Maritime work crane propeller strut hoisting method

By designing auxiliary lifting structures and alternate relay lifting methods on the offshore crane herringbone, the problem of large workload during the transportation and installation of herringbone in the prior art is solved, and a more efficient crane assembly is achieved.

CN119018760APending Publication Date: 2024-11-26CSSC NANJING LUZHOU MACHINE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411450026.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-17
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The existing offshore crane herringbone needs to be lifted twice during transportation and installation, resulting in large workload and slow progress, making it difficult to meet users' demand for high lifting capacity.

Method used

Design a herringbone lifting structure for auxiliary cranes, including setting up a shelter structure for auxiliary lifting and installation on the top and middle of the herringbone. The position of the shelter is determined through the center of gravity distribution calculation, and the alternating relay lifting method is used to reduce the sling rigging. Number of disassembly and assembled.

Benefits of technology

It effectively reduces the workload of herringbone lifting, shortens the lifting time, and improves the overall assembly efficiency of offshore cranes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119018760A_ABST
    Figure CN119018760A_ABST
Patent Text Reader

Abstract

The invention discloses a structure for assisting hoisting of a propeller strut of a maritime work crane. The structure comprises a top lifting lug structure and a middle lifting lug structure which are respectively arranged at the top and the middle of the propeller strut and are used for assisting hoisting and mounting; the top lifting lug structure is provided with at least two lifting holes, including a first lifting hole and a second lifting hole; the position of the middle lifting lug structure on the propeller strut is calculated through gravity center distribution, and the gravity center falls within the range between the top lifting lug structure and the middle lifting lug structure which serve as suspension points; the middle lifting lug structure comprises a third lifting hole; and the plurality of lifting holes of the top lifting lug structure can form alternate relay lifting. According to the propeller strut hoisting scheme, the number of times of dismounting and mounting the propeller strut sling twice in the final assembly process of the maritime work crane is reduced to one, the workload of propeller strut hoisting is effectively reduced, the working time of propeller strut hoisting is shortened, and the final assembly efficiency of the crane is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of offshore crane assembly technology, and in particular to a method for lifting an A-frame of an offshore crane. Background Art

[0002] For a long time, as an indispensable part of offshore resource development and various offshore operations, offshore cranes have been widely favored by various marine engineering projects for their convenient operation, strong adaptability and large lifting capacity. In order to meet users' high requirements for the lifting capacity of offshore cranes, offshore cranes usually adopt a turntable, herringbone frame and boom structure.

[0003] As an extremely important key component of large offshore cranes, the size of the A-frame is usually large to meet the large load-bearing capacity requirements of offshore cranes. The large structural size brings inconvenience in transportation. Due to the height restrictions on the transportation road and the height restrictions on the waterway, the A-frame is usually transported in a flat lying position. During assembly, the A-frame must first be turned over 90 degrees from a lying position to an upright position, and then the A-frame and the turntable must be closed. After closing, the A-frame and the turntable must be hoisted and installed on the hull base column. To complete the above work, the A-frame usually needs to be hoisted twice, but this type of lifting rigging requires a large amount of work to disassemble and assemble, and the plan progresses slowly. In order to meet the above requirements, it is necessary to develop a A-frame hoisting structure and method with low workload and fast progress.

[0004] In view of the above, it is necessary to propose a method for lifting the herringbone frame of an offshore crane to solve the above problems. Summary of the invention

[0005] The purpose of the present invention is to overcome the defects in the prior art and provide a method for lifting a herringbone frame of an offshore crane.

[0006] To achieve the above-mentioned purpose, the technical solution of the present invention is as follows: a structure for assisting the lifting of an A-frame of an offshore crane, comprising a top lifting ear structure and a middle lifting ear structure for assisting lifting and installation, respectively arranged at the top and middle of the A-frame; the top lifting ear structure is provided with at least two lifting holes, including a first lifting hole and a second lifting hole; the position of the middle lifting ear structure on the A-frame is calculated by the distribution of the center of gravity, so that the center of gravity falls within the range between the top lifting ear structure and the middle lifting ear structure as the suspension points; the middle lifting ear structure includes a third lifting hole; the multiple lifting holes of the top lifting ear structure can form alternating relay lifting.

[0007] Furthermore, the top lifting ear structure includes a first eye plate and a second eye plate, and the first eye plate and the second eye plate are arranged vertically and staggered to form reinforcing ribs for each other; the first eye plate is provided with a first lifting hole, and the second eye plate is provided with a second lifting hole.

[0008] Furthermore, the first lifting hole and the second lifting hole are staggered in the height direction, the second eye plate is located on one side of the first lifting hole to avoid mutual interference between the shackles, and the other side of the first lifting hole is provided with an auxiliary rib plate arranged perpendicular to the first eye plate.

[0009] Furthermore, the middle lifting ear structure includes a third eye plate, a third lifting hole is provided on the third eye plate, and middle lifting ear ribs are vertically provided on both side edges of the third eye plate.

[0010] Furthermore, the herringbone frame rotates from a flat state to an upright state, so that the herringbone frame forms a rotation plane during the rotation process, and the second eye plate and the third eye plate are parallel to the rotation plane.

[0011] Furthermore, the herringbone frame is provided with two groups of top hanging ear structures at the top, and the two groups of top hanging ear structures are respectively arranged on the left and right sides of the top of the herringbone frame; the middle hanging ear structure is provided with two groups, and the two groups of middle hanging ear structures are respectively located on the left and right sides of the middle of the herringbone frame.

[0012] Furthermore, all lifting ears are equipped with special slings, and the ends of the slings are connected to the lifting holes through shackles; the first lifting hole is connected to the first lifting wire rope, the second lifting hole is connected to the second lifting wire rope, and the third lifting hole is connected to the third lifting wire rope; there are two groups of slings on the left and right, with a total of six groups.

[0013] A method for hoisting a herringbone frame of an offshore crane comprises the following steps: Step 1: When the A-frame is lying down, install six sets of lifting slings into the first lifting hole, the second lifting hole, and the third lifting hole on both sides of the A-frame respectively; Step 2: Slowly tighten the second lifting wire rope connected to the second lifting hole and the third lifting wire rope connected to the third lifting hole, and adjust the posture of the herringbone frame by adjusting the rope length of the second lifting wire rope and the third lifting wire rope respectively, so that it can complete a 90-degree turn. During this process, keep the first lifting wire rope passing through the first lifting hole in a relaxed state; Step 3: Move the adjusted herringbone to a suitable position above the turntable for closing; after closing, slowly tighten the first lifting wire rope, and gradually loosen the second lifting wire rope when the wire rope is tightened; when the second lifting wire rope is loose, remove the second lifting wire rope and related slings; Step 4: After the A-frame and the turntable are closed, install the remaining equipment. After the installation is completed, move the A-frame and the turntable together to the top of the deck base column through the slings connected to the first lifting hole and the third lifting hole and install them; after the installation is completed, loosen the first lifting wire rope and the third lifting wire rope, and remove all the slings.

[0014] The advantages and beneficial effects of the present invention are that the A-frame lifting scheme proposed in the present application reduces the number of A-frame lifting rigging disassembly and assembly from two times during the assembly process of the offshore crane to one time, effectively reducing the workload of the A-frame lifting, shortening the A-frame lifting working time, and increasing the crane assembly efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the lifting lug structure of an A-frame of an offshore crane according to the present invention; Figure 2 It is a lifting state diagram of step 2 in the present invention; Figure 3 It is a lifting state diagram of step 4 in the present invention; In the figure: 1. A-frame; 2. Turntable; 3. First lifting hole; 4. Second lifting hole; 5. Third lifting hole; 6. First lifting wire rope; 7. Second lifting wire rope; 8. Third lifting wire rope; 9. Top lifting ear structure; 10. Middle lifting ear structure; 11. First eye plate; 12. Second eye plate; 13. Auxiliary rib plate; 14. Third eye plate; 15. Middle lifting ear rib plate. DETAILED DESCRIPTION

[0016] The specific implementation of the present invention is further described below in conjunction with the accompanying drawings and embodiments. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.

[0017] See also Figure 1 Two lifting ears are arranged on the left and right sides of the top crossbeam and the middle anti-collision beam of the herringbone frame 1, respectively, and are divided into a top lifting ear structure 9 and a middle lifting ear structure 10; the top lifting ear structure 9 on one side of the top of the herringbone frame 1 is provided with a first lifting hole 3 and a second lifting hole 4, and the angles of the two lifting holes are 90 degrees, wherein the eye plate where the first lifting hole 3 is located is along the left and right direction of the herringbone frame 1, and the lifting hole is used for the installation of various equipment on the herringbone frame 1 and the overall lifting and installation of the herringbone frame 1 on the deck base column after the herringbone frame 1 and the turntable 2 are closed; the eye plate where the second lifting hole 4 is located is along the front and rear direction of the herringbone frame 1, and the lifting hole is used for the herringbone frame 1 to turn over and close it with the turntable 2.

[0018] Specifically, the top lifting ear structure 9 includes a first eye plate 11 and a second eye plate 12, and the first eye plate 11 and the second eye plate 12 are arranged perpendicularly and staggered to form reinforcing ribs for each other; the first eye plate 11 is provided with a first lifting hole 3, and the second eye plate 12 is provided with a second lifting hole 4. The first lifting hole 3 and the second lifting hole 4 are staggered in the height direction, and the second eye plate 12 is located at one side of the first lifting hole 3 to avoid mutual interference between the shackles. The other side of the first lifting hole 3 is provided with an auxiliary rib 13 arranged perpendicular to the first eye plate 11. When the shackles at the ends of the slings are installed in the first lifting holes 3 and the second lifting holes 4, the two slings will not interfere with each other and can move freely.

[0019] The eye plate where the third lifting hole 5 of the middle lifting ear structure 10 in the middle of the A-frame 1 is located is along the front-to-back direction of the A-frame 1. The eye plate where the third lifting hole 5 is located is along the left-right direction of the A-frame 1. The lifting hole is used for installing various equipment on the A-frame 1 and for lifting the A-frame 1 and the turntable 2 as a whole and installing them on the deck base column after they are closed. Specifically, the middle lifting ear structure 10 includes a third eye plate 14, and the third lifting hole 5 is provided on the third eye plate 14. The two sides of the third eye plate 14 are respectively vertically provided with middle lifting ear ribs 15.

[0020] The eye plate where the second lifting hole 4 is located is along the front-to-back direction of the herringbone frame 1, and the lifting hole is used for turning the herringbone frame 1 over and closing it with the turntable 2. The eye plate where the lifting hole of the lifting ear in the middle of the herringbone frame 1 is located is along the front-to-back direction of the herringbone frame 1. Specifically, the herringbone frame 1 rotates from a flat state to an upright state, so that the herringbone frame 1 forms a rotation plane during the rotation process, and the second eye plate 12 and the third eye plate 14 are parallel to the rotation plane, so that when the herringbone frame 1 is lifted, the shaft of the shackle at the end of the sling can be rotated in the lifting hole.

[0021] Specifically, in this embodiment, the weight of the herringbone frame 1 is about 210T, the weight of the turntable 2 is about 200T, and the total weight after the equipment is installed is about 550T. Through the distribution of the center of gravity of the herringbone frame 1 and the turntable 2, it is calculated that during the lifting process, the maximum load of the first lifting hole 3 on one side is about 155T, the maximum load of the second lifting hole 4 on one side is about 70T, and the maximum load of the third lifting hole 5 on one side is about 170T. The diameter of the first lifting hole 3 is 110mm, matching the 200T shackle; the diameter of the second lifting hole 4 is 80mm, matching the 85T shackle; the diameter of the third lifting hole 5 is 110mm, matching the 200T shackle.

[0022] During the entire crane assembly process, the lifting plan for the herringbone frame 1 is as follows: Step 1: When the A-frame 1 is lying down, install six sets of slings in the first lifting hole 3, the second lifting hole 4, and the third lifting hole 5 on both sides of the A-frame 1. All lifting ears are equipped with special slings, and the ends of the slings are connected to the lifting holes through shackles; the two first lifting holes 3 are connected to the first lifting wire rope 6, the two second lifting holes 4 are connected to the second lifting wire rope 7, and the two third lifting holes 5 are connected to the third lifting wire rope 8; there are six sets of slings in two groups on the left and right.

[0023] Step 2: If Figure 2 As shown, the second lifting wire rope 7 connected to the second lifting hole 4 and the third lifting wire rope 8 connected to the third lifting hole 5 are slowly tensioned, and the posture of the herringbone frame 1 is adjusted by adjusting the rope lengths of the second and third lifting wire ropes 8 respectively, so that it can complete a 90-degree turn. In this process, the first lifting wire rope 6 passing through the first lifting hole 3 is kept in a relaxed state.

[0024] Step 3: Move the adjusted herringbone frame 1 to a suitable position above the turntable 2 for closing. After closing, slowly tighten the first lifting wire rope 6, and gradually loosen the second lifting wire rope 7 after the wire rope is tightened. When the second lifting wire rope 7 is relaxed, remove the second lifting wire rope 7 and related slings.

[0025] Step 4: Figure 3 As shown, after the herringbone frame 1 and the turntable 2 are closed, the remaining equipment is installed. After the installation is completed, the herringbone frame 1 and the turntable are moved to the top of the deck column and installed through the slings connected to the first lifting hole 3 and the third lifting hole 5. After the installation is completed, the first and third lifting wire ropes 8 are loosened and all the slings are removed.

[0026] The herringbone frame 1 lifting scheme proposed in the present application reduces the number of disassembly and assembly of the herringbone frame 1 lifting rigging from two times during the assembly process of the offshore crane to one time, thereby effectively reducing the workload of the herringbone frame 1 lifting, shortening the herringbone frame 1 lifting working time, and increasing the crane assembly efficiency.

[0027] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A structure for assisting offshore crane to lift a herringbone, characterized in that: The invention comprises a top hanging ear structure (9) and a middle hanging ear structure (10) for assisting lifting and installation, which are arranged at the top and the middle of an A-frame (1) respectively; the top hanging ear structure (9) is provided with at least two hanging holes, including a first hanging hole (3) and a second hanging hole (4); the position of the middle hanging ear structure (10) on the A-frame (1) is calculated by the distribution of the center of gravity, so that the center of gravity falls within the range between the top hanging ear structure (9) and the middle hanging ear structure (10) as the hanging points; the middle hanging ear structure (10) includes a third hanging hole (5); and the multiple hanging holes of the top hanging ear structure (9) can form an alternating relay lifting.

2. The structure for assisting the hoisting of an offshore crane with a herringbone frame according to claim 1 is characterized in that: The top lifting ear structure (9) comprises a first eye plate (11) and a second eye plate (12), wherein the first eye plate (11) and the second eye plate (12) are arranged vertically and staggered to form reinforcing ribs for each other; the first eye plate (11) is provided with a first lifting hole (3), and the second eye plate (12) is provided with a second lifting hole (4).

3. The structure for assisting the hoisting of an offshore crane with a herringbone frame according to claim 2 is characterized in that: The first lifting hole (3) and the second lifting hole (4) are staggered in the height direction; the second eye plate (12) is located on one side of the first lifting hole (3) to avoid mutual interference between the shackles; and the other side of the first lifting hole (3) is provided with an auxiliary rib plate (13) arranged perpendicular to the first eye plate (11).

4. A structure for assisting the hoisting of an offshore crane according to any one of claims 1 to 3, characterized in that: The middle lifting ear structure (10) comprises a third eye plate (14), a third lifting hole (5) is provided on the third eye plate (14), and middle lifting ear ribs (15) are respectively vertically provided on two side edges of the third eye plate (14).

5. The structure for assisting the hoisting of an offshore crane with a herringbone structure according to claim 4 is characterized in that: The herringbone frame (1) rotates from a flat state to an upright state, so that the herringbone frame (1) forms a rotation plane during the rotation process, and the second eye plate (12) and the third eye plate (14) are parallel to the rotation plane.

6. The structure for assisting the hoisting of an offshore crane with a herringbone frame according to claim 5, characterized in that: The herringbone frame (1) is provided with two groups of top hanging ear structures (9) at the top, and the two groups of top hanging ear structures (9) are respectively arranged on the left and right sides of the top of the herringbone frame (1); the middle hanging ear structures (10) are provided with two groups, and the two groups of middle hanging ear structures (10) are respectively located on the left and right sides of the middle of the herringbone frame (1).

7. The structure for assisting the hoisting of an offshore crane with a herringbone frame according to claim 6, characterized in that: All lifting ears are equipped with special lifting ropes, and the ends of the lifting ropes are connected to the lifting holes through shackles; the first lifting hole (3) is connected to the first lifting wire rope (6), the second lifting hole (4) is connected to the second lifting wire rope (7), and the third lifting hole (5) is connected to the third lifting wire rope (8); there are six groups of lifting ropes in total, divided into two groups on the left and right.

8. A method for hoisting a herringbone frame of an offshore crane according to claim 7, characterized in that: The following steps are involved: Step 1: When the A-frame (1) is in a lying position, six sets of lifting slings are respectively installed in the first lifting hole (3), the second lifting hole (4), and the third lifting hole (5) on both sides of the A-frame (1); Step 2: slowly tighten the second lifting wire rope (7) connected to the second lifting hole (4) and the third lifting wire rope (8) connected to the third lifting hole (5), and adjust the posture of the herringbone frame (1) by adjusting the rope retraction length of the second lifting wire rope (7) and the third lifting wire rope (8) respectively, so that it can complete a 90-degree turn. During this process, keep the first lifting wire rope (6) passing through the first lifting hole (3) in a relaxed state; Step 3: Move the adjusted herringbone frame (1) to a suitable position above the turntable (2) for closing; after closing, slowly tighten the first lifting wire rope (6), and gradually loosen the second lifting wire rope (7) when the wire rope is tightened; when the second lifting wire rope (7) is loosened, remove the second lifting wire rope (7) and related lifting slings; Step 4: After the A-frame (1) and the turntable (2) are closed, the remaining equipment is installed. After the installation is completed, the A-frame (1) and the turntable are moved to the top of the deck base column through the slings connected to the first lifting hole (3) and the third lifting hole (5) and installed. After the installation is completed, the first lifting wire rope (6) and the third lifting wire rope (8) are loosened, and all the slings are removed.