Test system and detection method for detection function of battery management system

By designing an automated test system and using the function of analog signal to detect the battery management system, the problem of low insulation detection efficiency of the battery management system in the prior art is solved, and more efficient and accurate detection results are achieved.

CN119024247APending Publication Date: 2024-11-26DEEPAL AUTOMOBILE TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411213552.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The existing battery management system has low efficiency and requires manual operation, resulting in low detection efficiency.

Method used

A test system is designed, including a control device, an analog device and a test device. Through the analog signal, the function of the battery management system is automatically detected. The control device determines whether the detection result is normal and avoids manual errors.

Benefits of technology

It improves the efficiency of the battery management system detection function, realizes automation and intelligence, reduces error steps, and ensures the accuracy and stability of the detection results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119024247A_ABST
    Figure CN119024247A_ABST
Patent Text Reader

Abstract

The invention provides a test system and a detection method for a detection function of a battery management system, relates to the technical field of automobiles, and is used for solving the problem of low efficiency of an existing detection device during insulation detection. The detection system comprises a control device, a simulation device and a test device. The simulation device is electrically connected with the control device and used for generating simulation signals under the control of the control device. The simulation device is further used for being electrically connected with the battery management system so that the battery management system can detect simulation signals of the simulation device. The testing device is used for setting the battery management system and is connected with the control device. The testing device is used for acquiring an analog signal detected by the battery management system and sending the analog signal detected by the battery management system to the control device. The control device is used for judging whether the detection function of the battery management system is normal or not. The detection system does not need manual operation, and the detection efficiency and the detection accuracy are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of automobile technology, and specifically to a test system and a method for testing the detection function of a battery management system. Background Art

[0002] With the improvement of people's living standards, cars have gradually become a necessary means of transportation for most families. At the same time, with the continuous development of new energy vehicles, the market for electric vehicles is gradually expanding and gradually becoming the mainstream choice of consumers. Among them, electric vehicles mainly rely on batteries to power electric motors, and then use electric motors to drive the operation of the vehicle.

[0003] In order to ensure the normal operation of the battery of electric vehicles and the safety of passengers, some structures of the battery need to be insulated. Therefore, in order to manage the battery, electric vehicles are generally equipped with a battery management system. The battery management system can perform insulation detection to ensure that the insulation treatment of the battery is in an effective state and avoid safety hazards caused by insulation failure.

[0004] CN220040689U discloses a test device for a BMS insulation detection function, which includes a host computer, and a first power supply and a second power supply connected to the host computer, the first power supply and the second power supply are also connected to an insulation resistance simulation device, and the insulation resistance simulation device is connected to a BMS controller. CN111337869A discloses a BMS board test device, which includes: a power module, a parameter adjustment module and a parameter acquisition module, the power module is used to simulate a lithium battery, which can generate a first voltage with an adjustable voltage range; the parameter adjustment module is connected to the power module, and is used to simulate the normal working state and / or abnormal working state of the lithium battery when working; and is provided with an interface for connecting to the BMS board; the parameter acquisition module is connected to the parameter adjustment module, and is used to detect the actual parameters of the parameter adjustment module when it is output to the BMS board after parameter adjustment.

[0005] However, the above solution requires staff to manually organize, compare and judge the data results, which is prone to errors and leads to low detection efficiency. Summary of the invention

[0006] The purpose of the present application is to provide a test system and a method for detecting the detection function of a battery management system, so as to solve the problem that the existing detection device has low efficiency when performing insulation detection.

[0007] In order to achieve the above object, the technical solution adopted by the present invention is as follows:

[0008] On the one hand, an embodiment of the present application provides a test system for detecting a detection function of a battery management system, and the detection system includes a control device, a simulation device, and a test device. The simulation device is electrically connected to the control device, and is used to generate an analog signal under the control of the control device. The simulation device is also used to be electrically connected to the battery management system so that the battery management system detects the analog signal of the simulation device. The test device is used to set up the battery management system and is connected to the control device. The test device is used to obtain the analog signal detected by the battery management system, and send the analog signal detected by the battery management system to the control device. Among them, the control device is used to determine whether the detection function of the battery management system is normal.

[0009] According to the above technical means, the test system provided in the embodiment of the present application, the test system provided in the embodiment of the present application, when testing the detection function of the battery management system, only needs to be set for the control device, and the control device can control the simulation device to generate a simulation signal according to the pre-set content, and the battery management system can obtain the simulation signal from the simulation device, and the parameters of the simulation signal detected by the battery management system can be transmitted to the control device through the test device, and the control device can compare the parameters of the simulation signal of the battery management system with the actual corresponding parameters of the simulation signal to determine whether the detection function of the battery management system is in normal working state. This process does not require manual operation, is not easy to produce wrong steps and missed steps, is more intelligent and automated, and greatly improves the efficiency of testing the detection function of the battery management system.

[0010] In a possible implementation, the simulation device may include a voltage generator, which is used to generate a voltage signal under the control of the control device, and the simulation signal includes the voltage signal.

[0011] According to the above technical means, through the voltage meter, the testing device can test whether the battery management system can normally detect the voltage signal, thereby avoiding the situation where the battery management system cannot detect the voltage during operation.

[0012] In a possible implementation, the simulation device includes a resistor. The resistor is used to generate a resistance signal under the control of the control device, and the simulation signal includes the resistance signal.

[0013] According to the above technical means, the control device can control the resistor to generate a resistance signal. Correspondingly, the battery management system can obtain the resistance signal. At this time, the control device can obtain the resistance signal measured by the battery management system from the test device, and compare it with the actual resistance signal to determine whether the battery management system can accurately detect the resistance value, thereby ensuring that the insulation detection function of the battery management system is normal, avoiding the failure of its insulation detection function and causing safety hazards.

[0014] In a possible implementation, the simulation device includes a simulator. The simulator is used to generate a circuit fault simulation signal under the control of the control device, and the simulation signal includes a circuit fault simulation signal.

[0015] According to the above-mentioned technical means, the battery management system can detect the circuit fault simulation signal through the simulator. After the control device obtains the parameters of the circuit fault simulation signal detected by the battery management system through the testing device, it can compare them with the actual parameters of the circuit fault simulation signal, and then determine whether the battery management system can detect the battery fault simulation signal normally.

[0016] In a possible implementation, the simulation device includes a simulator. The circuit fault simulation signal includes at least one of a circuit short circuit signal, a circuit open circuit signal, and a power supply fault signal.

[0017] According to the above-mentioned technical means, through the above-mentioned circuit fault simulation signal, when testing the test function of the battery management system, the battery management system can detect circuit fault simulation signals of different situations that are likely to occur when actually applied to the vehicle, so that the control device can determine whether the battery management system can normally detect the above-mentioned different circuit fault simulation signals when actually applied to the vehicle.

[0018] In a possible implementation, the simulation device includes a resistor. The resistor includes a plurality of resistors. The plurality of resistors are connected in series or in parallel, so that the resistors can generate resistance values ​​of different sizes under the control of the control device.

[0019] According to the above technical means, since the resistor can generate resistance signals with different resistance values, the battery management system can also detect resistance signals with different resistance values. In this way, when testing the battery management system, different resistance values ​​can be set within a cycle for testing to simulate the situation in which the insulation resistance value will change periodically in actual applications, so as to more accurately detect the detection function of the battery management system and accurately perform resistance detection.

[0020] In a possible implementation, the resistor further includes a capacitor. The capacitor is used to generate a capacitance signal under the control of the control device, and the analog signal includes the capacitance signal.

[0021] According to the above technical means, the battery management system can detect the capacitance signal through the resistor, and the control device can obtain the capacitance signal through the detection device, and then judge whether the battery management system can detect the capacitance signal normally by comparing whether the parameters of the capacitance signal detected by the battery management system are consistent with the actual parameters of the capacitance signal.

[0022] In a possible implementation manner, there are multiple capacitors, including X capacitors and Y capacitors, and the X capacitor and the Y capacitor are connected in parallel.

[0023] According to the above technical means, the control device can control the resistor to output the signal of the X capacitor or the signal of the Y capacitor. Since most of the capacitor types in the vehicle are X capacitors or Y capacitors, when the above resistor includes X capacitors and Y capacitors, the resistor can better simulate the actual application scenario of the battery management system, and thus can better detect whether the detection function of the battery management can accurately detect the signals of the X capacitor and the Y capacitor during the actual application process.

[0024] In a possible implementation, the testing device includes a testing box and a timer. The testing box is used to set the battery management system, and the timer is electrically connected to the control device and is also used to electrically connect to the battery management system to detect the time when the battery management system detects the analog signal.

[0025] According to the above technical means, in the actual detection process, the control device can control the simulation device to generate different simulation signals within a time period, so that the battery management system performs detection at different time points, thereby achieving stress testing of the battery management system. Since a timer is provided, the control device can obtain the simulation signals corresponding to the battery management system at different time points through the timer. In this way, when the circuit management system detects a parameter error at a certain time point, the control device can know at which time point the parameter detection is abnormal.

[0026] In a possible implementation, the test system further includes a display screen, which is electrically connected to the control device.

[0027] According to the above technical means, the user can input parameter data through the display screen, which is more convenient. At the same time, the processing results displayed by the control device can also be displayed through the display screen, so that the user can observe the final detection results more conveniently.

[0028] On the other hand, an embodiment of the present application provides a method for detecting a detection function of a battery management system, which is applied to any of the test systems described in the above aspect. The test method comprises the steps of: a control device controls a simulation device to generate a simulation signal. The battery management system detects the simulation signal. The control device compares whether the parameters of the simulation signal detected by the battery management system are consistent with the actual parameters of the simulation signal.

[0029] According to the above technical means, the detection method of the detection function of the battery management system provided in the embodiment of the present application only needs to be set for the control device when testing the detection function of the battery management system. The control device can control the simulation device to generate a simulation signal according to the pre-set content, and the battery management system can obtain the simulation signal from the simulation device. The parameters of the simulation signal detected by the battery management system can be transmitted to the control device through the test device. The control device can compare the parameters of the simulation signal of the battery management system with the parameters actually corresponding to the simulation signal to determine whether the detection function of the battery management system is in a normal working state. This process does not require manual operation, is not prone to wrong steps and missed steps, is more intelligent and automated, and greatly improves the efficiency of testing the detection function of the battery management system.

[0030] In one possible implementation, the simulation device includes a voltage generator and a resistor. The resistor includes a plurality of resistors, and the plurality of resistors are connected in series or in parallel. The control device controls the simulation device to produce a simulation signal, including: the control device controls the voltage generator to generate a plurality of groups of voltage values, and controls the resistor to generate a plurality of groups of resistance values. The battery management system detects the simulation signal, including: the battery management system detects a plurality of groups of voltage values ​​and a plurality of groups of resistance values ​​in sequence. The control device compares whether the parameters of the simulation signal detected by the battery management system are consistent with the actual parameters of the simulation signal, including: the control device compares the parameters of the plurality of groups of voltage values ​​and the plurality of groups of resistance values ​​detected by the battery management system, respectively, to see whether they are consistent with the actual parameters of the plurality of groups of voltage values ​​and the plurality of groups of resistance values.

[0031] According to the above technical means, the battery management system can detect multiple groups of voltage values ​​and resistance values ​​in sequence, without the need for manual adjustment of resistance values ​​and voltage values ​​multiple times, making the operation simpler and more convenient, and the detection process more intelligent and efficient. At the same time, since the battery management system can measure multiple groups of voltage values ​​and resistance values, the effect of the battery management system on the detection of different values ​​can be detected, ensuring the stability and accuracy of the measurement results.

[0032] In a possible implementation, the simulation device further includes a simulator. The simulator is used to generate a circuit fault simulation signal under the action of the control device. The detection method further includes: the control device controls the simulator to generate the circuit fault simulation signal. The battery management system detects the circuit fault simulation signal. The control device compares whether the parameters of the circuit fault simulation signal detected by the battery management system are consistent with the actual parameters of the circuit fault simulation signal.

[0033] According to the above technical means, the battery management system can detect common circuit fault simulation signals. In this way, the control device can determine that the battery management system can normally detect the above circuit fault simulation signal by comparing the parameters of the battery fault simulation signal detected by the battery management system with the actual parameters of the battery fault simulation signal. Through the above steps, the test effect of the detection function of the battery management system is better and the test is more comprehensive.

[0034] In a possible implementation, the detection method further includes: the control device controls the simulation device to generate multiple groups of pressure simulation signals at intervals within a preset time. The battery management system detects the multiple groups of pressure simulation signals in sequence. The control device compares whether the parameters of the multiple groups of pressure simulation signals detected by the battery management system are consistent with the actual parameters of the multiple groups of pressure simulation signals.

[0035] According to the above technical means, through the above steps, the battery management system can perform pressure testing, perform detection multiple times within a preset time, and detect multiple groups of different pressure simulation signals. In this way, the control device can determine that the battery management system can normally detect the above multiple groups of pressure simulation signals by comparing the parameters of the multiple groups of pressure simulation signals detected by the battery management system with the actual parameters of the multiple groups of pressure simulation signals. Through the above steps, the stability of the detection function of the battery management system can be tested, thereby ensuring that the battery management system has sufficient stability during actual application. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 A logic block diagram of a test system provided in an embodiment of the present application;

[0037] Figure 2 A functional schematic block diagram of a control device provided in an embodiment of the present application;

[0038] Figure 3 A schematic diagram of the structure of a voltage generator provided in an embodiment of the present application;

[0039] Figure 4 A partial circuit diagram of a resistor provided in an embodiment of the present application;

[0040] Figure 5 A schematic diagram of the structure of a resistor provided in an embodiment of the present application;

[0041] Figure 6 A schematic diagram of the structure of a simulator provided in an embodiment of the present application;

[0042] Figure 7 A schematic block diagram of a specific type of parameter setting for a control device provided in an embodiment of the present application;

[0043] Figure 8One of the flow charts of a detection method of a detection function of a battery management system provided in an embodiment of the present application;

[0044] Fig. 9 The present invention provides a second flow chart of a method for detecting a detection function of a battery management system according to an embodiment of the present application. Description of the drawings:

[0046] 100-test system; 10-control device; 20-simulation device; 21-voltage device; 211-box body; 2111-side wall; 2112-top wall; 2113-installation part; 2114-heat dissipation hole; 2115-heat dissipation grille; 212-box door; 22-resistor; 221-resistor; 222-capacitor; 2221-X capacitor; 2222-Y capacitor; 223-operation body; 224-operation knob; 225-display area; 23-simulator; 231-display component; 232-adjustment selection part; 233-indicator light; 30-test device; 40-battery management system; 50-display screen. DETAILED DESCRIPTION

[0047] In order to enable ordinary persons in the art to better understand the technical solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the accompanying drawings.

[0048] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present application. On the contrary, they are merely examples of devices and methods consistent with some aspects of the present application as detailed in the attached claims.

[0049] An electric car is a car that is driven by an electric motor, which is powered by a battery. However, the battery of a car has certain safety hazards and needs to be insulated. At the same time, in order to avoid passengers being unable to detect the failure of the battery insulation treatment in time, electric cars generally also include a battery management system. The battery management system has an insulation detection function, which can detect the insulation treatment of the battery, thereby avoiding the problem of battery insulation failure without being discovered.

[0050] From the above, it can be seen that the battery management system plays a very important role in the insulation detection of the battery. In order to ensure that the battery status is under management, it is necessary to ensure that the battery management system can be in normal operation. In the related technology, in the process of using equipment to test the insulation detection function of the battery management system, some steps require manual operation. For example, during the detection process, testers are required to compare and determine whether the measurement results are correct, and then determine whether the detection function of the battery management system can operate normally.

[0051] Since the above detection process requires testers to record data and judge the results, the entire measurement process takes a long time and the detection efficiency is low. To this end, the embodiment of the present application provides a test system, which can be used to detect the detection function of the battery management system. Figure 1 As shown, Figure 1 The following is a logic block diagram of a test system 100 provided in an embodiment of the present application. The test system includes a control device 10, a simulation device 20, and a test device 30. The simulation device 20 is electrically connected to the control device 10.

[0052] Among them, the control device 10 can realize the control function. It can be understood that the control device 10 only needs to realize the control function of other devices, and the specific form can be designed according to the actual situation. Exemplarily, the control device 10 can include components such as a processor to realize the control function of the control device 10. Among them, the controller can perform data processing functions such as data processing and signal sending.

[0053] It is understandable that the functions of the control device 10 provided in the embodiment of the present application can be designed according to actual conditions. Figure 2 As shown, Figure 2 This is a functional schematic block diagram of a control device 10 provided in an embodiment of the present application. The control device 10 can realize parameter setting, test operation, data query, data preservation and report export functions. The functions of the control device 10 can be designed according to actual needs. They are only described here as examples without further limitation.

[0054] The simulation device 20 is electrically connected to the control device 10, and is used to generate a simulation signal under the control of the control device 10. The simulation device 20 is also used to be electrically connected to the battery management system 40, so that the battery management system 40 detects the simulation signal of the simulation device 20. Therefore, under the control of the control device 10, the simulation device 20 can generate a corresponding simulation signal. In this way, when the detection function of the battery management system 40 is detected, the battery management system 40 can detect the simulation signal to simulate the signal detected in the actual application of the battery management system 40, and then detect the detection function of the battery management system 40.

[0055] The test device 30 is used to set up the battery management system 40 and is connected to the control device 10. The test device 30 is used to obtain the analog signal detected by the battery management system 40 and send the analog signal detected by the battery management system 40 to the control device 10. It can be understood that the test device 30 can include basic components such as a processor and a transmission module, so that the test device 30 can receive the analog signal detected by the battery management system 40 and transmit it to the control device 10.

[0056] Therefore, after the battery management system 40 detects the analog signal, the test device 30 can obtain the parameters of the analog signal detected by the battery management system 40. Since the test device 30 is connected to the control device 10, the test device 30 can transmit the obtained parameters of the analog signal detected by the battery management system 40 to the control device 10.

[0057] In addition, for example, Figure 1 As shown, the test device 30 can be provided with multiple battery management systems 40. In this way, multiple battery management systems 40 can be directly tested, and whether the detection functions of different battery management systems 40 are normal can be analyzed at the same time, thereby further improving the detection efficiency.

[0058] Among them, the control device 10 is used to determine whether the detection function of the battery management system 40 is normal. In this way, the control device 10 can compare the parameters of the analog signal detected by the battery management system 40 with the actual parameters of the analog signal. When the parameters of the two are the same, it can be said that the detection function of the battery management system 40 is in a normal state. On the contrary, when the parameters of the two are different, it can be said that the data detected by the battery management system 40 is inaccurate, and the battery management system 40 is in an abnormal state and needs to be repaired. Therefore, through the connection between the control device 10 and the test device 30, the results can be compared and judged by the control device 10, without manual data recording and comparison and judgment, thereby improving the test efficiency and accuracy.

[0059] Therefore, when testing the detection function of the battery management system 40, the test system 100 provided in the embodiment of the present application only needs to be set for the control device 10, and the control device 10 can control the simulation device 20 to generate a simulation signal according to the pre-set content, and the battery management system 40 can obtain the simulation signal from the simulation device 20, and the parameters of the simulation signal detected by the battery management system 40 can be transmitted to the control device 10 through the test device 30, and the control device 10 can compare the parameters of the simulation signal of the battery management system 40 with the actual corresponding parameters of the simulation signal to determine whether the detection function of the battery management system 40 is in a normal working state. This process does not require manual data recording and comparison and judgment, and is not prone to wrong steps and missed steps. It is more intelligent and automated, which greatly improves the efficiency of testing the detection function of the battery management system 40.

[0060] In some embodiments, Figure 1 As shown, the simulation device 20 may include a voltage generator 21. The voltage generator 21 may be used to generate a voltage signal under the control of the control device 10, and the simulation signal includes the above voltage signal. It can be understood that the above voltage signal is a voltage value. Therefore, through the voltage generator 21, the test system 100 can test whether the battery management system 40 can detect the voltage signal normally, thereby avoiding the situation where the battery management system 40 cannot detect the voltage during operation.

[0061] In addition, the voltage generator 21 can be used to generate voltage signals of different magnitudes under the control of the control device 10. In this way, the control device 10 can control the voltage generator 21 to generate voltages of different magnitudes. Correspondingly, the battery management system 40 can obtain voltage signals of different magnitudes. As a result, the test system 100 can more effectively test whether the battery management system 40 can accurately detect voltages of different magnitudes, and the test effect is better.

[0062] It is understandable that the specific structure of the voltage generator 21 can be designed according to the requirements, as long as it can generate voltage signals of different magnitudes. Figure 3 As shown, Figure 3 The schematic diagram of the structure of a voltage generator 21 provided in an embodiment of the present application is shown in FIG. 2 . The voltage generator 21 may include a housing and electrical components disposed in the housing. Figure 3 As shown, the box body may include a box body 211 and a box door 212. The box body 211 forms an installation cavity with an opening, and the electrical components may be arranged in the installation cavity. The box door 212 is rotatably connected to the opening and is rotatably connected to the box body 211, and is used to open or close the installation cavity of the box body 211. In this way, the installation cavity of the box body 211 can be opened and closed through the box door 212, which facilitates the maintenance and replacement of the electrical components inside the box body 211.

[0063] In addition, for example, Figure 3 As shown, the box body 211 includes a side wall 2111, a top wall 2112 and a bottom wall (not shown). The side wall 2111 is located on one side of the top wall 2112 and is arranged around the top wall 2112. The bottom wall is located on the side of the side wall 2111 away from the top wall 2112. The above-mentioned opening can be formed on the side wall 2111. In this way, the top wall 2112, the side wall 2111 and the bottom wall can enclose a mounting cavity with an opening.

[0064] For example, Figure 3 As shown, the top wall 2112 may be formed with a mounting portion 2113. The mounting portion 2113 is provided with a mounting hole. Bolts are inserted into the mounting holes and threadedly connected with the side wall 2111. In this way, the top wall 2112 and the side wall 2111 may be connected together more securely by the bolts, and are convenient for disassembly and installation.

[0065] Continue to refer to Figure 3 In order to facilitate the timely dissipation of the heat generated by the electrical components inside the box body 211, for example, Figure 3 As shown, a heat dissipation hole 2114 may be provided on the side wall 2111. Meanwhile, a heat dissipation grille 2115 may be formed on the top wall 2112. In this way, the heat generated by the electrical components inside the box body 211 can be dissipated through the heat dissipation hole 2114 and the heat dissipation grille 2115, ensuring that the temperature inside the box body is not too high, thereby avoiding accidents caused by excessive temperature.

[0066] In some embodiments, Figure 1 As shown, the simulation device 20 includes a resistor 22. The resistor 22 is used to generate a resistance signal under the control of the control device 10, and the simulation signal includes the above-mentioned resistance signal. Among them, the resistance signal is the resistance value of the resistor formed by the simulation of the resistor 22. In this way, the control device 10 can control the resistor 22 to generate a resistance signal. Correspondingly, the battery management system 40 can obtain the resistance signal. At this time, the control device 10 can obtain the resistance signal measured by the battery management system 40 from the test device 30, and compare it with the actual resistance signal to determine whether the battery management system 40 can accurately detect the resistance, and then ensure whether the insulation detection function of the battery management system 40 is normal, so as to avoid the failure of its insulation detection function and cause safety hazards.

[0067] In some embodiments, Figure 4 As shown, Figure 4A partial circuit diagram of a resistor 22 provided in an embodiment of the present application, the resistor 22 may include a plurality of resistors 221. The plurality of resistors 221 are connected in series or in parallel so that the resistor 22 generates resistance signals of different sizes under the control of the control device 10. Since the resistor 22 can generate resistance signals of different resistance values, the battery management system 40 can also detect resistance signals of different sizes respectively. In this way, when the battery management system 40 is detected, different resistance values ​​can be set within a preset period for detection to simulate the situation in which the insulation resistance will produce periodic changes in actual applications, so as to more accurately detect whether the detection function of the battery management system 40 can accurately perform resistance detection.

[0068] In some embodiments, Figure 4 As shown, the resistor 22 may further include a capacitor 222. The capacitor 222 is used to generate a capacitance signal under the control of the control device 10, and the analog signal includes the capacitance signal. In this way, the battery management system 40 can detect the capacitance signal through the resistor 22, and the control device 10 can obtain the capacitance signal through the detection device, and then judge whether the battery management system 40 can normally detect the capacitance signal by comparing the parameters of the capacitance signal detected by the battery management system 40 with the actual parameters of the capacitance signal.

[0069] In some embodiments, Figure 4 As shown, the number of capacitors 222 can be multiple. The multiple capacitors 222 can include an X capacitor 2221 and a Y capacitor 2222. The X capacitor 2221 and the Y capacitor 2222 are connected in parallel. In this way, the control device 10 can control the resistor 221 box to output the signal of the X capacitor 2221 or the signal of the Y capacitor 2222. Since the types of capacitors 222 in the vehicle are mostly X capacitors 2221 or Y capacitors 2222, when the above-mentioned resistor 22 includes the X capacitor 2221 and the Y capacitor 2222, the resistor 22 can better simulate the actual application scenario of the battery management system 40, and thus can better detect whether the detection function of the battery management can accurately detect the signals of the X capacitor 2221 and the Y capacitor 2222 during the actual application process.

[0070] It is understandable that the specific structure of the resistor 22 can be designed according to actual conditions. Figure 5 As shown, Figure 5 The structure diagram of a resistor 22 provided in an embodiment of the present application is shown in FIG. The resistor 22 may include an operating body 223. An operating knob 224 is provided on the operating body 223. At the same time, a display area 225 is also formed on the operating body 223. The display area 225 may be used to display the resistance value or capacitance value output by the resistor 22. For example, Figure 5As shown, the operating knobs 224 may be in two rows, one row may control the resistance value output by the resistor 22 , and the other row may control the capacitance value output by the resistor 22 .

[0071] It is understandable that the resistor 22 is provided with the resistor 221 and the capacitor 222. The resistor 221 and the capacitor 222 can be short-circuited, connected, and connected in series and parallel through the operating knob 224 to achieve the effect of outputting different resistance values ​​or capacitance values. The specific circuit design can be selected according to the actual situation and is not further limited here.

[0072] In some embodiments, Figure 1 As shown, the simulation device 20 may include a simulator 23. The simulator 23 may be used to generate a circuit fault simulation signal under the control of the control device 10, and the simulation signal includes the above-mentioned circuit fault simulation signal. Thus, through the simulator 23, the battery management system 40 may detect the circuit fault simulation signal, and after the control device 10 obtains the parameters of the circuit fault simulation signal detected by the battery management system 40 through the test device 30, it may compare the parameters with the actual parameters of the circuit fault simulation signal, and then determine whether the battery management system 40 can normally detect the battery fault simulation signal.

[0073] In some embodiments, the circuit fault simulation signal may include at least one of a circuit short circuit signal, a circuit open circuit signal, and a power supply fault signal.

[0074] Therefore, through the above-mentioned circuit fault simulation signal, when the test function of the battery management system 40 is tested, the battery management system 40 can detect circuit fault simulation signals of different situations that are likely to occur when actually applied to the vehicle, so that the control device 10 can determine whether the battery management system 40 can normally detect the above-mentioned different circuit fault simulation signals when actually applied to the vehicle.

[0075] It can be understood that the specific structure of the simulator 23 can be designed according to actual conditions, and the above-mentioned different circuit fault simulation signals can be realized through different circuit designs. The circuit design can be carried out according to actual conditions. As long as the above-mentioned circuit fault simulation signals can be realized, no further limitation is made here.

[0076] For example, Figure 6 As shown, Figure 6 The present invention provides a structural diagram of a simulator 23 provided in an embodiment of the present invention. The simulator 23 may include a control display component 231. The control display component 231 includes an adjustment selection unit 232 and an indicator light 233. The adjustment selection unit 232 may be used to control the type of signal generated by the simulator 23, and the indicator light 233 may be lit to distinguish the type of circuit fault simulation signal currently generated by the simulator 23.

[0077] In some embodiments, the test device 30 may include a test box and a timer. The test box is used to set the battery management system 40. The timer is electrically connected to the control device 10 and is also used to electrically connect to the battery management system 40 to detect the time when the battery management system 40 detects the analog signal. In this way, since the timer is set, the timer can record the time points when the battery management system 40 obtains different signals.

[0078] Therefore, in the actual detection process, the control device 10 can control the simulation device 20 to generate different simulation signals within a time period, so that the battery management system 40 performs detection at different time points, thereby achieving a stress test on the battery management system 40. Since a timer is provided, the control device 10 can obtain the simulation signals corresponding to the battery management system 40 at different time points through the timer. In this way, when the circuit management system detects a parameter error at a certain time point, the control device 10 can know at which time point the parameter detection is abnormal.

[0079] In some embodiments, Figure 1 As shown, the test system 100 may further include a display screen 50. The display screen 50 is electrically connected to the control device 10. In this way, the user can input parameter data through the display screen 50, which is more convenient. At the same time, the processing results displayed by the control device 10 can also be displayed through the display screen 50, and the user can observe the final test results more conveniently.

[0080] Based on the above embodiments, Figure 7 As shown, Figure 7 This is a schematic block diagram of a specific type of parameter setting of a control device 10 provided in an embodiment of the present application. The parameter setting in the control device 10 provided in an embodiment of the present application may include parameters such as voltage value, resistance value, capacitor type, capacitor value, simulated fault start and stop, fault type, pressure test start and stop, and pressure test time. In this way, when testing the detection function of the battery management system, the above different parameters can be input into the control device 10 to implement testing of different aspects of the battery management system, which is simple and convenient to operate.

[0081] Exemplarily, when using the detection system 100 for detection, the user can input the above-mentioned different parameter designs in the control device 10 through the display screen 50. Among them, the initial state of the simulated fault start and stop and the pressure test start and stop can be a closed state. When a simulated fault test and a pressure test are required, the above two parameters can be turned on. Then the control device 10 can test the battery management system 40 according to the parameter settings. The results and parameters after the test are completed can be displayed through the display screen 50.

[0082] On the other hand, based on the test system provided in the above embodiment of the present application, the embodiment of the present application provides a method for detecting the detection function of a battery management system, which is applied to the above test system. Figure 8 As shown, Figure 8 This is one of the flow charts of a method for detecting a detection function of a battery management system provided in an embodiment of the present application. The test method may include steps S100 to S300.

[0083] S100: The control device controls the simulation device to generate a simulation signal.

[0084] S200: The battery management system detects an analog signal.

[0085] S300: The control device compares whether the parameters of the analog signal detected by the battery management system are consistent with the actual parameters of the analog signal.

[0086] Therefore, the detection method of the detection function of the battery management system provided in the embodiment of the present application only needs to be set for the control device when testing the detection function of the battery management system. The control device can control the simulation device to generate a simulation signal according to the pre-set content, and the battery management system can obtain the simulation signal from the simulation device. The parameters of the simulation signal detected by the battery management system can be transmitted to the control device through the test device. The control device can compare the parameters of the simulation signal of the battery management system with the parameters actually corresponding to the simulation signal to determine whether the detection function of the battery management system is in a normal working state. This process does not require manual operation, is not prone to wrong steps and missed steps, is more intelligent and automated, and greatly improves the efficiency of testing the detection function of the battery management system.

[0087] In some embodiments, Fig. 9 As shown, Fig. 9 The second flowchart diagram of a detection method for a detection function of a battery management system provided in an embodiment of the present application, wherein the control device controls the simulation device to produce a simulation signal, including step S101.

[0088] S101: The control device controls the voltage generator to generate multiple sets of voltage values ​​and controls the resistor to generate multiple sets of resistance values. Thus, by setting the control device, the voltage generator can be controlled to generate multiple sets of voltage values ​​in sequence and the resistor can be controlled to generate multiple sets of resistance values ​​in sequence.

[0089] The battery management system detects the analog signal including step S201.

[0090] S201: The battery management system detects multiple groups of voltage values ​​and multiple groups of resistance values ​​in sequence. In this way, the battery management system can detect multiple groups of voltage values ​​and resistance values ​​in sequence, without the need to manually adjust the resistance values ​​and voltage values ​​multiple times, making the operation simpler and more convenient, and the detection process more intelligent and efficient. At the same time, since the battery management system can measure multiple groups of voltage values ​​and resistance values, the effect of the battery management system on detecting different values ​​can be detected, ensuring the stability and accuracy of the measurement results.

[0091] The control device compares whether the parameters of the simulation signal detected by the battery management system are consistent with the actual parameters of the simulation signal, including step S301.

[0092] S301: The control device compares the parameters of the multiple groups of voltage values ​​and resistance values ​​detected by the battery management system to see whether they are consistent with the actual parameters of the multiple groups of voltage values ​​and the multiple groups of resistance values.

[0093] In some embodiments, when the simulation device includes a simulator, the detection method further includes steps S400 - S600 .

[0094] S400: The control device controls the simulator to generate a circuit fault simulation signal.

[0095] S500: Battery management system detects circuit fault simulation signal.

[0096] S600: The control device compares the parameters of the circuit fault simulation signal detected by the battery management system with the actual parameters of the circuit fault simulation signal to see whether they are consistent.

[0097] Thus, through the above steps S400-S600, the battery management system can detect common circuit fault simulation signals. In this way, the control device can determine that the battery management system can normally detect the above circuit fault simulation signal by comparing the parameters of the battery fault simulation signal detected by the battery management system with the actual parameters of the battery fault simulation signal. Through the above steps S400-S600, the test effect of the detection function of the battery management system is better and the test is more comprehensive.

[0098] In some embodiments, the above detection method may further include steps S700 to S900.

[0099] S700: The control device controls the simulation device to generate multiple groups of pressure simulation signals at intervals within a preset time.

[0100] S800: The battery management system detects multiple groups of pressure simulation signals in sequence.

[0101] S900: The control device compares whether the parameters of the multiple groups of pressure simulation signals detected by the battery management system are consistent with the actual parameters of the multiple groups of pressure simulation signals.

[0102] Therefore, through the above steps S700-S900, the battery management system can perform a pressure test, perform detection multiple times within a preset time, and detect multiple groups of different pressure simulation signals. In this way, the control device can determine that the battery management system is able to normally detect the above multiple groups of pressure simulation signals by comparing the parameters of the multiple groups of pressure simulation signals detected by the battery management system with the actual parameters of the multiple groups of pressure simulation signals. Through the above steps S400-S600, the stability of the detection function of the battery management system can be tested, thereby ensuring that the battery management system has sufficient stability during actual application.

Claims

1. A test system for testing the detection function of a battery management system, It is characterized in that The testing system (100) comprises: Control device (10); a simulation device (20) electrically connected to the control device (10); the simulation device (20) is used to generate a simulation signal under the control of the control device (10); the simulation device (20) is also used to be electrically connected to the battery management system so that the battery management system detects the simulation signal of the simulation device (20); and, A testing device (30) is used to set the battery management system and is connected to the control device (10); the testing device (30) is used to obtain an analog signal detected by the battery management system and send the analog signal detected by the battery management system to the control device (10); Wherein, the control device (10) is used to determine whether the detection function of the battery management system is normal.

2. The test system according to claim 1, It is characterized in that The simulation device (20) comprises: a voltage generator (21), the voltage generator (21) being used to generate a voltage signal under the control of the control device (10); the analog signal comprising the voltage signal; and / or, a resistor (22), the resistor (22) being used to generate a resistance signal under the control of the control device (10); the analog signal comprising the resistance signal; and / or, A simulator (23), the simulator (23) being used to generate a circuit fault simulation signal under the control of the control device (10); the simulation signal includes the circuit fault simulation signal.

3. The test system according to claim 2, It is characterized in that The simulation device (20) comprises the simulator (23); the circuit fault simulation signal comprises at least one of a circuit short circuit signal, a circuit open circuit signal and a power supply fault signal.

4. The test system according to claim 2, It is characterized in that The simulation device (20) comprises a resistor (22); the resistor (22) comprises a plurality of resistors (221); the plurality of resistors (221) are connected in series or in parallel, so that the resistor (22) can generate resistance values ​​of different sizes under the control of the control device (10).

5. The test system according to claim 4, It is characterized in that The resistor (22) further comprises a capacitor (222); the capacitor (222) is used to generate a capacitor (222) signal under the control of the control device (10); and the analog signal comprises the capacitor signal.

6. The test system according to claim 5, It is characterized in that The number of the capacitors (222) is multiple; the multiple capacitors (222) include an X capacitor (2221) and a Y capacitor (2222); the X capacitor (2221) and the Y capacitor (2222) are connected in parallel.

7. The test system according to claim 1, It is characterized in that The testing device (30) comprises a testing box and a timer; the testing box is used to set the battery management system; the timer is electrically connected to the control device (10) and is also used to be electrically connected to the battery management system to detect the time when the battery management system detects the analog signal.

8. The test system according to claim 1, It is characterized in that The testing system (100) further comprises: A display screen is electrically connected to the control device (10).

9. A method for detecting a detection function of a battery management system, applied to the test system according to any one of claims 1 to 8, It is characterized in that The detection method comprises: The control device controls the simulation device to generate a simulation signal; The battery management system detects the analog signal; The control device compares whether the parameters of the analog signal detected by the battery management system are consistent with the actual parameters of the analog signal.

10. The detection method according to claim 9, It is characterized in that The simulation device includes a voltage meter and a resistor; the resistor includes a plurality of resistors; the plurality of resistors are connected in series or in parallel; The control device controls the simulation device to generate a simulation signal, which includes: The control device controls the voltage generator to generate multiple sets of voltage values ​​and controls the resistor to generate multiple sets of resistance values; The battery management system detecting the analog signal includes: The battery management system detects multiple groups of voltage values ​​and multiple groups of resistance values ​​in sequence; The control device compares whether the parameters of the analog signal detected by the battery management system are consistent with the actual parameters of the analog signal, including: The control device compares the parameters of the multiple groups of voltage values ​​and the multiple groups of resistance values ​​detected by the battery management system to see whether they are consistent with the actual parameters of the multiple groups of voltage values ​​and the multiple groups of resistance values.

11. The detection method according to claim 10, It is characterized in that The simulation device also includes a simulator; the simulator is used to generate a circuit fault simulation signal under the action of the control device; the detection method also includes: The control device controls the simulator to generate a circuit fault simulation signal; The battery management system detects the circuit fault simulation signal; The control device compares whether the parameters of the circuit fault simulation signal detected by the battery management system are consistent with the actual parameters of the circuit fault simulation signal.

12. The detection method according to claim 11, It is characterized in that The detection method further comprises: The control device controls the simulation device to generate multiple groups of pressure simulation signals at intervals within a preset time; The battery management system detects a plurality of groups of pressure simulation signals in sequence; The control device compares whether the parameters of the multiple groups of pressure simulation signals detected by the battery management system are consistent with the actual parameters of the multiple groups of pressure simulation signals.