Building prefabricated part machining equipment and building prefabricated part machining method

By designing prefabricated building components processing equipment, using the outer cylinder and the inner cylinder to form an annular space and inserting cylinders and steel bars, the problem of traditional concrete pipes being unable to be connected is solved, and concrete pipes with holes are processed, which improves construction efficiency and pipelines strength.

CN119017530AInactive Publication Date: 2024-11-26何立彬
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411421448.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-12
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The concrete pipes in traditional building prefabricated components do not have holes and cannot connect another concrete pipe, which lacks an apparatus and method to facilitate processing of concrete pipes with holes.

Method used

A prefabricated building component processing equipment is designed, including an outer cylinder and an inner cylinder, forming an annular space and setting through holes. By inserting cylinders and steel bars, pouring concrete and then unmolding it into concrete pipes with holes.

Benefits of technology

It is possible to facilitate processing of concrete pipes with holes, facilitate connection of other pipes, and improve the strength and construction efficiency of concrete pipes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119017530A_ABST
    Figure CN119017530A_ABST
Patent Text Reader

Abstract

The invention relates to the field of building prefabricated parts, in particular to building prefabricated part machining equipment and a building prefabricated part machining method. The building prefabricated part machining equipment comprises an outer cylinder, an inner cylinder is coaxially arranged in the outer cylinder, an annular space is formed between the outer cylinder and the inner cylinder, through holes are formed in the outer cylinder and the inner cylinder, and the two through holes communicate with each other. According to the building prefabricated part machining equipment, the machining method for machining the building prefabricated part comprises the following steps that S1, an outer cylinder and an inner cylinder are coaxially arranged on the upper side of a bottom plate; s2, a cylinder penetrates through the through holes in the outer barrel and the inner barrel; s3, a plurality of steel bars are inserted into an annular space formed between the outer cylinder and the inner cylinder; and S4, concrete is poured into the annular space, after the concrete is solidified, the cylinder is pulled out, the concrete is demolded, and the building prefabricated part is manufactured. And a concrete pipe with a hole can be conveniently processed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of building prefabricated components, and more specifically to a building prefabricated component processing device and a building prefabricated component processing method. Background Art

[0002] Prefabricated building components refer to a series of building components that are prefabricated and processed in factories or special facilities. These components are assembled on the construction site, thereby speeding up the construction of the building project, improving the construction quality, and reducing labor intensity. Prefabricated components can include columns, beams, floor slabs, wall panels, stairs, balconies and other types. The concrete pipes in traditional prefabricated building components do not have holes, and another concrete pipe cannot be connected to the concrete pipe. Therefore, a device and method for conveniently processing concrete pipes with holes is needed. Summary of the invention

[0003] In order to overcome the deficiencies of the prior art, the present invention provides a building prefabricated component processing device and a building prefabricated component processing method, which have the beneficial effect of being able to conveniently process concrete pipes with holes.

[0004] A building prefabricated component processing equipment comprises an outer cylinder, an inner cylinder is coaxially arranged inside the outer cylinder, an annular space is formed between the outer cylinder and the inner cylinder, and through holes are arranged on the outer cylinder and the inner cylinder, and the two through holes are connected.

[0005] The outer cylinder and the inner cylinder are both placed on the upper side of the bottom plate.

[0006] The front and rear ends of the upper side of the outer cylinder are both provided with notches, the front and rear ends of the upper side of the inner cylinder are both provided with notches, and the lower side of the pressure beam is provided with four pressure grooves, which are respectively pressed on the four notches.

[0007] The front and rear ends of the pressure beam are respectively connected to two round rods in a vertical sliding manner. A baffle is fixed to the upper end of each round rod. A compression spring is sleeved on the upper part of the round rod. The compression spring is located between the pressure beam and the baffle. A limiting ring is fixed in the middle of the round rod.

[0008] A building prefabricated component processing device, used for processing a building prefabricated component processing method, comprising the following steps:

[0009] S1: The outer cylinder and the inner cylinder are coaxially arranged on the upper side of the bottom plate;

[0010] S2: passing the cylinder through the through holes on the outer cylinder and the inner cylinder;

[0011] S3: inserting a plurality of steel bars into the annular space formed between the outer tube and the inner tube;

[0012] S4: Pour concrete into the annular space, wait for the concrete to solidify, pull out the cylinder, demould the concrete, and make a prefabricated building component. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] The present invention is further described in detail below with reference to the accompanying drawings and specific implementation methods.

[0014] Figure 1 A schematic diagram of the structure of a building prefabricated component processing equipment Figure 1 ;

[0015] Figure 2 A schematic diagram of the structure of a building prefabricated component processing equipment Figure 2 ;

[0016] Figure 3 A schematic diagram of the structure of a building prefabricated component processing equipment Figure 3 ;

[0017] Figure 4 The structure of the outer cylinder is shown in Figure 1. Figure 1 ;

[0018] Figure 5 The structure of the outer cylinder is shown in Figure 1. Figure 2 ;

[0019] Figure 6 The structure diagram of the compression beam Figure 1 ;

[0020] Figure 7 The structure diagram of the compression beam Figure 2 ;

[0021] Figure 8 Schematic diagram of the structure of the base plate and cylinder.

[0022] In the figure: outer cylinder 101; through hole 102; inner cylinder 103; notch 104; vertical bar 105; screw 1 106; rubber piece 107; vertical bar 2 108; screw 2 109; L-shaped piece 110;

[0023] Pressure beam 201; pressure groove 202; circular ring 203; plug hole 204; baffle 205; limit ring 206; round rod 207; cross rod 208;

[0024] Base plate 301; support leg 302; fixing sleeve 303; pressing screw 304;

[0025] Cylinder 401; telescopic rod 402; fixed column 403; side frame 404. DETAILED DESCRIPTION

[0026] like Figure 4-5 As shown, this example can achieve the effect of conveniently processing a concrete pipe with holes.

[0027] Since the building prefabricated component processing equipment includes an outer cylinder 101, an inner cylinder 103 is coaxially arranged inside the outer cylinder 101, an annular space is formed between the outer cylinder 101 and the inner cylinder 103, and through holes 102 are arranged on the outer cylinder 101 and the inner cylinder 103, and the two through holes 102 are connected, concrete can be poured into the annular space to form a concrete pipe, and the through holes 102 on the outer cylinder 101 and the inner cylinder 103 can be inserted into the cylinder 401, thereby forming holes on the side of the concrete pipe, which is convenient for processing a concrete pipe with holes. The holes on the concrete pipe with holes are convenient for connecting other pipes.

[0028] like Figure 4-5 As shown in Figure 8, this example can achieve the effect of closing the lower side of the annular space.

[0029] Since the outer cylinder 101 and the inner cylinder 103 are both placed on the upper side of the bottom plate 301 , the bottom plate 301 seals the lower side of the annular space, so that concrete can be poured into the annular space.

[0030] like Figure 4-7 As shown, this example can achieve the effect of preventing the outer cylinder 101 and the inner cylinder 103 from moving relative to each other.

[0031] Since notches 104 are provided at both the front and rear ends of the upper side of the outer cylinder 101, and notches 104 are provided at both the front and rear ends of the upper side of the inner cylinder 103, four pressing grooves 202 are provided at the lower side of the pressing beam 201, and the four pressing grooves 202 are pressed on the four notches 104 respectively. The pressing beam 201 presses on the outer cylinder 101 and the inner cylinder 103, thereby temporarily fixing the outer cylinder 101 and the inner cylinder 103, thereby preventing relative movement between the outer cylinder 101 and the inner cylinder 103.

[0032] like Figure 6-7 As shown, this example can achieve the effect of enabling the compression beam 201 to be compressed on the outer cylinder 101 and the inner cylinder 103 .

[0033] Since the front and rear ends of the pressure beam 201 are respectively vertically slidably connected to the two round rods 207, a baffle 205 is welded to the upper end of each round rod 207, and a compression spring is sleeved on the upper part of the round rod 207. The compression spring is located between the pressure beam 201 and the baffle 205, and a limiting ring 206 is welded in the middle of the round rod 207. The two compression springs give a downward force to the pressure beam 201, so that the pressure beam 201 always has a tendency to move downward along the two round rods 207, so that the pressure beam 201 can be pressed tightly on the outer cylinder 101 and the inner cylinder 103, thereby fixing the outer cylinder 101 and the inner cylinder 103.

[0034] like Figure 6-7 As shown, this example can facilitate demoulding after the concrete in the annular space is solidified.

[0035] Since fixing sleeves 303 are welded to the front and rear ends of the upper side of the bottom plate 301, each fixing sleeve 303 is threadedly connected with a pressing screw 304, the two cross bars 208 are respectively inserted into the two fixing sleeves 303, and the two round bars 207 are respectively fixed on the two cross bars 208. The pressing screws 304 are pressed on the corresponding cross bars 208. The cross bars 208 are inserted into the fixing sleeves 303, so that the two round bars 207 and the pressure beam 201 can be removed, thereby facilitating demoulding after the concrete in the annular space solidifies.

[0036] like Figure 6-8 As shown, this example can achieve the effect of inserting the control cylinder 401 into the annular space.

[0037] Since support legs 302 are welded at the four corners of the lower side of the bottom plate 301, the left side of the bottom plate 301 is connected to a side frame 404 by screws, a fixing column 403 is welded on the side frame 404, a cylinder 401 is slidably connected to the fixing column 403, and the cylinder 401 is inserted into the two through holes 102, and a telescopic rod 402 is connected to the side frame 404 by screws, and the movable end of the telescopic rod 402 is connected to the cylinder 401 by screws. The telescopic rod 402 is extended and retracted to make the cylinder 401 slide left and right along the fixing column 403, thereby controlling the cylinder 401 to be inserted into the annular space, thereby occupying the space in the annular space, and the manufactured concrete pipe has a through hole, and the cylinder 401 can be pulled out of the annular space when the concrete pipe needs to be demoulded.

[0038] like Figure 4-5 As shown, this example can achieve the effect of conveniently expanding the outer tube 101 outward and separating from the concrete pipe.

[0039] Since a gap is provided on the right side of the outer cylinder 101, two vertical bars 108 are welded on the outer side of the gap on the outer cylinder 101, and an L-shaped piece 110 is welded on the outer side of each vertical bar 108. A compression spring is provided between the two L-shaped pieces 110, and a screw rod 109 passes through the two vertical bars 108. Nuts are threadedly connected at both the front and rear ends of the screw rod 109. The screw rod 109 draws the gap closer to close the gap and prevents the concrete from being exposed from the annular space. When demoulding is required, the two nuts on the screw rod 109 are rotated outwards. At this time, due to the elastic force of the compression spring, the gap on the outer cylinder 101 is enlarged, thereby facilitating the outer cylinder 101 to expand outward and separate from the outer periphery of the concrete pipe.

[0040] like Figure 4-5 As shown, this example can achieve the effect of facilitating the inner tube 103 to be separated from the inner circumference of the concrete pipe.

[0041] Since a gap is provided on the right side of the inner cylinder 103, the rubber member 107 is bonded to the gap, and two vertical bars 105 are fixed to the inner side of the gap on the inner cylinder 103, and a screw rod 106 is inserted into the two vertical bars 105. Both the front and rear ends of the screw rod 106 are threadedly connected with nuts. When demoulding is required, the two nuts on the screw rod 106 are rotated to reduce the gap on the inner cylinder 103, thereby flattening the rubber member 107, and then retracting the inner cylinder 103, so that the inner cylinder 103 is conveniently separated from the inner periphery of the concrete pipe, and the concrete pipe is conveniently demoulded.

[0042] like Figure 6-7 As shown, this example can achieve the effect of setting multiple steel bars in the concrete pipe to improve the strength of the concrete pipe.

[0043] Since a circular ring 203 is fixed on the upper side of the compression beam 201, and a plurality of holes 204 are arranged in a ring shape on the circular ring 203, steel bars can be inserted into the plurality of holes 204 on the circular ring 203, so that the steel bars are inserted into the annular space, and the steel bars are supported by the circular ring 203. A plurality of steel bars are arranged in the concrete pipe to improve the strength of the concrete pipe.

[0044] A building prefabricated component processing device, used for processing a building prefabricated component processing method, comprising the following steps:

[0045] S1: The outer cylinder 101 and the inner cylinder 103 are coaxially arranged on the upper side of the bottom plate 301;

[0046] S2: Pass the cylinder 401 through the through holes 102 on the outer cylinder 101 and the inner cylinder 103;

[0047] S3: inserting a plurality of steel bars into the annular space formed between the outer tube 101 and the inner tube 103;

[0048] S4: pour concrete into the annular space, wait for the concrete to solidify, pull out the cylinder 401, demould the concrete, and make a prefabricated building component.

Claims

1. A building prefabricated component processing equipment, comprising an outer cylinder (101), characterized in that: An inner cylinder (103) is coaxially arranged inside the outer cylinder (101), an annular space is formed between the outer cylinder (101) and the inner cylinder (103), and through holes (102) are arranged on the outer cylinder (101) and the inner cylinder (103), and the two through holes (102) are connected.

2. A building prefabricated component processing equipment according to claim 1, characterized in that: The outer cylinder (101) and the inner cylinder (103) are both placed on the upper side of the bottom plate (301).

3. A building prefabricated component processing equipment according to claim 2, characterized in that: The front and rear ends of the upper side of the outer cylinder (101) are both provided with notches (104), the front and rear ends of the upper side of the inner cylinder (103) are both provided with notches (104), and the lower side of the pressure beam (201) is provided with four pressure grooves (202), and the four pressure grooves (202) are respectively pressed on the four notches (104).

4. A building prefabricated component processing equipment according to claim 3, characterized in that: The front and rear ends of the pressure beam (201) are respectively vertically slidably connected to two round rods (207); a baffle (205) is fixed to the upper end of each round rod (207); a compression spring is sleeved on the upper part of the round rod (207); the compression spring is located between the pressure beam (201) and the baffle (205); and a limiting ring (206) is fixed to the middle part of the round rod (207).

5. A building prefabricated component processing equipment according to claim 4, characterized in that: The front and rear ends of the upper side of the bottom plate (301) are fixed with fixing sleeves (303), each fixing sleeve (303) is threadedly connected with a pressing screw (304), the two cross bars (208) are respectively inserted into the two fixing sleeves (303), the two round bars (207) are respectively fixed on the two cross bars (208), and the pressing screws (304) are pressed on the corresponding cross bars (208).

6. A building prefabricated component processing equipment according to claim 5, characterized in that: Support legs (302) are fixed at the four corners of the lower side of the base plate (301), a side frame (404) is fixed on the left side of the base plate (301), a fixing column (403) is fixed on the side frame (404), a cylinder (401) is slidably connected to the fixing column (403), the cylinder (401) is inserted into the two through holes (102), a telescopic rod (402) is fixed on the side frame (404), and a movable end of the telescopic rod (402) is fixed on the cylinder (401).

7. A building prefabricated component processing equipment according to claim 6, characterized in that: The outer cylinder (101) is provided with a slit on the right side, and two vertical bars (108) are fixed on the outer side of the slit on the outer cylinder (101), and an L-shaped piece (110) is fixed on the outer side of each vertical bar (108), and a compression spring is provided between the two L-shaped pieces (110), and a screw rod (109) passes through the two vertical bars (108), and nuts are threadedly connected at both the front and rear ends of the screw rod (109).

8. The building prefabricated component processing equipment according to claim 7, characterized in that: The inner cylinder (103) is provided with a gap on the right side, and a rubber member (107) is bonded to the gap. Two vertical bars (105) are fixed to the inner side of the gap on the inner cylinder (103), and a screw rod (106) is inserted into the two vertical bars (105). The front and rear ends of the screw rod (106) are both threadedly connected with nuts.

9. A building prefabricated component processing equipment according to claim 8, characterized in that: A circular ring (203) is fixed on the upper side of the pressure beam (201), and a plurality of insertion holes (204) are arranged in a ring shape on the circular ring (203).

10. A method for processing a prefabricated building component using a processing device according to claim 1, characterized in that: The following steps are involved: S1: The outer cylinder (101) and the inner cylinder (103) are coaxially arranged on the upper side of the bottom plate (301); S2: Pass the cylinder (401) through the through holes (102) on the outer cylinder (101) and the inner cylinder (103); S3: inserting a plurality of steel bars into the annular space formed between the outer tube (101) and the inner tube (103); S4: pouring concrete into the annular space, waiting for the concrete to solidify, pulling out the cylinder (401), demoulding the concrete, and manufacturing a prefabricated building component.

Citation Information

Cited By

  • Energy-saving cement telegraph pole production device

    CN121105205A