Building forced arrangement scheme design method, system and equipment and storage medium

By obtaining and analyzing the basic and analytical data of architectural design, judging and adjusting the design plan, the problems of slow calculation speed and design in the existing technology are solved, the utilization rate and product value of architectural design are improved, and the lighting is carried out. Verification improves design efficiency.

CN119026201APending Publication Date: 2024-11-26HANGZHOU JUNZHENG ARCHITECTURAL DESIGN CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410871240.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-01
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

When calculating land value, existing architectural planning and design systems are prone to excessive time investment and low calculation rate due to artificial calculations. They are difficult to meet actual use needs and reduce the overall planned product value simply based on the sale area and product value.

Method used

By obtaining the basic data and analytical data of the area to be tested, we can judge the consistency of the building type corresponding to the preliminary estimate plan. If it is inconsistent, we will obtain the second estimate plan for planning, combining commercial utilization rate and residential utilization rate. Light verification and other data, adjust the design plan to improve the utilization rate of architectural design and product value.

Benefits of technology

It improves the utilization rate of architectural design and the product value of the overall planning, ensures that the design meets the actual needs of the area to be tested, and improves design efficiency through accurate lighting verification.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119026201A_ABST
    Figure CN119026201A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building planning and design, in particular to a building forced arrangement scheme design method, system and device and a storage medium, and the method comprises the following steps: obtaining basic data information of a to-be-detected area, and obtaining a first estimation scheme in a preset model according to the basic data information; obtaining analysis data around the to-be-detected area, and obtaining an estimation type according to the analysis data; whether the pre-estimation type is consistent with a building type corresponding to the first pre-estimation scheme or not is judged, and the pre-estimation type represents the building type obtained through analysis; if not, a second pre-estimation scheme is obtained in the preset model according to the pre-estimation type, the to-be-detected area is planned according to the second pre-estimation scheme, and the second pre-estimation scheme and the first pre-estimation scheme represent different building types. The utilization rate of building design can be improved, and then the product value of overall planning is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of building planning and design, and in particular to a building forced exhaust scheme design method, system, equipment and storage medium. Background Art

[0002] Forced sorting refers to the calculation of the maximum commercial value of a piece of land before the project starts, so as to achieve the maximum sales area of ​​the land or maximize the product value. However, when calculating the value of the land, it is necessary to ensure that the calculation data of the floor of the land meets the standards, such as the calculation of the sunshine time of the floor. If the calculation is done manually, it will lead to a lot of time investment, low calculation rate, and even repeated calculation due to ignoring a detail.

[0003] At present, the public system plans the terrain from the overall layout and algorithm, and can generate multiple different plans at one time, selectively adjust them, and batch output them. The calculation process is handed over to the computer, which is efficient and accurate. The functional application of the Unreal Engine based on computer algorithms can easily realize the 3D effect display of the planning scheme, and use advanced computer technology to provide technical support for architectural design with large computing volume.

[0004] Although the existing technology can adjust the scheme model as much as possible, the planning of the specific structure of a single building is only considered from the perspective of sales area and product value. However, some specific structures cannot be well applied in actual use, which will reduce the product value of the overall plan. Summary of the invention

[0005] In order to improve the utilization rate of buildings and thus enhance the product value of the overall planning, the present application provides a building forced drainage scheme design method, system, device and storage medium.

[0006] In the first aspect, the present application provides a method for designing a building forced drainage scheme, which adopts the following technical scheme: A building forced drainage scheme design method comprises the following steps: Obtaining basic data information of the area to be measured, and obtaining a first estimation solution in a preset model according to the basic data information; Obtaining analysis data around the area to be tested, and obtaining an estimated type based on the analysis data; Determining whether the estimated type is consistent with the building type corresponding to the first estimated solution, wherein the estimated type represents the building type obtained through analysis; If they are inconsistent, a second estimation scheme is obtained in the preset model according to the estimation type, and the area to be measured is planned according to the second estimation scheme, and the second estimation scheme and the first estimation scheme represent different building types.

[0007] By adopting the above technical solution, the analysis data around the area to be tested is analyzed to obtain the corresponding estimated type, and then the estimated type is compared with the building type corresponding to the first estimated scheme. If the two are consistent, it means that the design of the area to be tested according to the first estimated scheme is in line with the area to be tested. If they are inconsistent, the second estimated scheme is obtained in the preset model according to the estimated type, and the area to be tested is planned according to the second estimated scheme. The second estimated scheme and the first estimated scheme represent different building types, which can improve the utilization rate of the building design and thus improve the product value of the overall planning.

[0008] In one embodiment, the estimated type includes a commercial building or a residential building, and the method of obtaining the estimated type based on the analysis data includes the following steps: Obtaining the commercial utilization rate and commercial profit value corresponding to the commercial building according to the analysis data, and obtaining the residential utilization rate and residential profit value corresponding to the residential building; Obtaining a commercial priority value according to the commercial utilization rate and the commercial profit value, and obtaining a residential priority value according to the residential utilization rate and the residential profit value; Obtaining a comparison difference value according to the commercial priority value and the residential priority value, and determining whether the comparison difference value is greater than a preset difference value; If the comparison difference is greater than the preset difference, the commercial priority value and the residential priority value are judged to be greater or lesser; If the commercial priority value is greater than the residential priority value, determining that the estimated type is a commercial building; If the commercial priority value is less than the residential priority value, the estimated type is determined to be a residential building.

[0009] By adopting the above technical solution, based on obtaining the commercial priority value according to the commercial utilization rate and the commercial profit value, and obtaining the residential priority value according to the residential utilization rate and the residential profit value, by comparing the comparison difference between the commercial priority value and the residential priority value, it is judged whether the current area to be tested is suitable for designing as a commercial building or a residential building based on the surrounding environment. Specifically, if the comparison difference is greater than the preset difference, the commercial priority value and the residential priority value are judged; if the commercial priority value is greater than the residential priority value, the estimated type is determined to be a commercial building; if the commercial priority value is less than the residential priority value, the estimated type is determined to be a residential building, so that the actual design plan of the area to be tested can be accurately judged, thereby improving the utilization rate of the building design, and thereby improving the product value of the overall plan.

[0010] In one embodiment, the analysis data includes flow data, the flow data represents the flow data of people in a designated area corresponding to the area to be tested, and the process of obtaining the commercial profit value corresponding to the commercial building based on the analysis data includes the following steps: Obtaining a movement trajectory according to the traffic data, and determining whether there is a commercial building in the designated area; If there is no commercial building in the designated area, determining the commercial profit value corresponding to the commercial building according to the action trajectory; If there is a commercial building in the designated area, obtaining the area location corresponding to the commercial building and the corresponding customer flow; Acquire a distance interval according to a comparison position between the area position and a comparison position corresponding to the area to be measured, and determine whether the distance interval exceeds a preset interval; If the distance interval exceeds a preset interval, obtaining a commercial profit value according to the customer flow and the movement trajectory; If the distance interval does not exceed the preset interval, a commercial profit value is obtained according to the customer flow.

[0011] By adopting the above technical solution, based on judging whether there is a commercial building in the specified area, the commercial profit value is obtained based on different data. Specifically, if there is no commercial building in the specified area, the commercial profit value corresponding to the commercial building is judged based on the movement trajectory; if there is a commercial building in the specified area, the regional position corresponding to the commercial building and the corresponding customer flow are obtained; the distance interval is obtained based on the comparison position between the regional position and the corresponding area to be tested, and it is judged whether the distance interval exceeds the preset interval; if the distance interval exceeds the preset interval, the commercial profit value is obtained based on the customer flow and the movement trajectory; if the distance interval does not exceed the preset interval, the commercial profit value is obtained based on the customer flow, and then the commercial profit value can be accurately obtained, so that the design type of the area to be tested can be accurately judged.

[0012] In one embodiment, the step of obtaining the residential utilization rate corresponding to the residential building according to the analysis data comprises the following steps: Acquire traffic data and enterprise data around the area to be tested based on the analysis data; A residential comfort value is obtained based on the traffic data and the enterprise data, and a residential utilization rate is obtained based on the residential comfort value.

[0013] By adopting the above technical solution, for residential buildings, it is necessary to consider whether the area to be tested is suitable for living, mainly based on the traffic data and enterprise data around the area to be tested, and then judge whether there is enough traffic around the area to be tested to use the house and whether it is convenient enough to use the building. Specifically, the living comfort value is obtained based on the traffic data and the enterprise data, and the residential utilization rate is obtained through the living comfort value, so that the actual optimal design of the area to be tested can be accurately obtained based on the utilization rate.

[0014] In one embodiment, after obtaining the second estimation solution in the preset model according to the estimation type, the following steps are also included: Determining whether the building type corresponding to the area to be tested is a residential building according to the second estimation scheme; If the building type corresponding to the area to be tested is a residential building, obtaining the comparison house type according to the second estimation scheme in sequence; Obtaining a corresponding preference value in a preset database according to the compared room type, and determining whether the preference value is less than a preset preference value; If it is determined that the preference value is less than a preset value, a specified type is obtained according to the preset database, and the second estimation scheme is adjusted according to the specified type, where the specified type represents a type with high popularity in the preset database.

[0015] By adopting the above technical solution, each compared house type in the second estimated solution is adjusted based on the user's preference value, so that the residential building can be suitable for living in the surrounding people, and the utilization rate of the building design can be increased, thereby improving the product value of the overall plan.

[0016] In one embodiment, after planning the area to be measured according to the second estimation scheme, the following steps are also included: Acquire a floor model according to the second estimation scheme, divide the floor model into grids, and select illumination verification positions from a plurality of grids; Verifying the lighting verification position, if the lighting at the lighting verification position all meets the standard, then determining that the building of the floor model meets the standard; If the lighting at the lighting verification positions does not all meet the standards, the floor planning is adjusted according to the lighting verification positions that do not meet the standards to update the second estimation plan.

[0017] By adopting the above technical solution, when designing the building for the area to be tested, it is necessary to consider the lighting conditions between each floor, and further improve the strong arrangement design concept of the area to be tested while meeting the lighting standards. Therefore, if the lighting at the lighting verification position does not fully meet the standards, the floor planning is adjusted according to the lighting verification position that does not meet the standards to update the second estimation plan.

[0018] In one embodiment, the step of selecting the illumination verification positions from the plurality of grids comprises the following steps: Acquire a verification model adjacent to the floor model according to the floor model, and acquire a minimum verification illumination area corresponding to the floor model according to the highest point position of the verification model; The lighting verification position is obtained according to the minimum verification lighting area.

[0019] By adopting the above technical solution and screening the lighting verification positions, the verification efficiency of the entire building design can be improved.

[0020] In the second aspect, the present application provides a building forced drainage scheme design system, which adopts the following technical solutions: A building forced drainage scheme design system, comprising: A first solution generation module, the first solution generation module is used to obtain basic data information of the area to be measured, and obtain a first estimation solution in a preset model according to the basic data information; A data evaluation module, the data evaluation module is used to obtain analysis data around the area to be tested, and obtain an estimated type based on the analysis data; A data judgment module, the data judgment module is used to judge whether the estimated type is consistent with the building type corresponding to the first estimation scheme, wherein the estimated type represents the building type obtained through analysis; A result processing module, if the estimated type is inconsistent with the building type corresponding to the first estimation scheme, then the result processing module is used to obtain a second estimation scheme in the preset model according to the estimated type, and plan the area to be tested according to the second estimation scheme, and the second estimation scheme and the first estimation scheme represent different building types.

[0021] In a third aspect, the present application provides an electronic device, which adopts the following technical solution: An electronic device comprises: a processor and a memory, wherein the memory stores a computer program that can be run on the processor, and when the computer program is executed by the processor, the building forced drainage scheme design method as described in the first aspect is implemented.

[0022] In a fourth aspect, the present application provides a storage medium, which adopts the following technical solution: A storage medium storing at least one instruction, at least one program, a code set or an instruction set, wherein the at least one instruction, the at least one program, the code set or the instruction set is loaded and executed by a processor to implement the building forced drainage scheme design method as described in the first aspect.

[0023] In summary, the present application includes at least one of the following beneficial technical effects: 1. Analyze the analysis data around the area to be tested to obtain the corresponding estimated type, and then compare the estimated type with the building type corresponding to the first estimated solution. If the two are consistent, it means that the design of the area to be tested according to the first estimated solution is in line with the area to be tested. If they are inconsistent, obtain the second estimated solution in the preset model according to the estimated type, and plan the area to be tested according to the second estimated solution. The second estimated solution and the first estimated solution represent different building types, which can improve the utilization rate of the building design and thus improve the product value of the overall planning; 2. Based on judging whether there is a commercial building in the specified area, the commercial profit value is obtained according to different data. Specifically, if there is no commercial building in the specified area, the commercial profit value corresponding to the commercial building is judged according to the movement trajectory; if there is a commercial building in the specified area, the regional position corresponding to the commercial building and the corresponding customer flow are obtained; the distance interval is obtained according to the comparison position corresponding to the regional position and the area to be tested, and it is judged whether the distance interval exceeds the preset interval; if the distance interval exceeds the preset interval, the commercial profit value is obtained according to the customer flow and the movement trajectory; if the distance interval does not exceed the preset interval, the commercial profit value is obtained according to the customer flow, and then the commercial profit value can be accurately obtained, so that the design type of the area to be tested can be accurately judged; 3. When designing the building for the area to be tested, it is necessary to consider the lighting conditions between each floor. While meeting the lighting standards, the strong exhaust design concept of the area to be tested should be improved. Therefore, if the lighting at the lighting verification position does not meet the standards, the floor planning is adjusted according to the lighting verification position that does not meet the standards to update the second estimation plan. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a block diagram of a design method for a building forced drainage scheme provided in an embodiment of the present application; Figure 2 It is a block diagram of a method for obtaining an estimated type provided in an embodiment of the present application; Figure 3 This is a block diagram of a method for obtaining commercial profit value provided in an embodiment of the present application; Figure 4 is a method block diagram provided by another embodiment of the present application; Figure 5 is a block diagram of a method for updating a second estimation scheme provided by another embodiment of the present application; Figure 6 It is a structural block diagram of the electronic device provided in this embodiment.

[0025] Explanation of the reference numerals: 11, processor; 12, memory; 121, computer program. DETAILED DESCRIPTION

[0026] To more clearly understand the purpose, technical solutions and advantages of the present application, the present application is described and illustrated below in conjunction with the accompanying drawings and embodiments. However, it should be understood by those of ordinary skill in the art that the present application can be implemented without these details. In some cases, in order to avoid unnecessary descriptions that make various aspects of the present application obscure, well-known methods, processes, systems, components and / or circuits that have been described at a higher level will not be described in detail. For those of ordinary skill in the art, it is obvious that various changes can be made to the embodiments disclosed in the present application, and without departing from the principles and scope of the present application, the general principles defined in the present application can be applied to other embodiments and application scenarios. Therefore, the present application is not limited to the embodiments shown, but conforms to the broadest scope consistent with the scope claimed for protection of the present application.

[0027] The embodiment of the present application discloses a method for designing a building forced drainage scheme.

[0028] like Figure 1 As shown, the design method of building forced exhaust scheme includes the following steps: S100, obtaining basic data information of the area to be measured, and obtaining a first estimation solution in a preset model according to the basic data information.

[0029] The area to be tested represents the area where a forced drainage scheme needs to be designed, specifically a piece of vacant land without any construction, or an area that needs to be replanned. The basic data information specifically includes whether there are commercial buildings around the area to be tested, whether the traffic around the area to be tested is convenient, and the area occupied by the area to be tested. Designers evaluate the basic data information and obtain the first estimated plan for the area to be tested through a preset model.

[0030] It should be noted here that the preset model adopts the existing automatic solution generation system, and the basic data information can be input into the automatic solution generation system to obtain the first estimated solution for the area to be tested, and the entire first estimated solution can be displayed through the display unit of the automatic solution generation system.

[0031] Specifically, the processor obtains basic data information of the area to be tested, mainly from information obtained from actual research by designers, which can be directly input into the processor by designers, or collected by voice acquisition module in the processor through voice. In addition, the processor also inputs the basic data information into a preset model and obtains a first estimation solution based on the preset model.

[0032] S200, obtaining analysis data around the area to be tested, and obtaining an estimated type based on the analysis data.

[0033] Among them, the analysis data represents the analysis results based on the basic data information around the area to be tested, and the estimated type represents the building type obtained through the analysis. The building type here is the actual building type obtained by analyzing the data around the area to be tested, and the analysis is mainly based on the perspective of surrounding users.

[0034] S300, determining whether the estimated type is consistent with the building type corresponding to the first estimated solution.

[0035] Among them, the building type corresponding to the first estimation scheme is mainly the building type suitable for the tested area from the designer's perspective. Specifically, the corresponding building type is designed based on the different benefits obtained by designing different buildings in the tested area, that is, the type of building that can obtain the greatest benefit determines the type of building designed in the tested area. The processor determines whether the estimated type is consistent with the building type corresponding to the first estimation scheme, and then determines the optimal building type of the tested area from different angles, and then makes an actual judgment.

[0036] S400: If they are inconsistent, a second estimation scheme is obtained in a preset model according to the estimation type, and the area to be measured is planned according to the second estimation scheme.

[0037] The second estimated solution represents a design solution obtained from the user's perspective, and the second estimated solution and the first estimated solution represent different building types.

[0038] Specifically, according to the above steps S100-S400, the processor obtains the basic data information of the area to be measured, and obtains the first estimation scheme in the preset model based on the basic data information. The analysis data around the area to be measured is obtained, and the estimation type is obtained based on the analysis data. It is determined whether the estimated type is consistent with the building type corresponding to the first estimation scheme, wherein the estimated type represents the building type obtained through analysis. If inconsistent, a second estimation scheme is obtained in the preset model based on the estimation type, and the area to be measured is planned according to the second estimation scheme. If consistent, the area to be measured is planned according to the first estimation scheme, or a second estimation scheme is obtained in the preset model based on the estimation type, and the area to be measured is planned according to the second estimation scheme.

[0039] Reference Figure 2 In one embodiment, the estimated type includes a commercial building or a residential building, and the estimated type is obtained based on the analysis data, wherein the method for obtaining the estimated type includes the following steps: S210, obtaining the commercial utilization rate and commercial profit value corresponding to the commercial building based on the analysis data, and obtaining the residential utilization rate and residential profit value corresponding to the residential building.

[0040] S220, obtaining a commercial priority value based on the commercial utilization rate and the commercial profit value, and obtaining a residential priority value based on the residential utilization rate and the residential profit value.

[0041] S230, obtaining a comparison difference according to the commercial priority value and the residential priority value, and determining whether the comparison difference is greater than a preset difference.

[0042] S240: If the comparison difference is greater than the preset difference, the commercial priority value and the residential priority value are judged to be larger or smaller.

[0043] S250: If the commercial priority value is greater than the residential priority value, the estimated type is determined to be a commercial building.

[0044] S260: If the commercial priority value is less than the residential priority value, the estimated type is determined to be a residential building.

[0045] Among them, commercial buildings mainly use the area to be tested for commercial purposes, such as office buildings, shopping malls, etc. The commercial utilization rate is mainly used for the corresponding utilization rate of commercial buildings, and the commercial profit value is the profit that can be obtained from the commercial use of the area to be tested. The commercial utilization rate is generally obtained through recruitment, so it can be calculated by the number of stores settled in the specific type of actual design. The commercial profit value is the profit that can be obtained by deducting the cost of designing commercial buildings, and it is the estimated profit obtained by estimating the commercial building.

[0046] Residential buildings mainly use the area to be tested as a civilian residence, such as a residential building or a residential villa. The residential utilization rate is obtained based on the demand for residential housing based on the surrounding flow of people, while the residential profit value is the estimated profit obtained by estimating the residential building.

[0047] In obtaining the commercial priority value based on the commercial utilization rate and the commercial profit value, and obtaining the residential priority value based on the residential utilization rate and the residential profit value, the commercial priority value represents the priority of designing the area to be tested as a commercial building, and the residential priority value represents the priority of designing the area to be tested as a residential building. By comparing the specific sizes of the commercial priority value and the residential priority value, the building type of the area to be tested is judged. The larger the priority value, the more suitable it is for the user to design the corresponding building in the area to be tested, and the higher the corresponding profit value.

[0048] A similar calculation method can be used to obtain commercial priority values ​​and residential priority values. The residential priority value is used for demonstration here. Specifically, the residential profit value can be obtained through the second estimation scheme. The residential profit value represents the estimated profit after deducting the construction cost. The actual profit value is then obtained based on the residential profit value and the residential utilization rate. Finally, the residential priority value is obtained through the actual profit value and the residential profit value through a specified ratio.

[0049] It should be noted here that the designated ratio can be set by the residential utilization rate, and the designated ratio and the residential utilization rate are 1. The higher the residential utilization rate, the higher the proportion of residential profit value, that is, the product of the residential profit value and the residential utilization rate and the product of the actual profit value and the designated ratio are used as the residential priority value. When the residential utilization rate is 1, the residential priority value is the residential profit value.

[0050] However, in actual calculations, the commercial priority value may be close to the residential priority value. Therefore, if the design scheme of the area to be tested is obtained by directly comparing the commercial priority value with the residential priority value, the design of the area to be tested will not be comprehensive enough. Therefore, in this embodiment, a comparison difference is obtained based on the commercial priority value and the residential priority value, and it is determined whether the comparison difference is greater than the preset difference, thereby obtaining the actual building type of the area to be tested. The comparison difference mentioned here represents the difference between the commercial priority value and the residential priority value.

[0051] When the commercial priority value is close to the residential priority value, that is, the comparison difference is not greater than the preset difference, it means that based on the design perspective and the user perspective, the specific design of the area to be tested is a commercial building or a residential building, and the profit and use are similar. Therefore, at this time, the designer can design according to other aspects, but when the comparison difference is greater than the preset difference, the commercial priority value and the residential priority value are judged. If the commercial priority value is greater than the residential priority value, the estimated type is determined to be a commercial building. If the commercial priority value is less than the residential priority value, the estimated type is determined to be a residential building.

[0052] Reference Figure 3In one embodiment, the analysis data includes flow data, the flow data represents the flow data of people in a designated area corresponding to the area to be tested, and the commercial profit value corresponding to the commercial building is obtained according to the analysis data, including the following steps: S211, obtaining a movement trajectory based on traffic data, and determining whether there is a commercial building in the designated area.

[0053] S212: If there is no commercial building in the designated area, determine the commercial profit value corresponding to the commercial building based on the action trajectory.

[0054] S213: If there is a commercial building in the designated area, obtain the area location corresponding to the commercial building and the corresponding customer flow.

[0055] S214, obtaining a distance interval according to a comparison position between the area position and the area to be measured, and determining whether the distance interval exceeds a preset interval.

[0056] S215, if the distance interval exceeds the preset interval, the commercial profit value is obtained according to the customer flow and movement trajectory.

[0057] S216: If the distance interval does not exceed the preset interval, the commercial profit value is obtained based on the customer flow.

[0058] The motion trajectory represents the motion trajectory obtained from the human flow data in a designated area around the area to be tested, and the motion trajectory represents the motion trajectory of more than 80% of the human flow.

[0059] The designated area is divided according to the area to be tested. The specific size of the area can be determined through on-site audits and offline surveys to determine the acceptance range of shopping malls and choose the range that is suitable for most people as the designated area.

[0060] The processor obtains the movement trajectory based on the traffic data and determines whether there is a commercial building in the specified area. If there are other commercial buildings, it means that the flow of people in each shopping mall needs to be considered when calculating the commercial profit value. If there is no commercial building in the specified area, the commercial profit value corresponding to the commercial building is determined based on the movement trajectory. If there is a commercial building in the specified area, the regional position corresponding to the commercial building and the corresponding customer flow are obtained. The regional position corresponding to the commercial building and the corresponding customer flow are obtained. The position of the commercial building closest to the commercial building in the commercial building to be tested is the average daily flow data.

[0061] If the location of the commercial building is close to the comparison location corresponding to the area to be tested, it means that it will affect the customer flow, which will cause the actual consumption of the commercial buildings in the area to be tested to be too low, which will in turn make the commercial profit value lower.

[0062] Therefore, the processor obtains the distance interval according to the comparison position of the area position and the corresponding position of the area to be tested, and determines whether the distance interval exceeds the preset interval. If the distance interval exceeds the preset interval, the commercial profit value is obtained according to the customer flow and the movement trajectory. If the distance interval does not exceed the preset interval, the commercial profit value is obtained according to the customer flow.

[0063] The preset interval represents the minimum standard distance between two shopping malls. This distance interval can be set according to the traffic conditions between the two shopping malls. If there is no convenient transportation near the two shopping malls, the preset interval can be set smaller. If there is transportation near the two shopping malls, the preset interval can be set farther.

[0064] In addition, the shopping mall makes profits by recruiting merchants. Therefore, the overall consumption of all merchants is estimated through customer flow, thereby indirectly obtaining commercial profit value. For some merchants, if they are not open for business for a long time, they may withdraw from the mall, thus resulting in a decrease in commercial profit value. As for how to obtain commercial profit value through merchants, we will not go into details here. This embodiment specifically uses the consumption of customer flow as the estimated mall profit value of the entire mall.

[0065] In one embodiment, obtaining the residential utilization rate corresponding to the residential building according to the analysis data includes the following steps: S217, obtaining traffic data and enterprise data around the area to be tested based on the analysis data.

[0066] S218, obtaining a residential comfort value based on traffic data and enterprise data, and obtaining a residential utilization rate based on the residential comfort value.

[0067] Among them, traffic data represents the traffic conditions around the area to be tested. The traffic conditions here can be judged by the distance from the area to be tested to determine whether the entire traffic is convenient. The closest distance to the traffic area represents convenient traffic.

[0068] Enterprise data indicates whether there are many enterprises in the surrounding area. If there are enterprises, it means that there are many people working in the surrounding area, and the residential buildings designed in the tested area will be better sold or rented. Enterprise data includes the number of enterprises and their scale.

[0069] Among them, obtaining the residential comfort value based on traffic data and enterprise data is to obtain the degree of suitability of the area to be tested for living through the residential comfort value, which is specifically obtained based on traffic data and enterprise data. The corresponding traffic convenience value can be obtained based on traffic data, and the work convenience value can be obtained through enterprise data. Then, the traffic convenience value and the work convenience value are accumulated to obtain the residential comfort value. The higher the residential comfort value, the higher the residential utilization rate.

[0070] It should be noted that the transportation convenience value is mainly based on the distance to the subway, the distance to the surrounding shopping malls, and the distance to the company. The work convenience value takes into account the type of work in the specified area and the distance to the company.

[0071] In one of the embodiments, if it is determined that the building type corresponding to the area to be tested is a residential building, the current house type will be used for designing the area to be tested. However, some house types do not suit the user's preferences. Therefore, it is necessary to consider the sales data and occupancy status, obtain the specific structure of the residential building, and the overall structural layout to maximize people's preference for purchase.

[0072] Reference Figure 4 After obtaining the second estimation scheme in the preset model according to the estimation type, the following steps are also included: S500: Determine whether the building type corresponding to the area to be measured is a residential building according to the second estimation scheme.

[0073] S600: If the building type corresponding to the area to be tested is a residential building, then obtain the comparison house type according to the second estimation scheme.

[0074] S700, obtaining a corresponding preference value in a preset database according to the compared room type, and determining whether the preference value is less than a preset preference value.

[0075] S800: If it is determined that the preference value is less than the preset value, a specified type is obtained according to a preset database, and the second estimation scheme is adjusted according to the specified type.

[0076] Among them, the comparison of house types is based on the house types on each floor obtained according to the second estimation plan. It should be noted here that in order to reduce the design process, the second estimation plan uses the same house type for different buildings or different floors. Therefore, the comparison of house types here only needs to be compared once for the same house type. The preference value represents the degree of customer preference in the preset database. The preference value here is mainly based on the actual sales data and purchase situation. In addition, the economic situation of the surrounding people is also included. The preset degree value represents the minimum preference of the house type set in advance, which can be set to 70 here. The specified type represents the type with high popularity in the preset database.

[0077] It should be noted here that the preset database contains the sales data of various house types and subsequent customer experience data. The customer's preference values ​​for different house types can be obtained through the preset database.

[0078] Specifically, the processor determines whether the building type corresponding to the area to be tested is a residential building according to the second estimation scheme. If the building type corresponding to the area to be tested is a residential building, the processor obtains the comparison room type according to the second estimation scheme in turn. According to the comparison room type, the corresponding preference value is obtained in the preset database, and it is determined whether the preference value is less than the preset value. If it is determined that the preference value is less than the preset value, the specified type is obtained according to the preset database, and the second estimation scheme is adjusted according to the specified type. If it is determined that the preference value is not less than the preset value, the design is performed according to the comparison room type.

[0079] Reference Figure 5 In one embodiment, after planning the area to be measured according to the second estimation scheme, the following steps are also included: S410, obtaining a floor model according to the second estimation scheme, dividing the floor model into grids, and selecting lighting verification positions from a plurality of grids.

[0080] S420, verify the lighting verification position, if the lighting at the lighting verification position all meets the standard, then it is determined that the building of the floor model meets the standard.

[0081] S430: If the lighting at the lighting verification positions does not all meet the standards, the floor plan is adjusted according to the lighting verification positions that do not meet the standards to update the second estimation plan.

[0082] Among them, the floor model representation and the design model obtained by the second estimation scheme divide the floor model into grids to obtain grid points at various positions, and then select several lighting verification positions at the grid points at these positions. The lighting verification positions represent the positions that need to be verified for sunlight, and then determine whether they meet the standard lighting.

[0083] Then the lighting verification position is verified. If the lighting at the lighting verification position meets the standards, the floor model construction is determined to meet the standards. The standards here refer to the floor height and lighting data set by the country.

[0084] Specifically, the lighting area of ​​the main activity room of a residential building should not be less than 1 / 10 of the floor area of ​​the room, and the lighting area of ​​each main activity room should not be less than 1.5 square meters. The window-to-floor area ratio of bedrooms and living rooms should not be less than 1 / 6, or the lighting factor should not be less than 2.2%. The lighting area of ​​each office in an office building should not be less than 1 / 8 of the floor area of ​​the room, and the lighting area of ​​each office should not be less than 2.0 square meters. Educational and medical buildings, such as school classrooms and libraries, should have an illumination of more than 300 lux. The lighting level of museum exhibition halls should not be lower than level III. The main living rooms of nurseries and kindergartens should obtain a sunshine standard of ≥3 hours on the winter solstice. More than half of the wards and convalescent rooms in hospitals and sanatoriums should meet the sunshine standard of ≥2 hours on the winter solstice. Public buildings and commercial buildings, such as supermarkets and banquet halls, usually require an illumination of about 300 lux. The illumination requirements of high-end shopping malls and offices may reach more than 500 lux, so specific verification is carried out for specific buildings.

[0085] In this embodiment, for residential buildings, if the lighting at the lighting verification positions does not all meet the standards, the planning of the floors is adjusted according to the lighting verification positions that do not meet the standards to update the second estimation plan.

[0086] In one of the embodiments, in order to reduce the number of locations for lighting verification, the location that best reflects the lighting conditions in the floor model may be obtained for verification, thereby reducing the lighting verification process for the floor model and improving the overall verification efficiency.

[0087] Selecting the lighting verification positions from several grids includes the following steps: S411, obtaining the adjacent verification model based on the floor model, and obtaining the lowest verification lighting area corresponding to the floor model based on the highest point position of the verification model.

[0088] S412, obtaining a lighting verification position according to the minimum verification lighting area.

[0089] Among them, the verification model represents the model adjacent to the floor model, that is, the floor that blocks the sunlight on the floor model during illumination. The lowest verification illumination area is the highest blocked area position calculated by mathematical formula, and the illumination verification position is obtained in the lowest verification illumination area. Since the types of houses on the entire floor are roughly the same, as long as the lowest verification illumination area meets the national standards, the floors above the lowest verification illumination area meet the requirements.

[0090] The implementation principle is: The processor obtains basic data information of the area to be measured, and obtains a first estimation scheme in a preset model based on the basic data information. The analysis data around the area to be measured is obtained, and the estimation type is obtained based on the analysis data. It is determined whether the estimated type is consistent with the building type corresponding to the first estimation scheme, wherein the estimated type represents the building type obtained through analysis. If not, a second estimation scheme is obtained in the preset model based on the estimation type, and the area to be measured is planned based on the second estimation scheme. If consistent, the area to be measured is planned based on the first estimation scheme, or a second estimation scheme is obtained in the preset model based on the estimation type, and the area to be measured is planned based on the second estimation scheme.

[0091] The embodiment of the present application also discloses a building forced drainage scheme design system.

[0092] The building forced drainage scheme design system includes a scheme generation module, a data evaluation module, a data judgment module and a result processing module. The scheme generation module is used to obtain the basic data information of the area to be tested, and obtain the first estimated scheme in the preset model according to the basic data information. The data evaluation module is used to obtain the analysis data around the area to be tested, and obtain the estimated type according to the analysis data. The data judgment module is used to determine whether the estimated type is consistent with the building type corresponding to the first estimated scheme, wherein the estimated type represents the building type obtained by analysis. If the estimated type is inconsistent with the building type corresponding to the first estimated scheme, the result processing module is used to obtain the second estimated scheme in the preset model according to the estimated type, and plan the area to be tested according to the second estimated scheme, and the second estimated scheme and the first estimated scheme represent different building types. If the estimated type is consistent with the building type corresponding to the first estimated scheme, the result processing module plans the area to be tested according to the first estimated scheme, or obtains the second estimated scheme in the preset model according to the estimated type, and plans the area to be tested according to the second estimated scheme.

[0093] The other functions performed in the above-mentioned scheme generation module, data evaluation module, data judgment module and result processing module as well as the technical details of each function are the same or similar to the corresponding features in the building forced drainage scheme design method described above, so they will not be repeated here.

[0094] The embodiment of the present application also discloses an electronic device.

[0095] Reference Figure 6 The electronic device includes: a processor 11 and a memory 12, the memory 12 stores a computer program 121 that can be run on the processor, and the computer program 121 implements the building forced drainage scheme design method when executed by the processor.

[0096] The embodiment of the present application also discloses a storage medium.

[0097] The storage medium stores at least one instruction, at least one program, code set or instruction set, and the at least one instruction, at least one program, code set or instruction set is loaded and executed by the processor to implement the building forced drainage scheme design method.

[0098] It should be understood that although the steps in the flowchart of the accompanying drawings are shown in sequence according to the instructions of the arrows, these steps are not necessarily performed in the order indicated by the arrows. Unless otherwise clearly stated in this document, the execution of these steps is not strictly limited in order and can be performed in other orders.

[0099] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A design method for building forced drainage scheme, It is characterized in that The following steps are involved: Obtaining basic data information of the area to be measured, and obtaining a first estimation solution in a preset model according to the basic data information; Acquire analysis data around the area to be measured, and acquire an estimated type based on the analysis data, wherein the estimated type represents the building type acquired through analysis; Determining whether the estimated type is consistent with the building type corresponding to the first estimated solution; If they are inconsistent, a second estimation scheme is obtained in the preset model according to the estimation type, and the area to be measured is planned according to the second estimation scheme, and the second estimation scheme and the first estimation scheme represent different building types.

2. The building forced exhaust scheme design method according to claim 1, It is characterized in that The estimated type includes a commercial building or a residential building, and the estimated type is obtained based on the analysis data, wherein the method for obtaining the estimated type includes the following steps: Obtaining the commercial utilization rate and commercial profit value corresponding to the commercial building according to the analysis data, and obtaining the residential utilization rate and residential profit value corresponding to the residential building; Obtaining a commercial priority value according to the commercial utilization rate and the commercial profit value, and obtaining a residential priority value according to the residential utilization rate and the residential profit value; Obtaining a comparison difference value according to the commercial priority value and the residential priority value, and determining whether the comparison difference value is greater than a preset difference value; If the comparison difference is greater than the preset difference, the commercial priority value and the residential priority value are judged to be greater or lesser; If the commercial priority value is greater than the residential priority value, determining that the estimated type is a commercial building; If the commercial priority value is less than the residential priority value, the estimated type is determined to be a residential building.

3. The building forced exhaust scheme design method according to claim 2, It is characterized in that The analysis data includes flow data, and the flow data represents the flow data of people in the designated area corresponding to the area to be tested. The method of obtaining the commercial profit value corresponding to the commercial building based on the analysis data includes the following steps: Obtaining a movement trajectory according to the traffic data, and determining whether there is a commercial building in the designated area; If there is no commercial building in the designated area, determining the commercial profit value corresponding to the commercial building according to the action trajectory; If there is a commercial building in the designated area, obtaining the area location corresponding to the commercial building and the corresponding customer flow; Acquire a distance interval according to a comparison position between the area position and a comparison position corresponding to the area to be measured, and determine whether the distance interval exceeds a preset interval; If the distance interval exceeds a preset interval, obtaining a commercial profit value according to the customer flow and the movement trajectory; If the distance interval does not exceed the preset interval, a commercial profit value is obtained according to the customer flow.

4. The building forced exhaust scheme design method according to claim 3, It is characterized in that The method of obtaining the residential utilization rate corresponding to the residential building according to the analysis data comprises the following steps: Acquire traffic data and enterprise data around the area to be tested based on the analysis data; A residential comfort value is obtained based on the traffic data and the enterprise data, and a residential utilization rate is obtained based on the residential comfort value.

5. The building forced exhaust scheme design method according to claim 1, It is characterized in that After obtaining a second estimation solution in the preset model according to the estimation type, the following steps are also included: Determining whether the building type corresponding to the area to be tested is a residential building according to the second estimation scheme; If the building type corresponding to the area to be tested is a residential building, obtaining the comparison house type according to the second estimation scheme in sequence; Obtaining a corresponding preference value in a preset database according to the compared room type, and determining whether the preference value is less than a preset preference value; If it is determined that the preference value is less than a preset value, a specified type is obtained according to the preset database, and the second estimation scheme is adjusted according to the specified type, where the specified type represents a type with high popularity in the preset database.

6. The building forced exhaust scheme design method according to claim 1, It is characterized in that After planning the area to be tested according to the second estimation scheme, the method further includes the following steps: Acquire a floor model according to the second estimation scheme, divide the floor model into grids, and select illumination verification positions from a plurality of grids; Verifying the lighting verification position, if the lighting at the lighting verification position all meets the standard, then determining that the building of the floor model meets the standard; If the lighting at the lighting verification positions does not all meet the standards, the floor planning is adjusted according to the lighting verification positions that do not meet the standards to update the second estimation plan.

7. The building forced exhaust scheme design method according to claim 6, It is characterized in that The step of selecting the lighting verification positions from the plurality of grids comprises the following steps: Acquire a verification model adjacent to the floor model according to the floor model, and acquire a minimum verification illumination area corresponding to the floor model according to the highest point position of the verification model; The lighting verification position is obtained according to the minimum verification lighting area.

8. A building forced drainage scheme design system, It is characterized in that include: A solution generation module, the solution generation module is used to obtain basic data information of the area to be measured, and obtain a first estimation solution in a preset model according to the basic data information; A data evaluation module, the data evaluation module is used to obtain analysis data around the area to be tested, and obtain an estimated type based on the analysis data; A data judgment module, the data judgment module is used to judge whether the estimated type is consistent with the building type corresponding to the first estimation scheme, wherein the estimated type represents the building type obtained through analysis; A result processing module, if the estimated type is inconsistent with the building type corresponding to the first estimation scheme, then the result processing module is used to obtain a second estimation scheme in the preset model according to the estimated type, and plan the area to be tested according to the second estimation scheme, and the second estimation scheme and the first estimation scheme represent different building types.

9. An electronic device, It is characterized in that The electronic device comprises: a processor (11) and a memory (12), wherein the memory (12) stores a computer program (121) that can be run on the processor, and when the computer program (121) is executed by the processor, the building forced drainage scheme design method according to any one of claims 1 to 7 is implemented.

10. A storage medium, It is characterized in that The storage medium stores at least one instruction, at least one program, a code set or an instruction set, and the at least one instruction, the at least one program, the code set or the instruction set is loaded and executed by the processor to implement the building forced drainage scheme design method as described in any one of claims 1 to 7.

Citation Information

Cited By

  • Self-adaptive power supply driving method and system and electronic equipment

    CN120185432A