Construction method and construction device of inter-tunnel arch bridge and inter-tunnel arch bridge
By erecting a bracket on the tunnel construction platform and installing arch ribs using vertical hinges and cable systems, the installation problem of steel pipe arch ribs across mudslide ditches and environmental protection areas on the bridge is solved, and a low-cost and low-environmental impact tunnel is achieved Bridges are built quickly.
Patent Information
- Application Number
- CN202411411165.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-10
- Publication Date
- 2024-11-26
AI Technical Summary
The existing technology is difficult to apply to the installation method of steel pipe arch ribs. In the scene of direct connection between bridges and tunnels where both sides of the bridge are environmental protection areas, there are problems such as high construction risks, large environmental impact and difficult to meet environmental protection requirements.
A construction method of intertunnel arch bridge is adopted. By erecting brackets on the tunnel construction platforms on both sides of the shore, assemble the arch foot sections and connecting sections, and using vertical hinges and cable systems to achieve rotation and installation of arch ribs to avoid excavation of rocks. and use large lifting equipment to reduce the impact on the environment.
This method effectively reduces construction difficulty and cost, shortens construction period, ensures the satisfaction of construction safety and environmental protection requirements, and is especially suitable for the construction of intertunnel arch bridges in poor geological and environmental protection areas.
Smart Images

Figure CN119021113A_ABST
Abstract
Description
Technical Field
[0002] The invention relates to the technical field of bridge engineering, and in particular to a construction method and a construction device for an inter-tunnel arch bridge, and an inter-tunnel arch bridge. Background Art
[0003] Mountainous areas have undulating terrain and many giant landslides along the route, so the ratio of bridges to tunnels is high, and bridges and tunnels are often connected. For 60m~150m tunnel arch bridges, steel tube concrete arch bridges have excellent mechanical properties and strong span adaptability, and have strong competitive advantages.
[0004] For steel tube concrete arch bridges with a span of less than 150m, the main arch rib construction methods currently used include the support erection method, cable hoisting cantilever assembly method and rotation construction method. The support method refers to designing a temporary support at the bridge location according to the production line of the main arch rib, assembling the arch rib segments in place on the support and welding them into an arch. It is suitable for construction conditions with no water or shallow water level and good geological conditions. The cable hoisting cantilever assembly method is to erect towers on both sides or use the rock mass on both sides to set up a cable hoisting system and a buckle hanging system, and use the cable hoisting system to move the arch rib segments to the designated location to assemble with the existing segments, and use the buckle cable to buckle the arch rib segments on the tower or rock mass until they are connected to form an arch. It is suitable for deep canyons or deep waters with complex terrain and harsh environment at the bridge site. The rotation construction method is to divide the main arch rib into two half spans and place them on both sides. The main arch ribs are prefabricated and assembled using the mountain and the support. The main arch ribs of the two half spans are then rotated to the designated position with the help of power equipment to form an arch. This method is suitable for bridges located in deep valleys with rapid currents and where it is impossible to arrange cable systems on both sides.
[0005] However, some inter-tunnel arch bridges cross debris flow ditches, and the two banks are environmental protection areas. If the support method is used for construction, supports are set up in the debris flow flow area, and the structural safety is threatened by natural disasters such as floods and debris flows during the flood season, and the construction risk is high. If the cable hoisting cantilever assembly method is used for construction, since the two ends of the bridge are directly connected to the tunnel, the construction space is cramped and there is no site to set up towers. If it is directly anchored to the rock mass on both sides, it is difficult to change the construction lane, and the excavation activities will destroy the vegetation and affect the animal habitat, which does not meet the environmental protection requirements. If the rotation construction method is used to rotate the half-span arch rib segment at one time, it is difficult to find a prefabrication site to complete the assembly of the half-span arch rib segment. If the half-span arch rib is prefabricated in segments and then rotated in segments, a tower needs to be set up in the middle of the span to assemble and lift the arch rib segment. However, this method is not applicable to the poor geology where towers cannot be set up in the middle of the span. Summary of the invention
[0006] The purpose of the present invention is to solve the problem that the installation method of steel pipe arch ribs in the prior art is difficult to apply to the installation of the main arch of a bridge that crosses a debris flow ditch and the bridge and tunnel are directly connected with each other in an environmental protection zone on both sides, and to provide a construction method, construction device and tunnel-to-tunnel arch bridge.
[0007] In order to achieve the above object, the technical solution adopted by the present invention is: In a first aspect, the present invention provides a method for constructing an inter-tunnel arch bridge, comprising the following steps: S1, setting up brackets on the tunnel construction platforms on both sides respectively, assembling the arch foot section on the first platform of the bracket, and connecting the arch foot section to the pre-embedded arch foot section on the corresponding side; S2, assembling a connecting section on the second platform below the first platform, and connecting one end of the connecting section facing the mid-span to the corresponding arch foot section through a vertical hinge; S3, connecting a first cable to the connecting section on the local shore, tightening the first cable to separate the connecting section from the second platform, and then dismantling the corresponding second platform; S4, loosening the first cable until the connecting section is in a natural equilibrium state, and connecting a second cable between the connecting section and the bracket on the opposite bank; S5, tightening the second cable to drive the connecting section to rotate around the vertical hinge until it reaches the designed axis position and connect the joint; S6. Remove the first cable, the second cable and the two brackets to complete the erection of the main arch.
[0008] By adopting the construction method of an inter-tunnel arch bridge described in the present invention, a support is erected using a construction platform for building a tunnel, so that excavation of rock masses on both sides can be avoided, interference with the surrounding environment is small, and it is beneficial to protecting the ecological balance and natural resources of the bridge area and meeting environmental protection requirements. The connecting section and the arch foot section in the span are assembled using platforms of different heights of the same support, so as to avoid setting up assembly supports in the debris flow area. The second platform located below the first platform is used to assemble the connecting section, which can save assembly space and realize sharing with the tunnel construction site. In addition, since the first platform and the second platform correspond to each other up and down, the lifting link after assembly can be avoided, which is more suitable for the scene where the bridge and the tunnel are connected. By using the vertical hinge in combination with the first cable and the second cable, the connecting section with vertical space conflict can be installed using the support on the opposite bank, without anchoring to the rock masses on both sides and without using large lifting equipment. By adopting this construction method, the location of the bracket can avoid excavating the rock on both sides to affect the environment. The installation of the connecting section does not require the erection of brackets in the river channel to ensure construction safety. There is no need to anchor it to the rock on both sides, and there is no need to use large-scale lifting equipment. The bracket is relatively small in height and the construction difficulty is low. The bracket can be used for assembly and rotation. There are fewer on-site construction devices, which is conducive to reducing costs, reducing on-site workload, shortening construction period, and effectively realizing the rapid construction of tunnel bridges.
[0009] The height position of the first platform for assembling the arch foot section is determined according to the designed installation position of the arch foot section. The first platform is not limited to be the platform on the top surface of the bracket. If there is no need to assemble the connecting section on the opposite bank, the first platform may also be located at the bottom. The second platform is located below the first platform. The specific height is determined according to the actual main arch linearity, arch section length and other parameters to avoid interfering with the rotation of the connecting section.
[0010] Preferably, if there are two connecting sections, after step S5, steps S2 to S5 are repeated on the other bank, and then step S6 is performed.
[0011] When connecting sections need to be installed on both sides, the connecting sections are assembled and rotated in the same way on both sides successively, and finally connected.
[0012] Preferably, in step S4, the first cable is gradually relaxed in stages.
[0013] Preferably, before step S4, a balancing cable is provided on the bracket on which the second cable is provided.
[0014] Further preferably, the other end of the first cable and the other end of the balance cable are anchored to the abutments on the corresponding sides respectively.
[0015] By adopting the above-mentioned setting method, the existing structure can be directly used for anchoring without the need for additional excavation of the site or occupying the construction platform to set up ground anchors, thereby helping to reduce the demand for construction sites and damage to the mountain environment, and also facilitating the simultaneous construction of bridges and tunnels.
[0016] Preferably, in step S6, the first cable is removed between steps S4 and S5.
[0017] Preferably, the erection of the main arch is carried out synchronously with the construction of the tunnel.
[0018] Further shorten the construction period and ensure that the entire line is opened to traffic as soon as possible.
[0019] In a second aspect, the present invention further provides a construction device for an inter-tunnel arch bridge, which is applied to a construction method for an inter-tunnel arch bridge as described above, comprising: two brackets, the brackets comprising a first platform and a second platform; A first cable, used for lowering the connecting section; The second cable is used to lift the connecting section.
[0020] The construction device of the tunnel arch bridge described in the present invention has a simple structure, a safe installation position, and a small footprint, which is conducive to reducing construction costs and construction difficulty, does not require large-scale lifting equipment, and is particularly suitable for bridge construction where bridges and tunnels are directly connected in mountainous areas.
[0021] Preferably, the second platform is detachably connected to the bracket.
[0022] Preferably, the support comprises four columns, and a plurality of cross links are provided between two adjacent columns.
[0023] In a third aspect, the present invention further provides an inter-tunnel arch bridge, wherein the main arch is constructed using a construction method for an inter-tunnel arch bridge as described above or using a construction device for an inter-tunnel arch bridge as described above.
[0024] The use of the inter-tunnel arch bridge described in the present invention can shorten the construction period, reduce the construction risk, and help save construction costs. It is particularly suitable for the construction of inter-tunnel arch bridges in environmental protection areas with poor geology.
[0025] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are: 1. By adopting the construction method of an inter-tunnel arch bridge described in the present invention, the location of the bracket can avoid excavating the rock masses on both sides to affect the environment. The installation of the connecting section does not require the erection of a bracket in the river channel, thereby ensuring construction safety. There is no need to anchor it to the rock masses on both sides, and there is no need to use large-scale lifting equipment. The bracket is relatively small in height and has low construction difficulty. The bracket can be used for assembly and rotation. There are fewer on-site construction devices, which is conducive to reducing costs and on-site workload, which is conducive to shortening the construction period and effectively realizing the rapid construction of inter-tunnel bridges.
[0026] 2. The construction device of the tunnel arch bridge described in the present invention has a simple structure, a safe installation position, and a small footprint, which is conducive to reducing construction costs and construction difficulties. It does not require large-scale lifting equipment and is particularly suitable for bridge construction where bridges and tunnels are directly connected in mountainous areas.
[0027] 3. The use of the inter-tunnel arch bridge described in the present invention can shorten the construction period, reduce construction risks, and help save construction costs. It is particularly suitable for the construction of inter-tunnel arch bridges in environmental protection areas with poor geology. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the process of a construction method of an inter-tunnel arch bridge in Example 1; Figure 2 is a schematic diagram of step 1 of a construction method of an inter-tunnel arch bridge in Example 1; Figure 3 yes Figure 2 A left schematic view of the bracket on the left side of the middle; Figure 4 yes Figure 2 A right side schematic diagram of the bracket on the right side of the middle; Figure 5 is a schematic diagram of step 2 of a construction method of an inter-tunnel arch bridge in Example 1; Figure 6 yes Figure 5A left schematic view of the bracket on the left side of the middle; Figure 7 is a schematic diagram of step 3 of a construction method of an inter-tunnel arch bridge in Example 1; Figure 8 yes Figure 7 A left schematic view of the bracket on the left side of the middle; Fig. 9 is a schematic diagram of step 4 of a construction method of an inter-tunnel arch bridge in Example 1; Fig.10 yes Fig. 9 A left schematic view of the bracket on the left side of the middle; Fig.11 is a schematic diagram of step 5 of a construction method of an inter-tunnel arch bridge in Example 1; Fig.12 It is a schematic diagram of step six of the construction method of an inter-tunnel arch bridge in Example 1.
[0029] Icon: 00-embedded section of arch foot, 01-arch foot section, 02-connecting section, 03-vertical hinge, 1-bracket, 11-first platform, 12-second platform, 2-first cable, 3-second cable, 4-balance cable. DETAILED DESCRIPTION
[0030] The present invention will be described in detail below in conjunction with the accompanying drawings.
[0031] In order to make the purpose, technical scheme and advantages of the present invention more clear, the present invention is further described in detail below in conjunction with test examples and specific implementation methods. However, this should not be understood as the scope of the above-mentioned subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.
[0032] Unless otherwise specified, in the description of the specific embodiments of the present invention, the terms indicating the orientation or position relationship such as "up", "down", "left", "right", "center", "inside", "outside", etc. are all expressions based on the orientation or position relationship shown in the drawings, or are the orientation or position relationship when the invented product / equipment / device is usually used. These terms of orientation or position relationship are only for the convenience of describing the scheme of the present invention or simplifying the description in the specific embodiments, so as to facilitate the technicians to quickly understand the scheme, and do not indicate or imply that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation on the present invention.
[0033] In addition, if the terms "horizontal", "vertical", "overhanging", "parallel" and the like appear, it does not mean that the corresponding devices / components / elements are required to be absolutely horizontal or vertical or overhanging or parallel, but may be slightly tilted or have deviations. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but may be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices / components / elements are set in directions such as "horizontal", "vertical", "overhanging", "parallel", etc., and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its role in the scheme of the present invention.
[0034] In addition, the expressions "primary", "secondary", "tertiary", etc. that appear in the terms are merely descriptions used to distinguish the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.
[0035] In addition, in the description of the embodiments of the present invention, "several", "plurality" and "a number" represent at least 2. It can be any number such as 2, 3, 4, 5, 6, 7, 8, 9, and even more than 9.
[0036] In addition, in the description of the technical solution of the present invention, unless otherwise clearly specified / defined / restricted, the terms "set", "install", "connect", "connected", "provided with", "laid", and "arranged" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, and can be welding, riveting, bolting, threading, and other commonly used connection means in the field. This connection can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or an indirect connection through an intermediate medium, and it can be the internal connection of two elements.
[0037] Example 1 like Figure 1 As shown, a construction method of an inter-tunnel arch bridge adopted in this embodiment comprises the following steps: S1, respectively setting up a support 1 on the tunnel construction platforms on both sides, assembling an arch foot section 01 on the first platform 11 of the support 1, and connecting the arch foot section 01 to the arch foot embedded section 00 on the corresponding side; S2, assembling the connecting section 02 on the second platform 12 below the first platform 11 on the bank, and connecting one end of the connecting section 02 facing the mid-span with the corresponding arch foot section 01 through a vertical hinge 03; S3, connecting the first cable 2 to the connecting section 02, tightening the first cable 2 to separate the connecting section 02 from the second platform 12, and then dismantling the corresponding second platform 12; S4, loosen the first cable 2 until the connecting section 02 is in a natural equilibrium state, and connect the second cable 3 between the connecting section 02 and the bracket 1 on the opposite bank; S5, tightening the second cable 3 drives the connecting section 02 to rotate around the vertical hinge 03 until it reaches the designed axis position and connects the joint; S6. Remove the first cable 2, the second cable 3 and the two brackets 1 to complete the erection of the main arch.
[0038] Figure 1 In the figure, the dotted part is shown as the construction process.
[0039] Taking three segments as an example, i.e., including two arch foot segments 01 and one connecting segment 02, the tunnel entrance construction platforms on both sides are used to set up the bracket 1, and the arch foot segment 01 is assembled on the first platform 11 of the bracket 1. The height position of the first platform 11 is determined according to the designed installation position of the arch foot segment 01, such as Figure 2 The first platform 11 on the middle left bank is located at the top of the corresponding bracket 1. Figure 2 The first platform 11 on the middle right bank is located at the lower part of the corresponding bracket 1. The number of platforms on the bracket 1 is set according to actual needs. After the assembly is completed, it is spliced with the arch foot embedded section 00 on the same bank to complete the installation of the first section on both sides. Figure 2-Figure 4 shown.
[0040] Since there is only one connecting section 02, according to the construction conditions on both sides, the height of the bracket 1 and other factors, the connecting section 02 can be assembled on the corresponding bank side. In this embodiment, the connecting section 02 is assembled on the left bank as an example. The connecting section 02 is assembled on the second platform 12 below the first platform 11. Figure 5-Figure 6 As shown, the assembling process of the arch foot section 01 and the connecting section 02 is performed in accordance with the prior art. After the assembly is completed, the arch foot section 01 and the connecting section 02 are connected via the vertical hinge 03 .
[0041] like Figure 7 As shown, the first cable 2 is connected to the connecting section 02 of the local shore, and the first cable 2 is tightened to make the connecting section 02 separate from the second platform 12, and then the corresponding second platform 12 is removed, as shown in FIG. Figure 8 As shown, the first cable 2 can be connected to the anchor of the arch seat or construction platform on the same side.
[0042] Gradually loosen the first cable 2 to ensure the safe lowering of the connection section. When the connection section 02 reaches the deadweight balance point, use the support 1 on the opposite bank as a lifting tower to lift the connection section 02 through the second cable 3. Figure 9-10As shown, of course, the position where the second cable 3 is connected to the support 1 on the opposite bank should be sufficient to enable the connecting section 02 to be lifted to the designed linear position.
[0043] After the rotation is in place, re-measure the elevation of the control points of the arch rib to ensure that it meets the design requirements. You can choose to weld the joint of the connection section 02 and the arch foot section 01 in low temperature weather, such as Fig.11 shown.
[0044] Finally, the first cable 2, the second cable 3 and the two brackets 1 are removed to complete the erection of the main arch.
[0045] In some embodiments, the second cable 3 and the first cable 2 may be removed first, and then the two brackets 1 may be removed.
[0046] In some embodiments, the first cable 2 is removed between steps S4 and S5 , that is, the first cable 2 can be removed after the second cable 3 is connected.
[0047] In some embodiments, before step S4, a balancing cable 4 is provided on the bracket 1 provided with the second cable 3, such as Figure 7 shown.
[0048] In some embodiments, the other end (anchor end) of the first cable 2 and the other end (anchor end) of the balance cable 4 can be anchored at a location on the same side such as a mountain, a construction platform, an arch seat, etc.
[0049] In some embodiments, the erection of the main arch is synchronized with the construction of the tunnel.
[0050] In some embodiments, if there are two connecting sections 02, that is, there are four arch rib segments, after step S5, steps S2-S5 are repeated on the opposite bank, and then step S6 is performed, that is, the two connecting sections 02 are assembled on the second platform 12 of the brackets 1 on both sides, respectively, and the brackets 1 on both sides serve as lifting towers for the connecting sections 02 on the opposite bank.
[0051] A construction method for an inter-tunnel arch bridge described in the present invention is adopted. With this construction method, the erection position of the support 1 can avoid excavating the rock masses on both sides to affect the environment. The installation of the connecting section 02 does not require the support 1 to be erected in the river channel, thereby ensuring construction safety. There is no need to anchor it to the rock masses on both sides, and there is no need to use large-scale lifting equipment. The support 1 is relatively small in height and has low construction difficulty. The support 1 can be used for assembly as well as rotation. There are fewer on-site construction devices, which is conducive to reducing costs. The on-site workload is small, which is conducive to shortening the construction period, and effectively realizing the rapid construction of the inter-tunnel bridge.
[0052] Example 2 The present invention also provides a construction device for an inter-tunnel arch bridge, which is applied to a construction method for an inter-tunnel arch bridge as described in Example 1. Figure 1-Figure 11 As shown, including: Two brackets 1, each bracket 1 comprising a first platform 11 and a second platform 12; The first cable 2 is used to lower the connecting section 02; The second cable 3 is used to lift the connecting section 02 .
[0053] In some embodiments, the second platform 12 is detachably connected to the bracket 1 for easy removal, such as by bolt connection.
[0054] In some embodiments, the structure of the bracket 1 can select the structure of the assembled bracket in the prior art. In this embodiment, the bracket 1 includes four columns, and a number of cross-connections are provided between two adjacent columns to form a lattice structure. The columns can adopt a steel pipe structure.
[0055] In some embodiments, a balancing cable 4 is also included. Of course, other existing methods can also be used to stabilize the corresponding bracket 1. The balancing cable 4 and the second cable 3 are two independent cables.
[0056] In some embodiments, the other ends of the first cable 2 and the second cable 3 are respectively anchored to the arch seats on the corresponding sides. For example, in this embodiment, one end of the second cable 2 is connected to the arch seat on the left bank, and the other end is connected to the connecting section 02. Figure 7 As shown, one end of the second cable 3 is connected to the connecting section 02 and the other end is connected to the bracket 1, and one end of the balance cable 4 is connected to the bracket 1 and the other end is connected to the bracket 1. Fig. 9 The arch on the middle right bank, such as Fig. 9 shown.
[0057] By adopting the above-mentioned setting method, the existing structure can be directly used for anchoring without the need for additional excavation of the site or occupying the construction platform to set up ground anchors, thereby helping to reduce the demand for construction sites and damage to the mountain environment, and also facilitating the simultaneous construction of bridges and tunnels.
[0058] The construction device of the tunnel arch bridge described in the present invention has a simple structure, a safe installation position, and a small footprint, which is conducive to reducing construction costs and construction difficulty, does not require large-scale lifting equipment, and is particularly suitable for bridge construction where bridges and tunnels are directly connected in mountainous areas.
[0059] Example 3 The present invention also provides an inter-tunnel arch bridge, wherein the main arch is constructed by using the inter-tunnel arch bridge construction method as described in Example 1 or the inter-tunnel arch bridge construction device as described in Example 2. Fig.12 shown.
[0060] The use of the inter-tunnel arch bridge described in the present invention can shorten the construction period, reduce the construction risk, and help save construction costs. It is particularly suitable for the construction of inter-tunnel arch bridges in environmental protection areas with poor geology.
[0061] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for constructing an inter-tunnel arch bridge, characterized in that: The following steps are included: S1, setting up brackets (1) on the tunnel construction platforms on both sides respectively, assembling the arch foot section (01) on the first platform (11) of the bracket (1), and connecting the arch foot section (01) to the arch foot embedded section (00) on the corresponding side; S2, assembling a connecting section (02) on the second platform (12) below the first platform (11) on the bank, and connecting one end of the connecting section (02) facing the mid-span to the corresponding arch foot section (01) through a vertical hinge (03); S3, connecting a first cable (2) to the connecting section (02), tightening the first cable (2) to separate the connecting section (02) from the second platform (12), and then dismantling the corresponding second platform (12); S4, loosening the first cable (2) until the connecting section (02) is in a natural equilibrium state, and connecting a second cable (3) between the connecting section (02) and the support (1) on the opposite bank; S5, tightening the second cable (3) to drive the connecting section (02) to rotate around the vertical hinge (03) until it reaches the designed axis position and connects the joint; S6. Remove the first cable (2), the second cable (3) and the two brackets (1) to complete the erection of the main arch.
2. The construction method of a tunnel arch bridge according to claim 1, characterized in that: If there are two connecting sections (02), after step S5, steps S2-S5 are repeated on the other bank, and then step S6 is performed.
3. The construction method of a tunnel arch bridge according to claim 1, characterized in that: In step S4, the first cable (2) is gradually relaxed in stages.
4. The construction method of a tunnel arch bridge according to claim 1, characterized in that: Before step S4, a balancing cable (4) is provided on the support (1) on which the second cable (3) is provided.
5. The construction method of a tunnel arch bridge according to claim 4, characterized in that: The other end of the first cable (2) and the other end of the balance cable (4) are respectively anchored to the abutments on the corresponding sides.
6. The construction method of a tunnel arch bridge according to claim 1, characterized in that: The first cable (2) is replaced and removed between steps S4 and S5.
7. A method for constructing an inter-tunnel arch bridge according to any one of claims 1 to 6, characterized in that: The erection of the main arch is carried out synchronously with the construction of the tunnel.
8. A construction device for an inter-tunnel arch bridge, characterized in that: A construction method for an inter-tunnel arch bridge as claimed in any one of claims 1 to 7, comprising: Two supports (1), wherein the supports (1) comprise a first platform (11) and a second platform (12); A first cable (2), used for lowering the connecting section (02); The second cable (3) is used to lift the connecting section (02).
9. The construction device for an inter-tunnel arch bridge according to claim 8, characterized in that: The support (1) comprises four columns, a plurality of cross-connections are provided between two adjacent columns, and the second platform (12) is detachably connected to the support (1).
10. An inter-tunnel arch bridge, characterized in that: The main arch is constructed by using a construction method for an inter-tunnel arch bridge as described in any one of claims 1-7 or using a construction device for an inter-tunnel arch bridge as described in any one of claims 8-9.