Prefabricated supporting cylinder for side wall of manual hole digging pile and use method of prefabricated supporting cylinder

By using a support barrel composed of arc-shaped prefabricated sections in the construction of artificial hole pile foundations, combined with stress and strain sensors and through-hole reinforcement technology, the low efficiency and safety of side wall support of artificial hole piles in the prior art are solved. The problem of insufficient achieves a more efficient and safe construction process and reduces material waste.

CN119021204APending Publication Date: 2024-11-26MCC COMM CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411150374.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the construction of artificial hole-drilling pile foundations, the support of the side walls of artificial hole-drilling piles in the prior art is mostly molded, which causes workers to stay in the hole for too long, and the quality of on-site mixing and pouring concrete is difficult to ensure. It affects the stability of the support and increases the risk of casualties. The structures completed with the support cannot be recycled, resulting in waste of building materials.

Method used

The supporting barrel is composed of arc-shaped prefabricated joints, which is installed in artificial hole-drilled piles. Stress and strain sensors are installed to detect stress in real time, and concrete is injected into the prefabricated joints and inner walls through the through holes to reinforce them, shorten the construction time and improve support efficiency and safety. , ensure structural stability and allow recycling of prefabricated sections.

Benefits of technology

It effectively shortens the working time of workers in the pile holes, improves the efficiency and firmness of the wall formation, ensures construction safety, reduces the use of building materials, and avoids material waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021204A_ABST
    Figure CN119021204A_ABST
Patent Text Reader

Abstract

The invention provides a manual hole digging pile side wall prefabricated supporting cylinder which comprises at least two arc-shaped prefabricated sections, all the prefabricated sections are sequentially connected to form a cylinder in a surrounding mode, at least three protruding blocks are arranged on the outer side face of each prefabricated section, stress-strain sensors are embedded in the protruding blocks and connected with a displayer, and the displayer is connected with a display. A horizontal through hole is formed in the prefabricated section; the prefabricated sections are tightly attached to the inner wall of a to-be-supported pile hole to form a supporting barrel. Long-term work of workers in the pile hole can be avoided, the supporting efficiency and safety are improved, and the stability of the supporting barrel is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of artificial bored pile foundation construction, and more specifically, to a prefabricated supporting tube for a side wall of an artificial bored pile and a use method thereof. Background Art

[0002] With the rapid development of my country's construction technology and construction equipment, more and more infrastructure construction is being deployed in remote areas. The construction environment and geological conditions in remote areas are complex, and large equipment cannot reach the foundation pile foundation construction, so manual bored piles become the only option.

[0003] However, ensuring the safety and stability of the side walls of bored piles after drilling is a major problem that the industry needs to solve urgently. In the existing technology, the side walls of bored piles are mostly supported by the mold-casting method, which causes the workers to stay in the hole for too long, and the cast-in-place structure has no remedial measures for the instability warning of the side wall soil, resulting in a high probability of casualties; the quality of on-site mixing and pouring of concrete cannot be guaranteed, which seriously affects the stability of the support; the completed structure cannot be recycled, resulting in a waste of building materials. Summary of the invention

[0004] In view of the above problems, the purpose of the present invention is to provide a prefabricated supporting casing for the side wall of a bored pile and a method for using the same. Arc-shaped prefabricated sections are made in advance, and four prefabricated sections are formed into a supporting casing, which are installed section by section in the bored pile until a complete protective wall is formed. The stress of the prefabricated sections can also be detected in real time. Compared with cast-in-place casing, the prefabricated casing saves construction time, avoids workers working in the pile hole for a long time, improves support efficiency and safety, and ensures the stability of the casing.

[0005] The present invention provides a prefabricated supporting tube for the side wall of a bored pile, comprising at least two arc-shaped prefabricated sections, all of which are connected in sequence to form a cylindrical shape, at least three protruding blocks are arranged on the outer side surfaces of the prefabricated sections, stress and strain sensors are buried in the protruding blocks, the stress and strain sensors are all connected to a display, and horizontal through holes are arranged on the prefabricated sections; the prefabricated sections are all tightly fitted on the inner wall of the pile hole to be supported to form a supporting tube.

[0006] The height of the prefabricated section is the digging depth of the pile hole of each section.

[0007] There are gaps between adjacent prefabricated sections, and waterproof joint materials are filled in the gaps to connect the adjacent prefabricated sections.

[0008] At least two protruding blocks are respectively arranged at the upper and lower ends of the outer side of the prefabricated section.

[0009] The height of the protruding block is 1 cm-2 cm.

[0010] A magnetic embedded part is buried in the middle of the prefabricated section, and the magnetic embedded part is close to the inner side of the prefabricated section.

[0011] The two magnetic embedded parts are evenly embedded along the vertical center line of the prefabricated section.

[0012] The magnetic embedded parts on the two opposite prefabricated sections respectively absorb the two ends of the top-type jack, and the two ends of the top-type jack respectively press the absorbed prefabricated sections toward the inner walls of the opposite pile holes.

[0013] The stress strain sensors are all connected to an alarm. A stress threshold is set in the stress strain sensor. When the stress detected by the stress strain sensor is greater than the stress threshold, the alarm sounds an alarm.

[0014] Another aspect of the present invention provides a method for using a prefabricated supporting tube for the side wall of a bored pile, which uses the above-mentioned prefabricated supporting tube for the side wall of the bored pile to support the side wall of the bored pile, comprising the following steps:

[0015] Hoisting prefabricated sections: after the excavation of each pile hole is completed, the prefabricated sections are hoisted into the pile holes and close to the inner wall of the pile holes;

[0016] Tightening the prefabricated sections: Tightening the prefabricated sections against the inner wall to form a support tube, and the protruding blocks are frictionally connected with the inner wall;

[0017] Observing the prefabricated section: observing the stress detected by the stress-strain sensor through the display to grasp the stress of the protruding block where the stress-strain sensor is located;

[0018] Reinforce the prefabricated section: if the stress does not meet the required value, inject concrete between the prefabricated section and the inner wall through the through hole to reinforce the prefabricated section;

[0019] Dismantling the prefabricated section: After the excavation of the bored pile is completed and the steel cage is placed, the connection between the prefabricated section and the inner wall is loosened section by section from top to bottom, and the prefabricated section is separated from the inner wall, and the prefabricated section is hoisted out.

[0020] The above-mentioned prefabricated support tube for the side wall of the artificial bored pile and the method for using the same according to the present invention prepares arc-shaped prefabricated sections in advance, and forms a support tube in a group of several sections. After a section of the pile hole is excavated in the artificial bored pile, a group is installed to directly form a complete protective wall. The prefabricated section is provided with a stress strain sensor, which can detect the stress of the prefabricated section in real time and understand the connection force between the prefabricated section and the pile hole. The prefabricated section is also provided with a through hole, through which grouting is injected between the prefabricated section and the inner wall of the pile hole to reinforce the prefabricated section. The present invention effectively shortens the working time of the operating personnel staying in the pile hole, improves the efficiency of forming the protective wall, grasps the stress of the prefabricated section in real time, and reinforces the prefabricated section in time, improves the firmness of the protective wall, ensures the safety of the pile hole, and the prefabricated section can be recycled for secondary use, reducing the use of building materials.

[0021] In order to achieve the above and related purposes, one or more aspects of the present invention include features that will be described in detail later and are particularly pointed out in the claims. The following description and the accompanying drawings describe some exemplary aspects of the present invention in detail. However, these aspects indicate only some of the various ways in which the principles of the present invention can be used. In addition, the present invention is intended to include all of these aspects and their equivalents. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] By referring to the following description in conjunction with the accompanying drawings, and with a more comprehensive understanding of the present invention, other objects and results of the present invention will become more apparent and easy to understand. In the accompanying drawings:

[0023] Figure 1 It is a schematic diagram of the structure of the prefabricated supporting tube for the side wall of a bored pile according to Example 1 of the present invention;

[0024] Figure 2 is a schematic structural diagram of a prefabricated section according to Example 1 of the present invention;

[0025] Figure 3 This is a schematic diagram of tightening a prefabricated section according to Embodiment 1 of the present invention;

[0026] Figure 4 This is a flow chart of a method for using a prefabricated supporting tube for side walls of a bored pile according to Embodiment 2 of the present invention;

[0027] Among them, 1-prefabricated section, 2-protruding block, 3-stress and strain sensor, 4-through hole, 5-joining material, 6-magnetic embedded part, 7-top jack;

[0028] The same reference numerals throughout the drawings indicate similar or corresponding features or functions. DETAILED DESCRIPTION

[0029] In the following description, for the purpose of illustration, in order to provide a comprehensive understanding of one or more embodiments, many specific details are set forth. However, it is apparent that these embodiments may also be implemented without these specific details. In other examples, for ease of describing one or more embodiments, known structures and devices are shown in the form of block diagrams.

[0030] The present invention can be subjected to various changes and can have various embodiments, and specific embodiments are illustrated and described in the accompanying drawings. However, the present invention is not limited to the specific implementation, and all changes, equivalents and substitutes falling within the concept and technical scope of the present invention are included, and should be understood to be included.

[0031] Ordinal terms such as first, second, etc. may be used to describe various constituent elements, but the constituent elements are not limited to the terms. The terms are only used to distinguish one constituent element from another constituent element. For example, without departing from the scope of the claims of the present invention, the second constituent element may be named as the first constituent element, and similarly, the first constituent element may be named as the second constituent element. The terms and / or include a combination of multiple associated items or a certain item among multiple associated items.

[0032] It should be understood that when a certain component is mentioned to be "connected" or "contacted" with other components, this includes not only the case where it is directly connected or contacted with other components, but also the case where other components exist in between. Conversely, when a certain component is mentioned to be "directly connected" or "directly contacted" with other components, it should be understood that there are no other components in between.

[0033] In the description of the embodiments, when it is described that a certain component is formed "on or under" another component, on or under includes two components directly contacting each other or at least one other component is arranged and formed between the two components. Moreover, when it is expressed as on or under, it refers to not only the upper direction but also the lower direction based on a certain component.

[0034] The terms used in this application are only used to illustrate specific embodiments and are not intended to limit the present invention. Unless the context clearly provides otherwise, singular expressions include plural expressions. In this application, it should be understood that terms such as "including" or "having" are used to specify the presence of features, numbers, steps, operations, constituent elements, parts or combinations thereof recorded in the specification, and do not preclude the presence or additional possibility of one or more other features, numbers, steps, operations, constituent elements, parts or combinations thereof.

[0035] Unless otherwise defined, all terms used herein, including technical or scientific terms, have the same meaning as those generally understood by those skilled in the art. Terms defined in commonly used dictionaries should be interpreted as having the same meaning as in the context of the relevant technology, and if not clearly defined in this application, they should not be interpreted as ideal or overly formal meanings.

[0036] Glossary:

[0037] Manually dug piles, an engineering term, are piles that are made by manually digging holes, placing steel cages, and pouring concrete. Concrete casings are poured for each section of the pile hole, and the construction is carried out section by section. Manually dug piles are generally thicker in diameter, and the thinnest is more than 800 mm. They can support structural entities with fewer floors and greater pressure, and are widely used. A cap is set on the top of the pile, and then it is tied and connected with a cap beam to evenly distribute the force on each pile to support the entire building.

[0038] The specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings.

[0039] Example 1

[0040] Figure 1 It is a schematic diagram of the structure of the prefabricated supporting tube for the side wall of a bored pile according to Example 1 of the present invention;

[0041] Figure 2 is a schematic structural diagram of a prefabricated section according to Example 1 of the present invention; Figure 3 is a schematic diagram of a prefabricated jacking section according to Example 1 of the present invention;

[0042] like Figure 1 , Figure 2 and Figure 3 As shown together, the prefabricated supporting tube for the side wall of the bored pile proposed in this embodiment can be used for supporting the inner wall of the bored pile, and can also be used for temporary support of the inner wall of other pile wells.

[0043] The prefabricated supporting tube for the side wall of the artificially excavated bored pile comprises at least two arc-shaped prefabricated sections 1, which are sequentially connected to form a cylindrical supporting tube, and are used to be installed in each excavated pile hole of the artificially excavated bored pile to support the inner wall of the pile hole and prevent the soil on the inner wall from collapsing. The supporting tube should be installed in time after the excavation of one section of the pile hole is completed, and then the next section of the pile hole can be excavated downward.

[0044] In this embodiment, one supporting tube includes four arc-shaped prefabricated sections 1.

[0045] Several prefabricated concrete sections 1 are processed on the outside. The outer diameter of the prefabricated section 1 is adapted to the inner diameter of the pile hole. The thickness should meet the support requirements. The height is determined according to the construction needs and should meet the construction applicability and convenience. In this embodiment, the height can be the digging depth of each section of the pile hole of the manual bored pile. Each section of the pile hole is about 1m. The inner wall needs to be supported after digging about 1m to ensure the safety of the inner wall. Four prefabricated sections 1 form a group of support tubes surrounding a section of the pile hole.

[0046] In order to increase the connection strength between the prefabricated section 1 and the inner wall, at least three protruding blocks 2 are provided on the outer side of the prefabricated section 1. When the prefabricated section 1 is installed close to the inner wall, several protruding blocks 2 are squeezed between the prefabricated section 1 and the inner wall, and the protruding blocks 2 can also be embedded in the rock and soil of the inner wall to enhance the connection strength and friction of the two structures, and the prefabricated section 1 is firmly fixed.

[0047] Due to the complex geology, sometimes the soil on the inner wall of the pile hole will lose stability and tend to collapse, and sometimes the installation of the prefabricated section 1 will become loose. In order to grasp the stability of each prefabricated section 1 during use in real time, a stress strain sensor 3 is buried in the protruding block 2 of each prefabricated section 1, and each stress strain sensor 3 of a support tube is connected to an external display.

[0048] The stress strain sensor 3 detects the stress at the position of the protruding block 2 in real time, and the display shows the stress detected by each stress strain sensor 3 in real time. Workers can check the display to understand the detection value of each stress strain sensor 3 and the stress of each protruding block 2 in a supporting tube, so as to understand whether the supporting tube is stable and which prefabricated section 1 is unstable.

[0049] All stress-strain sensors 3 on a supporting tube are connected to a display correspondingly, and each supporting tube is connected to a display correspondingly, so that the stability of each supporting tube can be observed separately.

[0050] In order to facilitate reinforcement when the casing is unstable, a horizontal through hole 4 is provided on the precast section 1. When it is observed that the stress at a point of the protruding block 2 does not meet the required value, concrete slurry is injected into the through hole 4 of the corresponding precast section 1, and the slurry enters between the precast section 1 and the inner wall of the pile hole, and adheres the precast section 1 and the inner wall to reinforce the casing.

[0051] The through hole 4 can also be used as a drainage hole on the inner wall of the pile hole to drain water from the inner wall and improve the stability of the inner wall. A through hole 4 can be provided on each prefabricated section 1, or only on one or two prefabricated sections 1 of the supporting tube.

[0052] The prefabricated section 1 can be hoisted into the pile hole by vertical hoisting equipment such as an electric hoist, and then the prefabricated section 1 can be tightened toward the inner wall by a tightening tool such as a jack. Each prefabricated section 1 fits tightly against the inner wall of the pile hole to be supported to form a supporting tube.

[0053] In a specific embodiment of the present invention, in order to ensure stable connection between four prefabricated sections 1, there are gaps between adjacent prefabricated sections 1, and waterproof joint materials 5 are arranged in the gaps to connect adjacent prefabricated sections 1. The joint materials 5 that swell when exposed to water are poured into the gaps to improve the waterproof effect of the gaps. The joint materials squeeze the gaps between the prefabricated sections 1, which further ensures that the prefabricated sections 1 are close to the inner wall and the stability of the support tube is ensured.

[0054] In a specific embodiment of the present invention, in order to enhance the installation strength of the prefabricated section 1, at least two protruding blocks 2 are evenly arranged at the upper and lower ends of the outer side of the prefabricated section 1. Several protruding blocks 2 are arranged along the upper and lower ends of the outer side of the prefabricated section 1. The protruding blocks 2 increase the friction connection force between the prefabricated section 1 and the inner wall of the pile hole, so that the prefabricated section 1 is firmly installed. Each protruding block 2 has a stress strain sensor 3, which can detect stress at multiple positions, and the unstable position of the prefabricated section 1 can be discovered in time.

[0055] The height of the protruding block 2 is set according to the geotechnical conditions of the pile hole. The height and volume of the protruding block 2 should ensure a stable connection between the prefabricated section 1 and the inner wall of the pile hole. In a specific embodiment of the present invention, the height of the protruding block 2 is 1cm-2cm, which can grasp the inner wall.

[0056] In a specific embodiment of the present invention, in order to facilitate the prefabricated section 1 to be pressed against the inner wall of the pile hole, a magnetic embedded part 6 is embedded in the middle of the prefabricated section 1, and the magnetic embedded part 6 is close to the inner side of the prefabricated section 1. The metal pressing tool is sucked on the magnetic embedded part 6, and will not deviate or fall off, and the prefabricated section 1 is pressed against the inner wall of the pile hole stably. After pressing, the worker pushes the prefabricated section 1 against the inner wall of the pile hole at the left and right ends of the prefabricated section 1, and then removes the pressing tool.

[0057] When the prefabricated section 1 and the inner wall are separated later, the joint material 5 between the adjacent prefabricated sections can be removed first, and the connection between the prefabricated section 1 and the inner wall can be loosened appropriately. The prefabricated section 1 can also be sucked away from the inner wall of the pile hole by a tightening tool sucked on the magnetic suction embedded part 6, and the prefabricated section 1 can be lifted out of the pile hole for easy removal. The dismantled prefabricated section 1 can be reused to save building materials.

[0058] In a specific embodiment of the present invention, in order to tighten the prefabricated section 1 more evenly, two magnetic embedded parts 6 are evenly embedded along the vertical center line of the prefabricated section 1. Two magnetic embedded parts 6 are arranged above and below the middle of the prefabricated section 1, and tightened at two positions respectively. After tightening, the distance between the prefabricated section 1 and the inner wall is more balanced, and the installation is more stable.

[0059] In a specific embodiment of the present invention, the tightening tool is a top jack 7. Two relative prefabricated sections 1 are installed at the same time, and the two relative prefabricated sections 1 are hoisted at the same time and close to the corresponding positions of the inner wall of the pile hole. The magnetic embedded parts 6 on the two relative prefabricated sections 1 respectively absorb the two ends of the top jack 7, and the two ends of the top jack 7 respectively tighten the absorbed prefabricated sections 1 against the inner wall of the pile hole.

[0060] Due to the adsorption of the magnetic embedded part 6, both ends of the top jack 7 can be stably connected to the prefabricated section 1, reducing the workers' support of the top jack 7. After the prefabricated section 1 is tightened, the workers push the prefabricated section 1 toward the inner wall and then remove the top jack 7.

[0061] After installing a pair of prefabricated sections 1, another pair of opposite prefabricated sections 1 is installed using top-to-top jacks 7.

[0062] The top jack 7 is two hydraulic cylinders that are connected to each other. The fixed ends of the two hydraulic cylinders are butt-jointed, and the telescopic ends extend in opposite directions. When the top jack 7 is used, it is supported to an appropriate height by a support frame, and the two telescopic ends extend toward a pair of prefabricated sections 1 that are hoisted. The telescopic ends are attracted to the magnetic embedded parts 6 and continue to extend to tighten the prefabricated sections 1.

[0063] In a specific embodiment of the present invention, in order to avoid workers staring at the display to observe stress data in real time, each stress strain sensor 3 on a support tube is connected to an alarm, and a stress threshold is set in each stress strain sensor 3. When the stress detected by any stress strain sensor 3 is greater than the stress threshold, the alarm will sound.

[0064] When any stress-strain sensor 3 on the supporting tube detects that the stress is greater than the stress threshold, the alarm will sound. The worker can check through the display which stress-strain sensor 3 has a value that does not meet the stress threshold, and inject slurry into the through hole 4 on the prefabricated section 1 where the stress-strain sensor 3 is located to reinforce the supporting tube in time. Alternatively, the worker can inject slurry into all the through holes 4 on the supporting tube without checking the display to reinforce the supporting tube in time.

[0065] The stress strain sensor 3 may be a stress sensor with a very small volume.

[0066] Example 2

[0067] Figure 4 This is a flow chart of a method for using a prefabricated supporting tube for side walls of a bored pile according to Embodiment 2 of the present invention;

[0068] like Figure 4 As shown, the method for using the prefabricated supporting tube for the side wall of a bored pile provided in this embodiment adopts the prefabricated supporting tube for the side wall of the bored pile described in Example 1 to support the side wall of the bored pile.

[0069] The method comprises the following steps: hoisting the prefabricated section, tightening the prefabricated section, observing the prefabricated section, reinforcing the prefabricated section, and removing the prefabricated section. If the prefabricated section is not loose, there is no need to reinforce the prefabricated section.

[0070] The prefabricated sections 1 are hoisted, including hoisting the prefabricated sections 1 into the pile holes and close to the inner walls of the pile holes after the excavation of each pile hole is completed.

[0071] Vertical lifting equipment such as an electric hoist can be used to lift the prefabricated section 1 into the pile hole, and then tools such as a jack can be used to tighten the prefabricated section 1 toward the inner wall.

[0072] A pad may also be placed below the location where the prefabricated section 1 is to be installed to properly support the prefabricated section 1 and facilitate the tightening work.

[0073] The prefabricated sections are pressed tightly, including pressing the prefabricated sections 1 tightly against the inner wall to form a supporting tube, and the protruding blocks 2 are frictionally connected with the inner wall.

[0074] In this embodiment, the tightening tool can be a top jack 7, and the number of prefabricated sections 1 is 4. Two relative prefabricated sections 1 are installed at the same time, and the two relative prefabricated sections 1 are hoisted at the same time and close to the corresponding positions of the inner wall of the pile hole. The magnetic embedded parts 6 on the two relative prefabricated sections 1 respectively adsorb the two ends of the top jack 7, and the two ends of the top jack 7 respectively tighten the adsorbed prefabricated sections 1 against the inner wall of the pile hole. Due to the adsorption of the magnetic embedded parts 6, the two ends of the top jack 7 can be stably connected to the prefabricated section 1, reducing the manpower to support the top jack 7. After the prefabricated section 1 is tightened, the worker pushes the prefabricated section 1 toward the inner wall, and then removes the top jack 7.

[0075] After installing a pair of prefabricated sections 1, another pair of opposite prefabricated sections 1 is hoisted and installed using top-to-top jacks 7. The four prefabricated sections 1 are connected to each other to form a cylindrical support tube to stably support the inner wall of the pile hole.

[0076] A plurality of protruding blocks 2 are squeezed between the prefabricated section 1 and the inner wall. The protruding blocks 2 can also be embedded in the rock and soil of the inner wall to enhance the connection strength and friction of the two structures, and the prefabricated section 1 is firmly fixed.

[0077] In order to ensure stable connection between the four prefabricated sections 1 , gaps are provided between adjacent prefabricated sections 1 , and waterproof joint materials 5 are filled in the gaps to connect adjacent prefabricated sections 1 .

[0078] Observing the prefabricated section includes observing the stress detected by the stress-strain sensor 3 through a display to grasp the stress of the protruding block 2 where the stress-strain sensor 3 is located.

[0079] The stress strain sensor 3 detects the stress at the position of the protruding block 2 in real time, and the display shows the stress detected by each stress strain sensor 3 in real time. Workers can check the display to understand the detection value of each stress strain sensor 3 and the stress of each protruding block 2 in a supporting tube, so as to understand whether the supporting tube is stable and which prefabricated section 1 is unstable.

[0080] Reinforce the prefabricated section: If the stress does not meet the required value, concrete is injected between the prefabricated section 1 and the inner wall through the through hole 4 to reinforce the prefabricated section 1.

[0081] When it is observed that the stress at a point of a protruding block 2 does not meet the required value, concrete slurry is injected into the through hole 4 of the corresponding precast section 1. The slurry enters between the precast section 1 and the inner wall of the pile hole, and adheres the precast section 1 and the inner wall to reinforce the support tube.

[0082] The through hole 4 can also be used as a drainage hole on the inner wall of the pile hole to drain water from the inner wall and improve the stability of the inner wall.

[0083] The prefabricated section is dismantled, including when the bored pile is excavated, after the steel cage is placed in the pile, separating the prefabricated section 1 from the inner wall section by section from top to bottom, and hoisting out the prefabricated section 1.

[0084] When separating the prefabricated section 1 and the inner wall, the joint material 5 between the adjacent prefabricated sections 1 can be removed first, and the connection between the prefabricated section 1 and the inner wall can be properly pried. The jacking tool can also be sucked on the magnetic embedded part 6, and the jacking tool can be recovered. The prefabricated section 1 is sucked away from the inner wall of the pile hole by suction, and the pile hole is lifted out, which is convenient for removal. The dismantled prefabricated section 1 can be reused, saving construction materials. The jacking tool can pass through the mesh of the steel cage.

[0085] As described above, the prefabricated supporting tube for the side wall of the artificial bored pile and the method for using the same according to the present invention are described by way of example with reference to the accompanying drawings. However, those skilled in the art should understand that various improvements can be made to the prefabricated supporting tube for the side wall of the artificial bored pile and the method for using the same according to the present invention without departing from the content of the present invention. Therefore, the protection scope of the present invention should be determined by the content of the attached claims.

Claims

1. A prefabricated support tube for the side wall of a bored pile, characterized in that: It comprises at least two arc-shaped prefabricated sections, all of which are connected in sequence to form a cylindrical shape, at least three protruding blocks are arranged on the outer side of the prefabricated section, stress and strain sensors are embedded in the protruding blocks, and the stress and strain sensors are all connected to the display, and a horizontal through hole is arranged on the prefabricated section; The prefabricated sections are tightly fitted on the inner wall of the pile hole to be supported to form a supporting tube.

2. The prefabricated supporting tube for the side wall of the bored pile according to claim 1, characterized in that: The height of the prefabricated section is the digging depth of the pile hole of each section.

3. The prefabricated supporting tube for the side wall of the bored pile according to claim 1, characterized in that: There are gaps between adjacent prefabricated sections, and waterproof joint materials are filled in the gaps to connect the adjacent prefabricated sections.

4. The prefabricated supporting tube for the side wall of the bored pile according to claim 1, characterized in that: At least two protruding blocks are respectively arranged at the upper and lower ends of the outer side of the prefabricated section.

5. The prefabricated supporting tube for the side wall of the bored pile according to claim 1, characterized in that: The height of the protruding block is 1 cm-2 cm.

6. The prefabricated supporting tube for the side wall of the bored pile according to claim 1, characterized in that: A magnetic embedded part is buried in the middle of the prefabricated section, and the magnetic embedded part is arranged close to the inner side of the prefabricated section.

7. The prefabricated supporting tube for the side wall of the bored pile according to claim 6, characterized in that: The two magnetic embedded parts are evenly embedded along the vertical center line of the prefabricated section.

8. The prefabricated supporting tube for the side wall of a bored pile according to claim 6, characterized in that: The magnetic embedded parts on the two opposite prefabricated sections respectively absorb the two ends of the top-type jack, and the two ends of the top-type jack respectively press the absorbed prefabricated sections toward the inner walls of the opposite pile holes.

9. The prefabricated supporting tube for the side wall of a bored pile according to claim 1, characterized in that: The stress strain sensors are all connected to an alarm. A stress threshold is set in the stress strain sensor. When the stress detected by the stress strain sensor is greater than the stress threshold, the alarm sounds an alarm.

10. A method for using a prefabricated supporting tube for the side wall of a bored pile, characterized in that: The side wall of a bored pile is supported by the prefabricated supporting tube for the side wall of the bored pile according to any one of claims 1 to 9, comprising the following steps: Hoisting prefabricated sections: after the excavation of each pile hole is completed, the prefabricated sections are hoisted into the pile holes and close to the inner wall of the pile holes; Tightening the prefabricated sections: Tightening the prefabricated sections against the inner wall to form a support tube, and the protruding blocks are frictionally connected with the inner wall; Observing the prefabricated section: observing the stress detected by the stress-strain sensor through the display to grasp the stress of the protruding block where the stress-strain sensor is located; Reinforce the prefabricated section: if the stress does not meet the required value, inject concrete between the prefabricated section and the inner wall through the through hole to reinforce the prefabricated section; Dismantling the prefabricated sections: After the excavation of the bored piles is completed and the steel cage is placed, the prefabricated sections are separated from the inner wall section by section from top to bottom, and the prefabricated sections are hoisted out.