Karst foundation grouting reinforcement method based on stress diffusion and corrosion rate

Through the calculation of stress diffusion and dissolution rate and the encircling layer-by-layer dynamic grouting method, the reinforcement problem under complex conditions of karst foundations is solved, the accuracy and efficiency of foundation reinforcement are achieved, resource waste and engineering costs are reduced, and the cost of resources is ensured. Long-term stability and safety of foundations.

CN119021197APending Publication Date: 2024-11-26SHANDONG LUQIAO GROUP CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411441952.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-16
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

Under the complex geological conditions of karst foundations, traditional grouting and reinforcement methods are difficult to accurately control the construction scope and material use, resulting in waste of resources and unstable foundation structure, and failing to solve the problem of soil caves and caves continuing to develop from the root.

Method used

Through the calculation of stress diffusion and dissolution rate, the foundation reinforcement length is divided and the enclosed layer-by-layer dynamic grouting method is adopted. According to the geological survey results, cement slurry or fast gelling materials are poured into a specific range to form a stable holding layer, and control the Soil cohesion and prevent soil particles from flowing.

Benefits of technology

The accuracy and efficiency of foundation reinforcement are achieved, the use of construction materials and engineering costs are reduced, the bearing capacity and stability of the foundation are significantly improved, the formation of new caves and soil caves is prevented, and the safety and economicality of the project are ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021197A_ABST
    Figure CN119021197A_ABST
Patent Text Reader

Abstract

The invention discloses a karst foundation grouting reinforcement method based on stress diffusion and corrosion rate. The method comprises the following steps: firstly, determining a foundation reinforcement length through a project general situation, and determining bedrock lithology and underground water characteristics according to geological exploration; and then determining the horizontal diffusion width and the vertical diffusion safety depth of the roadbed stress according to the roadbed width and the roadbed load. And testing the corrosion rate of the bedrock by adopting an indoor constant-temperature dynamic corrosion test in combination with the lithology of the bedrock and the characteristics of underground water. And the final grouting reinforcement range is determined by combining the roadbed stress diffusion range and the distance from karst corrosion to the foundation, and finally surrounding type layer-by-layer dynamic grouting is adopted. And after grouting is completed, the grouting effect is detected, it is ensured that the karst foundation is effectively reinforced, and engineering safety is guaranteed. The method has the advantages of being efficient, economical and safe, and a more reliable and economical solution is provided for engineering construction of the karst development area.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of geotechnical engineering, and in particular to a karst foundation grouting reinforcement method based on stress diffusion and dissolution rate. Background Art

[0002] Karst, also known as karst, refers to the comprehensive geological action and phenomena produced by soluble rocks (including carbonate rocks, sulfate rocks and halide rocks, etc.) under the action of corrosive water flow, which is mainly chemical dissolution, supplemented by mechanical erosion of water and gravity collapse of rock mass, accompanied by material dissolution, migration and redeposition. The development of karst is affected by engineering geology, hydrogeology and other factors, and is the result of the coupling of many factors. Karst foundation, as a geological phenomenon caused by geological action in which subsurface rock layers are dissolved and caves are formed, has complex and unstable foundation conditions, which can easily cause various geological disasters, such as ground collapse, subsidence, landslide, etc., which seriously threaten the safety and stability of infrastructure such as roads and buildings. my country's karst landforms are widely distributed and cover a large area. It is one of the largest karst areas in the world. Grouting, also known as grouting, is the preparation of slurry with determined raw materials and additives. Generally, hydraulic pressure is used, and air pressure or electrochemical principles are also used. The slurry is injected into the formation through pumping equipment. The slurry displaces water, air, etc. between rock and soil particles or in cracks by means of penetration, filling and splitting. After the slurry gels and hardens, the strength, impermeability and stability of the new slurry consolidation body are greatly improved, thereby achieving the purpose of strengthening the formation or preventing seepage and blocking water.

[0003] When grouting reinforcement treatment is carried out, it is inevitable to encounter complex karst geological conditions, including complex terrains such as beaded caves, sinkholes, and large cavities. The theoretical research and practical application of grouting technology are still insufficient. These special geological structures put forward higher requirements on the design, material selection, and construction control of grouting technology. The implementation of the grouting scheme relies on a lot of experience accumulation and lacks a systematic and scientific theoretical guidance framework. Therefore, it is necessary to conduct in-depth research on the grouting reinforcement treatment technology of complex karst foundations under the roadbed in order to build a more complete and scientific theoretical system to guide the grouting design and construction in practice and ensure the safety and stability of high-speed railway projects.

[0004] Although the traditional method of karst grouting can strengthen the foundation and improve the bearing capacity of the foundation, it will waste a lot of resources and increase the cost of the project, and fail to solve the problem of soil caves and karst caves continuing to develop upward, thus threatening the roadbed structure. This method can accurately grasp the grouting range through the calculation of foundation stress diffusion and dissolution test, saving construction materials and unnecessary areas, and solving the problem of karst upward. This method is characterized by its high efficiency and economy, which brings more reliability and cost-effectiveness to the engineering construction field in karst development areas, and effectively guarantees the smooth implementation and long-term safe operation of the project. It also provides a practical solution for future grouting theory research and practical application, enriching the theory of karst foundation grouting and making it more systematic and scientific. Summary of the invention

[0005] The object of the present invention is to provide a karst foundation grouting reinforcement method based on stress diffusion and dissolution rate to solve the problems raised in the background technology.

[0006] To achieve the above object, the present invention provides the following technical solution: a karst foundation grouting reinforcement method based on stress diffusion and dissolution rate, comprising the following steps:

[0007] Step 1: Determine the foundation reinforcement length L based on the project overview, and divide the reinforcement length into several partition lengths L according to the geological conditions. i ;

[0008] Step 2: Through geological survey, determine the karst bedrock lithology and groundwater characteristics. The groundwater characteristics include temperature, pH value and flow rate. Use indoor constant temperature dynamic dissolution test to test the dissolution rate of rock and determine the top depth H after karst dissolution during operation. kd ;

[0009] Step 3: Determine the horizontal diffusion width W of the roadbed stress and the vertical diffusion safety depth γH of the roadbed stress according to the roadbed width B and the roadbed load P. sd ;

[0010] Step 4: Compare the roadbed stress diffusion depth γH sd The top depth of karst dissolution H kd The value of

[0011] Step 5: Based on the results of step 3, two grouting schemes are used to carry out surrounding layer-by-layer dynamic grouting reinforcement of the foundation:

[0012] Step 51: When the roadbed stress diffusion safety depth reaches the top depth of karst dissolution, i ×W×γH sdGrouting is carried out within the range of 3-5 meters above and below the contact surface between rock and soil layer to fill all soil holes, karst grooves and karst grooves. For the karst caves penetrating the top plate of bedrock, quick-setting materials are used to seal them, so as to form a stable bearing layer;

[0013] Step 52: When the roadbed stress diffusion depth does not reach the top depth of karst dissolution, i ×W×γH sd Cement slurry is poured into the area to increase the cohesion c value of the soil, control the freedom of soil particles and avoid the flow of soil particles.

[0014] Preferably, in step 1, the foundation reinforcement length L is determined based on the working condition overview, and the reinforcement length is divided into n units according to the geological conditions, and the length of each unit partition is L i (i=1,2,……n).

[0015] Preferably, in step 2, bedrock sampling is performed at key karst development sites, the rock samples are made into 30 mm×10 mm×5 mm cuboids, rinsed with distilled water, dried in a drying oven at 40° C. for 24 hours, and weighed using an electronic balance with an accuracy of 0.1 mg;

[0016] Groundwater is prepared according to the local groundwater composition, and water and CO2 are mixed using water tanks and carbon dioxide cylinders. 2 Prepare the dissolving water in the mixing container; use the constant temperature control system to ensure that the water and CO 2 The temperature of the dissolved water in the mixing container is the temperature of the local karst groundwater; a high-precision constant-flow water pump is used to control the water flow rate to the common flow rate of the local karst groundwater; in the dissolution reaction device, the dissolved water is in full contact with the test rock sample, and the rock sample is taken out, dried and weighed after the experiment; the dissolution amount, dissolution rate and dissolution velocity are solved using formulas;

[0017] △m 1 =m 1 -m 2 , r = △m 1 / m 1 ׉,v=△m 1 / t;

[0018] Where m 1 、m 2 are the mass of the rock sample before and after dissolution; △m 1 is the total amount of dissolution; r is the dissolution rate; v is the dissolution velocity; t is the water-rock interaction time;

[0019] After obtaining the local rock dissolution rate, the distance of karst dissolution upward is calculated according to the engineering design life, and the top depth of karst dissolution H is determined. kd .

[0020] Preferably, in step 3, the partition length L i According to the distribution law of horizontal additional stress in the Code for Design of Building Foundations (GB50007-2011), the horizontal stress diffusion width W is calculated by the roadbed width B and the roadbed load P;

[0021] In the partition length L i According to the distribution law of vertical additional stress in the Code for Design of Building Foundations (GB50007-2011), the range of vertical stress diffusion is calculated by the roadbed width B and the roadbed load P, which is defined as the roadbed stress diffusion depth H. sd , considering the safety factor γ, determine the safe depth of roadbed stress diffusion γH sd .

[0022] Preferably, in step 3, when the roadbed stress diffusion safety depth γH sd Less than the top depth of karst dissolution H kd When: Using the surrounding layer-by-layer dynamic grouting method, only L i ×W×γH sd Cement slurry is poured into the soil to increase the cohesion c value of the soil, control the freedom of soil particles and avoid the flow of soil particles;

[0023] When the roadbed stress diffuses to a safe depth γH sd Greater than the top depth of karst dissolution H kd , in L i ×W×γH sd A surrounding layer-by-layer dynamic grouting method is used within a range of 3-5 meters above and below the contact surface between rock and soil to fill all caves and karst grooves; the surrounding layer-by-layer dynamic grouting method uses a gel material that can be quickly cured and has high bonding strength to seal caves and soil holes, and constructs a stable bearing layer in the key area of ​​the rock-soil boundary that significantly improves the bearing capacity.

[0024] Preferably, when filling caves and gullies, injecting cement slurry into the soil, and constructing the bearing layer of the rock-soil interface, the formula p=p 0 +mh determines the grouting pressure, p 0 is the allowable grouting pressure of the bedrock surface layer, in MPa. In karst areas, it is taken as 0.3-0.5; m is the increase in pressure for every 1m of bedrock depth, in MPa. In karst areas, it is taken as 0.2-0.5; h is the depth of the grouting section, in m.

[0025] Preferably, the hole arrangement system for grouting is such that the hole spacing and row spacing should be arranged so that the effective filling range of adjacent holes can be connected to each other, leaving no large cracks and not making too many overlapping parts; the grouting ports are arranged in multiple rows in a matrix to facilitate the construction of the subsequent surrounding layer-by-layer dynamic grouting method.

[0026] Preferably, the construction is carried out from the outside to the inside, row by row, with skipping of holes in each row; first grouting the outermost row to form a closed circle, and then advancing inwards row by row without skipping; during the grouting process, dynamic construction and exploration and injection are combined, and construction parameters are dynamically adjusted according to the detection results; when karst caves, soil holes, drill drops, serious water leakage, and a large amount of grouting in a single hole are found, the grouting holes should be increased around the hole until the karst cave or soil hole is detected to be full, and then extended construction exploration holes are constructed to confirm.

[0027] Preferably, the standard for ending grouting is that the injection volume of continuous grouting for 10 minutes under the termination pressure is no more than 5.0L / min; the grouting point appears 3 to 5m outside the grouting range; the bedrock of the grouting borehole is intact, or after multiple groutings, the hole pressure exceeds 1.5MPa; the grouting volume of a single hole reaches 1.5 to 2.0 times the average grouting volume, and the grouting volume is significantly reduced; the grouting effect detection methods are inspection hole method, standard penetration test method, plate load test method and foundation settlement detection method.

[0028] Preferably, the grouting material in step 5 is 42.5 grade ordinary Portland cement, and the water-cement ratio of the cement slurry is 0.6:1 to 1:1, which is thin at first and thick later.

[0029] Compared with the prior art, the present invention has the following beneficial effects:

[0030] According to the geological characteristics of the proposed area, an innovative foundation reinforcement strategy is proposed. Compared with the traditional foundation grouting treatment method, this strategy has significant advantages in optimizing the efficiency of slurry use; reducing engineering costs; significantly improving the bearing capacity of the foundation; preventing the formation of new caves and soil caves; and greatly reducing safety hazards. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 A schematic flow chart of a karst foundation grouting reinforcement method based on stress diffusion and dissolution rate provided in an embodiment of the present application;

[0032] Figure 2 A foundation grouting reinforcement method based on stress diffusion and karst development rate provided in the embodiment of the present application sd >H kd Relationship diagram;

[0033] Figure 3 A foundation grouting reinforcement method based on stress diffusion and karst development rate provided in the embodiment of the present application sd <H kd Relationship diagram;

[0034] Figure 2 and Figure 3 Description of the mark:

[0035] 1. Roadbed; 2. Boundary before karst development; 3. Overlying soft soil layer; 4. Soluble bedrock layer; 5. Karst cave;

[0036] Figure 4 It is a schematic diagram of the surrounding layer-by-layer grouting method;

[0037] Figure 4 The serial number in the middle is the grouting order;

[0038] Figure 5 Schematic diagram of horizontal stress diffusion and horizontal grouting construction range of roadbed, W is the horizontal stress diffusion range, B is the roadbed width, L is the roadbed width i (i=1,2,……n) is the construction unit. DETAILED DESCRIPTION

[0039] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0040] Please see attached Figure 1-2 The present invention provides: a karst foundation grouting reinforcement method based on stress diffusion and dissolution rate, comprising the following steps:

[0041] Step 1: Determine the foundation reinforcement length L based on the project overview, and divide the reinforcement length into several partition lengths L according to the geological conditions. i ; Divide the reinforcement length into n units according to the geological conditions, and the length of each unit is L i (i=1,2,……n);

[0042] Step 2: Through geological survey, determine the karst bedrock lithology and groundwater characteristics. The groundwater characteristics include temperature, pH value and flow rate. Use indoor constant temperature dynamic dissolution test to test the dissolution rate of rock and determine the top depth H after karst dissolution during operation. kd ;

[0043] Bedrock sampling was carried out in key karst development areas. The rock samples were made into 30mm×10mm×5mm cuboids, rinsed with distilled water, dried in a drying oven at 40℃ for 24 hours and weighed using an electronic balance with an accuracy of 0.1mg;

[0044] Groundwater is prepared according to the local groundwater composition, and water and CO2 are mixed using water tanks and carbon dioxide cylinders. 2 Prepare the dissolving water in the mixing container; use the constant temperature control system to ensure that the water and CO 2The temperature of the dissolved water in the mixing container is the temperature of the local karst groundwater; a high-precision constant-flow water pump is used to control the water flow rate to the common flow rate of the local karst groundwater; in the dissolution reaction device, the dissolved water is in full contact with the test rock sample, and the rock sample is taken out, dried and weighed after the experiment; the dissolution amount, dissolution rate and dissolution velocity are solved using formulas;

[0045] △m 1 =m 1 -m 2 , r = △m 1 / m 1 ׉,v=△m 1 / t;

[0046] Where m 1 、m 2 are the mass of the rock sample before and after dissolution; △m 1 is the total amount of dissolution; r is the dissolution rate; v is the dissolution velocity; t is the water-rock interaction time;

[0047] After obtaining the local rock dissolution rate, the distance of karst dissolution upward is calculated according to the engineering design life, and the top depth of karst dissolution H is determined. kd ;

[0048] Step 3: Determine the horizontal diffusion width W of the roadbed stress and the vertical diffusion safety depth γH of the roadbed stress according to the roadbed width B and the roadbed load P. sd ;

[0049] In the partition length L i According to the distribution law of horizontal additional stress in the Code for Design of Building Foundations (GB50007-2011), the horizontal stress diffusion width W is calculated by the roadbed width B and the roadbed load P;

[0050] In the partition length L i According to the distribution law of vertical additional stress in the Code for Design of Building Foundations (GB50007-2011), the range of vertical stress diffusion is calculated by the roadbed width B and the roadbed load P, which is defined as the roadbed stress diffusion depth H. sd , considering the safety factor γ, determine the safe depth of roadbed stress diffusion γH sd ;

[0051] When the roadbed stress diffuses to a safe depth γH sd Less than the top depth of karst dissolution H kd When: Using the surrounding layer-by-layer dynamic grouting method, only L i ×W×γH sd Cement slurry is poured into the soil to increase the cohesion c value of the soil, control the freedom of soil particles and avoid the flow of soil particles;

[0052] When the roadbed stress diffuses to a safe depth γH sd Greater than the top depth of karst dissolution H kd , in L i ×W×γH sd The surrounding layer-by-layer dynamic grouting method is used to fill all karst caves and karst grooves within the range of 3-5 meters above and below the contact surface between rock and soil layer; the surrounding layer-by-layer dynamic grouting method uses a gel material that can be quickly solidified and has high bonding strength to seal karst caves and soil caves, and constructs a stable bearing layer in the key area of ​​rock-soil boundary that significantly improves the bearing capacity;

[0053] When filling caves and gullies, injecting cement slurry into the soil, and constructing the bearing layer of the rock-soil interface, the formula p = p 0 +mh determines the grouting pressure, p 0 is the permissible grouting pressure of the bedrock surface layer, in MPa. In karst areas, it is 0.3-0.5. m is the pressure that can be increased for every 1m of bedrock depth, in MPa. In karst areas, it is 0.2-0.5. h is the depth of the grouting section, in m.

[0054] The hole arrangement system for grouting is that the arrangement of hole spacing and row spacing should make the effective filling range of adjacent holes connect with each other, without leaving large cracks and too much overlap; the grouting ports are arranged in multiple rows and columns to facilitate the construction of the subsequent surrounding layer-by-layer dynamic grouting method;

[0055] The construction is carried out row by row from the outside to the inside, and each row of holes is skipped; the outermost row is grouted first to form a closed circle, and then the grouting is pushed inward row by row without skipping; during the grouting process, dynamic construction and exploration and grouting are combined, and the construction parameters are dynamically adjusted according to the detection results; when karst caves, soil holes, drill drops, serious water leakage, and large grouting volume of a single hole are found, the grouting holes should be increased around the hole until the karst cave or soil hole is detected to be full, and then the extension construction exploration holes are constructed to confirm;

[0056] The standard for ending grouting is that the injection volume of continuous grouting for 10 minutes under the termination pressure is no more than 5.0L / min; the grouting point appears 3 to 5m outside the grouting range; the bedrock of the grouting borehole is intact, or after multiple grouting, the hole pressure exceeds 1.5MPa; the grouting volume of a single hole reaches 1.5 to 2.0 times the average grouting volume, and the grouting volume is significantly reduced; the grouting effect detection methods are inspection hole method, standard penetration test method, plate load test method and foundation settlement detection method;

[0057] Step 4: Compare the roadbed stress diffusion depth γH sd The top depth of karst dissolution H kd The value of

[0058] Step 5: According to the results of step 3, the grouting material is 42.5 grade ordinary Portland cement, the water-cement ratio of the cement slurry is 0.6:1 to 1:1, first thin and then thick; two grouting schemes are used to carry out surrounding dynamic grouting reinforcement of the foundation layer by layer:

[0059] Step 51: When the roadbed stress diffusion safety depth reaches the top depth of karst dissolution, i ×W×γH sd Grouting is carried out within the range of 3-5 meters above and below the contact surface between rock and soil layer to fill all soil holes, karst grooves and karst grooves. For the karst caves penetrating the top plate of bedrock, quick-setting materials are used to seal them, so as to form a stable bearing layer;

[0060] Step 52: When the roadbed stress diffusion depth does not reach the top depth of karst dissolution, i ×W×γH sd Cement slurry is poured into the area to increase the cohesion c value of the soil, control the freedom of soil particles and avoid the flow of soil particles.

[0061] Through comprehensive and effective foundation reinforcement, the potential safety hazards of foundation settlement and collapse caused by soil caves and karst caves in karst areas have been completely resolved, providing a solid guarantee for the long-term and stable operation of the building.

[0062] When the amount of grouting in a single hole is too large during the grouting process, the grouting holes should be increased outside the current grouting hole until the cave is filled. The construction parameters should be adjusted according to the real-time detection results.

[0063] The following are the advantages of applying this embodiment compared to the traditional grouting solution, including:

[0064] Through precise design and calculation, the amount of slurry required in the grouting process is greatly reduced, achieving efficient use of resources. This reduces the amount of slurry used and shortens the construction period, directly reducing the project investment cost and improving the economic benefits of the project.

[0065] Through scientific reinforcement schemes, the foundation is ensured to have higher stability and bearing capacity when bearing the weight of the building and external loads. This strategy not only strengthens the existing foundation, but also effectively prevents the formation of new karst caves and soil caves in the foundation area, fundamentally eliminating the potential threat of karst development areas to the long-term safe operation of buildings.

[0066] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A karst foundation grouting reinforcement method based on stress diffusion and dissolution rate, characterized in that: The following steps are involved: Step 1: Determine the foundation reinforcement length L based on the project overview, and divide the reinforcement length into several partition lengths L according to the geological conditions. i ; Step 2: Through geological survey, determine the karst bedrock lithology and groundwater characteristics. The groundwater characteristics include temperature, pH value and flow rate. Use indoor constant temperature dynamic dissolution test to test the dissolution rate of rock and determine the top depth H after karst dissolution during operation. kd ; Step 3: Determine the horizontal diffusion width W of the roadbed stress and the vertical diffusion safety depth γH of the roadbed stress according to the roadbed width B and the roadbed load P. sd ; Step 4: Compare the roadbed stress diffusion depth γH sd The top depth of karst dissolution H kd The value of Step 5: Based on the results of step 3, two grouting schemes are used to carry out surrounding dynamic grouting reinforcement of the foundation layer by layer: Step 51: When the roadbed stress diffusion safety depth reaches the top depth of karst dissolution, i ×W×γH sd Grouting is carried out within the range of 3-5 meters above and below the contact surface between rock and soil layer to fill all soil holes, karst grooves and karst grooves. For the karst caves penetrating the top plate of bedrock, quick-setting materials are used to seal them, so as to form a stable bearing layer; Step 52: When the roadbed stress diffusion depth does not reach the top depth of karst dissolution, i ×W×γH sd Cement slurry is poured into the area to increase the cohesion c value of the soil, control the freedom of soil particles and avoid the flow of soil particles.

2. A karst foundation grouting reinforcement method based on stress diffusion and dissolution rate according to claim 1, characterized in that: In step 1, the foundation reinforcement length L is determined according to the working conditions, and the reinforcement length is divided into n units according to the geological conditions, and the length of each unit is L i (i=1,2,……n).

3. The karst foundation grouting reinforcement method based on stress diffusion and dissolution rate according to claim 1 is characterized in that: In the step 2, bedrock sampling is performed at key karst development sites, the rock samples are made into 30 mm×10 mm×5 mm cuboids, rinsed with distilled water, dried in a drying oven at 40° C. for 24 hours, and weighed using an electronic balance with an accuracy of 0.1 mg; The groundwater is prepared according to the local groundwater composition, and the dissolved water is prepared in the water and CO2 mixing container using a water tank and a carbon dioxide cylinder; the temperature of the dissolved water in the water and CO2 mixing container is ensured to be the local karst groundwater temperature using a constant temperature control system; the water flow rate is controlled to be the common flow rate of local karst groundwater using a high-precision constant flow water pump; the dissolved water is fully in contact with the test rock sample in the dissolution reaction device, and the rock sample is taken out, dried and weighed after the experiment; the dissolution amount, dissolution rate and dissolution rate are solved using formulas; △m1=m1-m2, r=△m1 / m1׉, v=△m1 / t; Where m1 and m2 are the mass of the rock sample before and after dissolution, respectively; △m1 is the total dissolution amount; r is the dissolution rate; v is the dissolution velocity; t is the water-rock interaction time; After obtaining the local rock dissolution rate, the distance of karst dissolution upward is calculated according to the engineering design life, and the top depth of karst dissolution H is determined. kd .

4. The karst foundation grouting reinforcement method based on stress diffusion and dissolution rate according to claim 1 is characterized in that: In step 3, the partition length L i According to the distribution law of horizontal additional stress in the Code for Design of Building Foundations (GB50007-2011), the horizontal stress diffusion width W is calculated by the roadbed width B and the roadbed load P; In the partition length L i According to the distribution law of vertical additional stress in the Code for Design of Building Foundations (GB50007-2011), the range of vertical stress diffusion is calculated by the roadbed width B and the roadbed load P, which is defined as the roadbed stress diffusion depth H. sd , considering the safety factor γ, determine the safe depth of roadbed stress diffusion γH sd .

5. The karst foundation grouting reinforcement method based on stress diffusion and dissolution rate according to claim 1 is characterized in that: In step 3, when the roadbed stress diffusion safety depth γH sd Less than the top depth of karst dissolution H kd When: Using the surrounding layer-by-layer dynamic grouting method, only L i ×W×γH sd Cement slurry is poured into the soil to increase the cohesion c value of the soil, control the freedom of soil particles and avoid the flow of soil particles; When the roadbed stress diffuses to a safe depth γH sd Greater than the top depth of karst dissolution H kd , in L i ×W×γH sd A surrounding layer-by-layer dynamic grouting method is used within a range of 3-5 meters above and below the contact surface between rock and soil to fill all caves and karst grooves; the surrounding layer-by-layer dynamic grouting method uses a gel material that can be quickly cured and has high bonding strength to seal caves and soil holes, and constructs a stable bearing layer in the key area of ​​the rock-soil boundary that significantly improves the bearing capacity.

6. The karst foundation grouting reinforcement method based on stress diffusion and dissolution rate according to claim 5 is characterized in that: When filling caves and gullies, injecting cement slurry into the soil, and constructing the bearing layer of the rock-soil interface, the grouting pressure is determined by the formula p=p0+mh, where p0 is the allowable grouting pressure of the bedrock surface segment, in MPa. In karst areas, it is taken as 0.3-0.5; m is the pressure that can be increased for every 1m of bedrock depth, in MPa. In karst areas, it is taken as 0.2-0.5; h is the depth of the grouting segment, in m.

7. The karst foundation grouting reinforcement method based on stress diffusion and dissolution rate according to claim 6 is characterized in that: The hole arrangement system for grouting is that the arrangement of hole spacing and row spacing should enable the effective filling range of adjacent holes to be connected to each other, leaving no large cracks and not making too many overlapping parts; the grouting ports are arranged in multiple rows in a matrix to facilitate the subsequent construction of the surrounding layer-by-layer dynamic grouting method.

8. The grouting reinforcement method for karst foundation based on stress diffusion and dissolution rate according to claim 7 is characterized in that: The construction is carried out from the outside to the inside, row by row, with skipping of holes in each row; first grouting the outermost row to form a closed circle, and then advancing inwards row by row without skipping; during the grouting process, dynamic construction and exploration and injection are combined, and construction parameters are dynamically adjusted according to the detection results; when karst caves, soil holes, dropped drills, serious water leakage, and large grouting volume of a single hole are found, the grouting holes around the hole should be increased until the karst cave or soil hole is detected to be full, and then extended construction exploration holes are constructed to confirm.

9. The karst foundation grouting reinforcement method based on stress diffusion and dissolution rate according to claim 8 is characterized in that: The criteria for ending grouting are that the injection volume for 10 minutes of continuous grouting under the termination pressure is no more than 5.0L / min; the grouting point appears 3 to 5m outside the grouting range; the bedrock of the grouting borehole is intact, or after multiple groutings, the hole pressure exceeds 1.5MPa; the grouting volume of a single hole reaches 1.5 to 2.0 times the average grouting volume, and the grouting volume is significantly reduced; the grouting effect detection methods are inspection hole method, standard penetration test method, plate load test method and foundation settlement detection method.

10. The karst foundation grouting reinforcement method based on stress diffusion and dissolution rate according to claim 1, characterized in that: The grouting material in step 5 is 42.5 grade ordinary Portland cement, and the water-cement ratio of the cement slurry is 0.6:1 to 1:1, which is thin at first and thick later.