Asphalt road maintenance and repair method
By pouring concrete columns and slabs on the bottom and sides of the asphalt road collapse pit, filling soil and gravel layers, and installing connecting rods, the problem of poor connectivity between the highway and the original road after repair in the existing technology is solved, and the load-bearing capacity is improved. Security.
Patent Information
- Application Number
- CN202411206772.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing asphalt road maintenance and repair methods have resulted in poor connectivity and integrity between the restored road and the original road, low load-bearing capacity and insufficient safety.
Use the finishing on the bottom and sides of the collapsed pit to pour concrete columns and slabs to form a stable foundation, fill the soil to form a roadbed layer, pave the gravel layer and pour concrete, install connecting rods to enhance connectivity, and lay asphalt on the original highway layer.
It improves the connectivity and integrity of the repaired highway, enhances the load-bearing capacity, ensures safety, and avoids collapse.
Smart Images

Figure CN119021054A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of highway maintenance, and more specifically, relates to a method for maintaining and repairing an asphalt highway. Background Art
[0002] Asphalt pavement refers to various types of pavement paved with road asphalt materials mixed into mineral materials. Asphalt binder improves the ability of paving aggregate to resist damage to the road surface caused by traffic and natural factors, making the road surface smooth, dust-free, waterproof and durable. After a long period of use, and under the influence of factors such as rain and earthquakes, the road is prone to collapse; currently, when maintaining and repairing collapsed roads, the collapsed road is first filled, and then poured and compacted in layers. However, this repair method and structure makes the connectivity and integrity of the repaired road with the original road poor, and the repaired road has a low bearing capacity and poor safety. Summary of the invention
[0003] The purpose of the present invention is to provide a method for maintaining and repairing an asphalt road, so as to solve the technical problems existing in the prior art that the repaired road has poor connectivity and integrity with the original road, low bearing capacity and poor safety.
[0004] To achieve the above object, the technical solution adopted by the present invention is: to provide an asphalt road maintenance and repair method, comprising: S1: Clearing stones and debris out of the collapsed pit, processing the bottom surface of the collapsed pit to form a base bottom surface, and processing the inner wall of the collapsed pit to remove protruding blocks to form a flat surface; S2: machining a plurality of embedded holes downward on the bottom surface of the foundation, pouring concrete into the plurality of embedded holes to form a plurality of concrete columns; installing a template on the bottom surface of the foundation and pouring concrete to form a plurality of vertically arranged concrete slabs, and the plurality of concrete slabs are staggered to form a plurality of filling slots; opening a plurality of inclined holes obliquely downward on the flat surface, and pouring concrete into the inclined holes to form concrete rods; S3: filling soil in the plurality of filling grooves and compacting the soil to form a road base, wherein the thickness of the road base is greater than the depth of the filling grooves; and a plurality of arc-shaped grooves are provided on the road base, and the central angles corresponding to the arc-shaped grooves are 60-120 degrees; S4: laying gravel on the road base to form a gravel layer, wherein the gravel layer fills the plurality of arc-shaped grooves, and the thickness of the gravel layer is three to five times the depth of the arc-shaped grooves; the gravel layer is arranged in a corrugated shape; S5: installing a plurality of connecting rods arranged along the circumferential direction on the inner wall of the collapse pit, wherein the connecting rods extend into the collapse pit and are located above the gravel layer; pouring cement concrete on the gravel layer to form a base layer; S6: performing surface treatment on the road surface adjacent to the collapse pit and forming an overlap area arranged around the collapse pit, and laying an asphalt layer on the base layer and the overlap area.
[0005] In a possible implementation, the area of the bottom surface of the foundation is not less than two-thirds of the area of the upper end surface of the collapse pit, and the height of the flat surface is not less than one-half of the depth of the collapse pit; there are multiple concrete rods, which are divided into multiple groups, and multiple concrete rods in the same group are arranged at intervals along the circumferential direction of the inner wall of the collapse pit; multiple groups of concrete rods are arranged at intervals along the vertical direction, and multiple groups of concrete rods correspond to the roadbed layer and the gravel layer.
[0006] In a possible implementation, in step S2, the plurality of concrete columns correspond one-to-one to the plurality of filling slots, and the plurality of concrete slabs are staggered; the height of the concrete column is greater than the depth of the embedded hole, and the upper end of the concrete column is located in the roadbed.
[0007] In a possible implementation, in step S2, after the inclined hole is formed on the flat surface, a mold sleeve is fixedly installed on the flat surface, the mold sleeve is arranged obliquely, and one end is fixedly connected to the flat surface, and the other end extends toward the collapse pit; the mold sleeve is coaxially arranged with the inclined hole, and the inner diameter of the mold sleeve is consistent with the aperture of the inclined hole; when pouring concrete into the inclined hole, the concrete fills the mold sleeve.
[0008] In a possible implementation, before installing the multiple mold sleeves, a limit frame is installed in the collapse pit, and the limit frame is provided with a plurality of rotating frames corresponding one by one to the multiple inclined holes, and the rotating frame is provided with an arc-shaped supporting surface for matching with the outer surface of the mold sleeve; the rotating frame has the freedom to move in the vertical direction on the limit frame.
[0009] In a possible implementation, a plurality of first operating holes and a plurality of second operating holes are provided on the rotating frame, a first rotating shaft is provided in the first operating hole, and a second rotating shaft is provided in the second operating hole; the length direction of the first rotating shaft is parallel to the length direction of the mold sleeve, and the axis of the second rotating shaft is perpendicular to the axis of the first rotating shaft; elastic friction wheels are provided on the first rotating shaft and the second rotating shaft, and the elastic friction wheels are used to act on the mold sleeve and to drive the mold sleeve to move axially or circumferentially.
[0010] In a possible implementation, in step S3, a plurality of dispersion groove groups are provided on the inner wall of the arc-shaped groove, the plurality of dispersion groove groups are arranged at intervals along the inner wall of the arc-shaped groove, and the recessed directions of the plurality of dispersion grooves in the same dispersion groove group are different.
[0011] In a possible implementation, in step S4, two arched corrugated steel plates are arranged at intervals up and down inside the gravel layer, and the ends of the two arched corrugated steel plates are fixedly connected to the ends of the concrete rods on the flat surface; the crest of the arched corrugated steel plate located above corresponds to the trough of the arched corrugated steel plate located below, and the trough of the arched corrugated steel plate located above corresponds to the crest of the arched corrugated steel plate located below; the arched corrugated steel plate located above covers the gravel layer.
[0012] In a possible implementation, in step S5, a connecting hole corresponding to the base layer is opened on the inner wall of the collapse pit, one end of the connecting rod is inserted into the connecting hole, and the other end is located in the base layer; the connecting rod includes a hollow pipe section and a solid pipe section, and a grouting hole connected to the hollow pipe section is provided on the outer surface of the connecting rod. After the hollow pipe section is installed in the connecting hole, concrete is poured into the grouting hole, and concrete fills the connecting hole and the hollow pipe section; the connecting hole is an inclined hole with a slope of 1:15 to 1:10, and a downwardly bent portion is provided at one end of the solid pipe section away from the hollow pipe section.
[0013] In a possible implementation, the plurality of connecting rods are divided into a plurality of groups, and the plurality of groups of connecting rods are arranged at intervals from top to bottom; the lengths of the solid pipe segments in two adjacent groups of connecting rods are different; and the bending portions on the plurality of connecting rods in the same group have an angle between their arrangement directions in the base layer.
[0014] The asphalt road maintenance and repair method provided by the present invention has the following beneficial effects: compared with the prior art, the asphalt road maintenance and repair method of the present invention, when working, pre-arranges the collapsed pit so that its bottom surface and side surface are the foundation bottom surface and the flat surface, casts concrete columns and concrete slabs on the foundation bottom surface, and casts concrete rods on the flat surface, so that the collapsed pit has a firm and stable foundation; then fills the filling grooves between the concrete slabs with soil to form a roadbed, and the roadbed has an arc-shaped groove; then paves a crushed stone layer in the roadbed and the arc-shaped groove, and makes The gravel layer is corrugated, and the range of force transmission of the gravel in the gravel layer is increased by means of the gravel layer filled in the arc-shaped groove; before pouring concrete on the gravel layer, a plurality of connecting rods are pre-installed on the inner wall of the position, and the connecting rods connect the new and old roads into a whole, and pour concrete; finally, an overlap area is opened on the original road and an asphalt layer is laid; in this way, the connectivity and integrity between the repaired road and the original road can be effectively improved, and the repaired road can bear a larger impact force, etc., and will no longer collapse, and has a higher safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0016] Figure 1 A schematic diagram of the structure of an asphalt road after maintenance and repair provided by an embodiment of the present invention; Figure 2 A schematic diagram of the structure of a concrete slab and a filling slot provided by an embodiment of the present invention; Figure 3 A schematic diagram of the connection between the limiting frame, the rotating frame and the mold sleeve provided in an embodiment of the present invention; Figure 4 A partial schematic diagram of a rotating frame provided by an embodiment of the present invention; Figure 5 A schematic structural diagram of a connecting rod provided in an embodiment of the present invention.
[0017] Among them, the reference numerals in the figure are: 10. Collapse pit; 11. Foundation bottom surface; 12. Flat surface; 13. Embedded hole; 14. Concrete column; 15. Concrete slab; 16. Inclined hole; 17. Concrete rod; 18. Filling groove; 19. Road base; 20. Arc groove; 21. Gravel layer; 22. Connecting rod; 23. Base layer; 24. Overlap area; 25. Asphalt layer; 26. Mold sleeve; 27. Limiting frame; 28. Rotating frame; 29. First operating hole; 30. Second operating hole; 31. First rotating shaft; 32. Second rotating shaft; 33. Elastic friction wheel; 34. Arched corrugated steel plate; 35. Connecting hole; 36. Hollow pipe section; 37. Solid pipe section; 38. Grouting hole; 39. Bending part. DETAILED DESCRIPTION
[0018] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0019] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0020] It should be understood that the orientation or position relationship indicated by terms such as "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0021] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0022] See also Figures 1 to 5 The asphalt road maintenance and repair method provided by the present invention is now described. An asphalt road maintenance and repair method comprises: S1: Clear the rocks and debris out of the collapsed pit 10, process the bottom surface of the collapsed pit 10 to form a base bottom surface 11, and process the inner wall of the collapsed pit 10 to remove protruding blocks to form a flat surface 12; S2: machining a plurality of embedded holes 13 downward on the bottom surface 11 of the foundation, pouring concrete into the plurality of embedded holes 13 to form a plurality of concrete columns 14; installing a template on the bottom surface 11 of the foundation and pouring concrete to form a plurality of vertically arranged concrete slabs 15, and the plurality of concrete slabs 15 are staggered to form a plurality of filling slots 18; opening a plurality of inclined holes 16 obliquely downward on the flat surface 12, and pouring concrete into the inclined holes 16 to form concrete rods 17; S3: filling soil in the plurality of filling grooves 18 and compacting the soil to form a roadbed 19, wherein the thickness of the roadbed 19 is greater than the depth of the filling grooves 18; and a plurality of arc-shaped grooves 20 are formed on the roadbed 19, and the central angles of the arc-shaped grooves 20 are 60-120 degrees; S4: laying gravel on the road base 19 to form a gravel layer 21, the gravel layer 21 fills the plurality of arc-shaped grooves 20, the thickness of the gravel layer 21 is three to five times the depth of the arc-shaped grooves 20; the gravel layer 21 is arranged in a corrugated shape; S5: installing a plurality of connecting rods 22 arranged along the circumferential direction on the inner wall of the collapse pit 10, and the connecting rods 22 extend into the collapse pit 10 and are located above the gravel layer 21; pouring cement concrete on the gravel layer 21 to form a base layer 23; S6: Surface treatment is performed on the road surface adjacent to the collapse pit 10 to form an overlap area 24 arranged around the collapse pit 10 , and an asphalt layer 25 is laid on the base layer 23 and the overlap area 24 .
[0023] Compared with the prior art, the asphalt road maintenance and repair method provided by the present invention is as follows: during operation, the collapsed pit 10 is pre-arranged so that its bottom surface and side surface form a foundation bottom surface 11 and a flat surface 12; concrete columns 14 and concrete slabs 15 are cast on the foundation bottom surface 11; concrete rods 17 are cast on the flat surface 12, so that the collapsed pit 10 has a firm and stable foundation; then, soil is filled in the filling grooves 18 between the concrete slabs 15 to form a roadbed 19, and the roadbed 19 has an arc-shaped groove 20; then, a crushed stone layer 21 is paved in the roadbed 19 and the arc-shaped groove 20, and the crushed stone layer 21 is formed. 21 is corrugated, and the range of the transmission force of the gravel in the gravel layer 21 is increased by means of the gravel layer 21 filled in the arc-shaped groove 20; and then before pouring concrete on the gravel layer 21, a plurality of connecting rods 22 are pre-installed on the inner wall of the position, and the connecting rods 22 connect the new and old roads into a whole, and pour concrete; finally, an overlap area 24 is opened on the original road and an asphalt layer 25 is laid; in this way, the connectivity and integrity between the repaired road and the original road can be effectively improved, and the repaired road can bear a larger impact force, etc., and is not prone to collapse, and has a higher safety.
[0024] See also Figure 1 As a specific implementation of the asphalt highway maintenance and repair method provided by the present invention, the area of the foundation bottom surface 11 is not less than two-thirds of the area of the upper end surface of the collapse pit 10, and the height of the flat surface 12 is not less than one-half of the depth of the collapse pit 10; there are multiple concrete rods 17, which are divided into multiple groups, and multiple concrete rods 17 in the same group are arranged at intervals along the circumferential direction of the inner wall of the collapse pit 10; multiple groups of concrete rods 17 are arranged at intervals in the vertical direction, and multiple groups of concrete rods 17 correspond to the roadbed layer 19 and the gravel layer 21; thus, the entire foundation bottom surface 11 occupies a larger proportion of the cross-sectional area of the collapse pit 10, so that the bearing surface of the repaired highway is larger; at the same time, the flat surface 12 occupies a larger proportion in the vertical direction, and the multiple concrete rods 17 are divided into multiple groups and arranged at intervals up and down, so that the multiple concrete columns 14 arranged in this way have a strong connectivity between the repaired highway and the original highway, and also make the repaired highway and the original highway combined as a whole.
[0025] See also Figure 1As a specific embodiment of the asphalt highway maintenance and repair method provided by the present invention, in step S2, a plurality of concrete columns 14 correspond to a plurality of filling grooves 18 one by one, and a plurality of concrete slabs 15 are arranged in a staggered manner; the height of the concrete column 14 is greater than the depth of the embedded hole 13, and the upper end of the concrete column 14 is located in the road base 19; that is, the upper end of the concrete column 14 is inserted into the filling groove 18, and soil is added to the filling groove 18 and compacted to form a base 23. With the help of the concrete slab 15 and the concrete column 14, the soil of the base 23 is relatively independent. When the soil in one or some filling grooves 18 flows or loses, the base 23 can be in a stable and good state under the action of the concrete slab 15. The concrete slab 15 and the concrete column 14 are arranged in a staggered manner, so that the coverage of the concrete is larger.
[0026] See also Figure 1 , Figure 3 and Figure 4 As a specific implementation of the asphalt highway maintenance and repair method provided by the present invention, in step S2, after the inclined hole 16 is formed on the flat surface 12, a mold sleeve 26 is fixedly installed on the flat surface 12, the mold sleeve 26 is arranged obliquely, and one end is fixedly connected to the flat surface 12, and the other end extends toward the collapse pit 10; the mold sleeve 26 is coaxially arranged with the inclined hole 16, and the inner diameter of the mold sleeve 26 is consistent with the aperture of the inclined hole 16; when pouring concrete into the inclined hole 16, the concrete fills the mold sleeve 26; by providing the mold sleeve 26, the effective working length of the inclined hole 16 is increased, and the length of the concrete rod 17 formed after pouring concrete into the inclined hole 16 and the mold sleeve 26 is increased, and the increased part enters the interior of the collapse pit 10, so that there are more connections between the subsequently repaired highway and the original highway, and the distribution is uniform.
[0027] See also Figure 1 , Figure 3 and Figure 4As a specific embodiment of the asphalt highway maintenance and repair method provided by the present invention, before installing a plurality of mold sleeves 26, a limiting frame 27 is installed in the collapse pit 10, and a plurality of rotating frames 28 corresponding to the plurality of inclined holes 16 are provided on the limiting frame 27, and an arc-shaped supporting surface adapted to the outer side surface of the mold sleeve 26 is provided on the rotating frame 28; the rotating frame 28 has the freedom to move in the vertical direction on the limiting frame 27; the limiting frame 27 is set in the collapse pit 10, and the limiting frame 27 is provided There are multiple rotating frames 28, and the rotating frames 28 are provided with arc-shaped supporting surfaces; when in use, the mold sleeve 26 is docked with the inner wall of the collapse pit 10, and the mold sleeve 26 is coaxially aligned with the inclined hole 16, and then the rotating frame 28 is controlled to move up and down so that the arc-shaped supporting surface at the upper end of the rotating frame 28 corresponds to the height of the outer wall of the mold sleeve 26, and then the rotating frame 28 is controlled to rotate on the limiting frame 27, so that the arc-shaped supporting surface is matched and installed with the outer wall of the mold sleeve 26, so that the mold sleeve 26 is firmly supported.
[0028] See also Figure 3 and Figure 4 As a specific embodiment of the asphalt highway maintenance and repair method provided by the present invention, a plurality of first operating holes 29 and a plurality of second operating holes 30 are provided on the rotating frame 28, a first rotating shaft 31 is provided in the first operating hole 29, and a second rotating shaft 32 is provided in the second operating hole 30; the length direction of the first rotating shaft 31 is parallel to the length direction of the mold sleeve 26, and the axis of the second rotating shaft 32 is perpendicular to the axis of the first rotating shaft 31; elastic friction wheels 33 are provided on the first rotating shaft 31 and the second rotating shaft 32, and the elastic friction wheels 33 are used to act on the mold sleeve 26 and drive the mold sleeve 26 to move axially or circumferentially; after the concrete in the mold sleeve 26 is hardened, the staff manipulates the elastic friction wheels 33 in the first operating holes 29 and the second operating holes 30 to rotate around the first rotating shaft 31 and the second rotating shaft 32, and the elastic friction wheels 33 squeeze the mold sleeve 26, so that the elastic friction wheels 33 drive the mold sleeve 26 to move slightly, thereby facilitating the detachment of the mold sleeve 26. Specifically, the elastic friction wheel 33 on the first rotating shaft 31 and the second elastic friction wheel 33 on the second rotating shaft 32 are arranged perpendicular to the direction of the force acting on the mold sleeve 26, and respectively drive the mold sleeve 26 to move in the circumferential direction and the axial direction.
[0029] See also Figure 1As a specific implementation of the asphalt highway maintenance and repair method provided by the present invention, in step S3, a plurality of dispersion groove groups are provided on the inner wall of the arc-shaped groove 20, and the plurality of dispersion groove groups are arranged at intervals along the inner wall of the arc-shaped groove 20, and the depression directions of the plurality of dispersion grooves in the same dispersion groove group are different. When crushed stone is added, the crushed stone is respectively entered into the plurality of dispersion grooves, and the depression directions in the dispersion grooves are different, so that the force continues to be dispersed, thereby achieving the effect of protecting the highway.
[0030] See also Figure 1 As a specific embodiment of the asphalt highway maintenance and repair method provided by the present invention, in step S4, two arched corrugated steel plates 34 are arranged in an upper and lower interval arrangement inside the gravel layer 21, and the ends of the two arched corrugated steel plates 34 are fixedly connected to the ends of the concrete rods 17 on the flat surface 12; the crest of the arched corrugated steel plate 34 located at the top corresponds to the trough of the arched corrugated steel plate 34 located at the bottom, and the trough of the arched corrugated steel plate 34 located at the top corresponds to the crest of the arched corrugated steel plate 34 located at the bottom; the arched corrugated steel plate 34 located at the top covers the gravel layer 21; the arched corrugated steel plate 34 is arranged in the gravel layer 21, which improves the strength and bearing capacity of the gravel layer 21, and the arched corrugated steel plate 34 is fixedly connected by using the concrete rods 17 on the flat surface 12. And setting two arched corrugated steel plates 34 can make the force distribution of the gravel layer 21 more uniform and have high stability.
[0031] See also Figure 1 and Figure 5As a specific embodiment of the asphalt road maintenance and repair method provided by the present invention, in step S5, a connecting hole 35 corresponding to the base layer 23 is opened on the inner wall of the collapse pit 10, one end of the connecting rod 22 is inserted into the connecting hole 35, and the other end is located in the base layer 23; the connecting rod 22 includes a hollow pipe section 36 and a solid pipe section 37, and a grouting hole 38 connected to the hollow pipe section 36 is provided on the outer surface of the connecting rod 22. After the hollow pipe section 36 is installed in the connecting hole 35, concrete is poured into the grouting hole 38, and concrete is filled. The connecting hole 35 and the hollow pipe section 36; the connecting hole 35 is an inclined hole 16, and the slope is 1:15 to 1:10, and the end of the solid pipe section 37 away from the hollow pipe section 36 is provided with a downward bending portion 39; when in use, the hollow pipe section 36 is inserted into the connecting hole 35, and the grouting hole 38 is located inside the collapse pit 10; and then concrete is added into the hollow pipe section 36 through the grouting hole 38, so that a good connection is formed between the connecting rod 22 and the original road, and the solid pipe section 37 also makes the base 23 have a strong bearing capacity. The connecting rod 22 is set to have a certain slope, so that it has a certain elastic deformation ability, and then withstands a certain impact force. The solid pipe section 37 is provided with a bending portion 39, and the bending portion 39 increases the contact area between the connecting rod 22 and the concrete, so that the strength and bearing capacity of the entire base 23 are further improved, and the uniformity is also high.
[0032] See also Figure 1 As a specific implementation of the asphalt highway maintenance and repair method provided by the present invention, multiple connecting rods 22 are divided into multiple groups, and the multiple groups of connecting rods 22 are arranged at intervals from top to bottom; the lengths of the solid pipe sections 37 in the two adjacent groups of connecting rods 22 are different; the bending parts 39 on the multiple connecting rods 22 in the same group are located at an angle between the arrangement directions in the base layer 23; in this way, the base layer 23 formed by the concrete and the connecting rods 22 has a certain difference in stratified performance, so when subjected to a strong load impact, it can achieve a buffering effect through a certain deformation.
[0033] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for maintaining and repairing an asphalt road, characterized in that: include: S1: Clearing stones and debris out of the collapsed pit, processing the bottom surface of the collapsed pit to form a base bottom surface, and processing the inner wall of the collapsed pit to remove protruding blocks to form a flat surface; S2: machining a plurality of embedded holes downward on the bottom surface of the foundation, pouring concrete into the plurality of embedded holes to form a plurality of concrete columns; installing a template on the bottom surface of the foundation and pouring concrete to form a plurality of vertically arranged concrete slabs, and the plurality of concrete slabs are staggered to form a plurality of filling slots; opening a plurality of inclined holes obliquely downward on the flat surface, and pouring concrete into the inclined holes to form concrete rods; S3: filling soil in the plurality of filling grooves and compacting the soil to form a road base, wherein the thickness of the road base is greater than the depth of the filling grooves; and a plurality of arc-shaped grooves are formed on the road base, and the central angles corresponding to the arc-shaped grooves are 60-120 degrees; S4: laying gravel on the road base to form a gravel layer, wherein the gravel layer fills the plurality of arc-shaped grooves, and the thickness of the gravel layer is three to five times the depth of the arc-shaped grooves; the gravel layer is arranged in a corrugated shape; S5: installing a plurality of connecting rods arranged along the circumferential direction on the inner wall of the collapse pit, wherein the connecting rods extend into the collapse pit and are located above the gravel layer; pouring cement concrete on the gravel layer to form a base layer; S6: performing surface treatment on the road surface adjacent to the collapse pit and forming an overlap area arranged around the collapse pit, and laying an asphalt layer on the base layer and the overlap area.
2. The asphalt road maintenance and repair method according to claim 1, characterized in that: The area of the bottom surface of the foundation is not less than two-thirds of the area of the upper end surface of the collapse pit, and the height of the flat surface is not less than one-half of the depth of the collapse pit; there are multiple concrete rods, which are divided into multiple groups, and multiple concrete rods in the same group are arranged at intervals along the circumferential direction of the inner wall of the collapse pit; multiple groups of concrete rods are arranged at intervals along the vertical direction, and multiple groups of concrete rods correspond to the road base layer and the gravel layer.
3. The asphalt road maintenance and repair method according to claim 2, characterized in that: In step S2, the plurality of concrete columns correspond to the plurality of filling slots one by one, and the plurality of concrete slabs are arranged in a staggered manner; the height of the concrete column is greater than the depth of the embedded hole, and the upper end of the concrete column is located in the roadbed.
4. The asphalt road maintenance and repair method according to claim 1, characterized in that: In step S2, after the inclined hole is formed on the flat surface, a mold sleeve is fixedly installed on the flat surface, the mold sleeve is arranged obliquely, and one end of the mold sleeve is fixedly connected to the flat surface, and the other end extends toward the collapse pit; the mold sleeve is coaxially arranged with the inclined hole, and the inner diameter of the mold sleeve is consistent with the aperture of the inclined hole; when pouring concrete into the inclined hole, the concrete fills the mold sleeve.
5. The asphalt road maintenance and repair method according to claim 4, characterized in that: Before installing the multiple mold sleeves, a limit frame is installed in the collapse pit, and the limit frame is provided with multiple rotating frames corresponding to the multiple inclined holes one by one, and the rotating frame is provided with an arc-shaped supporting surface adapted to the outer side surface of the mold sleeve; the rotating frame has the freedom to move in the vertical direction on the limit frame.
6. The asphalt road maintenance and repair method according to claim 5, characterized in that: The rotating frame is provided with a plurality of first operating holes and a plurality of second operating holes, the first operating hole is provided with a first rotating shaft, and the second operating hole is provided with a second rotating shaft; the length direction of the first rotating shaft is parallel to the length direction of the mold sleeve, and the axis of the second rotating shaft is perpendicular to the axis of the first rotating shaft; elastic friction wheels are provided on the first rotating shaft and the second rotating shaft, and the elastic friction wheels are used to act on the mold sleeve and drive the mold sleeve to move axially or circumferentially.
7. The asphalt road maintenance and repair method according to claim 1, characterized in that: In step S3, a plurality of dispersion groove groups are provided on the inner wall of the arc-shaped groove, and the plurality of dispersion groove groups are arranged at intervals along the inner wall of the arc-shaped groove, and the recessed directions of the plurality of dispersion grooves in the same dispersion groove group are different.
8. The asphalt road maintenance and repair method according to claim 1, characterized in that: In step S4, two arched corrugated steel plates are arranged in an upper and lower interval inside the gravel layer, and the ends of the two arched corrugated steel plates are fixedly connected to the ends of the concrete rods on the flat surface; the crest of the arched corrugated steel plate located above corresponds to the trough of the arched corrugated steel plate located below, and the trough of the arched corrugated steel plate located above corresponds to the crest of the arched corrugated steel plate located below; The arched corrugated steel plate located above covers the gravel layer.
9. The asphalt road maintenance and repair method according to claim 1, characterized in that: In step S5, a connecting hole corresponding to the base layer is opened on the inner wall of the collapse pit, one end of the connecting rod is inserted into the connecting hole, and the other end is located in the base layer; the connecting rod includes a hollow pipe section and a solid pipe section, and a grouting hole connected to the hollow pipe section is provided on the outer side surface of the connecting rod. After the hollow pipe section is installed in the connecting hole, concrete is poured into the grouting hole, and concrete fills the connecting hole and the hollow pipe section; the connecting hole is an inclined hole with a slope of 1:15 to 1:10, and a downwardly bent portion is provided at one end of the solid pipe section away from the hollow pipe section.
10. The asphalt road maintenance and repair method according to claim 9, characterized in that: The multiple connecting rods are divided into multiple groups, and the multiple groups of connecting rods are arranged at intervals from top to bottom; the lengths of the solid pipe sections in two adjacent groups of connecting rods are different; the bending parts on the multiple connecting rods in the same group have an angle between the arrangement directions in the base layer.
