Risk management and control method, device and equipment and storage medium

By conducting risk identification and situation analysis on equipment data, risk control strategies are activated in real time, which solves the problem that equipment risk control methods cannot be timely managed and protected, and improves the timeliness and protection capabilities of risk control.

CN119026908APending Publication Date: 2024-11-26CHINA MERCHANTS BANK
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411115054.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

Current equipment risk control methods cannot effectively carry out immediate governance and protection, rely on post-event analysis and manual addition of rules, and lack real-time protection capabilities.

Method used

By collecting equipment data, risk identification is carried out based on preset risk identification rules, and risk index and threshold are calculated in combination with risk coefficients to identify risk situations. If there is a risk alarm message, risk control will be activated, and the business side issues corresponding strategies to achieve real-time risk Confrontational protection.

Benefits of technology

It improves the timeliness of risk control, increases the ability to resist real-time risk, and reduces the complexity of risk control and the time difference between strategy lag.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119026908A_ABST
    Figure CN119026908A_ABST
Patent Text Reader

Abstract

The invention discloses a risk management and control method, device and equipment and a storage medium, and relates to the technical field of risk management and control. Performing risk identification on the equipment data according to a preset risk identification rule; calculating a risk index and a risk index threshold based on the identified risk item in combination with a corresponding risk coefficient; performing risk situation identification based on the risk index and the risk index threshold to obtain an identification result; and if the risk alarm message exists in the identification result, risk management and control are started, so that the service side issues a risk management and control strategy, and timely management and protection can be effectively carried out.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of risk management technology, and in particular to a risk management method, device, equipment and storage medium. Background Art

[0002] With the popularity of mobile devices such as smartphones, many financial services such as remittances and credit card limit increases have gradually migrated to mobile platforms. However, criminals take advantage of the uncontrollable characteristics of mobile devices and use technical means to counterfeit or defraud in order to gain profits. In order to meet this challenge, terminal device risk detection technology is also gradually developing and maturing.

[0003] Current equipment risk management methods mainly rely on post-analysis and manual rule addition. However, current equipment risk management methods cannot effectively carry out immediate governance and protection.

[0004] The above contents are only used to assist in understanding the technical solution of the present application and do not constitute an admission that the above contents are prior art. Summary of the invention

[0005] The main purpose of this application is to provide a risk management method, device, equipment and storage medium, aiming to solve the technical problem that the current equipment risk management method cannot effectively carry out timely management and protection.

[0006] To achieve the above objectives, this application proposes a risk management method, which includes:

[0007] Collect equipment data;

[0008] Perform risk identification on the device data according to preset risk identification rules;

[0009] Based on the identified risk items, the risk index and risk index threshold are calculated in combination with the corresponding risk coefficients;

[0010] Perform risk situation identification based on the risk index and the risk index threshold to obtain an identification result;

[0011] If there is a risk warning message in the identification result, risk control is enabled so that the business side can issue a risk control strategy.

[0012] In one embodiment, if there is a risk warning message in the identification result, risk control is started so that the business side can issue a risk control strategy according to the step of:

[0013] If there is a risk elimination message in the identification result, the risk control is closed.

[0014] In one embodiment, if there is a risk elimination message in the identification result, the step of closing the risk control includes:

[0015] The risk items and the corresponding risk factors are regularly maintained and updated.

[0016] In one embodiment, the step of calculating the risk index and the risk index threshold based on the identified risk item and the corresponding risk coefficient includes:

[0017] performing normalization processing on the corresponding risk coefficient;

[0018] The number of requests for the risk item within the preset time window and the corresponding risk coefficient are multiplied and summed to obtain a total risk value;

[0019] Dividing the total risk value by the normalized risk coefficient to obtain the risk index;

[0020] Calculate the average risk index of a preset number of time windows and record it as the first risk index;

[0021] Calculate a first risk index average based on the first risk index;

[0022] Calculate the average risk index of the time window within the preset number of days and record it as the second risk index;

[0023] Calculate a second risk index average based on the second risk index;

[0024] Calculate a variance based on the first risk index and the second risk index;

[0025] Calculating an upper limit of the risk index threshold based on the first risk index average value, the second risk index average value and the variance;

[0026] The step of performing risk situation identification based on the risk index and the risk index threshold to obtain an identification result comprises:

[0027] The risk index is compared with an upper limit of the risk index threshold based on the preset comparison rule to obtain the identification result.

[0028] In one embodiment, the upper limit of the risk index threshold includes a first threshold upper limit, a second threshold upper limit, and a third threshold upper limit, and the step of comparing the risk index with the upper limit of the risk index threshold based on the preset comparison rule to obtain the identification result includes:

[0029] Determine whether the risk indexes of a preset number of time windows all exceed the first threshold upper limit;

[0030] If not, sending the risk elimination message;

[0031] If so, determining whether the risk index of the preset number of time windows exceeds the third threshold upper limit;

[0032] If yes, a high-risk warning message is sent;

[0033] If not, determining whether the risk index of the preset number of time windows exceeds the second threshold upper limit;

[0034] If not, a low-risk warning message is sent;

[0035] If yes, a medium risk warning message is sent.

[0036] In one embodiment, the step of calculating the risk index and the risk index threshold based on the identified risk item and the corresponding risk coefficient includes:

[0037] Determine whether the number of risk items exceeds a preset upper limit of a first risk item number threshold within a preset number of time windows;

[0038] If not, the risk item is recorded in the database and a risk elimination message is sent;

[0039] If yes, the risk item is recorded in the database, and it is determined whether the number of the risk items exceeds a preset upper limit of a third risk item number threshold within the preset number time window;

[0040] If yes, a high-risk warning message is sent;

[0041] If not, determining whether the number of risk items exceeds a preset upper limit of a second risk item number threshold within the preset number time window;

[0042] If yes, a medium risk warning message is sent;

[0043] If not, a low risk warning message is sent.

[0044] In one embodiment, if there is a risk warning message in the identification result, the step of starting risk control includes:

[0045] Obtaining the risk items of the warning from the database through the risk management service;

[0046] Issue risk control activation rules for the risk items of the alarm;

[0047] If there is a risk elimination message in the identification result, the step of closing the risk control includes:

[0048] Obtaining the relieved risk items from the database through the risk management service;

[0049] Issue risk management and control closure rules for the lifted risk items.

[0050] In addition, to achieve the above objectives, the present application also proposes a risk management and control device, which includes:

[0051] Data acquisition module, used to collect equipment data;

[0052] A risk identification module, used to identify risks of the device data according to preset risk identification rules;

[0053] A calculation module, used to calculate the risk index and the risk index threshold based on the identified risk items and the corresponding risk coefficients;

[0054] A situation identification module, used to identify the risk situation based on the risk index and the risk index threshold, and obtain an identification result;

[0055] The risk control module is used to enable risk control if there is a risk warning message in the identification result, so that the business side can issue a risk control strategy.

[0056] In addition, to achieve the above-mentioned purpose, the present application also proposes a risk management device, which includes: a memory, a processor, and a computer program stored in the memory and executable on the processor, and the computer program is configured to implement the steps of the risk management method described above.

[0057] In addition, to achieve the above-mentioned purpose, the present application also proposes a storage medium, which is a computer-readable storage medium, and a computer program is stored on the storage medium. When the computer program is executed by a processor, the steps of the risk management method described above are implemented.

[0058] One or more technical solutions proposed in this application have at least the following technical effects:

[0059] The present application identifies risks of equipment data according to preset risk identification rules, calculates risk index and risk index threshold based on identified risk items in combination with corresponding risk coefficients, identifies risk situation based on the risk index and risk index threshold, and obtains identification results. If there is a risk warning message in the identification result, risk management is enabled so that the business side can issue risk management strategies in real time, thereby increasing real-time risk protection capabilities and improving the timeliness of risk management. BRIEF DESCRIPTION OF THE DRAWINGS

[0060] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0061] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0062] Figure 1 A flowchart of the first embodiment of the risk management method of this application is provided;

[0063] Figure 2 This is a scenario diagram of the risk management method for this application. Figure 1 ;

[0064] Figure 3 This is a scenario diagram of the risk management method for this application. Figure 2 ;

[0065] Figure 4 This is the overall flow chart of the risk management method for this application;

[0066] Figure 5 This is a schematic diagram of the module structure of the risk management and control device according to an embodiment of the present application;

[0067] Figure 6 Schematic diagram of the device structure of the hardware operating environment involved in the risk management method in the embodiment of the present application.

[0068] The purpose, features and advantages of this application will be further described in conjunction with the embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0069] It should be understood that the specific embodiments described herein are only used to explain the technical solutions of the present application and are not used to limit the present application.

[0070] In order to better understand the technical solution of the present application, a detailed description will be given below in conjunction with the accompanying drawings and specific implementation methods.

[0071] The main solution of the embodiment of the present application is: collecting equipment data; identifying risks on the equipment data according to preset risk identification rules; calculating the risk index and risk index threshold based on the identified risk items and the corresponding risk coefficients; identifying the risk situation based on the risk index and the risk index threshold to obtain an identification result; if there is a risk warning message in the identification result, risk control is enabled so that the business side can issue a risk control strategy.

[0072] In this embodiment, for ease of description, the risk management and control system is used as the execution entity for explanation below.

[0073] Since the current equipment risk management method mainly relies on post-analysis and manual addition of rules, however, the current equipment risk management method cannot effectively carry out immediate governance and protection.

[0074] Therefore, the present application provides a solution, which performs risk identification on device data according to preset risk identification rules, calculates risk index and risk index threshold based on identified risk items in combination with corresponding risk coefficients, performs risk situation identification based on the risk index and the risk index threshold, and obtains identification results. If there is a risk warning message in the identification result, risk management is enabled so that the business side can issue risk management strategies in real time, thereby increasing real-time risk protection capabilities and improving the timeliness of risk management.

[0075] It should be noted that the execution subject of this embodiment can be a computing service device with data processing, network communication and program running functions, such as a tablet computer, a personal computer, a mobile phone, etc., or an electronic device capable of realizing the above functions, a risk management device, etc., or an electronic system capable of realizing the above functions, a risk management system, etc. The following takes the risk management system as an example to illustrate this embodiment and the following embodiments.

[0076] Based on this, the present application embodiment provides a risk management method, referring to Figure 1 , Figure 1 A flowchart of the first embodiment of the risk management method of this application is provided.

[0077] In this embodiment, the risk management method includes steps S10, S20, S100-S120:

[0078] Step S10, collecting device data;

[0079] Among them, devices include all devices in the risk management and control system, such as mobile devices.

[0080] The device data includes but is not limited to at least one of operating system information, device identifier, network information, location information, battery information, storage information, sensor data, application information, and operating status.

[0081] Furthermore, the device data can be collected when the application is started through the security SDK integrated into the mobile device.

[0082] Step S20, performing risk identification on the device data according to a preset risk identification rule;

[0083] It should be noted that the preset risk identification rules can be formulated by domain experts.

[0084] As an implementation method, the risk identification rules may include the following three items:

[0085] (1) Abnormal data traffic rules:

[0086] Detecting abnormal data traffic patterns in device data transmission, such as a sudden increase in data volume or unusually frequent data transmission requests, may indicate that the device has been attacked or is at risk of data leakage.

[0087] (2) Access pattern exception rules:

[0088] Analyze the access patterns of the device, including time, location, frequency, etc., to identify whether there are abnormal access behaviors. For example, whether there are users who have never accessed at this time point, or whether there are access requests that have never appeared at this location.

[0089] (3) Device behavior abnormality rules:

[0090] Monitor abnormal device behavior to identify abnormal operations, such as device information tampering, access to high system permissions, etc.

[0091] Step S100, based on the identified risk items, the risk index and the risk index threshold are calculated in combination with the corresponding risk coefficient;

[0092] It should be noted that each risk item has a preset corresponding risk coefficient, and the risk index and risk index threshold are calculated for the risk item in combination with the risk coefficient.

[0093] For example, the risk items identified by the above three rules are abnormal data traffic items, abnormal access mode items, and abnormal device behavior items. Each risk item has a preset corresponding risk coefficient. The risk index and risk index threshold are calculated for the risk item combined with the risk coefficient.

[0094] In addition, it should be noted that risk items and risk factors must be checked, maintained and updated regularly.

[0095] Step S110, performing risk situation identification based on the risk index and the risk index threshold to obtain an identification result;

[0096] It should be noted that the current risk status of the system and whether there are risk warning messages or risk relief messages that require attention are judged based on the risk index and the risk index threshold.

[0097] As an implementation method, the risk index and the risk index threshold may be compared based on a preset comparison rule to obtain an identification result.

[0098] Step S120: If there is a risk warning message in the identification result, risk control is enabled so that the business side issues a risk control strategy.

[0099] It should be noted that the business side issues risk control strategies. For example, when a user performs financial business operations, the business side obtains the control status calculated by the risk control rule engine, and the business side issues risk control strategies based on the control status.

[0100] In business scenarios, corresponding processes are executed in combination with risk management strategies. For example, if the user is denied financial business operations, the business is terminated; if risk management passes, the business process proceeds to the next step.

[0101] You can refer to Figure 2 , Figure 2 This is a scenario diagram of the risk management method for this application. Figure 1 .

[0102] Among them, the user side collects device data, and the service side identifies the risk situation of the device data to obtain an identification result. If there is a risk warning message in the identification result, risk control is turned on to enable the business side to issue a risk control strategy, specifically, to enable the business side to issue a risk control activation rule; if there is a risk release message in the identification result, risk control is turned off to enable the business side to issue a risk control strategy, specifically, to enable the business side to issue a risk control closure rule.

[0103] This embodiment provides a risk management method, which identifies risks in device data according to preset risk identification rules, calculates risk index and risk index threshold based on identified risk items in combination with corresponding risk coefficients, identifies risk situations based on the risk index and risk index threshold, and obtains identification results. If there is a risk warning message in the identification result, risk management is enabled so that the business side can issue risk management strategies in real time, thereby increasing the real-time risk resistance and protection capabilities and improving the timeliness of risk management. In addition, the management method proposed in this embodiment, which issues and controls specific risk items based on risk indexes, greatly reduces the complexity of risk management and reduces the strategy lag time difference.

[0104] Based on the first embodiment of the present application, in the second embodiment of the present application, the same or similar contents as those in the first embodiment can be referred to the above description, and will not be described in detail later. On this basis, in step S120, if there is a risk warning message in the identification result, risk control is enabled so that the business side issues a risk control strategy. The risk control method further includes step S130:

[0105] Step S130: If there is a risk elimination message in the identification result, the risk control is closed.

[0106] Among them, the risk index and the risk index threshold are compared based on the preset comparison rules to obtain the identification result. If there is a risk elimination message in the identification result, the risk control is closed.

[0107] The control method proposed in this embodiment of issuing and controlling specific risk items based on risk indexes greatly reduces the complexity of risk control and reduces the strategy lag time difference.

[0108] Based on the second embodiment of the present application, in the third embodiment of the present application, the same or similar contents as those in the second embodiment can be referred to the above description, and will not be repeated in the following. On this basis, in step S130, if there is a risk release message in the identification result, after closing the risk control, the risk control method further includes step S140:

[0109] Step S140: regularly maintain and update the risk items and the corresponding risk coefficients.

[0110] In order to maintain the accuracy of risk management, it is necessary to regularly maintain and update the risk items and the corresponding risk coefficients.

[0111] As an implementation method, the risk items and corresponding risk coefficients may be maintained and updated every month, every quarter, or every year.

[0112] Among them, risk items introduced by environmental changes or new projects can also be evaluated, and new risk items can be determined based on the evaluation results.

[0113] The embodiment of the present application can maintain the accuracy of risk management by regularly maintaining and updating the risk items and the corresponding risk coefficients.

[0114] Considering the following drawbacks of the existing solution:

[0115] (1) There is a lack of quantitative means to quantify the risk of attacking devices, and it is impossible to effectively measure the overall risk trend.

[0116] (2) The labor cost of post-risk analysis is high and the timeliness of management and control is poor.

[0117] Therefore, embodiment 4 of the present application is proposed.

[0118] Based on the first embodiment of the present application, in the fourth embodiment of the present application, the same or similar contents as those in the first embodiment can refer to the above description, and will not be described in detail later. On this basis, step S100, based on the identified risk items, calculates the risk index and the risk index threshold in combination with the corresponding risk coefficient, and also includes steps S101 to S109:

[0119] Step S101, normalizing the corresponding risk coefficient;

[0120] Step S102, multiplying and summing the number of requests for the risk item within a preset time window and the corresponding risk coefficient to obtain a total risk value;

[0121] Step S103, dividing the total risk value by the normalized risk coefficient to obtain the risk index;

[0122] Among them, the different risk items of mobile devices are set as x k , such as jailbreak root, simulator and other risks, and set the weight according to the risk factors of the risk items, recorded as risk coefficient a k .

[0123] Among them, the risk coefficient is mainly formulated according to expert rules (the coefficient ranges from 1 to 10). For example, the jailbreaking root risk is a key risk point for mobile devices, and its coefficient is set at 6.

[0124] Then, by accumulating the number of risk item requests x within the preset time window k with a k The total risk value is obtained by multiplying the total number of requests c and the maximum risk coefficient a. k The product of (here the denominator is c*max(a k ) is to normalize the risk coefficient) to obtain the risk index r, the calculation formula is as follows:

[0125]

[0126] Among them, x k is the risk term, a k is the risk coefficient, c is the total number of requests, and r is the risk index.

[0127] Step S104, calculating the average risk index of a preset number of time windows, and recording it as a first risk index;

[0128] For example, the average value of the risk indexes of three time windows is taken as the first risk index.

[0129] Step S105, calculating a first risk index average based on the first risk index;

[0130] Step S106, calculating the average risk index of the time window within a preset number of days, and recording it as the second risk index;

[0131] For example, the average risk index of the same time window in the last three days is taken as the second risk index.

[0132] Step S107, calculating a second risk index average based on the second risk index;

[0133] Step S108, calculating a variance based on the first risk index and the second risk index;

[0134] Step S109, calculating an upper limit of the risk index threshold based on the first risk index average value, the second risk index average value and the variance;

[0135] It should be noted that the main process of calculating the risk index threshold is as follows:

[0136] (1) Take the average of the risk index of the most recent m preset time windows

[0137] (2) Take the average risk index of the preset time window in the last n days

[0138] (3) Calculate the variance σ of the m+n values.

[0139] (4) Take As the first upper threshold, is the second upper threshold, is the upper limit of the third threshold.

[0140] The step S110, performing risk situation identification based on the risk index and the risk index threshold, and obtaining the identification result includes step S111:

[0141] Step S111, comparing the risk index with the upper limit of the risk index threshold based on the preset comparison rule to obtain the identification result.

[0142] Among them, as an implementation method, the risk index and the risk index threshold are compared based on the preset comparison rules, and the identification results can be listed in the following three schemes:

[0143] A. Threshold judgment scheme: Set a fixed risk index threshold, such as a threshold determined based on historical data or expert experience. If the currently calculated risk index exceeds this threshold, the identification result is high risk; otherwise, it is low risk.

[0144] Implementation steps: Compare the currently calculated risk index with the preset risk index threshold. If it is greater than the threshold, it is identified as high risk, otherwise it is identified as low risk.

[0145] B. Change rate analysis scheme: Consider the change rate of the risk index for identification, that is, analyze the change trend of the risk index. If the change rate of the current risk index exceeds the preset change rate threshold, it is identified as a possible change in the risk situation.

[0146] Implementation steps: Calculate the difference or percentage change between the current risk index and the risk index of the previous time window, and compare it with the preset change rate threshold. If it exceeds the threshold, it is considered that there is a change in the risk situation.

[0147] C. Comprehensive assessment scheme: Comprehensively consider the current risk index value, the trend of historical data, and possible external influencing factors to formulate a complex comparison rule. This scheme may combine multiple indicators and thresholds to identify risk situations from a more comprehensive perspective.

[0148] Implementation steps: Use statistical analysis or machine learning methods to comprehensively consider multiple factors such as the current risk index value, its changing trend, and the statistical characteristics of historical data to determine the upper limit of the risk index threshold, and compare it with the currently calculated risk index to identify the possibility of a risk situation.

[0149] The embodiment of the present application constructs a quantitative index through multi-dimensional risk data of mobile devices, dynamically issues management and control instructions, quantifies the risk situation in the device dimension, saves labor input costs, and improves the timeliness of management and control.

[0150] Based on the fourth embodiment of the present application, in the fifth embodiment of the present application, the same or similar contents as those in the fourth embodiment can be referred to the above description, and will not be described in detail later. On this basis, the upper limit of the risk index threshold includes a first threshold upper limit, a second threshold upper limit, and a third threshold upper limit. Step S111, based on the preset comparison rule, compares the risk index with the upper limit of the risk index threshold, and obtains the identification result, which also includes steps S1111 to S1117:

[0151] Step S1111, determining whether the risk indexes of a preset number of time windows all exceed the first threshold upper limit;

[0152] Step S1112: if not, sending the risk elimination message;

[0153] Step S1113: If yes, determine whether the risk index of the preset number of time windows exceeds the upper limit of the third threshold;

[0154] Step S1114: If yes, send a high risk warning message;

[0155] Step S1115: if not, determining whether the risk index of the preset number of time windows exceeds the second threshold upper limit;

[0156] Step S1116, if not, send a low risk warning message;

[0157] Step S1117: If yes, send a medium risk warning message.

[0158] It should be noted that in this embodiment, the risk index at the current time point is compared with the upper limit of the risk index threshold. If the risk index of k consecutive time windows (k>=3) exceeds the upper limit of the first threshold, a risk alarm is issued, and if there is a risk index exceeding the second upper limit threshold among the k times, a medium-risk message is sent; if there is a risk index exceeding the third upper limit threshold, a high-risk message is sent, and otherwise a low-risk message is sent.

[0159] Likewise, if the risk indexes of k (k>=3) consecutive time windows are all lower than the first upper threshold, a risk relief notification is sent.

[0160] For example, the risk index of the three most recent time windows is continuously judged, and if the risk index of the three time windows is less than the upper limit of the first threshold, a risk relief message is sent. Similarly, for risk warnings, if the risk index of any of the three time windows is greater than the second threshold, a medium risk message is sent, and if it is greater than the third threshold, a high risk message is sent.

[0161] The embodiment of the present application constructs a quantitative index through multi-dimensional risk data of mobile devices, dynamically issues control instructions, quantifies the risk situation of the device dimension, saves labor input costs, and improves the timeliness of control. In addition, the threshold calculation and alarm method of the device risk index and the number of specific risk items of the device proposed in this application can effectively mark the risk status at a certain point in time.

[0162] Based on the second embodiment of the present application, in the sixth embodiment of the present application, the same or similar contents as those in the second embodiment can be referred to the above description, and will not be described in detail later. On this basis, step S100, based on the identified risk items, calculates the risk index and the risk index threshold in combination with the corresponding risk coefficient, and also includes steps S30 to S90:

[0163] Step S30, determining whether the number of risk items exceeds a preset upper limit of a first risk item number threshold within a preset number of time windows;

[0164] Step S40: if not, the risk item is recorded in the database and a risk elimination message is sent;

[0165] Step S50: If yes, the risk item is recorded in the database, and it is determined whether the number of risk items exceeds a preset upper limit of a third risk item number threshold within the preset number time window;

[0166] Step S60: If yes, send a high risk warning message;

[0167] Step S70: If not, determine whether the number of risk items exceeds a preset upper limit of a second risk item number threshold within the preset number time window;

[0168] Step S80: If yes, send a medium risk warning message;

[0169] Step S90: If not, send a low risk warning message.

[0170] It should be noted that, in this embodiment, the number of risk items is identified in order to determine whether the number of risk items exceeds a risk item number threshold.

[0171] Among them, the equipment risk item x k The quantity threshold calculation process is the same as the risk index threshold calculation process. If the quantity threshold of the first risk item is exceeded for k consecutive time windows (k>=3), the relevant risk item will be recorded in the database. If the quantity threshold of the second risk item is exceeded for k times, the relevant risk item will be recorded in the database and a medium risk alarm message will be sent.

[0172] If there is a third risk item quantity threshold upper limit that exceeds k times, the relevant risk item will be recorded in the database and a high risk warning message will be sent.

[0173] In other cases, the relevant risk items are also recorded in the database and a low-risk warning message is sent.

[0174] If k (k>=3) consecutive time windows are lower than the upper limit of the first risk item threshold, the relevant risk item is recorded in the database and a risk relief message is sent.

[0175] The embodiment of the present application constructs a quantitative index through multi-dimensional risk data of mobile devices, dynamically issues control instructions, quantifies the risk situation of the device dimension, saves labor input costs, and improves the timeliness of control. In addition, the threshold calculation and alarm method of the device risk index and the number of specific risk items of the device proposed in this application can effectively mark the risk status at a certain point in time.

[0176] Based on the sixth embodiment of the present application, in the seventh embodiment of the present application, the same or similar contents as those in the sixth embodiment can be referred to the above description, and will not be described in detail later. On this basis, step S120, if there is a risk warning message in the identification result, then risk control is enabled so that the business side can issue a risk control strategy, and further includes steps S121 to S122:

[0177] Step S121, obtaining the risk item of the alarm from the database through the risk management and control service;

[0178] Step S122, issuing risk control activation rules for the risk item of the alarm;

[0179] When the risk management service receives a risk warning message, it obtains all risk items x of the recorded risk level of the current business scenario from the database. k , for xk Issue risk management activation rules.

[0180] You can refer to Figure 3 , Figure 3 This is a scenario diagram of the risk management method for this application. Figure 2 .

[0181] Among them, the risk management service obtains the risk items of the alarm from the database, and issues risk management activation rules for the risk items of the alarm; the risk management service obtains the lifted risk items from the database, and issues risk management closing rules for the lifted risk items.

[0182] As an implementation method, the risk control activation rule includes at least one of the following:

[0183] (1) Automated response measures: For example, when the system detects a high-risk event, it can automatically trigger emergency response measures, such as restricting access to critical resources or adjusting network configuration to prevent potential attacks.

[0184] (2) Notification and alerting: Immediately notify relevant individuals or teams to ensure they can take timely action to address risks, such as sending alerts via email, SMS, or instant messaging tools.

[0185] (3) Temporary adjustment: Temporarily modify system settings or parameters to reduce or prevent potential security risks, such as temporarily shutting down certain services or strengthening login authentication requirements.

[0186] (4) Enable additional monitoring and auditing: Increase real-time monitoring of specific systems or resources to more quickly detect and respond to potential security incidents or abnormal behavior.

[0187] In step S130, if there is a risk elimination message in the identification result, closing the risk control further includes steps S131 to S132:

[0188] Step S131, obtaining the relieved risk items from the database through the risk management service;

[0189] Step S132: issuing risk control closing rules for the released risk items.

[0190] When the risk management service receives the risk release message, it obtains all the risk items x released in the current business scenario from the database. k , for x k Issue risk management and control closure rules.

[0191] As an implementation method, the risk control closing rule includes at least one of the following:

[0192] (1) Canceling emergency response measures: For example, when the risk is eliminated, the enabled emergency response measures are automatically disabled and the normal system configuration or access permission settings are restored.

[0193] (2) Restoring business functions: Automatically cancel restrictions or adjustments to certain business functions to ensure that users and customers can access and use related services normally.

[0194] (3) Send recovery notification: Send a notification to the relevant team or manager to indicate that the risk has been controlled or resolved and confirm that normal business operations can be resumed.

[0195] (4) Evaluation and Learning: Initiate the evaluation process to analyze the causes and impacts of risk events and provide data support and lessons learned for future improvements in risk management strategies.

[0196] The control method proposed in this embodiment of issuing and controlling specific risk items based on risk indexes greatly reduces the complexity of risk control and reduces the strategy lag time difference.

[0197] For example, to help understand the implementation process of the risk management method of the above embodiment, please refer to Figure 4 , Figure 4 The following is an overall flow chart of the risk management method for this application.

[0198] Specifically, on the user side, service side and business side, the process includes the following steps:

[0199] (1) When the application is started, the security SDK integrated into the mobile device asynchronously collects multi-dimensional data of the mobile device and transmits it back to the risk identification service.

[0200] (2) Risk identification service detects device risks such as jailbreak, Root, emulator, etc. based on the expert rule engine.

[0201] (3) Aggregate the risk items of all devices in the scenario and calculate the risk index of the scenario based on the risk coefficient.

[0202] (4) Calculate the threshold of the risk index at the current point in time.

[0203] (5) Compare the difference between the risk index and its threshold for the most recent k times. If it is greater than the threshold for k consecutive times, a risk warning message is issued. If it is less than the threshold for k consecutive times, a risk elimination message is issued.

[0204] (6) The risk control service switches the control status according to the received message. If it is a risk warning, the control is turned on; if it is a risk relief message, the control is turned off.

[0205] (7) On the business side, the business side issues risk control strategies. For example, when a user performs a financial business operation, the business side obtains the control status calculated by the risk control rule engine, and the business side issues risk control strategies based on the control status.

[0206] (8) In business scenarios, the corresponding process is executed in combination with the risk management strategy. For example, if the user is denied financial business operations, the business is terminated; if the risk management passes, the business process proceeds to the next step.

[0207] It should be noted that the above examples are only used to understand the present application and do not constitute a limitation on the risk management method of the present application. More simple transformations based on this technical concept are all within the scope of protection of the present application.

[0208] This application also provides a risk management device, please refer to Figure 5 , the risk management and control device comprises:

[0209] A data acquisition module 10, used for collecting device data;

[0210] A risk identification module 20, configured to identify risks of the device data according to preset risk identification rules;

[0211] A calculation module 30, configured to calculate a risk index and a risk index threshold based on the identified risk items and the corresponding risk coefficients;

[0212] A situation identification module 40, configured to identify a risk situation based on the risk index and the risk index threshold, and obtain an identification result;

[0213] The risk control module 50 is used to enable risk control if there is a risk warning message in the identification result, so that the business side can issue a risk control strategy.

[0214] The risk control device provided by the present application adopts the risk control method in the above-mentioned embodiment, which can solve the technical problem that the current equipment risk control method cannot effectively and timely manage and protect. Compared with the prior art, the beneficial effects of the risk control device provided by the present application are the same as the beneficial effects of the risk control method provided by the above-mentioned embodiment, and the other technical features in the risk control device are the same as the features disclosed in the above-mentioned embodiment method, which will not be repeated here.

[0215] The present application provides a risk management and control device, which includes: at least one processor; and a memory that is communicatively connected to the at least one processor; wherein the memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the risk management method in the above-mentioned embodiment one.

[0216] Reference below Figure 6 , which shows a schematic diagram of the structure of a risk management device suitable for implementing the embodiment of the present application. The risk management device in the embodiment of the present application may include but is not limited to devices such as mainly mobile phones, PADs (tablet computers), laptops, desktop computers, etc. Figure 6 The risk management device shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0217] like Figure 6 As shown, the risk control device may include a processing device 1001 (e.g., a central processing unit, a graphics processing unit, etc.), which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM: Read Only Memory) 1002 or a program loaded from a storage device 1003 to a random access memory (RAM: Random Access Memory) 1004. In RAM1004, various programs and data required for the operation of the risk control device are also stored. The processing device 1001, ROM1002, and RAM1004 are connected to each other via a bus 1005. An input / output (I / O) interface 1006 is also connected to the bus. Generally, the following systems can be connected to the I / O interface 1006: an input device 1007 including, for example, a touch screen, a touchpad, a keyboard, a mouse, an image sensor, a microphone, an accelerometer, a gyroscope, etc.; an output device 1008 including, for example, a liquid crystal display (LCD: Liquid Crystal Display), a speaker, a vibrator, etc.; a storage device 1003 including, for example, a magnetic tape, a hard disk, etc.; and a communication device 1009. The communication device 1009 may allow the risk management device to communicate wirelessly or wired with other devices to exchange data. Although the risk management device with various systems is shown in the figure, it should be understood that it is not required to implement or have all the systems shown. More or fewer systems may be implemented or have alternatively.

[0218] In particular, according to the embodiments disclosed in the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, the embodiments disclosed in the present application include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication device, or installed from a storage device 1003, or installed from a ROM 1002. When the computer program is executed by the processing device 1001, the above-mentioned functions defined in the method of the embodiment disclosed in the present application are executed.

[0219] The risk management and control equipment provided by this application adopts the risk management and control method in the above embodiment, which can solve the technical problem that the current equipment risk management and control method cannot effectively carry out immediate management and protection. Compared with the prior art, the beneficial effects of the risk management and control equipment provided by this application are the same as the beneficial effects of the risk management and control method provided by the above embodiment, and the other technical features in the risk management and control equipment are the same as the features disclosed in the method of the previous embodiment, which will not be repeated here.

[0220] It should be understood that the various parts disclosed in this application can be implemented by hardware, software, firmware or a combination thereof. In the description of the above embodiments, specific features, structures, materials or characteristics can be combined in any one or more embodiments or examples in a suitable manner.

[0221] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

[0222] The present application provides a computer-readable storage medium having computer-readable program instructions (ie, computer programs) stored thereon, and the computer-readable program instructions are used to execute the risk management method in the above-mentioned embodiment.

[0223] The computer-readable storage medium provided in the present application may be, for example, a USB flash drive, but is not limited to electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, systems or devices, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this embodiment, the computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, system or device. The program code contained on the computer-readable storage medium may be transmitted using any appropriate medium, including but not limited to: wires, optical cables, RF (Radio Frequency), etc., or any suitable combination of the above.

[0224] The computer-readable storage medium may be included in the risk management and control device; or it may exist independently without being assembled into the risk management and control device.

[0225] The above-mentioned computer-readable storage medium carries one or more programs. When the above-mentioned one or more programs are executed by the risk management and control device, the risk management and control device: collects equipment data; performs risk identification on the equipment data according to preset risk identification rules; calculates the risk index and risk index threshold based on the identified risk items and the corresponding risk coefficients; identifies the risk situation based on the risk index and the risk index threshold to obtain an identification result; if there is a risk warning message in the identification result, risk management is enabled so that the business side can issue a risk management strategy.

[0226] Computer program code for performing the operations of the present application may be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, C++, and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0227] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0228] The modules involved in the embodiments described in this application may be implemented by software or hardware, wherein the name of the module does not constitute a limitation on the unit itself in some cases.

[0229] The readable storage medium provided in this application is a computer-readable storage medium, which stores computer-readable program instructions (i.e., computer programs) for executing the above-mentioned risk management method, and can solve the technical problem that the current equipment risk management method cannot effectively carry out immediate governance and protection. Compared with the prior art, the beneficial effects of the computer-readable storage medium provided in this application are the same as the beneficial effects of the risk management method provided in the above-mentioned embodiment, which will not be repeated here.

[0230] The above descriptions are only some embodiments of the present application, and are not intended to limit the patent scope of the present application. All equivalent structural changes made using the contents of the present application specification and drawings under the technical concept of the present application, or direct / indirect applications in other related technical fields are included in the patent protection scope of the present application.

Claims

1. A risk management method, characterized in that: The method comprises: Collect equipment data; Perform risk identification on the device data according to preset risk identification rules; Based on the identified risk items, the risk index and risk index threshold are calculated in combination with the corresponding risk coefficients; Perform risk situation identification based on the risk index and the risk index threshold to obtain an identification result; If there is a risk warning message in the identification result, risk control is enabled so that the business side can issue a risk control strategy.

2. The method according to claim 1, characterized in that If there is a risk warning message in the identification result, risk control is started so that the business side can issue a risk control strategy according to the following steps: If there is a risk elimination message in the identification result, the risk control is closed.

3. The method according to claim 2, characterized in that If there is a risk elimination message in the identification result, the step of closing the risk control includes: The risk items and the corresponding risk factors are regularly maintained and updated.

4. The method according to claim 1, characterized in that The step of calculating the risk index and the risk index threshold based on the identified risk items and the corresponding risk coefficients includes: performing normalization processing on the corresponding risk coefficient; The number of requests for the risk item within the preset time window and the corresponding risk coefficient are multiplied and summed to obtain a total risk value; Dividing the total risk value by the normalized risk coefficient to obtain the risk index; Calculate the average risk index of a preset number of time windows and record it as the first risk index; Calculate a first risk index average based on the first risk index; Calculate the average risk index of the time window within the preset number of days and record it as the second risk index; Calculate a second risk index average based on the second risk index; Calculate a variance based on the first risk index and the second risk index; Calculating an upper limit of the risk index threshold based on the first risk index average value, the second risk index average value and the variance; The step of performing risk situation identification based on the risk index and the risk index threshold to obtain an identification result comprises: The risk index is compared with an upper limit of the risk index threshold based on the preset comparison rule to obtain the identification result.

5. The method according to claim 4, characterized in that The upper limit of the risk index threshold includes a first threshold upper limit, a second threshold upper limit, and a third threshold upper limit. The step of comparing the risk index with the upper limit of the risk index threshold based on the preset comparison rule to obtain the identification result includes: Determine whether the risk indexes of a preset number of time windows all exceed the first threshold upper limit; If not, sending the risk elimination message; If so, determining whether the risk index of the preset number of time windows exceeds the third threshold upper limit; If yes, a high-risk warning message is sent; If not, determining whether the risk index of the preset number of time windows exceeds the second threshold upper limit; If not, a low-risk warning message is sent; If yes, a medium risk warning message is sent.

6. The method according to claim 2, characterized in that The step of calculating the risk index and the risk index threshold based on the identified risk items and the corresponding risk coefficients includes: Determine whether the number of risk items exceeds a preset upper limit of a first risk item number threshold within a preset number of time windows; If not, the risk item is recorded in the database and a risk elimination message is sent; If yes, the risk item is recorded in the database, and it is determined whether the number of the risk items exceeds a preset upper limit of a third risk item number threshold within the preset number time window; If yes, a high-risk warning message is sent; If not, determining whether the number of risk items exceeds a preset upper limit of a second risk item number threshold within the preset number time window; If yes, a medium risk warning message is sent; If not, a low risk warning message is sent.

7. The method according to claim 6, characterized in that If there is a risk warning message in the identification result, the steps of starting risk control include: Obtaining the risk items of the warning from the database through the risk management service; Issue risk control activation rules for the risk items of the alarm; If there is a risk elimination message in the identification result, the step of closing the risk control includes: Obtaining the relieved risk items from the database through the risk management service; Issue risk management and control closure rules for the lifted risk items.

8. A risk management device, characterized in that: The device comprises: Data acquisition module, used to collect equipment data; A risk identification module, used to identify risks of the device data according to preset risk identification rules; A calculation module, used to calculate the risk index and the risk index threshold based on the identified risk items and the corresponding risk coefficients; A situation identification module, used to identify the risk situation based on the risk index and the risk index threshold, and obtain an identification result; The risk control module is used to enable risk control if there is a risk warning message in the identification result, so that the business side can issue a risk control strategy.

9. A risk management device, characterized in that: The device comprises: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the computer program is configured to implement the steps of the risk management method according to any one of claims 1 to 7.

10. A storage medium, characterized in that: The storage medium is a computer-readable storage medium, and a computer program is stored on the storage medium. When the computer program is executed by a processor, the steps of the risk management method according to any one of claims 1 to 7 are implemented.

Citation Information

Cited By

  • Self-adaptive risk assessment adjustment method and system based on penetration supervision

    CN120198213A