Pile core waterproof grouting device and method
By adopting detachable connecting pipes, water-to-enhancing expansion rings and flanges in the pile foundation grouting device, the problem of groundwater outflow and installation inconvenient, the problem of efficient waterproofing and low-cost construction is achieved.
Patent Information
- Application Number
- CN202411273963.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2024-11-26
AI Technical Summary
The existing pile foundation grouting device cannot effectively prevent groundwater from coming out during use, and the installation and operation of the connecting pipe is inconvenient, making it difficult to achieve a stable connection.
A pile core waterproof grouting device is designed, using a multi-section detachable connecting pipe, equipped with a water-touch expansion ring and a flange, which can achieve stable fixation of the connecting pipe through components such as rotary rods, fasteners and guide plates, and Use high-pressure grouting to reduce groundwater.
It effectively prevents groundwater from coming out, reduces construction costs and operation difficulty, improves construction efficiency and quality, and most of the devices are detachable designs and have high reuse rates.
Smart Images

Figure CN119021227A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of grouting structures of pile foundations, and in particular to a pile core waterproof grouting device and method. Background Art
[0002] Pile foundation is a deep foundation form, which connects the tops of several piles into a whole through the cap, jointly bears dynamic and static loads, and transfers these loads to the soil layer with good bearing performance deep in the foundation. Pile foundation is widely used in high-rise buildings, ports, bridges and other projects. Its significant advantage is that it improves the work efficiency of house construction and lays a solid foundation for the quality of construction in the process of modern construction.
[0003] When the pile foundation is cored, it is necessary to drill a hole in the center of the pile foundation to take the core. After drilling, a pile core hole is formed. The pile core hole needs to be grouting treated. However, due to the infiltration of groundwater, the pile core hole is seriously watered. When the existing grouting device is used, it is not possible to perform a good anti-watering treatment. When installing the connecting pipe used in the grouting device, two connecting pipes need to be vertically connected and then placed in the pile core hole. The connection method of keeping the connecting pipe vertical is inconvenient to operate.
[0004] To this end, we propose a pile core waterproof grouting device and method. Summary of the invention
[0005] The object of the present invention is to provide a pile core waterproof grouting device and method to solve the problems raised in the above background technology.
[0006] To achieve the above-mentioned purpose, the present invention provides a pile core waterproof grouting device, which is used for installation and cooperation with a pile foundation, and comprises a plurality of detachable connecting pipes, wherein the connecting pipes are inserted into the pile core holes of the pile foundation, wherein one of the connecting pipes is provided with a flange plate connected and fixed to the top surface of the pile foundation, a switch member is provided between the two connecting pipes located above the pile foundation, and a multi-layer water-expandable ring connected to the connecting pipe is provided below the flange plate, and the water-expandable ring is pressed and matched with a notch drilled on the top surface of the pile foundation;
[0007] The mounting assembly and the pressing block, the mounting assembly is located between two adjacent connecting tubes below the flange, the mounting assembly includes a rotating rod rotatably connected to one of the connecting tubes, a fastener is provided at the end of the rotating rod, a mating piece cooperating with the fastener is provided in the other connecting tube, the fastener is rotatably connected with an introduction plate cooperating with the mating piece, the pressing block is pressed and mated with the mating piece, a slide plate cooperating with the pressing block is slidably fitted in the fastener, the slide plate is slidably fitted with a sliding assembly, the sliding assembly is rotatably connected to the edge of the end of the introduction plate, so that the introduction plate is rotated to fit and fix the mating piece.
[0008] Preferably, the sliding assembly includes a sliding column and a first rotating plate and a second rotating plate rotatably connected to the sliding column, the sliding plate is provided with a first sliding groove which is obliquely distributed and slidably cooperates with the sliding column, the pressing block inserted into the fastener is provided with a rotating groove, the end of the first rotating plate is inserted into the rotating groove and is rotatably connected to the fastener, the end of the sliding plate is provided with a limit piece, and the end of the second rotating plate is rotatably connected to the edge of the end of the introduction plate.
[0009] Preferably, a second sliding groove with an inclined distribution is opened in the fastener, the second sliding groove is slidably matched with the sliding column, and the inclination directions of the second sliding groove and the first sliding groove are oppositely distributed, thereby increasing the sliding distance of the slide plate.
[0010] Preferably, a groove that is pressed and matched with the pressing block is opened on the side of the slide plate, a filter screen is fixedly connected to the inner wall of the fastener, and the middle part of the filter screen is fixedly connected to the rotating rod.
[0011] Preferably, the limiting member includes a plurality of plug rods connected and fixed to the slide plate, the plug rods are slidably matched with the fasteners, and a tension spring is hung and matched between the fasteners and the slide plate to ensure the smooth operation of the slide plate.
[0012] Preferably, a first inclined surface is provided at the end of the introduction plate, and the first inclined surface is pressed and matched with the end of the slide plate to ensure stable pressing and stable fitting of the introduction plate on the mating piece.
[0013] Preferably, a plurality of fixing plates are fixedly connected to the inner wall of the connecting tube, the ends of the fixing plates pass through the fitting, an inclined pressure ring is fixedly connected to the end of the fitting, a second inclined surface is provided on the side of the pressure block, and the second inclined surface is slidably matched with the pressure ring.
[0014] Preferably, the end of the introduction plate is pressed and fitted with the fixing plate, and the side surface of the fixing plate that matches the end of the introduction plate is inclined, which helps to press and fit the introduction plate firmly.
[0015] Preferably, the fastener is an externally threaded sleeve, the mating piece is an internally threaded sleeve, the fastener is threadedly connected to the mating piece, the end of the rotating rod is fixedly connected to a movable ball, one of the connecting tubes is fixedly connected to the inside of an L-shaped rod, the top of the L-shaped rod is fixedly connected to a fixed ball that movably cooperates with the movable ball, and the fixed ball is provided with a rotating groove that rotates with the rotating rod.
[0016] An operating method of a pile core waterproof grouting device is provided, wherein the operating method is performed using the above-mentioned pile core waterproof grouting device, and the specific operating method comprises the following steps:
[0017] S 1. After the concrete strength of the pile foundation reaches the requirement, a hole is drilled from top to bottom at the center of the pile foundation using a drilling rig to form a pile core hole, and a notch is drilled on the top surface of the pile foundation;
[0018] Put one of the connecting pipes vertically into the pile core hole, and then move the other connecting pipe horizontally, so that the matching piece can be quickly plugged into the plurality of inclined introduction plates;
[0019] S2, continue to make the port of the other connecting pipe close to the port of one of the connecting pipes, and at the same time erect the other connecting pipe upward, so that one of the connecting pipes moves downward along the pile core hole, so that the fastener and the rotating rod are switched from horizontal distribution to vertical state, and the fastener is fixedly installed with the matching piece, so that the two adjacent connecting pipes are fixedly connected, the installation is completed, and penetrates into the pile core hole;
[0020] S3, when the multiple sections of the connecting pipe are inserted into the pile core hole, the water-expandable ring connected and fixed to the connecting pipe is placed in the notch, and then the connecting pipe is connected and fixed to the top surface of the pile foundation through the flange, and finally the connecting pipe at the top is connected and fixed to the injection pipe of the grouting equipment;
[0021] S4, open the switch member, inject high-pressure grouting into the connecting pipe through the grouting equipment, so that the slurry enters the pile foundation through the connecting pipe, and the slurry and the pressure during grouting are used to press the upward groundwater until the slurry fills the pile core, and then close the switch member. After the injected slurry concrete solidifies, remove the switch member and the parts above the switch member.
[0022] Compared with the prior art, the present invention has the following beneficial effects:
[0023] The cost of the pile core control water-bearing device of the pile foundation is low, and most of the devices have detachable devices, which are greatly improved compared with the existing technology in terms of cost reduction rate and efficiency improvement rate; and the water-expanding ring is used to increase the stable connection between the connecting pipe and the pile foundation on the one hand, and to ensure that the water-expanding ring can absorb water and expand to block the groundwater and avoid serious groundwater bubbling;
[0024] In the present application, the second connecting pipe is moved horizontally to quickly perform the insertion and positioning, and then the connecting pipe is vertically erected to automatically complete the correction and fixation of the two connecting pipes. This method of docking operation is simple and convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the overall structure of the present invention being located on the top surface of the pile foundation;
[0026] Figure 2 It is a schematic diagram of the overall structure of the present invention;
[0027] Figure 3 It is a schematic diagram of the installation structure of two connecting pipes of the present invention;
[0028] Figure 4 This is a schematic diagram of the internal structure of the connecting pipe of the present invention;
[0029] Figure 5 It is a schematic diagram of the matching structure of the fastener and the matching piece of the present invention;
[0030] Figure 6 It is a schematic diagram of the cross-sectional structure of the fastener and the matching piece of the present invention;
[0031] Figure 7 It is a schematic diagram of the matching structure between the lead-in plate and the pressing block in the fastener of the present invention;
[0032] Figure 8 It is a structural schematic diagram of the introduction plate and the pressing block being separated from the fastener of the present invention;
[0033] Fig. 9 for Figure 8 Schematic diagram of further decomposition of the structure.
[0034] In the figure: 1. connecting pipe; 2. flange; 3. switch member; 4. water expansion ring; 5. pressure block; 6. rotating rod; 7. fastener; 8. matching member; 9. inlet plate; 10. slide plate; 11. slide column; 12. first rotating plate; 13. second rotating plate; 14. first slide groove; 15. rotating groove; 16. second slide groove; 17. groove; 18. filter screen; 19. plug rod; 20. tension spring; 21. first inclined surface; 22. fixed plate; 23. pressure ring; 24. second inclined surface; 25. movable ball; 26. L-shaped rod; 27. fixed ball; 28. rotating groove. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] See also Figure 1-Figure 9The present invention provides a pile core waterproof grouting device, which is used for installation and cooperation with a pile foundation, and comprises a plurality of detachable connecting pipes 1, the connecting pipes 1 are inserted into the pile core holes of the pile foundation, one of the connecting pipes 1 is provided with a flange 2 connected and fixed to the top surface of the pile foundation, a switch member 3 (a ball valve switch is preferably used as the switch member 3) is provided between the two connecting pipes 1 located above the pile foundation, and a multi-layer water-expandable ring 4 connected to the connecting pipe 1 is provided below the flange 2, and the water-expandable ring 4 is pressed and matched with a notch drilled on the top surface of the pile foundation;
[0037] Among them, the end of the connecting pipe 1 located at the top is provided with a multifunctional switching joint, which is convenient for connecting with the injection pipe of the grouting equipment;
[0038] The flange 2 includes a flange 2 top cover, a rubber sealing ring and bolts, so that the connecting pipe 1 is connected and fixed to the flange 2 and the pile foundation;
[0039] Among them, the water-expandable ring 4 is used to increase the stable connection between the connecting pipe 1 and the pile foundation on the one hand, and on the other hand, the water-expandable ring 4 can block the groundwater through the water absorption and expansion effect to avoid serious groundwater outburst (especially for some pile foundations with a low design top surface elevation, the water outburst is more serious).
[0040] This study combines the actual situation of the on-site engineering piles to determine the pile core control water-bearing device of the pile foundation to develop a prefabricated tool. The structure is simple, most of the device accessories are detachable, and it has the function of multiple use, which ensures the quality measures and effects and improves the efficiency and quality assurance of production.
[0041] Economic benefit analysis of this plan:
[0042] 1. The cost of the pile core control water-bearing device of the pile foundation is low, most of the devices have detachable devices, and the reuse rate is as high as 70% (comparison statistics between on-site statistics and old processes);
[0043] 2. The engineering pile core control water-bearing device is 50% more efficient than the traditional construction method (comparison of on-site statistical data with the old process), which improves labor efficiency and reduces labor costs.
[0044] Social benefit analysis of this plan
[0045] 1. The pressurized water device controlled by the pile core of the pile foundation is easy to operate on site, which reduces the difficulty of on-site operation for workers and improves construction efficiency and process safety.
[0046] 2. The pile core control water pressure device of the pile foundation can be manufactured off-site, which strengthens the manufacturing standards and increases industrial output value.
[0047] 3. The pile core pressure water control device effectively controls the construction quality of the foundation pedestal and bottom slab concrete, effectively reduces the risk of leakage, and improves the satisfaction of relevant personnel.
[0048] It also includes: a mounting assembly and a pressing block 5. The mounting assembly is located between two adjacent connecting pipes 1 below the flange 2. The mounting assembly includes a rotating rod 6 rotatably connected to one of the connecting pipes 1. A fastener 7 is provided at the end of the rotating rod 6. A matching piece 8 matching with the fastener 7 is provided in the other connecting pipe 1. The fastener 7 is rotatably connected with an introduction plate 9 matching with the matching piece 8. The pressing block 5 is pressed and matched with the matching piece 8. A slide plate 10 matching with the pressing block 5 is slidably matched in the fastener 7. The slide plate 10 is slidably matched with a sliding assembly. The sliding assembly is rotatably connected to the edge of the end of the introduction plate 9, so that the introduction plate 9 is rotated to fit the fixing matching piece 8.
[0049] An operating method of a pile core waterproof grouting device is performed using the above-mentioned pile core waterproof grouting device. The specific operating method includes the following steps:
[0050] S1. After the concrete strength of the pile foundation reaches the requirement, a hole is drilled from top to bottom at the center of the pile foundation by a drilling rig to form a pile core hole (the removed pile core concrete is taken away for testing), and a notch is drilled on the top surface of the pile foundation;
[0051] Put one of the connecting pipes 1 vertically into the pile core hole, and then move the other connecting pipe 1 horizontally, so that the matching piece 8 and the multiple inclined introduction plates 9 can be quickly plugged in;
[0052] S2, continue to make the port of the other connecting tube 1 close to the port of one of the connecting tubes 1, and at the same time erect the other connecting tube 1 upwards, so that one of the connecting tubes 1 moves downward along the pile core hole, so that the fastener 7 and the rotating rod 6 are switched from horizontal distribution to a vertical state, and the fastener 7 and the matching piece 8 are installed and fixed (the ports of the connecting tubes 1 are semi-cylindrical shapes that match each other. When the two connecting tubes 1 are connected to each other, the two semi-cylindrical structures are pressed against each other, wherein the port positions of the connecting tubes 1 can be provided with plug-in holes and plug-in rods that are plugged in and matched with each other, which are not shown in the conventional technical diagrams, to ensure a stable connection between the two connected connecting tubes 1), so that the two adjacent connecting tubes 1 are fixedly connected, the installation is completed, and they are deeply inserted into the pile core hole;
[0053] S3, when the multi-section connecting pipe 1 goes deep into the pile core hole, and the water-expandable ring 4 connected and fixed to the connecting pipe 1 is placed in the notch, then the connecting pipe 1 is connected and fixed to the top surface of the pile foundation through the flange 2, and finally the connecting pipe 1 at the top is connected and fixed to the injection pipe of the grouting equipment;
[0054] S4, open the switch 3, and use the grouting equipment to inject high pressure grouting into the connecting pipe 1, so that the slurry enters the pile foundation through the connecting pipe 1, and the slurry and the pressure during grouting are used to press the upward groundwater (a pressure sensor can be added to the connecting pipe 1, and the grouting pressure must be greater than the pressure of the groundwater) until the slurry fills the pile core, and then close the switch 3. After the injected slurry concrete solidifies, remove the switch 3 and the parts above the switch 3;
[0055] That is, transverse steel bars are laid on the steel bars of the pile foundation (to ensure the stability of the bottom plate and prevent it from sinking), and then concrete is poured as a whole, wherein the concrete height is lower than the position of the switch member 3 (i.e., the ball valve switch, which is closed at this time and opened during the subsequent grouting process), and the top surface of the concrete forms the bottom plate (and in the process, water is drained to the outside through the pile core waterproof grouting device to prevent groundwater from surging up and causing the bottom plate to be unable to form). After the bottom plate concrete solidifies, high-pressure grouting is performed into the connecting pipe 1 (i.e., the drainage pipe) (a pressure sensor can be added, and the grouting pressure must be greater than the pressure of the groundwater surging up) until the pile core is filled, and then the ball valve is closed. After the concrete solidifies, the ball valve and parts above the ball valve are removed.
[0056] In the present application, in step S2, the fitting 8 is first plugged into the inclined introduction plate 9, which facilitates accurate plugging of the fitting 8 and the fastener 7, so that the port positions of the two connecting pipes 1 correspond;
[0057] Then, the fitting 8 continues to move and acts with the fitting 8, the fitting 8 presses and fixes the pressing block 5, so that the pressing block 5 is received in the fastener 7, so that the slide post 11 moves along the sliding assembly, and the slide plate 10 moves a large distance, so that the introduction plate 9 rotates and fits and is fixed on the inner wall of the fitting 8, and at the same time, the rotating rod 6 rotates to ensure the rapid installation between the two ports of the connecting pipe 1;
[0058] The installation between the two connecting pipes 1 is traditionally performed by vertically connecting the two connecting pipes 1 and then fastening them. This method is not convenient to operate, especially when the second connecting pipe 1 is vertically suspended in the air and connected to the first vertical connecting pipe 1. The docking accuracy is difficult to ensure and multiple adjustments are required, which is time-consuming and laborious.
[0059] In this solution, the second connecting pipe 1 is moved horizontally to quickly perform insertion and positioning, and then the connecting pipe 1 is vertically erected to automatically complete the correction and fixation of the two connecting pipes 1. This method of docking operation is simple and convenient.
[0060] The sliding assembly includes a sliding post 11 and a first rotating plate 12 and a second rotating plate 13 both rotatably connected to the sliding post 11. The sliding plate 10 is provided with a first sliding groove 14 which is inclined and slidably matched with the sliding post 11. The pressing block 5 which penetrates into the fastener 7 is provided with a rotating groove 15. The end of the first rotating plate 12 penetrates into the rotating groove 15 and is rotatably connected to the fastener 7. A stopper is provided at the end of the sliding plate 10. The end of the second rotating plate 13 is rotatably connected to the edge of the end of the introduction plate 9.
[0061] In the present application, when the matching member 8 and the fastener 7 move in coordination with each other, the matching member 8 presses against the pressing block 5, so that the pressing block 5 is received in the fastener 7, thereby driving the first rotating plate 12 to rotate, and the slide post 11 moves synchronously, and cooperates with the inclined first slide groove 14, so that the slide plate 10 moves along the direction of the fastener 7 close to the introduction plate 9, and the movement distance of the slide plate 10 is relatively large;
[0062] At the same time, the second rotating plate 13 rotates to rotate the inclined introduction plate 9 to fit the inner wall of the matching piece 8. On the one hand, after the inclined introduction plate 9 completes the quick docking of the auxiliary fastener 7 and the matching piece 8, it rotates by itself, so that the matching piece 8 is connected and fixed with the fastener 7. On the other hand, the introduction plate 9 fits the inner wall of the matching piece 8 to reduce the blocking effect on the slurry in the connecting pipe 1.
[0063] The slide plate 10 is moved a relatively large distance to press and fix the lead-in plate 9 (at this time, the lead-in plate 9 is tightly fitted on the inner wall of the matching piece 8), so as to further ensure the stability of the installation.
[0064] It is worth noting that: a second slide groove 16 with an inclined distribution is provided in the fastener 7, and the second slide groove 16 slides with the slide column 11, and the inclination directions of the second slide groove 16 and the first slide groove 14 are oppositely distributed. In this way, the rotation amplitude of the first rotating plate 12 is increased, so that the moving distance of the slide plate 10 is large, which helps the introduction plate 9 with a large inclination angle to rotate and fit the mating part 8 (the large inclination angle of the introduction plate 9 is more conducive to the rapid plug-in mating of the mating part 8 with the fastener 7).
[0065] A groove 17 is provided on the side of the slide plate 10 to cooperate with the pressing block 5, so that the pressing block 5 and the slide plate 10 are pressed and cooperated to further ensure stability. A filter screen plate 18 is fixedly connected to the inner wall of the fastener 7, and the middle part of the filter screen plate 18 is connected and fixed to the rotating rod 6. Before grouting the pile core, there may be a possibility that groundwater will bring out mud and sand. If sand and soil emerge, it may cause the whole pile to sink. The filter screen plate 18 can prevent mud and sand from emerging, and the filter screen plate 18 will not be damaged during grouting (in the figure, the filter screen plate 18 is combined with the dense net through three rods. In order to facilitate clear display and avoid obstruction, the dense net is not shown, and only three rods connected to the dense net are shown).
[0066] The limiting member includes a plurality of plug rods 19 connected and fixed to the slide plate 10. The plug rods 19 are slidably matched with the fastener 7. A tension spring 20 is hung between the fastener 7 and the slide plate 10. Through the action of the plug rods 19 and the tension spring 20, the slide plate 10 is ensured to slide smoothly in the fastener 7.
[0067] A first inclined surface 21 is formed at the end of the introduction plate 9 , and the first inclined surface 21 is pressed and matched with the end of the slide plate 10 .
[0068] A plurality of fixing plates 22 are fixedly connected to the inner wall of the connecting pipe 1, the ends of the fixing plates 22 penetrate the fitting 8, the ends of the fitting 8 are fixedly connected to an inclined pressing ring 23, and a second inclined surface 24 is provided on the side of the pressing block 5, and the second inclined surface 24 is slidably matched with the pressing ring 23;
[0069] The ports of the two connecting pipes 1 are close to each other, and the fitting 8 and the fastener 7 interact and fasten the connection, so that the ports of the two connecting pipes 1 are butted against each other and fixed.
[0070] The end of the introduction plate 9 is pressed and fitted with the fixed plate 22, and the side surface of the fixed plate 22 that cooperates with the end of the introduction plate 9 is inclined. On the one hand, the fixed plate 22 ensures the position of the matching piece 8, and on the other hand, it presses and fixes the introduction plate 9 that is fitted on the matching piece 8, and ensures the stable position of the introduction plate 9 through the inclined angle.
[0071] The fastener 7 is an external threaded sleeve, the matching piece 8 is an internal threaded sleeve, the fastener 7 is threadedly connected to the matching piece 8, the end of the rotating rod 6 is fixedly connected to a movable ball 25, an L-shaped rod 26 is fixedly connected inside one of the connecting tubes 1, and a fixed ball 27 that movably cooperates with the movable ball 25 is fixedly connected to the top of the L-shaped rod 26, and a rotating groove 28 that rotates with the rotating rod 6 is opened on the fixed ball 27;
[0072] The fastener 7 and the mating piece 8 in this scheme preferably use external threaded sleeves and internal threaded sleeves, and the installation is completed by the threaded connection method of the external threaded sleeve and the internal threaded sleeve (the threaded method in this scheme is tightly tightened), and the mating piece 8 does not rotate under the action of the fixed plate 22, while the rotating rod 6 rotates along the rotating groove 28, and due to the movement of the movable ball 25 in the fixed ball 27, the rotating rod 6 rotating along the direction of the rotating groove 28 also has the ability to rotate, so that the fastener 7 rotates and cooperates with the mating piece 8 thread.
[0073] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0074] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A pile core waterproof grouting device, used for installation with pile foundation, It is characterized in that include: A plurality of detachable connecting pipes (1), the connecting pipes (1) being inserted into the pile core hole of the pile foundation, one of the connecting pipes (1) being provided with a flange (2) connected and fixed to the top surface of the pile foundation, a switch member (3) being provided between the two connecting pipes (1) located above the pile foundation, a multi-layer water-expandable ring (4) connected to the connecting pipe (1) being provided below the flange (2), the water-expandable ring (4) being press-fitted with a notch drilled on the top surface of the pile foundation; The mounting assembly and the pressing block (5) are located between two adjacent connecting pipes (1) below the flange (2). The mounting assembly comprises a rotating rod (6) rotatably connected to one of the connecting pipes (1). A fastener (7) is provided at the end of the rotating rod (6). A matching piece (8) matching with the fastener (7) is provided in the other connecting pipe (1). The fastener (7) is rotatably connected with an introduction plate (9) matching with the matching piece (8). The pressing block (5) is pressed and matched with the matching piece (8). A slide plate (10) matching with the pressing block (5) is slidably matched in the fastener (7). The slide plate (10) is slidably matched with a sliding assembly. The sliding assembly is rotatably connected with the edge of the end of the introduction plate (9).
2. A pile core waterproof grouting device according to claim 1, Features: The sliding assembly includes a sliding column (11) and a first rotating plate (12) and a second rotating plate (13) both of which are rotatably connected to the sliding column (11); the sliding plate (10) is provided with a first sliding groove (14) which is inclined and slidably matched with the sliding column (11); the pressing block (5) inserted into the fastener (7) is provided with a rotating groove (15); the end of the first rotating plate (12) is inserted into the rotating groove (15) and is rotatably connected to the fastener (7); a limiting piece is provided at the end of the sliding plate (10); and the end of the second rotating plate (13) is rotatably connected to the end edge of the introduction plate (9).
3. A pile core waterproof grouting device according to claim 2, Features: The fastener (7) is provided with a second sliding groove (16) which is distributed in an inclined manner. The second sliding groove (16) is slidably matched with the sliding column (11). The inclination directions of the second sliding groove (16) and the first sliding groove (14) are distributed in opposite directions.
4. A pile core waterproof grouting device according to claim 1, Features: The side of the slide plate (10) is provided with a groove (17) for pressing and matching with the pressing block (5); the inner wall of the fastener (7) is fixedly connected with a filter screen plate (18); and the middle part of the filter screen plate (18) is connected and fixed to the rotating rod (6).
5. A pile core waterproof grouting device according to claim 2, Features: The limiting member comprises a plurality of insertion rods (19) connected and fixed to the slide plate (10); the insertion rods (19) are slidably matched with the fasteners (7); and a tension spring (20) is hung and matched between the fasteners (7) and the slide plate (10).
6. A pile core waterproof grouting device according to claim 1, Features: The end of the introduction plate (9) is provided with a first inclined surface (21), and the first inclined surface (21) is pressed and matched with the end of the slide plate (10).
7. A pile core waterproof grouting device according to claim 1, Features: A plurality of fixing plates (22) are fixedly connected to the inner wall of the connecting tube (1), the ends of the fixing plates (22) pass through the matching piece (8), the ends of the matching piece (8) are fixedly connected to an inclined pressing ring (23), and a second inclined surface (24) is provided on the side of the pressing block (5), and the second inclined surface (24) is slidably matched with the pressing ring (23).
8. A pile core waterproof grouting device according to claim 7, Features: The end of the introduction plate (9) is pressed and matched with the fixing plate (22), and the side surface of the fixing plate (22) is inclined.
9. A pile core waterproof grouting device according to claim 1, Features: The fastener (7) is an external threaded sleeve, the matching piece (8) is an internal threaded sleeve, the fastener (7) is threadedly connected to the matching piece (8), the end of the rotating rod (6) is fixedly connected to a movable ball (25), one of the connecting tubes (1) is fixedly connected to the inside of an L-shaped rod (26), the top of the L-shaped rod (26) is fixedly connected to a fixed ball (27) that is movably matched with the movable ball (25), and the fixed ball (27) is provided with a rotating groove (28) that rotates with the rotating rod (6).
10. An operating method of a pile core waterproof grouting device, It is characterized in that The method of operating the pile core waterproof grouting device according to any one of claims 1 to 9 comprises the following steps: S1. After the concrete strength of the pile foundation reaches the requirement, a hole is drilled from top to bottom at the center of the pile foundation by a drilling rig to form a pile core hole, and a notch is drilled on the top surface of the pile foundation; One of the connecting pipes (1) is vertically placed into the pile core hole, and then the other connecting pipe (1) is horizontally moved so that the matching piece (8) and the plurality of inclined introduction plates (9) are quickly plugged in; S2, continue to make the port of the other connecting tube (1) close to the port of one of the connecting tubes (1), and at the same time erect the other connecting tube (1) upwards, so that one of the connecting tubes (1) moves downwards along the pile core hole, so that the fastener (7) and the rotating rod (6) are switched from horizontal distribution to a vertical state, and the fastener (7) and the matching piece (8) are installed and fixed, so that the two adjacent connecting tubes (1) are fixedly connected, the installation is completed, and they are inserted into the pile core hole; S3, when the multiple sections of the connecting pipe (1) are inserted into the pile core hole, the water-expandable ring (4) connected and fixed to the connecting pipe (1) is placed in the groove, and then the connecting pipe (1) is connected and fixed to the top surface of the pile foundation through the flange (2), and finally the connecting pipe (1) at the top is connected and fixed to the injection pipe of the grouting equipment; S4, opening the switch member (3), injecting high pressure grouting into the connecting pipe (1) through grouting equipment, allowing the grouting liquid to enter the pile foundation through the connecting pipe (1), and using the grouting liquid and the pressure during grouting to resist the upwardly surging groundwater until the grouting liquid fills the pile core, and then closing the switch member (3), and after the injected grouting liquid concrete solidifies, removing the switch member (3) and the parts located above the switch member (3).