the safety of the loading process and the reactor inside the loading process Stability of helium.

CN119008056APending Publication Date: 2024-11-22HUANENG SHANDONG SHIDAOBAY NUCLEAR POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411122507.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The ball bed modular high-temperature air-cooled stack is likely to lead to the risk of negative rate of change protection of the first circuit pressure during the loading process due to improper operation, especially due to the series of helium and air atmosphere or the leakage of high-pressure helium.

Method used

Logically control the opening and locking status of multiple pipelines of the ball bed modular high-temperature air-cooled stack, monitor the pressure difference and atmosphere type in real time, and automatically lock the relevant pipelines to prevent helium leakage and series of gas. Pressure monitoring and valve status are used The monitoring and atmosphere detection device cooperates with the control module to achieve safe loading.

Benefits of technology

It effectively prevents the negative pressure rate protection caused by improper operation of the charging temporary storage device, ensures the safety of helium in the reactor, prevents helium leakage and gas series, and improves the safety and reliability of the charging process. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119008056A_ABST
    Figure CN119008056A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of nuclear power operation protection, in particular to a pebble bed module type high-temperature gas cooled reactor charging control method which comprises the steps that when a first feeding pipeline is opened and a first charging device fills a first charging temporary storage device, and / or when a second feeding pipeline is opened and a second charging device fills a second charging temporary storage device, the first charging device and the second charging device are opened; locking the first charging pipeline and the second charging pipeline; when the first charging pipeline is opened and the first charging temporary storage device charges the first reactor or the second reactor, and / or when the second charging pipeline is opened and the second charging temporary storage device charges the first reactor or the second reactor, the first feeding pipeline and the second feeding pipeline are locked. By logically controlling the opening and closing states of a plurality of pipelines in the charging process of the pebble-bed modular high-temperature gas cooled reactor, the situation that primary loop pressure negative change rate protection is triggered due to misoperation of a charging temporary storage device is prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of nuclear power operation protection, and in particular to a method for controlling loading of a pebble bed modular high temperature gas-cooled reactor. Background Art

[0002] The pebble bed modular high temperature gas-cooled reactor nuclear power plant (HTR-PM) adopts a modular design and consists of two reactor units, including two temporary loading storage devices. The external loading device is connected to the two temporary loading storage devices through a primary loading pipeline, and the two temporary loading storage devices are connected to the two reactor units through secondary loading pipelines. The secondary loading pipeline has interfaces with the fuel loading and unloading systems of the two reactors. Since the reactor unit is filled with helium atmosphere and the external environment is air atmosphere, there is a risk of gas cross-talk between the two reactors or leakage of high-pressure helium due to improper operation during the loading process, thereby triggering the negative rate of change protection of the primary circuit pressure. Summary of the invention

[0003] Therefore, the technical problem to be solved by the present invention is to overcome the defect of the prior art that the negative rate of change protection of the pressure in a circuit is triggered due to improper operation of the charging temporary storage device during the charging process of the pebble bed modular high temperature gas-cooled reactor, thereby providing a charging control method for the pebble bed modular high temperature gas-cooled reactor.

[0004] In order to solve the above technical problems, the present invention provides a charging control method for a pebble bed modular high temperature gas-cooled reactor, the pebble bed modular high temperature gas-cooled reactor comprising a first charging device, a second charging device, a first charging temporary storage device, a second charging temporary storage device, a first reactor and a second reactor, a first feeding pipeline is connected between the first charging device and the first charging temporary storage device, a second feeding pipeline is connected between the second charging device and the second charging temporary storage device, the first charging temporary storage device is respectively connected with the first reactor and the second reactor through the first charging pipeline, and the second charging temporary storage device is respectively connected with the first reactor and the second reactor through the second charging pipeline;

[0005] Control methods include:

[0006] When the first feeding pipeline is opened and the first charging device is filling the first charging temporary storage device, and / or when the second feeding pipeline is opened and the second charging device is filling the second charging temporary storage device, the first charging pipeline and the second charging pipeline are locked;

[0007] When the first charging pipeline is opened and the first charging temporary storage device charges the first reactor or the second reactor, and / or when the second charging pipeline is opened and the second charging temporary storage device charges the first reactor or the second reactor, the first feeding pipeline and the second feeding pipeline are locked.

[0008] Optionally, when the first charging pipeline between the first charging temporary storage device and the first reactor is opened, the first charging pipeline between the first charging temporary storage device and the second reactor is locked;

[0009] When the first charging pipeline between the first charging temporary storage device and the second reactor is opened, the first charging pipeline between the first charging temporary storage device and the first reactor is locked.

[0010] Optionally, when the second charging pipeline between the second charging temporary storage device and the first reactor is opened, the second charging pipeline between the second charging temporary storage device and the second reactor is locked;

[0011] When the second charging pipeline between the second charging temporary storage device and the second reactor is opened, the second charging pipeline between the second charging temporary storage device and the first reactor is locked.

[0012] Optionally, when the first charging pipeline between the first charging temporary storage device and the first reactor is opened, the pressure difference between the first charging temporary storage device and the first reactor is monitored in real time, and when the pressure difference is greater than a preset threshold, the first charging pipeline between the first charging temporary storage device and the first reactor is closed.

[0013] Optionally, when the first loading pipeline between the first loading temporary storage device and the second reactor is opened, the pressure difference between the first loading temporary storage device and the second reactor is monitored in real time, and when the pressure difference is greater than a preset threshold, the first loading pipeline between the first loading temporary storage device and the second reactor is closed.

[0014] Optionally, when the second charging pipeline between the second charging temporary storage device and the first reactor is opened, the pressure difference between the second charging temporary storage device and the first reactor is monitored in real time, and when the pressure difference is greater than a preset threshold, the second charging pipeline between the second charging temporary storage device and the first reactor is closed.

[0015] Optionally, when the second charging pipeline between the second charging temporary storage device and the second reactor is opened, the pressure difference between the second charging temporary storage device and the second reactor is monitored in real time, and when the pressure difference is greater than a preset threshold, the second charging pipeline between the second charging temporary storage device and the second reactor is closed.

[0016] Optionally, the gas atmosphere in the first charging temporary storage device is monitored in real time. If it is a helium atmosphere, the first feeding pipeline is prohibited from opening; if it is an air atmosphere, the first charging pipeline is prohibited from opening.

[0017] Optionally, the gas atmosphere in the second charging temporary storage device is monitored in real time. If it is a helium atmosphere, the second feeding pipeline is prohibited from opening; if it is an air atmosphere, the second charging pipeline is prohibited from opening.

[0018] Optionally, a pair of control valves are installed on the first feeding pipeline, the second feeding pipeline, the first charging pipeline and the second charging pipeline.

[0019] The technical solution of the present invention has the following advantages:

[0020] 1. The present invention provides a pebble bed modular high-temperature gas-cooled reactor charging control method. When the first feeding pipeline is opened and the first charging device is loading into the first charging temporary storage device, and / or when the second feeding pipeline is opened and the second charging device is loading into the second charging temporary storage device, the first charging pipeline and the second charging pipeline are locked; when the first charging pipeline is opened and the first charging temporary storage device is loading into the first reactor or the second reactor, and / or when the second charging pipeline is opened and the second charging temporary storage device is loading into the first reactor or the second reactor, the first feeding pipeline and the second feeding pipeline are locked.

[0021] When the first feeding pipeline or the second feeding pipeline is opened, the first charging temporary storage device or the second charging temporary storage device will lock its respective connection with the first reactor and the second reactor during the primary charging process to prevent helium leakage in the first reactor or the second reactor. When the first charging pipeline or the second charging pipeline is opened, the first charging temporary storage device or the second charging temporary storage device will lock the first feeding pipeline and the second feeding pipeline of the primary charging during the secondary charging process to prevent helium leakage in the first reactor or the second reactor through the first charging temporary storage device or the second charging temporary storage device. The opening and closing states of multiple pipelines of the pebble bed modular high temperature gas-cooled reactor during the charging process are controlled by logic to prevent the triggering of the negative rate of change protection of the primary pressure due to improper operation of the charging temporary storage device.

[0022] 2. The present invention provides a method for controlling loading of a pebble bed modular high-temperature gas-cooled reactor. During the secondary loading process, when loading one reactor, the first loading temporary storage device or the second loading temporary storage device blocks the loading pipeline connecting it with the other reactor to prevent gas cross-talk between the two reactors. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0024] Figure 1 It is a schematic structural diagram of a pebble bed modular high temperature gas-cooled reactor provided in an embodiment of the present invention.

[0025] Explanation of the accompanying drawings: 1. First charging device; 2. Second charging device; 3. First charging temporary storage device; 4. Second charging temporary storage device; 5. First reactor; 6. Second reactor; 7. First feeding pipeline; 8. Second feeding pipeline; 9. First charging pipeline; 10. Second charging pipeline; 11. Control valve. DETAILED DESCRIPTION

[0026] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0027] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0028] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0029] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0030] Example

[0031] This embodiment provides a method for controlling the loading of a pebble bed modular high temperature gas-cooled reactor. Figure 1As shown, the pebble bed modular high temperature gas-cooled reactor comprises a first charging device 1, a second charging device 2, a first charging temporary storage device 3, a second charging temporary storage device 4, a first reactor 5 and a second reactor 6. A first feeding pipeline 7 is connected between the first charging device 1 and the first charging temporary storage device 3, a second feeding pipeline 8 is connected between the second charging device 2 and the second charging temporary storage device 4, the first charging temporary storage device is connected to the first reactor and the second reactor respectively through the first charging pipeline, and the second charging temporary storage device is connected to the first reactor and the second reactor respectively through the second charging pipeline. A pair of control valves 11 are installed on the first feeding pipeline 7, the second feeding pipeline 8, the first charging pipeline 9 and the second charging pipeline 10. In order to realize automatic control and make the control logic provided in the pebble bed modular high temperature gas-cooled reactor charging control method run automatically, the pebble bed modular high temperature gas-cooled reactor also includes a pressure monitoring device, a valve state monitoring device, an atmosphere detection device and a control module, wherein the pressure monitoring device is used to monitor the internal air pressure of the first charging temporary storage device 3, the second charging temporary storage device 4, the first reactor 5 and the second reactor 6 in real time. The valve state monitoring device is used to monitor the open or closed state of multiple control valves 11 in real time. The atmosphere detection device is used to monitor the internal gas atmosphere of the first charging temporary storage device 3 and the second charging temporary storage device 4 in real time. The control module is used to control the operation of the valve 11 according to the preset safety logic in the pebble bed modular high temperature gas-cooled reactor charging control method provided in this embodiment.

[0032] The charging control method of the pebble bed modular high temperature gas-cooled reactor includes:

[0033] When the first feeding pipeline 7 is opened and the first charging device 1 is feeding the first charging temporary storage device 3, and when the second feeding pipeline 8 is opened and the second charging device 2 is feeding the second charging temporary storage device 4, the first charging pipeline 9 and the second charging pipeline 10 are locked. When the first charging pipeline 9 is opened and the first charging temporary storage device 3 is feeding the first reactor 5 or the second reactor 6, and when the second charging pipeline 10 is opened and the second charging temporary storage device 4 is feeding the first reactor 5 or the second reactor 6, the first feeding pipeline 7 and the second feeding pipeline 8 are locked.

[0034] Specifically, when the first charging pipeline 9 between the first charging temporary storage device 3 and the first reactor 5 is opened, the first charging pipeline 9 between the first charging temporary storage device 3 and the second reactor 6 is locked; when the first charging pipeline 9 between the first charging temporary storage device 3 and the second reactor 6 is opened, the first charging pipeline 9 between the first charging temporary storage device 3 and the first reactor 5 is locked. When the second charging pipeline 10 between the second charging temporary storage device 4 and the first reactor 5 is opened, the second charging pipeline 10 between the second charging temporary storage device 4 and the second reactor 6 is locked; when the second charging pipeline 10 between the second charging temporary storage device 4 and the second reactor 6 is opened, the second charging pipeline 10 between the second charging temporary storage device 4 and the first reactor 5 is locked.

[0035] When the first charging pipeline 9 between the first charging temporary storage device 3 and the first reactor 5 is opened, the pressure difference between the first charging temporary storage device 3 and the first reactor 5 is monitored in real time. When the pressure difference is greater than a preset threshold, the first charging pipeline 9 between the first charging temporary storage device 3 and the first reactor 5 is closed. When the first charging pipeline 9 between the first charging temporary storage device 3 and the second reactor 6 is opened, the pressure difference between the first charging temporary storage device 3 and the second reactor 6 is monitored in real time. When the pressure difference is greater than a preset threshold, the first charging pipeline 9 between the first charging temporary storage device 3 and the second reactor 6 is closed. When the second charging pipeline 10 between the second charging temporary storage device 4 and the first reactor 5 is opened, the pressure difference between the second charging temporary storage device 4 and the first reactor 5 is monitored in real time. When the pressure difference is greater than a preset threshold, the second charging pipeline 10 between the second charging temporary storage device 4 and the first reactor 5 is closed. When the second charging pipeline 10 between the second charging temporary storage device 4 and the second reactor 6 is opened, the pressure difference between the second charging temporary storage device 4 and the second reactor 6 is monitored in real time. When the pressure difference is greater than a preset threshold, the second charging pipeline 10 between the second charging temporary storage device 4 and the second reactor 6 is closed. In this embodiment, the preset threshold is 0.3MPa. The pressure monitoring device monitors the pressure of the two charging temporary storage devices and the pressure of the two reactors in real time, and sends the pressure difference between the two to the control module; when the difference is greater than 0.3MPa, the control module automatically locks the charging pipeline in the open state to avoid the charging process triggering the primary circuit pressure negative change rate protection.

[0036] Monitor the gas atmosphere in the first charging temporary storage device 3 in real time. If it is a helium atmosphere, the first feeding pipeline 7 is prohibited from opening; if it is an air atmosphere, the first charging pipeline 9 is prohibited from opening. Monitor the gas atmosphere in the second charging temporary storage device 4 in real time. If it is a helium atmosphere, the second feeding pipeline 8 is prohibited from opening; if it is an air atmosphere, the second charging pipeline 10 is prohibited from opening. When the atmosphere detection device detects that there is a helium atmosphere in a charging temporary storage device and the device is likely to be connected to the outside world, the control module automatically locks the corresponding feeding pipeline to prevent the negative change rate protection of the first circuit pressure from being triggered due to helium leakage. When the atmosphere detection device detects that there is an air atmosphere in a charging temporary storage device and the device is likely to be connected to the reactor, the control module automatically locks the corresponding charging pipeline to prevent helium gas leakage in the reactor.

[0037] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.

Claims

1. A method for controlling loading of a pebble bed modular high temperature gas-cooled reactor, characterized in that: The pebble bed modular high temperature gas-cooled reactor comprises a first charging device (1), a second charging device (2), a first charging temporary storage device (3), a second charging temporary storage device (4), a first reactor (5) and a second reactor (6); a first feeding pipeline (7) is connected between the first charging device (1) and the first charging temporary storage device (3); a second feeding pipeline (8) is connected between the second charging device (2) and the second charging temporary storage device (4); the first charging temporary storage device (3) is connected to the first reactor (5) and the second reactor (6) respectively through a first charging pipeline (9); and the second charging temporary storage device (4) is connected to the first reactor (5) and the second reactor (6) respectively through a second charging pipeline (10); The control method comprises: When the first feeding pipeline (7) is opened and the first charging device (1) is filling the first charging temporary storage device (3), and / or when the second feeding pipeline (8) is opened and the second charging device (2) is filling the second charging temporary storage device (4), the first charging pipeline (9) and the second charging pipeline (10) are locked; When the first loading pipeline (9) is opened and the first loading temporary storage device (3) is loading the first reactor (5) or the second reactor (6), and / or when the second loading pipeline (10) is opened and the second loading temporary storage device (4) is loading the first reactor (5) or the second reactor (6), the first feeding pipeline (7) and the second feeding pipeline (8) are locked.

2. The method for controlling the loading of a pebble bed modular high temperature gas-cooled reactor according to claim 1, characterized in that: When the first charging pipeline (9) between the first charging temporary storage device (3) and the first reactor (5) is opened, the first charging pipeline (9) between the first charging temporary storage device (3) and the second reactor (6) is locked; When the first charging pipeline (9) between the first charging temporary storage device (3) and the second reactor (6) is opened, the first charging pipeline (9) between the first charging temporary storage device (3) and the first reactor (5) is locked.

3. The method for controlling the loading of a pebble bed modular high temperature gas-cooled reactor according to claim 1, characterized in that: When the second charging pipeline (10) between the second charging temporary storage device (4) and the first reactor (5) is opened, the second charging pipeline (10) between the second charging temporary storage device (4) and the second reactor (6) is locked; When the second charging pipeline (10) between the second charging temporary storage device (4) and the second reactor (6) is opened, the second charging pipeline (10) between the second charging temporary storage device (4) and the first reactor (5) is locked.

4. The method for controlling loading of a pebble bed modular high temperature gas-cooled reactor according to any one of claims 1 to 3, characterized in that: When the first charging pipeline (9) between the first charging temporary storage device (3) and the first reactor (5) is opened, the pressure difference between the first charging temporary storage device (3) and the first reactor (5) is monitored in real time, and when the pressure difference is greater than a preset threshold, the first charging pipeline (9) between the first charging temporary storage device (3) and the first reactor (5) is closed.

5. The method for controlling loading of a pebble bed modular high temperature gas-cooled reactor according to any one of claims 1 to 3, characterized in that: When the first charging pipeline (9) between the first charging temporary storage device (3) and the second reactor (6) is opened, the pressure difference between the first charging temporary storage device (3) and the second reactor (6) is monitored in real time, and when the pressure difference is greater than a preset threshold, the first charging pipeline (9) between the first charging temporary storage device (3) and the second reactor (6) is closed.

6. The method for controlling loading of a pebble bed modular high temperature gas-cooled reactor according to any one of claims 1 to 3, characterized in that: When the second charging pipeline (10) between the second charging temporary storage device (4) and the first reactor (5) is opened, the pressure difference between the second charging temporary storage device (4) and the first reactor (5) is monitored in real time, and when the pressure difference is greater than a preset threshold, the second charging pipeline (10) between the second charging temporary storage device (4) and the first reactor (5) is closed.

7. The method for controlling loading of a pebble bed modular high temperature gas-cooled reactor according to any one of claims 1 to 3, characterized in that: When the second charging pipeline (10) between the second charging temporary storage device (4) and the second reactor (6) is opened, the pressure difference between the second charging temporary storage device (4) and the second reactor (6) is monitored in real time, and when the pressure difference is greater than a preset threshold, the second charging pipeline (10) between the second charging temporary storage device (4) and the second reactor (6) is closed.

8. The method for controlling loading of a pebble bed modular high temperature gas-cooled reactor according to any one of claims 1 to 3, characterized in that: The gas atmosphere in the first charging temporary storage device (3) is monitored in real time. If it is a helium atmosphere, the first feeding pipeline (7) is prohibited from opening. If it is an air atmosphere, the first charging pipeline (9) is prohibited from opening.

9. The method for controlling loading of a pebble bed modular high temperature gas-cooled reactor according to any one of claims 1 to 3, characterized in that: The gas atmosphere in the second charging temporary storage device (4) is monitored in real time. If it is a helium atmosphere, the second feeding pipeline (8) is prohibited from opening. If it is an air atmosphere, the second charging pipeline (10) is prohibited from opening.

10. The method for controlling loading of a pebble bed modular high temperature gas-cooled reactor according to any one of claims 1 to 3, characterized in that: A pair of control valves are installed on the first feeding pipeline (7), the second feeding pipeline (8), the first loading pipeline (9) and the second loading pipeline (10).