Method for filling can with sliver and spinning preparation device for carrying out method

By adjusting the speed of the rod rotary table, changing the longitudinal tension of the fiber strips in the cleaning window in the spinning preparation equipment, the problem of particles accumulation on the fiber strips is solved, and efficient and low-cost cleaning effect is achieved, ensuring the continuous operation of the equipment and fiber strip quality.

CN119013210APending Publication Date: 2024-11-22TRUETZSCHLER GRP SE
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202380033341.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2022-05-25
Filing Date
2023-04-05
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

During the filling process, the existing spinning preparation equipment is due to the friction caused by the difference in the speed of the ring strip and the barrel rotor table, causing the particles that detached from the fiber strips to accumulate in the ring strip tube, affecting production efficiency and requiring frequent cleaning, which increases the complexity of the equipment. Sex and cost.

Method used

By adjusting the speed of the barrel rotor in at least one cleaning window, changing the longitudinal tension of the fiber strips, ensuring that the fiber strips pass through the untouched area of ​​the ring tube, cleaning up the accumulation, and bringing it into the barrel at the end of the filling, Avoid the "rat" phenomenon.

Benefits of technology

It realizes efficient cleaning of particle accumulation without affecting production, reduces equipment complexity and cost, and ensures continuous operation of spinning preparation equipment and fiber strip quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119013210A_ABST
    Figure CN119013210A_ABST
Patent Text Reader

Abstract

The invention relates to a method for filling a can (12) with a sliver (8), during a filling process, the sliver is placed in a cycloidal annular loop into the can (12) through a coil tube (17) of a coil (10) of a spinning preparation device (1), which coil is rotated about a first axis of rotation (D1) at a loop speed (n10), at a feed speed specified by a feed device (9) of the spinning preparation device (1), the can (17) is cleaned by means of the sliver (8) passing through the can (17) in at least one cleaning window (23) during the filling process, characterized in that the first drive (15) is in drive connection with the can (10) and the supply device (9), and the first drive (15) is in drive connection with the can turntable (11) and the can turntable (11), and the second drive (15) is in drive connection with the can turntable (11) and the can turntable (11). The second drive (16) is in driving connection with the can turntable (11), and the difference (23) between the turntable speed (n11) and the winding speed (n10) is changed in the at least one cleaning window (23) by changing the driving speed of the second drive (16) while the driving speed of the first drive (15) remains constant. The invention also relates to a spinning preparation device (1) for carrying out the method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method for filling cans with fiber sliver, during which the fiber sliver is placed in a cycloidal ring shape into the can at a feed speed preset by a feed device of a spinning preparation device through a coiling tube of a coiling disk of the spinning preparation device, the coiling disk rotates about a first rotation axis at a turn speed, and the can rotates about a second rotation axis on a can turntable at a turntable speed, wherein the coiling tube is cleaned in at least one cleaning window during the filling process by means of the fiber sliver passing through the coiling tube. The invention also relates to a spinning preparation device for carrying out the method. Background Art

[0002] During the filling process, the coiling disk and the can turret arranged below it rotate, wherein the rotation speed of the can turret is always slightly faster than the rotation speed of the coiling disk, so that the fiber strand is pulled through the coiler tube under constant tension. However, the fiber strand always passes through the same channel area of ​​the coiler tube. Due to the contact with the inner wall of the channel, friction forces are generated, which cause particles such as short fibers and dust to be detached from the fiber strand. The particles can accumulate in the channel areas of the coiler tube that are not passed by the fiber strand. However, when the cans are changed, the accumulation falls out of the coiler tube and as so-called "rats" Visible on the fiber strips placed in the circle of the full can.

[0003] From EP 1902990 B1 a spinning preparation device is known, in which the coiling tube is temporarily cleaned by the fiber strip itself during the filling process in order to bring the accumulation distributed during the filling process into the can being filled. For this purpose, the coiling disk is equipped with a drive system, which is designed to temporarily reduce the speed of the coiling disk relative to a fixed basic speed during the filling process according to a predefined guideline so that the longitudinal tension in the fiber strip is reduced during the reduction. This leads to a temporary increase in the diameter of the fiber composite strip, as a result of which the entire inner surface of the coiling tube is swept by the traveling fiber strip. The drive system of the coiling disk can include a controllable coupling, a transmission mechanism with a controllable transmission ratio or a separate drive, so that the speed of the coiling disk can be adjusted independently of the supply speed of the upstream supply device and the speed of the downstream can turntable. Summary of the invention

[0004] The object of the present invention is to provide a method by which particle accumulations can be removed from a coiler tube more efficiently and at lower cost. In addition, the object of the present invention is to provide a spinning preparation device equipped with such a cleaning function which is more efficient and less complex.

[0005] The object is achieved by a method of the type mentioned at the outset in that a first drive is drive-connected to the coiling disk and the supply device, and a second drive is drive-connected to the can turntable, wherein, within the at least one cleaning window, the difference between the turntable speed and the coiling speed is changed by varying the drive speed of the second drive while the drive speed of the first drive remains constant.

[0006] The advantage is that the spinning preparation device can continue to operate without affecting production, because for the cleaning process, only the speed of the can turntable needs to be changed. As a result, the supply device and the coiling disk can both continue to operate at their rated speed, so that the cleaning method does not affect the components of the spinning preparation device that are located upstream of the can turntable (such as the drafting mechanism) or the upstream equipment (such as the carding machine). This is particularly advantageous in the case of an integrated drawing frame that is directly coupled to the carding machine. In this way, the continuous operation of the spinning preparation device can be ensured and the fiber strips produced during the can change can be temporarily stored in a ring sliver storage (Bandschlaufenspeicher). In addition, the cleaning method can be carried out particularly easily using an existing drive system of the spinning preparation device, in which the supply device and the coiling disk are driven by a common first drive and the can turntable is driven by a mechanically independent second drive.

[0007] By varying the can turret speed within the at least one cleaning window, the longitudinal tension on the fiber strand is temporarily varied, so that the fiber strand passes over the inner wall areas of the coiler tube that are not touched during the filling process and scrapes off the particle accumulations that form there. In this way, the particle accumulations are carried into the can with the fiber strand during the filling process and are not located as visible "rats" above the coiled strands at the end of the filling process.

[0008] For ease of reading, "at least one cleaning window" is also referred to as "cleaning window", which should include exactly one or more of the cleaning windows. If the method has only a single cleaning window, this point will be emphasized accordingly. "Cleaning window" is to be understood as a cleaning process with a limited time within the filling process, during which the fiber strips are continuously coiled into the can. The size of the cleaning window or the length of time is preferably determined by the duration required for the supply device to coil a predetermined length of fiber strips in the can. For example, the size of the cleaning window can be such that 50 meters of fiber strips can be coiled.

[0009] Depending on the size of the can, the filling process may last several minutes. In order to keep the coil tube free of particle accumulation during this period, cleaning can be carried out regularly and especially periodically in time. Thus, a large amount of dirt accumulation is completely avoided in the first place. In particular, the method can have exactly one single cleaning window or two or three cleaning windows. The spacing between the cleaning windows and the size of the cleaning windows themselves can be related to the length of the fiber strips supplied by the supply device during the filling process. The method can, for example, set the cleaning windows according to the length of the supplied fiber strips (preferably greater than 300 meters and / or less than 1000 meters). A spacing between the cleaning windows greater than 400 meters and less than 600 meters will achieve particularly good results in terms of fiber strip quality and cleaning effect. During the cleaning window, the fiber strips supplied by the supply device are preferably longer than 20 meters and / or shorter than 70 meters. It is further preferred to supply fiber strips between 30 meters and 60 meters during the cleaning window. On the one hand, this ensures a sufficiently good cleaning effect, and on the other hand, it has little effect on the quality of the strips produced by the spinning preparation device.

[0010] The length of the supplied fiber strip can be measured by a meter length gauge of the spinning preparation device, which meter length gauge can be arranged in particular on the supply device. In a particularly simple embodiment, the cleaning window can also be started after a preset duration has passed, for example after 60 seconds. The duration of the cleaning window can be preset by a prescribed duration and has, for example, a duration of 1 second to 3 seconds.

[0011] In normal operation, the difference between the turntable speed and the winding speed is constant. Since the can turntable runs slightly faster than the coiling disk, the fiber strip is tensioned during winding, which can be about 1.05, for example. Accordingly, the can turntable speed can be 5% greater than the winding speed. In order to clean the coil tube during the filling process, the tension is changed. The above description is to be understood only as exemplary values.

[0012] According to a first embodiment, the difference between the turntable speed and the coiling speed can be reduced by reducing the driving speed of the second drive within at least one cleaning window. This achieves a particularly good cleaning effect. The tension can be reduced by 0.02, for example, keeping the previous example unchanged, so that the tension can be 1.03. According to a second embodiment, the difference between the turntable speed and the coiling speed can be increased by increasing the driving speed of the second drive within at least one cleaning window. As a result, the inner wall areas of the coil tube that are not reached by the fiber strip during the filling operation are also swept over, so that particle accumulations during the filling process can also be wiped off in this way. The tension can be increased by 0.02, for example, keeping the previous example unchanged, so that the tension can be 1.07. It goes without saying that, depending on the sliver material used, the sliver quality, etc., a tension different from the above example can also be preset.

[0013] Instead of increasing or decreasing the driving speed of the second drive or the turntable speed directly proportional thereto for the duration of the cleaning window, the difference between the turntable speed and the coiling speed can be set to fluctuate periodically in time within the cleaning window. This fluctuation can be especially sinusoidal over the time course of the cleaning window. As a result, a good cleaning effect can also be achieved. In addition, the filling amount can be maximized and / or the quality of the coiled fiber strip can be positively affected, because the pressure between the stacked fiber strip layers in the can at the barrel mouth can be reduced and the pressure points in the middle can be prevented. The cleaning window especially extends over more than 70% of the entire time length of the filling process. In addition, the method can have only one cleaning window.

[0014] The filling process can extend over several phases, in particular a start-up phase, an operating phase and a shutdown phase.

[0015] In the startup phase, the rotational speeds of both drives are increased and the filling process is started. Preferably, the drive rotational speed of the first drive is directly proportional to the supply and winding speed, and the drive rotational speed of the second drive is directly proportional to the can table speed. As soon as the supply speed reaches the desired final speed, the operating phase can be started. In the operating phase, the drive rotational speed of the first drive remains constant. The supply speed can be, for example, 1000 meters of fiber sliver per minute. In the stop phase, the can is changed. For this purpose, the rotational speeds of both drives are reduced. The supply speed can be reduced to 0 meters per minute for can replacement. If the spinning preparation device is an integrated drawing frame directly coupled to the carding machine, it is advantageous that the first drive continues to drive the supply device and the coiling disc in order to avoid a complete stop of the slow coiling disc. In this regard, the stop phase can also be referred to as a braking phase. The fiber sliver produced during this period can be temporarily stored in a sliver ring storage in a known manner.

[0016] The cleaning window is preferably located in an operating phase, wherein the cleaning window can in principle also extend over a plurality of operating phases.

[0017] In an embodiment in which the difference between the turntable speed and the winding speed fluctuates periodically in time within the cleaning window, it is advantageous if the time length of the cleaning window extends over at least 80% of the time length of the filling process.

[0018] The object is also achieved by a spinning preparation device of the type mentioned at the outset in that the spinning preparation device comprises a coiling disk, which can be driven to rotate about a first rotation axis and has a coiling tube for placing the fiber sliver in a can, a supply device for conveying the fiber sliver to the coiling disk, a first drive connected in driving connection with the coiling disk and the supply device, a second drive connected in driving connection with the can turntable, and a control device configured to control the first drive and the second drive. With this spinning preparation device, the same advantages as the method for filling cans with fiber sliver are obtained, and vice versa, so that reference is made to the above description of the method.

[0019] The control unit is particularly configured to control the driving speed of the first drive and the second drive. The control unit can be connected to a meter gauge or include such a meter gauge so as to use its measured value to control the length of the cleaning window or the interval between each cleaning window (if there are multiple cleaning windows). In this way, the cleaning window can be started after reaching a predetermined fiber length (e.g., 500 meters), and remain open until another predetermined fiber length (e.g., 50 meters) is reached. Similarly, in addition to the meter gauge or alternatively, the control unit can include a timer or be coupled to such a timer so as to start the cleaning window after a preset duration passes in a similar manner and remain open for the prescribed duration accordingly. The length value or time value can be related to the supply speed and can be stored in the database of the control unit, or can be manually input by an operator through an input device connected to the spinning preparation device.

[0020] The second drive can be arranged in a fixed position at the spinning preparation device. Alternatively, the second drive can be a can turntable of a self-propelled transport vehicle, by which the cans can be moved autonomously in the spinning mill. To control the turntable speed, the self-propelled transport vehicle can, for example, have a transmitting and / or receiving unit, by means of which the control unit can control the drive speed of the second drive during the filling process.

[0021] The first rotational axis of the coiling disk and the second rotational axis of the can turret are preferably oriented parallel to one another. The spinning preparation device can include, for example, a controlled or uncontrolled draw frame or at least one drafting device. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Further features and advantages of the invention emerge from the following description of preferred embodiments.

[0023] In the figure:

[0024] Figure 1 A schematic cross-sectional view showing a spinning preparation device according to one embodiment of the present invention;

[0025] Figure 2 Show Figure 1 A cross-sectional view of a coiling disc of a spinning preparation device;

[0026] Figure 3 Show Figure 2 A cross-sectional view of a sliver coiling tube of a sliver coiling plate;

[0027] Figure 4 a diagram showing a method according to a first specific embodiment of the invention, wherein the diagram shows the rotational speed on the ordinate versus the time on the abscissa; and

[0028] Figure 5 The diagram shows a method according to a second specific embodiment of the present invention, wherein the diagram shows the rotational speed on the ordinate as a function of time on the abscissa. DETAILED DESCRIPTION

[0029] Figure 1 2 shows a spinning preparation device 1 which is designed here by way of example as a draw frame and which has an infeed area 2 , a drafting arrangement 3 and a coiling system 4 in a manner known per se.

[0030] Figure 1 In order to indicate the spatial orientation of the spinning preparation device 1 , a longitudinal direction X, a transverse direction Y and a vertical direction Z are indicated, which are defined in a Cartesian coordinate system assigned to the spinning preparation device 1 and are indicated by corresponding arrows.

[0031] The vertical direction Z is usually perpendicular to the installation plane E on which the spinning preparation device 1 is installed. The terms "below", "beneath", "above" or "above" are used here to refer to the spatial indication of the installed spinning preparation device 1.

[0032] In the feed area 2, the spinning cans 5 (here round cans) filled with feed sliver are arranged below the creel 6. The feed sliver is pulled out by the conveyor rollers 7 and conveyed to the drafting mechanism 3. After passing the drafting mechanism 3, the feed sliver as a combined and drafted fiber sliver 8 arrives via the supply device 9 to the coiling disk 10 of the coiling system 4. Below the coiling disk 10 is arranged a can turntable 11, on which the cans 12 to be filled are positioned. As shown here, the can turntable 11 can belong to the spinning preparation device 1.

[0033] During the filling process, the fiber strip 8 is continuously deposited into the can 12 by the coiling disk 10 in a cycloidal manner. The cycloidal motion is formed by the superposition of two rotational movements, namely the rotational movement of the coiling disk 10 about the first rotational axis D1 and the rotational movement of the can turntable 11 about the second rotational axis D2. The supply device 9 has two delivery rollers 13, 14, between which the fiber strip 8 is guided and supplied to the coiling disk 10. The supply speed provided by the delivery rollers 13, 14 can be adapted to the winding speed n10 of the coiling disk 10 rotating about the rotational axis D1.

[0034] The driven coiling disk 10 and the two delivery rollers 13, 14 are jointly connected to a first drive 15 of the spinning preparation device 1, wherein the driving speed of the first drive 15 is directly proportional to the winding speed n10 of the coiling disk 10 and the supply speed of the supply device 9. The can turret 11 is connected to a second drive 16 that is mechanically separated from the first drive 15, wherein the driving speed of the second drive 16 is directly proportional to the turret speed n11 of the can turret 11 rotating about the rotation axis D2. The two drives 15, 16 can each include an electric motor, which is connected to the delivery rollers 13, 14 and the coiling disk 10 or the can turret 11 by means of a transmission mechanism or a similar transmission device (not shown).

[0035] Figure 2 1 shows a cross section of a coiling disk 10. The coiling disk 10 has a coiling tube 17, through which the fiber strip 8 is guided. The coiling tube 17 is curved in space and has an inlet 18 on the drafting mechanism side and an outlet 19 on the can side for the fiber strip 8. The inlet 18 is coaxial with the first axis of rotation D1 and the outlet 19 is arranged at a radial distance a and an axial distance b from the inlet 18.

[0036] During the filling process, due to the faster rotation of the can turret 11 compared to the coiling disk 10, the fiber strip 8 is subjected to a traction force which acts on the fiber strip 8. Figure 3 Indicated by arrow F in the figure. This traction force leads to a slight tensioning pull of the fiber strip 8. The fiber strip 8 here follows the bending direction of the coil tube 17 and passes over the inner wall area 20 of the coil tube 17 inside the bend and leaves the inner wall area 21 of the coil tube 17 outside the bend.

[0037] Along the swept inner wall area 20, pressure or friction forces P are generated between the coiler tube 17 and the fiber strip 8. These forces cause short fibers and dust to be detached from the fiber strip 8, wherein the detached particles accumulate along the unswept inner wall area 21. In order to remove the particle accumulation 22 from the coiler tube 17, at least one cleaning window 23 is provided during the filling process, in which the continuous fiber strip 8 itself is used to wipe off the particle accumulation 22 by temporarily changing the traction force F acting on the fiber strip 8. The filling process is explained in detail below.

[0038] Figure 4 2 shows the filling process for cans 12 according to a first embodiment. The speed-time diagram shown shows the course of the winding speed n10 of the winding disk 10 and the turntable speed n11 of the turntable 11 over time t. The filling process is divided into three phases, namely a start phase 24, an operating phase 25 and a stop phase 26.

[0039] At the beginning of the startup phase 24, t 0 , the can 12 to be filled stands on the can turntable 11 and the drives 15, 16 are stopped. However, it is also possible in principle for the first drive 15 to drive the supply device 9 and the coiling disk 10 at a low speed in order to avoid the slow coiling disk 10 from stopping. The speeds of the two drives 15, 16 are increased until the supply speed, the coiling speed n10 and the turntable speed n11 have reached their predefined final speed n10. End 、n11 End (Here is the time point t 1 ). The startup phase 24 usually lasts only a few seconds.

[0040] From time point t 1 At the beginning, an operating phase 25 begins, during which the drive speed of the first drive 15 is kept constant. In normal operation (i.e. outside the cleaning window 23), the drive speed of the second drive 16 is also kept constant, so that the difference Δ25 between the turntable speed n11 and the coiling speed n10 is also kept constant. In the operating phase 25, for example, three cleaning windows 23 are provided, wherein the drive speed of the second drive 16 is controlled to decrease for a time period Δt 23 , deviates from the difference △23. In each cleaning window 23, the difference △23 is smaller than the difference △25, because the can turret 11 rotates slower in each cleaning window 23 than in normal operation. In principle, the difference △23 can also be increased in each cleaning window 23 or in at least one of the three cleaning windows 23 by increasing the drive speed of the second drive 16.

[0041] The time period Δt of each cleaning window 23 23 and the time interval Δt between each cleaning window 23 25 The length of the fiber strip 8 supplied by the supply device 9 can be related to this. For this purpose, the spinning preparation device 1 has a meter length meter (not shown) for measuring the length of the continuous fiber strip 8. The measurement signal of the meter length meter can be transmitted to the control device (not shown) of the spinning preparation device 1, which controls the driving speed of the two drives 15 and 16 based on the measurement signal. For example, from t 0 or 1At the beginning, every time a 500-meter-long fiber strip is passed, a corresponding cleaning window 23 is started, in which the driving speed of the second drive 16 is reduced for a fiber strip length of 50 meters. After the cleaning window 23, the driving speed of the second drive 16 is correspondingly increased to the desired final speed for normal operation. The control device can adjust the number of cleaning windows 23 and the intervals between each cleaning window 23 according to the size of the can 12, the supply speed of the supply device 9, the fiber strip material, etc. For this purpose, the corresponding data, such as the can size, the rated speed or the desired final speed, the fiber strip material, etc., can be stored in the storage unit of the control device, and / or can be input by the operator of the spinning preparation device 1 through the input unit. In addition or alternatively, the spinning preparation device 1 can have an operating unit 27, such as a touch display or a similar unit, or a wireless interface for coupling with a mobile device, through which the operator can input the data and / or the number, size and interval of the cleaning windows 23, the driving speed of the two drives 15, 16, the desired final speed n10, n11, etc. into the control device.

[0042] Shortly before the can change, at time t 2 A stop phase 26 begins, during which the two drives 15, 16 reduce their drive speed. The stop phase 26 usually lasts only a few seconds. At time t 3 , the drives 15, 16 stop and the can change is performed. Then, the filling process starts again from the beginning with the start phase 24 in order to fill the next can 12.

[0043] Figure 5 The filling process for cans 12 according to a second embodiment is shown in FIG. Figure 4 The same is basically the same, so the common points refer to the above description. Here, the same or modified details are provided with the same reference numerals. The difference lies in the design of the cleaning window 23.

[0044] Figure 5 As can be seen from the figure, the method has only a single cleaning window 23, which here, for example, extends over the entire operating phase 25. In the single cleaning window 23, the drive speed of the second drive 16 and the turntable speed n11 of the can turntable 11 are around the desired final speed n11. End Fluctuation, so that the difference △23 between the turntable speed n11 and the coiling speed n10 is in the time process △t of the cleaning window 23 23 The minimum value is △23 min With the maximum value △ 23 max Sinusoidal oscillations.

[0045] Reference numerals list

[0046] 1 Spinning preparation equipment

[0047] 2 Feeding area

[0048] 3 Drafting mechanism

[0049] 4 Sliver Coiling System

[0050] 5 Spinning cans

[0051] 6 Creel

[0052] 7 Conveyor roller

[0053] 8 Fiber Strips

[0054] 9 Supply device

[0055] 10 Coil plate

[0056] 11 Can turret

[0057] 12 cans

[0058] 13 Delivery roller

[0059] 14 Delivery rollers

[0060] 15 Driver

[0061] 16 Driver

[0062] 17 Coil tube

[0063] 18 Entrance

[0064] 19 Exit

[0065] 20 Inner wall area

[0066] 21 Inner wall area

[0067] 22 Particle accumulation

[0068] 23. Cleaning the Window

[0069] 24 Start-up phase

[0070] 25 Operation Phase

[0071] 26 Stop phase 27 Operating Units a,b spacing D1, D2 rotation axis E Placement plane F Longitudinal force P pressure or friction X vertical axis Y horizontal axis Z vertical axis

[0072] △ Difference

Claims

1. A method for filling a can (12) with fiber sliver (8), during which the fiber sliver is placed in a cycloidal manner into the can (12) at a supply speed preset by a supply device (9) of a spinning preparation device (1) through a coiling tube (17) of a coiling disk (10) of the spinning preparation device (1), the coiling disk rotating at a winding speed (n10) about a first rotation axis (D1), and the can rotating on a can turntable (11) at a turntable speed (n11) about a second rotation axis (D2), in, The coiling tube (17) is cleaned during the filling process in at least one cleaning window (23) by means of the fiber strand (8) passing through the coiling tube (17), characterized in that The first drive (15) is connected to the winding disk (10) and the supply device (9) by driving, and the second drive (16) is connected to the can turntable (11) by driving, wherein, in the at least one cleaning window (23), the driving speed of the second drive (16) is changed, while the driving speed of the first drive (15) is kept constant, and the difference (△23) between the turntable speed (n11) and the winding speed (n10) is changed.

2. The method according to claim 1, It is characterized in that By reducing the driving speed of the second drive (16) within the at least one cleaning window (23), the difference (Δ23) between the turntable speed (n11) and the coiling speed (n10) is reduced.

3. The method according to claim 1, It is characterized in that During the filling process, only one of the at least one cleaning window (23) is provided, wherein the time length (Δt 23 ) extends over at least 70% of the total time length of the filling process.

4. The method according to any one of claims 1 to 3, It is characterized in that In the at least one cleaning window (23), the driving speed of the second driver (16) has a sinusoidal curve, so that the difference (Δ23) between the turntable speed (n11) and the coiling speed (n10) fluctuates periodically.

5. The method according to any one of claims 1 to 4, It is characterized in that The filling process comprises a start-up phase (24), an operation phase (25) and a stop phase (26), wherein in the operation phase (25), the driving speed of the first drive (16) is kept constant.

6. The method according to claim 5, It is characterized in that The at least one cleaning window (23) is within an operating phase (25).

7. Spinning preparation device (1) for carrying out the method according to one of claims 1 to 6, include: A coiling disk (10) which can be driven to rotate about a first rotation axis (D1) and has a coiling tube (17) for coiling the fiber strip (8) into a can (12); A supply device (9) for conveying the fiber strip (8) to the coiling disk (10); A first driver (15) is drivingly connected to the coiling disc (10) and the supply device (9); A second driver (16) drivingly connected to the can turret (11); and A control device is configured to control a first driver (15) and a second driver (16).

Citation Information

Patent Citations

  • Device for a preparatory machine for spinning

    CN101148790A

  • Laying a drawn roving / sliver in a can, for use at a spinning station, uses independent drives for the rotating plate and drawing unit calender rollers, to give different speed ratios according to the drawing unit condition

    DE10064853A1

  • Device for a preparatory machine for spinning

    EP1902990A1

  • Textile Machine with Variable Tension Draft

    US20150152575A1

  • Sliver stacking device

    WO1992004266A2