Concrete retaining wall structure and construction method thereof

The problems of ultra-high fill slope support and solid waste treatment are solved by using concrete retaining wall structure assembled by bins on ultra-high fill slopes, filling solid waste and combining ultra-high performance concrete and corrosion-resistant materials. , realizes the dual effects of structural stability and environmental protection.

CN119021267APending Publication Date: 2024-11-26CHINA RAILWAY CHONGQING SURVEYING DESIGN RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411263185.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The prior art is difficult to effectively deal with ultra-high fill slopes with a height of more than 30 meters, and the landfill of solid waste leads to environmental pollution and land occupation problems.

Method used

A concrete retaining wall structure is used assembled from several vertical bins. The bins are filled with solid waste with high density, and the use of ultra-high performance concrete and corrosion-resistant materials combines continuous step distribution and groove design. , improve structural stability and maintenance convenience.

Benefits of technology

It has achieved safety support for ultra-high fill slopes and low-impact absorption of solid waste, improved structural compression resistance and maintenance efficiency, and reduced material usage and environmental pollution risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021267A_ABST
    Figure CN119021267A_ABST
Patent Text Reader

Abstract

The invention provides a concrete retaining wall structure and a construction method thereof. The concrete retaining wall structure solves the problem that an existing slope retaining structure is low in height and cannot be combined with solid waste. The concrete retaining wall structure comprises a bottom plate and a retaining wall body arranged on the bottom plate, the retaining wall body is formed by splicing a plurality of bins extending vertically, the lower ends of the bins are in seamless connection with the bottom plate, and the bins are filled with solid waste filler. The construction method comprises the following steps that the bottom plate is poured on a foundation; building silos which are continuously distributed in a stepped manner on the bottom plate; the silo is filled with solid waste filler; and the top of the silo is sealed by using ultra-high performance concrete. The solid waste filler is sealed and stored through the silo, so that a large amount of solid waste is consumed, the leakage risk does not exist, and the influence on the environment is extremely low; and the silo is filled with the solid waste filler, so that the stability of the retaining wall structure can be improved, and the safety of ultrahigh filling disposal is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of geotechnical engineering and relates to a concrete retaining wall structure and a construction method thereof. Background Art

[0002] When building large-scale fields (such as railway stations, airports, municipal fields, etc.) in mountainous areas, it is difficult to use slope reduction treatment when the terrain or land use is limited. The effective treatment height of retaining measures such as conventional retaining walls, anti-sliding piles or their combination is limited. The general retaining height is within 20m and it is difficult to exceed 30m. The retaining structure of the super-high fill slope with a height greater than 30m is subject to large bending moments and shear forces, and has relatively high requirements for anti-sliding and anti-overturning.

[0003] The disposal process of solid waste (including hazardous solid waste, industrial solid waste, etc.) will bring about a series of environmental and social problems. Harmful substances in solid waste will seep into the soil, water and atmosphere, causing environmental pollution. For example, some heavy metals, chemicals and petroleum products may have long-term impacts on the ecological environment. In addition, solid waste requires a large amount of land resources for stacking and landfilling, which not only occupies precious land resources, but may also lead to problems such as land degradation and ecosystem destruction. Summary of the invention

[0004] The purpose of the present invention is to address the above-mentioned problems in the prior art and to propose a concrete retaining wall structure combined with solid waste disposal.

[0005] A construction method of a concrete retaining wall structure is also proposed.

[0006] The purpose of the present invention can be achieved by the following technical solutions:

[0007] The concrete retaining wall structure comprises a base plate and a retaining wall body arranged on the base plate, wherein the retaining wall body is assembled from a plurality of vertically extending silos, the lower ends of the silos are seamlessly connected to the base plate, and the silos are filled with solid waste fillers.

[0008] Solid waste filling materials are hazardous solid waste or industrial solid waste with high density. Through the sealing and preservation of silos, large-scale disposal of solid waste can be achieved without the risk of leakage and extremely low impact on the environment. Filling the silo with solid waste filling materials can improve the stability of the retaining wall structure and ensure the safety of ultra-high fill disposal.

[0009] In the above concrete retaining wall structure, adjacent silos are seamlessly spliced, at least two silos are arranged in the thickness direction of the retaining wall, and the heights of the silos arranged in sequence along the thickness direction of the retaining wall are gradually increased along the sloping direction of the slope.

[0010] The slope has a slope direction and a slope inclination (the direction of slope reduction). The slope direction is the direction in which the slope extends in space and the azimuth of the intersection line between the slope surface and the horizontal plane. The slope inclination is the size of the slope surface's inclination in space. The length direction of the retaining wall is the same as the direction of the slope, and the thickness direction of the retaining wall is perpendicular to the direction of the retaining wall. The continuous stepped distribution of several silos arranged in sequence along the thickness direction of the retaining wall helps to disperse the load of the slope and improve the compressive strength of the concrete retaining wall structure. At the same time, it can also reduce the amount of materials used and reduce automation, thereby achieving lightweight.

[0011] In the above concrete retaining wall structure, the cross section of the silo is a regular hexagon.

[0012] After seamlessly assembling multiple silos with regular hexagonal cross-sections, a groove is left on the outermost side of the retaining wall, which can provide sufficient space for maintenance personnel to easily access the parts that need to be repaired or replaced, greatly simplifying the maintenance process and saving time and energy. The groove can also be used to locate and fix the parts that need to be repaired or replaced. For example, positioning pins or fixing fixtures can be set in the groove to ensure the stability of the parts during the maintenance process, which helps to improve the accuracy and efficiency of maintenance.

[0013] In the above concrete retaining wall structure, the part of the silo that contacts the solid waste filling is made of corrosion-resistant material, which can avoid leakage of the solid waste filling filled in the silo, and can solve environmental problems such as land degradation and ecosystem destruction.

[0014] In the above concrete retaining wall structure, the silo is made of ultra-high performance concrete. Ultra-high performance concrete (UHPC) has high strength, high durability and excellent corrosion resistance, which helps to prevent erosion and damage to the land by solid waste filling.

[0015] In the above concrete retaining wall structure, the silo includes an outer shell, an inner shell and a cast-in-place layer arranged between the outer shell and the inner shell, the outer shell and the inner shell are made of ultra-high performance concrete, and the cast-in-place layer is made of ordinary concrete.

[0016] Ordinary concrete (OPC) is one of the most commonly used cement types. Ordinary concrete (OPC) is used for the cast-in-place layer, which is combined with the shell to form a complete structure. The cast-in-place process can ensure the integrity and stability of the structure, and at the same time, customized design and construction can be carried out as needed, saving construction costs.

[0017] The outer shell is not only the outer surface of the silo, but also the outer formwork. When pouring the cast-in-place layer, the outer shell can play a supporting and shaping role, thereby simplifying the construction process and improving work efficiency. The outer shell can also provide additional fire protection and improve structural safety. At the same time, the outer shell can also provide an additional protective layer to increase the service life of the silo. The inner shell also acts as an inner formwork. When pouring the cast-in-place layer, the inner shell can play a supporting and shaping role to ensure the accuracy and consistency of the internal structure.

[0018] In the above concrete retaining wall structure, the silo includes a body and an inner coating, the body is made of ordinary concrete, and the inner coating is made of ultra-high performance concrete.

[0019] Applying an internal coating inside the main body can not only enhance the silo's anti-seepage and anti-corrosion properties, but also increase its service life. The internal coating made of ultra-high performance concrete has good adhesion and weather resistance, which can ensure the durability of the structure.

[0020] In the above concrete retaining wall structure, the base plate is made of ultra-high performance concrete. The base plate made of ultra-high performance concrete has high strength, high durability and excellent corrosion resistance, so that the base plate can withstand large loads, while providing stable support for the upper structure and helping to prevent erosion and damage to the soil by solid waste filling.

[0021] A construction method for a concrete retaining wall structure comprises the following steps:

[0022] Step 1: pour the base plate on the foundation;

[0023] Step 2: Build silo tubes with continuous stepped distribution on the base plate; the silo tubes are prefabricated parts, which are seamlessly assembled on the base plate. The assembly methods include slot assembly, sleeve + pouring connection, steel bar braiding and then pouring, or mortise and tenon structure, etc. The assembly method is selected according to the specific needs of the project, budget, construction conditions and time.

[0024] Step 3: Fill the silo with solid waste filler;

[0025] In order to facilitate construction, step two and step three can be performed alternately, that is, each time a silo of a certain height is built, solid waste fillers must be filled, and on this basis, a silo of a certain height is built again, and then filled with solid waste fillers, and so on.

[0026] Step 4: Use ultra-high performance concrete to cap the silo.

[0027] When the silo includes a body and an internal coating, after the pouring of the OPC body is completed, a layer of UHPC coating is applied inside it as an internal coating.

[0028] A construction method for a concrete retaining wall structure comprises the following steps:

[0029] Step 1: pour the base plate on the foundation;

[0030] Step 2: Build prefabricated outer shell and inner shell on the base plate, and then pour a cast-in-place layer between the outer shell and the inner shell to form a silo tube; the assembly method between multiple shells is slot assembly, sleeve + pouring connection, steel bars braided together and then poured or mortise and tenon structure, etc. The assembly method is selected according to the specific needs of the project, budget, construction conditions and time and other factors.

[0031] Step 3: Fill the silo with solid waste filler;

[0032] To facilitate construction, step two and step three can be performed alternately, that is, after each outer shell and inner shell of a certain height are built and the cast-in-place layer is poured, solid waste fillers must be filled. On this basis, an outer shell and inner shell of a certain height are built again and the cast-in-place layer is poured, and then solid waste fillers are filled, and the process is stacked upwards.

[0033] Step 4: Use ultra-high performance concrete to cap the silo.

[0034] Compared with the prior art, the present invention has the following advantages:

[0035] Solid waste filling can be sealed and preserved in the silo, so that a large amount of solid waste can be disposed of without the risk of leakage and with extremely low impact on the environment. Filling the solid waste filling in the silo can improve the stability of the retaining wall structure and ensure the safety of ultra-high fill disposal. The contact between the silo and the solid waste filling is made of corrosion-resistant materials to avoid leakage of the solid waste filling and solve environmental problems such as land degradation and ecosystem destruction. The silo with a regular hexagonal cross-section has high spatial rigidity and stability, can better adapt to complex terrain conditions, is easy to splice, improves the stability of the retaining wall, and provides convenience for maintenance. The use of full prefabrication or semi-prefabrication methods during construction can greatly improve work efficiency, and the excellent impermeability of ultra-high performance concrete can be used to greatly improve impermeability, avoid solid waste penetration and leakage, and improve mechanics and durability. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 It is a top view of the concrete retaining wall structure provided by the present invention.

[0037] Figure 2 It is a longitudinal sectional view of the concrete retaining wall structure provided by the present invention.

[0038] Figure 3 This is a top view of the silo provided in Example 1.

[0039] Figure 4 It is a top view of the silo provided in the second embodiment.

[0040] Figure 5 It is a top view of the silo provided in Example 3.

[0041] In the figure, 1, bottom plate; 2, silo; 21, outer shell; 22, inner shell; 23, cast-in-place layer; 24, main body; 25, internal coating; 3, slope. DETAILED DESCRIPTION

[0042] The following are specific embodiments of the present invention and the accompanying drawings to further describe the technical solution of the present invention, but the present invention is not limited to these embodiments.

[0043] Embodiment 1

[0044] like Figure 1 and Figure 2 The concrete retaining wall structure shown includes a base plate 1 and a retaining wall body arranged on the base plate 1. The base plate 1 is made of ultra-high performance concrete. The base plate 1 made of ultra-high performance concrete has high strength, high durability and excellent corrosion resistance, so that the base plate 1 can withstand a large load, while providing stable support for the upper structure and helping to prevent erosion and damage to the soil by solid waste filling.

[0045] The retaining wall is assembled from a number of vertically extending silos 2, the lower end of which is seamlessly connected to the bottom plate 1, and adjacent silos 2 are seamlessly spliced, and each silo 2 is filled with solid waste fillers and capped. The solid waste fillers are hazardous solid waste or industrial solid waste with a high density. Through the sealing and preservation of the silos 2, a large amount of solid waste can be disposed of without the risk of leakage, and the impact on the environment is extremely low.

[0046] At the same time, filling the silo 2 with solid waste filling materials can improve the strength of the silo 2, thereby improving the stability of the retaining wall structure and ensuring the safety of super-high fill disposal.

[0047] This concrete retaining wall structure is used to support the super-high fill slope 3. The slope 3 has a slope 3 direction and a slope 3 inclination. The slope 3 direction is the direction in which the slope 3 extends in space ( Figure 2 The direction perpendicular to the paper), the azimuth of the intersection of the slope 3 surface and the horizontal plane, and the slope 3 inclination are the magnitude of the slope 3 surface inclination in space ( Figure 2 The inclination direction of the inclined plane indicated by mark 3 in the figure).

[0048] In this embodiment, Figure 1 and Figure 2 As shown, the retaining wall is composed of 9 rows of units extending along the slope 3, and the number of unit rows is determined according to specific circumstances.

[0049] In each unit row, multiple silos 2 are arranged in sequence along the slope 3, and adjacent unit rows are staggered and seamlessly spliced. Every three adjacent unit rows form a group. Figure 2 As shown in FIG. 3 , the three groups of unit rows are gradually increased along the slope direction of the slope 3. Specifically, Figure 2 As shown, the three groups of unit rows close to the slope 3 are of the same height, the three groups of unit rows in the middle are of the same height, and the three groups of unit rows farthest from the slope 3 are of the same height, and the upper ends of the three groups of unit rows farthest from the slope 3 are higher than the upper ends of the three groups of unit rows in the middle, and the upper ends of the three groups of unit rows in the middle are higher than the upper ends of the three groups of unit rows close to the slope 3.

[0050] The plurality of silos 2 arranged in sequence along the thickness direction of the retaining wall are distributed in a continuous stepped manner, which helps to disperse the load of the slope 3 and improve the compressive strength of the concrete retaining wall structure. At the same time, the amount of material used can be reduced, and the automaticity can be reduced, thereby achieving lightweight.

[0051] like Figure 1 and 3 As shown, the cross section of the silo 2 is a regular hexagon.

[0052] After seamlessly assembling a plurality of silos 2 with regular hexagonal cross sections, a groove is left on the outermost side of the formed retaining wall, which can provide sufficient space so that maintenance personnel can easily access the parts that need to be repaired or replaced, greatly simplifying the maintenance process and saving time and energy. The groove can also be used to locate and fix the parts that need to be repaired or replaced, such as setting a positioning pin or a fixing fixture in the groove to ensure the stability of the parts during the maintenance process, which helps to improve the accuracy and efficiency of the maintenance.

[0053] In this embodiment, the silo 2 is made of ultra-high performance concrete. Ultra-high performance concrete (UHPC) has high strength, high durability and excellent corrosion resistance, which helps to prevent erosion and damage to the land by solid waste filling and can form a support height of more than 30 meters.

[0054] The construction method of the concrete retaining wall structure comprises the following steps:

[0055] Step 1: pour the base plate 1 on the foundation.

[0056] Step 2: Build a silo 2 with continuous step distribution on the bottom plate 1. The silo 2 is a prefabricated part, and the prefabricated silo 2 is seamlessly assembled on the bottom plate 1. The assembly method is slot assembly, sleeve + pouring connection, steel bar braiding and then pouring, or mortise and tenon structure, etc. The assembly method is selected according to the specific needs of the project, budget, construction conditions and time.

[0057] Step 3: Fill the silo 2 with solid waste filler.

[0058] In order to facilitate construction, step two and step three can be performed alternately, that is, each time a silo 2 of a certain height is built, solid waste fillers must be filled, and on this basis, another silo 2 of a certain height is built, and then filled with solid waste fillers, and so on.

[0059] Step 4: Cap the silo 2 with ultra-high performance concrete.

[0060] Embodiment 2

[0061] like Figure 1 and Figure 2 The concrete retaining wall structure shown includes a base plate 1 made of ultra-high performance concrete and a retaining wall body arranged on the base plate 1. The retaining wall body is assembled from a number of vertically extending silos 2. The lower end of the silo 2 is seamlessly connected to the base plate 1, and adjacent silos 2 are seamlessly spliced. Each silo 2 is filled with solid waste fillers and capped. The solid waste fillers are hazardous solid waste or industrial solid waste with a high density. Through the sealing and preservation of the silos 2, a large amount of solid waste can be disposed of without the risk of leakage, and the impact on the environment is extremely low.

[0062] At the same time, filling the silo 2 with solid waste filling materials can improve the strength of the silo 2, thereby improving the stability of the retaining wall structure and ensuring the safety of super-high fill disposal.

[0063] This concrete retaining wall structure is used to support the super-high fill slope 3. The slope 3 has a slope 3 direction and a slope 3 inclination. The slope 3 direction is the direction in which the slope 3 extends in space ( Figure 2 The direction perpendicular to the paper), the azimuth of the intersection of the slope 3 surface and the horizontal plane, and the slope 3 inclination are the magnitude of the slope 3 surface inclination in space ( Figure 2 The inclination direction of the inclined plane indicated by mark 3 in the figure).

[0064] In this embodiment, Figure 1 and Figure 2 As shown, the retaining wall is composed of 9 rows of unit rows extending along the slope 3. In each unit row, multiple silos 2 are arranged in sequence along the slope 3. Adjacent unit rows are staggered and seamlessly spliced. Every three adjacent unit rows form a group. Figure 2 As shown in FIG. 3 , the three groups of unit rows are gradually increased along the slope direction of the slope 3. Specifically, Figure 2 As shown, the three groups of unit rows close to the slope 3 are of the same height, the three groups of unit rows in the middle are of the same height, and the three groups of unit rows farthest from the slope 3 are of the same height, and the upper ends of the three groups of unit rows farthest from the slope 3 are higher than the upper ends of the three groups of unit rows in the middle, and the upper ends of the three groups of unit rows in the middle are higher than the upper ends of the three groups of unit rows close to the slope 3.

[0065] The plurality of silos 2 arranged in sequence along the thickness direction of the retaining wall are distributed in a continuous stepped manner, which helps to disperse the load of the slope 3 and improve the compressive strength of the concrete retaining wall structure. At the same time, the amount of material used can be reduced, and the automaticity can be reduced, thereby achieving lightweight.

[0066] like Figure 1 and 3 As shown, the cross section of the silo 2 is a regular hexagon.

[0067] After seamlessly assembling a plurality of silos 2 with regular hexagonal cross sections, a groove is left on the outermost side of the formed retaining wall, which can provide sufficient space so that maintenance personnel can easily access the parts that need to be repaired or replaced, greatly simplifying the maintenance process and saving time and energy. The groove can also be used to locate and fix the parts that need to be repaired or replaced, such as setting a positioning pin or a fixing fixture in the groove to ensure the stability of the parts during the maintenance process, which helps to improve the accuracy and efficiency of the maintenance.

[0068] In this embodiment, Figure 4 As shown, the silo 2 includes an outer shell 21, an inner shell 22 and a cast-in-place layer 23 disposed between the outer shell 21 and the inner shell 22. The outer shell 21 and the inner shell 22 are made of ultra-high performance concrete, and the cast-in-place layer 23 is made of ordinary concrete. Ordinary concrete (OPC) is one of the most commonly used cement types. Ordinary concrete (OPC) is used to cast the cast-in-place layer 23, which is combined with the outer shell 21 to form a complete structure. The cast-in-place process can ensure the integrity and stability of the structure, and can also be customized according to needs. Design and construction can save construction costs.

[0069] The outer shell 21 serves not only as the outer surface of the silo 2, but also as an outer formwork. When pouring the cast-in-place layer 23, the outer shell 21 can play a supporting and shaping role, thereby simplifying the construction process and improving work efficiency. The outer shell 21 can also provide additional fire protection functions and improve structural safety. At the same time, the outer shell 21 can also provide an additional protective layer to increase the service life of the silo 2. The inner shell 22 also serves as an inner formwork. When pouring the cast-in-place layer 23, the inner shell 22 can play a supporting and shaping role to ensure the accuracy and consistency of the internal structure. In addition, the outer shell 21 and the inner shell 22 made of ultra-high performance concrete can play the performance advantage of ultra-high impermeability, thereby avoiding the seepage of solid waste and causing environmental pollution.

[0070] The construction method of the concrete retaining wall structure comprises the following steps:

[0071] Step 1: pour the base plate 1 on the foundation.

[0072] Step 2: build a prefabricated outer shell 21 and inner shell 22 on the bottom plate 1, and then cast a cast-in-place layer 23 between the outer shell 21 and the inner shell 22 to form the silo 2. The assembly method between the multiple outer shells 21 is slot assembly, sleeve + casting connection, steel bar braiding and then casting, or mortise and tenon structure, etc. The assembly method is selected according to the specific needs of the project, budget, construction conditions and time and other factors.

[0073] Step 3: Fill the silo 2 with solid waste filler.

[0074] To facilitate construction, step two and step three can be performed alternately, that is, after each outer shell 21 and inner shell 22 of a certain height are built and the cast-in-place layer 23 is poured, solid waste fillers are filled, and on this basis, the outer shell 21 and inner shell 22 of a certain height are built again and the cast-in-place layer 23 is poured, and then solid waste fillers are filled, and the process is stacked upwards.

[0075] Step 4: Cap the silo 2 with ultra-high performance concrete.

[0076] Embodiment 3

[0077] like Figure 1 and Figure 2 The concrete retaining wall structure shown includes a base plate 1 made of ultra-high performance concrete and a retaining wall body arranged on the base plate 1. The retaining wall body is assembled from a number of vertically extending silos 2. The lower end of the silo 2 is seamlessly connected to the base plate 1, and adjacent silos 2 are seamlessly spliced. Each silo 2 is filled with solid waste fillers and capped. The solid waste fillers are hazardous solid waste or industrial solid waste with a high density. Through the sealing and preservation of the silos 2, a large amount of solid waste can be disposed of without the risk of leakage, and the impact on the environment is extremely low.

[0078] At the same time, filling the silo 2 with solid waste filling materials can improve the strength of the silo 2, thereby improving the stability of the retaining wall structure and ensuring the safety of super-high fill disposal.

[0079] This concrete retaining wall structure is used to support the super-high fill slope 3. The slope 3 has a slope 3 direction and a slope 3 inclination. The slope 3 direction is the direction in which the slope 3 extends in space ( Figure 2 The direction perpendicular to the paper), the azimuth of the intersection of the slope 3 surface and the horizontal plane, and the slope 3 inclination are the magnitude of the slope 3 surface inclination in space ( Figure 2 The inclination direction of the inclined plane indicated by mark 3 in the figure).

[0080] In this embodiment, Figure 1 and Figure 2 As shown, the retaining wall is composed of 9 rows of unit rows extending along the slope 3. In each unit row, multiple silos 2 are arranged in sequence along the slope 3. Adjacent unit rows are staggered and seamlessly spliced. Every three adjacent unit rows form a group. Figure 2As shown in FIG. 3 , the three groups of unit rows are gradually increased along the slope direction of the slope 3. Specifically, Figure 2 As shown, the three groups of unit rows close to the slope 3 are of the same height, the three groups of unit rows in the middle are of the same height, and the three groups of unit rows farthest from the slope 3 are of the same height, and the upper ends of the three groups of unit rows farthest from the slope 3 are higher than the upper ends of the three groups of unit rows in the middle, and the upper ends of the three groups of unit rows in the middle are higher than the upper ends of the three groups of unit rows close to the slope 3.

[0081] The plurality of silos 2 arranged in sequence along the thickness direction of the retaining wall are distributed in a continuous stepped manner, which helps to disperse the load of the slope 3 and improve the compressive strength of the concrete retaining wall structure. At the same time, the amount of material used can be reduced, and the automaticity can be reduced, thereby achieving lightweight.

[0082] like Figure 1 and 3 As shown, the cross section of the silo 2 is a regular hexagon.

[0083] After seamlessly assembling a plurality of silos 2 with regular hexagonal cross sections, a groove is left on the outermost side of the formed retaining wall, which can provide sufficient space so that maintenance personnel can easily access the parts that need to be repaired or replaced, greatly simplifying the maintenance process and saving time and energy. The groove can also be used to locate and fix the parts that need to be repaired or replaced, such as setting a positioning pin or a fixing fixture in the groove to ensure the stability of the parts during the maintenance process, which helps to improve the accuracy and efficiency of the maintenance.

[0084] In this embodiment, Figure 5 As shown, the silo 2 includes a body 24 and an inner coating 25, wherein the body 24 is made of ordinary concrete and the inner coating 25 is made of ultra-high performance concrete.

[0085] Applying a layer of inner coating 25 inside the main body 24 can not only enhance the anti-seepage and anti-corrosion performance of the silo 2, but also improve the service life. The inner coating 25 made of ultra-high performance concrete has good adhesion and weather resistance, which can ensure the durability of the structure.

[0086] The construction method of the concrete retaining wall structure comprises the following steps:

[0087] Step 1: pour the base plate 1 on the foundation.

[0088] Step 2: Build a silo 2 with continuous step distribution on the bottom plate 1. The silo 2 is a prefabricated part. After the pouring of the OPC body 24 is completed, a layer of UHPC coating is applied inside as the internal coating 25. The prefabricated silo 2 is seamlessly assembled on the bottom plate 1. The assembly method is slot assembly, sleeve + pouring connection, steel bar braiding and then pouring or mortise and tenon structure, etc. The assembly method is selected according to the specific needs of the project, budget, construction conditions and time and other factors.

[0089] Step 3: Fill the silo 2 with solid waste filler.

[0090] In order to facilitate construction, step two and step three can be performed alternately, that is, each time a silo 2 of a certain height is built, solid waste fillers must be filled, and on this basis, another silo 2 of a certain height is built, and then filled with solid waste fillers, and so on.

[0091] Step 4: Cap the silo 2 with ultra-high performance concrete.

[0092] The specific embodiments described herein are merely examples of the spirit of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in similar ways, but they will not deviate from the spirit of the present invention or exceed the scope defined by the appended claims.

Claims

1. A concrete retaining wall structure, It is characterized in that It comprises a base plate (1) and a retaining wall arranged on the base plate (1), wherein the retaining wall is assembled from a plurality of vertically extending silos (2), the lower end of the silo (2) is seamlessly connected to the base plate (1), and the silo (2) is filled with solid waste filler.

2. The concrete retaining wall structure according to claim 1, It is characterized in that Adjacent silos (2) are seamlessly spliced, at least two silos (2) are arranged in the thickness direction of the retaining wall, and the heights of a plurality of silos (2) arranged in sequence in the thickness direction of the retaining wall are gradually increased along the sloping direction of the slope (3).

3. The concrete retaining wall structure according to claim 1, It is characterized in that The cross section of the silo (2) is a regular hexagon.

4. The concrete retaining wall structure according to claim 1, It is characterized in that The portion of the silo (2) that contacts the solid waste filling is made of corrosion-resistant material.

5. The concrete retaining wall structure according to claim 4, It is characterized in that The silo (2) is made of ultra-high performance concrete.

6. The concrete retaining wall structure according to claim 4, It is characterized in that The silo (2) comprises an outer shell (21), an inner shell (22) and a cast-in-place layer (23) arranged between the outer shell (21) and the inner shell (22); the outer shell (21) and the inner shell (22) are made of ultra-high performance concrete, and the cast-in-place layer (23) is made of ordinary concrete.

7. The concrete retaining wall structure according to claim 4, It is characterized in that The silo (2) comprises a body (24) and an inner coating (25), wherein the body (24) is made of ordinary concrete, and the inner coating (25) is made of ultra-high performance concrete.

8. The concrete retaining wall structure according to any one of claims 1 to 7, It is characterized in that The base plate (1) is made of ultra-high performance concrete.

9. A construction method for the concrete retaining wall structure of claim 5 or 7, It is characterized in that The following steps are involved: Step 1: pouring a base plate (1) on the foundation; Step 2: Building a silo (2) with continuous step distribution on the bottom plate (1); Step 3: Filling the silo (2) with solid waste filler; Step 4: Cap the silo (2) with ultra-high performance concrete.

10. A construction method for the concrete retaining wall structure of claim 6, It is characterized in that The following steps are involved: Step 1: pouring a base plate (1) on the foundation; Step 2: constructing a prefabricated outer shell (21) and inner shell (22) on the bottom plate (1), and then pouring a cast-in-place layer (23) between the outer shell (21) and the inner shell (22) to form a silo (2); Step 3: Filling the silo (2) with solid waste filler; Step 4: Cap the silo (2) with ultra-high performance concrete.