Over-claim sharing method and device, electronic equipment and storage medium
By obtaining the overpay contract code and dividing the overpay time combination, calculating the target overpay amount, the problem of low calculation efficiency of catastrophe overpayment and amortization is solved, the processing efficiency is improved, and case backlog and cash flow pressure are reduced.
Patent Information
- Application Number
- CN202410719402.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-05
- Publication Date
- 2024-11-26
AI Technical Summary
It is difficult for existing technology to efficiently calculate and handle catastrophe overpayment, resulting in backlog of cases, lagging out ofpayment, increasing the cash flow pressure of insurance companies, and being affected by international currency.
By obtaining the code of the overpay contract, determine the time interval for the catastrophe, divide the overpay time combination based on the time interval and the maximum compensation duration, calculate the target overpay amount, and thus improve the efficiency of overpay sharing.
It effectively avoids case backlog and lagging in compensation, reduces the cash flow pressure of insurance companies and the impact of international currency on settlement, and improves the efficiency of over compensation sharing.
Smart Images

Figure CN119027246A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of data processing technology, and in particular to an excess loss allocation method, device, electronic equipment and storage medium. Background Art
[0002] In recent years, with the frequent occurrence of natural disasters such as typhoons, floods, and earthquakes around the world, the number of cases has increased. The catastrophe excess compensation of property insurance companies can no longer be calculated manually as in the early years. This has led to a backlog of cases and a delay in compensation, which not only increases the cash flow pressure of insurance companies, but also affects the settlement of international currencies. Therefore, the development of a systematic excess compensation allocation method is an urgent problem to be solved. Summary of the invention
[0003] In view of this, the purpose of the present invention is to provide a method, device, electronic device and storage medium for excess loss allocation, so as to improve the efficiency of excess loss allocation, avoid the backlog of cases, delay in compensation, and reduce the cash flow pressure of insurance companies and the impact of international currency settlement.
[0004] In a first aspect, an embodiment of the present invention provides an excess compensation allocation method for determining a target excess compensation amount corresponding to a catastrophic disaster, the method comprising: obtaining a code for an excess compensation contract, and determining a time interval during which the catastrophic disaster will occur based on the code; determining an excess compensation time combination based on the time interval and a maximum compensation duration corresponding to the excess compensation contract; and determining a target excess compensation amount based on the excess compensation amount corresponding to the excess compensation time combination.
[0005] In a preferred embodiment of the present invention, the above-mentioned determination of the excess compensation time combination based on the time interval and the maximum compensation duration corresponding to the excess compensation contract includes: determining the catastrophe duration of the catastrophe based on the time interval; determining the time slice based on the maximum compensation duration; the time slice represents the continuous time unit corresponding to the maximum compensation duration; and dividing the catastrophe duration based on the time slice to obtain the excess compensation time combination.
[0006] In a preferred embodiment of the present invention, the above-mentioned division of the catastrophe duration based on time slices to obtain excess compensation time combinations includes: if there is one continuous time unit, dividing the catastrophe duration according to the continuous time unit to obtain a group of time combinations; using one group of time combinations as the excess compensation time combination; if there are multiple continuous time units, dividing the catastrophe duration according to the multiple continuous time units respectively to obtain multiple groups of time combinations; determining the excess compensation time combination based on the multiple groups of time combinations.
[0007] In a preferred embodiment of the present invention, when the continuous time unit is one type, the above-mentioned determination of the target excess compensation amount based on the excess compensation amount corresponding to the excess compensation time combination includes: determining a first maximum excess compensation amount among the excess compensation amounts corresponding to the excess compensation time combination; the first maximum excess compensation amount is the maximum excess compensation amount among the excess compensation amounts corresponding to the excess compensation time combination; determining whether the first maximum excess compensation amount exceeds a pre-set first-level limit; if it does not exceed the first-level limit, taking the first maximum excess compensation amount as the target excess compensation amount.
[0008] In a preferred embodiment of the present invention, when there are multiple types of continuous time units, the above-mentioned determination of the target excess compensation amount based on the excess compensation amount corresponding to the excess compensation time combination includes: determining the second maximum excess compensation amount among the excess compensation amounts corresponding to each group of time combinations in the excess compensation time combination; the second maximum excess compensation amount is the maximum excess compensation amount among the excess compensation amounts corresponding to each group of time combinations in the excess compensation time combination; determining the third maximum excess compensation amount among the second maximum excess compensation amount; the third maximum excess compensation amount is the maximum excess compensation amount among the second maximum excess compensation amounts; determining whether the third maximum excess compensation amount exceeds the preset second-layer limit; if it does not exceed the second-layer limit, using the third maximum excess compensation amount as the target excess compensation amount.
[0009] In a preferred embodiment of the present invention, the above-mentioned excess compensation time combination includes at least one excess compensation time interval, and the above-mentioned determination of the excess compensation time combination based on multiple groups of time combinations includes: determining the overlapping time in the excess compensation time interval, and screening the time combinations based on the overlapping time to determine the candidate time combination containing the overlapping time; retaining the time combination with the largest continuous time unit in the candidate time combination, and deleting the remaining time combinations to obtain a target time combination; and using the target time combination and the time combination not containing the overlapping time as the excess compensation time combination.
[0010] In a preferred embodiment of the present invention, after determining the target excess compensation amount based on the excess compensation amount corresponding to the excess compensation time combination, the method further includes: determining and deriving a case list under the excess compensation time combination corresponding to the target excess compensation amount; the case list includes: excess compensation case number, target excess compensation amount, accident date and case closing date.
[0011] In a second aspect, an embodiment of the present invention further provides an excess compensation allocation device for determining a target excess compensation amount corresponding to a catastrophic disaster, including: a time interval determination module for obtaining the code of an excess compensation contract and determining the time interval in which the catastrophic disaster occurs based on the code; an excess compensation time combination determination module for determining an excess compensation time combination based on the time interval and the maximum compensation duration corresponding to the excess compensation contract; and a target excess compensation amount determination module for determining a target excess compensation amount based on the excess compensation amount corresponding to the excess compensation time combination.
[0012] In a third aspect, an embodiment of the present invention further provides an electronic device, comprising a processor and a memory, wherein the memory stores computer executable instructions that can be executed by the processor, and the processor executes the computer executable instructions to implement the excess loss allocation method of the first aspect.
[0013] In a fourth aspect, an embodiment of the present invention further provides a computer-readable storage medium, which stores computer-executable instructions. When the computer-executable instructions are called and executed by a processor, the computer-executable instructions prompt the processor to implement the excess loss allocation method of the first aspect mentioned above.
[0014] The embodiments of the present invention bring the following beneficial effects:
[0015] The embodiment of the present invention provides an excess compensation allocation method, device, electronic device and storage medium, which obtains the code of the excess compensation contract, determines the time interval of the catastrophe based on the code, and then determines the excess compensation time combination based on the time interval and the maximum compensation duration corresponding to the excess compensation contract, and finally determines the target excess compensation amount based on the excess compensation amount corresponding to the excess compensation time combination. In this way, the excess compensation allocation efficiency is improved, thereby avoiding the backlog of cases and the delay of compensation, and relieving the cash flow pressure of insurance companies and the impact of international currency pair settlement.
[0016] Other features and advantages of the present disclosure will be set forth in the following description, or some features and advantages may be inferred or unambiguously determined from the description, or may be learned by implementing the above-mentioned technology of the present disclosure.
[0017] In order to make the above-mentioned objectives, features and advantages of the present disclosure more obvious and easy to understand, preferred embodiments are specifically cited below and described in detail with reference to the attached drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0019] Figure 1 A flow chart of an excess compensation allocation method provided by an embodiment of the present invention;
[0020] Figure 2a A flow chart of another excess compensation allocation method provided by an embodiment of the present invention;
[0021] Figure 2b A schematic diagram of multiple time combinations provided by an embodiment of the present invention;
[0022] Figure 3a A flow chart of another excess compensation allocation method provided by an embodiment of the present invention;
[0023] Figure 3b A schematic diagram of an excess compensation model provided by an embodiment of the present invention;
[0024] Figure 4 A schematic diagram of the structure of an excess compensation allocation device provided by an embodiment of the present invention;
[0025] Figure 5 A schematic diagram of the structure of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0026] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] In recent years, with the frequent occurrence of natural disasters such as typhoons, floods, and earthquakes around the world, the number of cases has increased. The catastrophe excess compensation of property insurance companies can no longer be calculated manually as in the early years. This has led to a backlog of cases and a delay in compensation, which not only increases the cash flow pressure of insurance companies, but also affects the settlement of international currencies. Therefore, the development of a systematic excess compensation allocation method is an urgent problem to be solved.
[0028] Based on this, an excess compensation allocation method, device, electronic device and storage medium provided by the embodiment of the present invention can obtain the code of the excess compensation contract, determine the time interval of the catastrophe based on the code, and then determine the excess compensation time combination based on the time interval and the maximum compensation duration corresponding to the excess compensation contract, and finally determine the target excess compensation amount based on the excess compensation amount corresponding to the excess compensation time combination. In this way, the excess compensation allocation efficiency is improved, thereby avoiding the backlog of cases and the lag of compensation, and relieving the cash flow pressure of insurance companies and the impact of international currency pair settlement.
[0029] To facilitate understanding of this embodiment, a method for allocating excess compensation disclosed in an embodiment of the present invention is first introduced in detail.
[0030] Example 1
[0031] The embodiment of the present invention provides an excess compensation allocation method for determining a target excess compensation amount corresponding to a catastrophe. Figure 1 Flow chart of a method for allocating excess compensation provided by an embodiment of the present invention. Figure 1As shown, the excess loss allocation method may include the following steps:
[0032] Step S101, obtaining the code of the excess loss contract, and determining the time interval of the occurrence of the catastrophic disaster based on the code.
[0033] Among them, the excess loss contract stipulates the relevant terms and conditions for catastrophic compensation, and the code of the excess loss contract corresponds to all excess loss contracts of the same type within a specified time period.
[0034] The specified time period in the excess compensation contract can be located through the code, and the system can automatically query at least one time interval of the occurrence of a catastrophe within the specified time period. When a catastrophe occurs, the system can automatically record the time interval of the catastrophe, which is released by the Meteorological Bureau and represents the time from the occurrence of the catastrophe to the end of the catastrophe.
[0035] Among them, major disasters can be typhoons, floods, earthquakes, etc.
[0036] Step S102, determining an excess loss time combination based on the time interval and the maximum compensation duration corresponding to the excess loss contract.
[0037] Among them, the excess compensation time combination refers to all time combinations that satisfy the excess compensation contract.
[0038] Specifically, the duration of a catastrophe can be determined by time intervals, and the time slice can be determined based on the maximum compensation duration, and then the excess compensation time combination can be determined by the time slice and the catastrophe duration.
[0039] Among them, the time slice represents the continuous time unit corresponding to the maximum compensation duration. The maximum continuous time unit can be stipulated in the excess compensation contract. For example, if the maximum continuous time unit is 3 days, then when the duration of the catastrophe is greater than or equal to 3 days, the continuous time unit can be 1 day, 2 days and 3 days.
[0040] Step S103, determining a target excess compensation amount based on the excess compensation amount corresponding to the excess compensation time combination.
[0041] Among them, each excess compensation time combination has a corresponding excess compensation amount. The target excess compensation amount is determined based on each excess compensation amount. The target excess compensation amount is the highest compensation amount.
[0042] Specifically, after determining a target excess compensation amount based on the excess compensation amount corresponding to the excess compensation time combination, the method further includes: determining and exporting a case list under the excess compensation time combination corresponding to the target excess compensation amount.
[0043] Among them, the case list includes: excess compensation case number, target excess compensation amount, date of accident and case closing date, etc.
[0044] In practical applications, the excess compensation allocation method can be applied to the compensation system. The staff only needs to enter the code of the excess compensation contract, and the compensation system can automatically calculate the target compensation amount corresponding to the code, and export and account for the case list under the excess compensation time combination corresponding to the target compensation amount for the enterprise to make compensation, thereby avoiding delays in compensation and reducing the cash flow pressure of insurance companies and the impact of international currency settlement.
[0045] The excess compensation allocation method provided by the embodiment of the present invention can obtain the code of the excess compensation contract, determine the time interval of the catastrophe based on the code, determine the excess compensation time combination based on the time interval and the maximum compensation duration corresponding to the excess compensation contract, and finally determine the target excess compensation amount based on the excess compensation amount corresponding to the excess compensation time combination. In this way, the excess compensation allocation efficiency is improved, thereby avoiding the backlog of cases and the delay of compensation, and relieving the cash flow pressure of insurance companies and the impact of international currency pair settlement.
[0046] Example 2
[0047] An embodiment of the present invention also provides another excess loss allocation method; this method is implemented on the basis of the method in the above embodiment; this method focuses on describing the specific implementation method of determining the excess loss time combination based on the time interval and the maximum compensation duration corresponding to the excess loss contract.
[0048] Figure 2a A flowchart of another excess compensation allocation method provided by an embodiment of the present invention is shown in FIG. Figure 2a As shown, the method of determining the excess compensation time combination based on the time interval and the maximum compensation duration corresponding to the excess compensation contract may include the following steps:
[0049] Step S201, determining the duration of the catastrophe based on the time interval.
[0050] The time interval may be, for example, July 25 to July 31, and the duration of the disaster is 7 days.
[0051] Step S202, determining the time slice based on the maximum compensation duration.
[0052] Among them, the time slice represents the continuous time unit corresponding to the maximum compensation duration. The maximum continuous time unit can be stipulated in the excess compensation contract. For example, if the maximum continuous time unit is 3 days, then when the duration of the catastrophe is greater than or equal to 3 days, the continuous time unit can be 1 day, 2 days and 3 days. When the duration of the catastrophe is equal to 2 days, the continuous time unit can be 1 day and 2 days. When the duration of the catastrophe is equal to 1 day, the continuous time unit can be 1 day.
[0053] Step S203, dividing the duration of the catastrophe based on time slices to obtain excess compensation time combinations.
[0054] Specifically, dividing the duration of a catastrophe based on time slices to obtain excess compensation time combinations may include: if there is one continuous time unit, dividing the duration of the catastrophe according to the continuous time unit to obtain a group of time combinations; using a group of time combinations as excess compensation time combinations; if there are multiple continuous time units, dividing the duration of the catastrophe according to the multiple continuous time units respectively to obtain multiple groups of time combinations; and determining the excess compensation time combinations based on the multiple groups of time combinations.
[0055] Among them, when the duration of a catastrophic disaster is 1 day, the continuous time unit can only be 1 day, that is, the continuous time unit is one type, and a set of time combinations can be obtained at this time.
[0056] Among them, when the duration of a catastrophic disaster is greater than 1 day, taking the duration of a catastrophic disaster as 3 days and the maximum continuous time unit as 3 days as an example, the continuous time units can be 1 day, 2 days and 3 days. Then the duration of the catastrophic disaster can be divided into 1 day, 2 days and 3 days respectively, and time combinations corresponding to 1 day, 2 days and 3 days are obtained, that is, multiple groups of time combinations.
[0057] For ease of understanding, Figure 2b A schematic diagram of multiple time combinations provided by an embodiment of the present invention, such as Figure 2b As shown in the figure, m represents the continuous time unit, k represents the duration of the catastrophe, and 7.25, 7.26, 7.27, 7.28, 7.29, 7.30, and 7.31 represent the dates within the time interval. ① represents the first time combination, which includes 7 excess compensation time intervals, ② represents the second time combination, which includes 6 excess compensation time intervals, and ③ represents the third time combination, which includes 5 excess compensation time intervals.
[0058] Among them, the excess compensation time combination includes at least one excess compensation time interval, and determining the excess compensation time combination based on multiple groups of time combinations may include: determining the overlapping time in the excess compensation time interval, and screening the time combinations based on the overlapping time to determine the candidate time combination containing the overlapping time; retaining the time combination with the largest continuous time unit in the candidate time combination, and deleting the remaining time combinations to obtain the target time combination; and using the target time combination and the time combination not containing the overlapping time as the excess compensation time combination.
[0059] Among them, the excess compensation time interval is, for example, the 1st day, the 2nd day, the 3rd day, the 1st day to the 2nd day, the 2nd day to the 3rd day, and the 1st day to the 3rd day. The overlapping time is the 1st day, the 2nd day and the 3rd day. The candidate time combinations including the overlapping time are the 1st day, the 2nd day, the 3rd day, the 1st day to the 2nd day, the 2nd day to the 3rd day, and the 1st day to the 3rd day. The time combination with the largest continuous time unit is the 1st day to the 3rd day. Then this time combination is retained and the other time combinations are deleted to obtain the target time combination, i.e., the 1st day to the 3rd day.
[0060] The excess compensation allocation method provided by the embodiment of the present invention can determine the duration of a catastrophe based on a time interval, determine a time slice based on a maximum compensation duration, and then divide the catastrophe duration based on the time slice to obtain an excess compensation time combination. Then, the target excess compensation amount is determined through the excess compensation time combination, thereby improving the excess compensation allocation efficiency, thereby avoiding the backlog of cases and the lag in compensation, and alleviating the cash flow pressure of insurance companies and the impact of international currency pair settlement.
[0061] Example 3
[0062] An embodiment of the present invention also provides another excess compensation allocation method; this method is implemented on the basis of the method in the above embodiment; this method focuses on describing a specific implementation method for determining a target excess compensation amount based on the excess compensation amount corresponding to an excess compensation time combination.
[0063] Figure 3a A flowchart of another excess compensation allocation method provided by an embodiment of the present invention is shown in FIG. Figure 3a As shown, the method of determining the target excess compensation amount based on the excess compensation amount corresponding to the excess compensation time combination may include the following steps:
[0064] Step S301, determining whether the continuous time unit is one type.
[0065] Exemplarily, if yes, that is, the continuous time unit is one, then execute step S302; if no, that is, the continuous time unit is multiple, then execute step S305.
[0066] Step S302, determining a first maximum excess compensation amount among the excess compensation amounts corresponding to the excess compensation time combination.
[0067] Among them, the excess compensation amount is the value obtained by deducting the liability restoration premium from the compensation amount.
[0068] Among them, the first maximum excess compensation amount is the largest excess compensation amount among the excess compensation amounts corresponding to the excess compensation time combination.
[0069] Step S303, determining whether the first maximum excess compensation amount exceeds the preset first layer limit.
[0070] Step S304: If the first layer limit is not exceeded, the first maximum excess compensation amount is used as the target excess compensation amount.
[0071] Among them, when exceeding the first layer limit, the target layer limit corresponding to the first maximum excess compensation amount is determined, the first maximum excess compensation amount is compared with the excess amount in the target layer limit, and the largest excess amount is used as the target excess amount.
[0072] Step S305, determining the second maximum excess compensation amount among the excess compensation amounts corresponding to each time combination in the excess compensation time combination.
[0073] Among them, the second maximum excess compensation amount is the maximum excess compensation amount among the excess compensation amounts corresponding to each time combination in the excess compensation time combination.
[0074] Step S306, determining a third maximum excess compensation amount in the second maximum excess compensation amount.
[0075] Among them, the third maximum excess compensation amount is the largest excess compensation amount among the second maximum excess compensation amounts.
[0076] Step S307, determining whether the third maximum excess compensation amount exceeds the preset second layer limit.
[0077] Step S308: If the second limit is not exceeded, the third maximum excess compensation amount is used as the target excess compensation amount.
[0078] Among them, when the second layer limit is exceeded, the target layer limit corresponding to the third maximum excess compensation amount is determined, the third maximum excess compensation amount is compared with the excess amount in the target layer limit, and the largest excess amount is used as the target excess amount.
[0079] in, Figure 3b A schematic diagram of an excess compensation model provided for an embodiment of the present invention. When conducting catastrophic excess compensation, a layer compensation limit, i.e., layer limit, and a starting point for each layer are usually set, and each layer will have a corresponding number of liability recovery premiums and a total compensation limit.
[0080] In actual applications, each time combination can be defined with a group name. Figure 2bTaking the time combination in as an example, the group names can be TSlice_1, TSlice_2, TSlice_3, and each time combination is set as a map key. The corresponding map values of the second maximum excess compensation amount are map○①, map②, and map③, which can be expressed as map①=max(key=TSlice_1, value), map②=max(key=TSlice_2, value), map③=max(key=TSlice_3, value), then the target excess compensation amount is max(map①, map②, map③).
[0081] The excess compensation allocation method provided in the embodiment of the present invention improves the excess compensation allocation efficiency by determining the target excess compensation amount, thereby avoiding the backlog of cases and the delay of compensation, and alleviating the cash flow pressure of the insurance company and the impact of international currency settlement.
[0082] Example 4
[0083] Corresponding to the above method embodiment, the embodiment of the present invention provides an excess compensation allocation device for determining a target excess compensation amount corresponding to a catastrophe. Figure 4 A schematic diagram of the structure of an excess compensation allocation device provided by an embodiment of the present invention is shown in FIG. Figure 4 As shown, the excess loss allocation device may include:
[0084] The time interval determination module 401 is used to obtain the code of the excess loss contract and determine the time interval of the occurrence of the catastrophe based on the code.
[0085] The excess compensation time combination determining module 402 is used to determine the excess compensation time combination based on the time interval and the maximum compensation duration corresponding to the excess compensation contract.
[0086] The target excess compensation amount determination module 403 is used to determine the target excess compensation amount based on the excess compensation amount corresponding to the excess compensation time combination.
[0087] The excess compensation allocation device provided by the embodiment of the present invention can obtain the code of the excess compensation contract, determine the time interval of the catastrophe based on the code, determine the excess compensation time combination based on the time interval and the maximum compensation duration corresponding to the excess compensation contract, and finally determine the target excess compensation amount based on the excess compensation amount corresponding to the excess compensation time combination. In this way, the excess compensation allocation efficiency is improved, thereby avoiding the backlog of cases and the delay of compensation, and relieving the cash flow pressure of insurance companies and the impact of international currency pair settlement.
[0088] In some embodiments, the excess compensation time combination determination module is also used to determine the catastrophe duration of the catastrophe based on the time interval; determine the time slice based on the maximum compensation duration; the time slice represents the continuous time unit corresponding to the maximum compensation duration; and divide the catastrophe duration based on the time slice to obtain the excess compensation time combination.
[0089] In some embodiments, the module for determining the excess compensation time combination is further used to, if the continuous time unit is one type, divide the duration of the catastrophe according to the continuous time unit to obtain a group of time combinations; use a group of time combinations as the excess compensation time combination; if the continuous time unit is multiple types, divide the duration of the catastrophe according to the multiple types of continuous time units respectively to obtain multiple groups of time combinations; and determine the excess compensation time combination based on the multiple groups of time combinations.
[0090] In some embodiments, when the continuous time unit is one type, the target excess compensation amount determination module is also used to determine a first maximum excess compensation amount among the excess compensation amounts corresponding to the excess compensation time combination; the first maximum excess compensation amount is the largest excess compensation amount among the excess compensation amounts corresponding to the excess compensation time combination; determine whether the first maximum excess compensation amount exceeds a pre-set first-level limit; if it does not exceed the first-level limit, use the first maximum excess compensation amount as the target excess compensation amount.
[0091] In some embodiments, when there are multiple continuous time units, the target excess compensation amount determination module is further used to determine the second maximum excess compensation amount among the excess compensation amounts corresponding to each time combination in the excess compensation time combination; the second maximum excess compensation amount is the maximum excess compensation amount among the excess compensation amounts corresponding to each time combination in the excess compensation time combination; determine the third maximum excess compensation amount among the second maximum excess compensation amount; the third maximum excess compensation amount is the maximum excess compensation amount among the second maximum excess compensation amounts; determine whether the third maximum excess compensation amount exceeds the pre-set second-layer limit; if it does not exceed the second-layer limit, use the third maximum excess compensation amount as the target excess compensation amount.
[0092] In some embodiments, the excess compensation time combination includes at least one excess compensation time interval, and the excess compensation time combination determination module is further used to determine the overlapping time in the excess compensation time interval, and screen the time combinations based on the overlapping time to determine the candidate time combinations containing the overlapping time; retain the time combination with the largest continuous time unit in the candidate time combinations, and delete the remaining time combinations to obtain the target time combination; and use the target time combination and the time combination that does not contain the overlapping time as the excess compensation time combination.
[0093] In some embodiments, the target excess compensation amount determination module is also used to determine and export a case list corresponding to the target excess compensation amount; the case list includes: excess compensation case number, target excess compensation amount, accident date and case closing date.
[0094] The device provided in the embodiment of the present invention has the same implementation principle and technical effects as those of the aforementioned method embodiment. For the sake of brief description, for matters not mentioned in the device embodiment, reference may be made to the corresponding contents in the aforementioned method embodiment.
[0095] Example 5
[0096] The embodiment of the present invention also provides an electronic device for executing the above excess compensation allocation method; see Figure 5 A structural schematic diagram of an electronic device is shown, which includes a memory 500 and a processor 501, wherein the memory 500 is used to store one or more computer instructions, and the one or more computer instructions are executed by the processor 501 to implement the above-mentioned excess loss allocation method.
[0097] Further, Figure 5 The electronic device shown further includes a bus 502 and a communication interface 503 , and the processor 501 , the communication interface 503 and the memory 500 are connected via the bus 502 .
[0098] The memory 500 may include a high-speed random access memory (RAM), and may also include a non-volatile memory, such as at least one disk storage. The communication connection between the system network element and at least one other network element is realized through at least one communication interface 503 (which may be wired or wireless), and the Internet, wide area network, local area network, metropolitan area network, etc. may be used. The bus 502 may be an ISA bus, a PCI bus, or an EISA bus, etc. The bus can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 5 Only one bidirectional arrow is used in the diagram, but this does not mean that there is only one bus or only one type of bus.
[0099] The processor 501 may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by the hardware integrated logic circuit or software instructions in the processor 501. The above processor 501 can be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it can also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The methods, steps and logic block diagrams disclosed in the embodiments of the present invention can be implemented or executed. The general processor can be a microprocessor or the processor can also be any conventional processor, etc. The steps of the method disclosed in the embodiment of the present invention can be directly embodied as a hardware decoding processor for execution, or a combination of hardware and software modules in the decoding processor for execution. The software module may be located in a storage medium mature in the art, such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory, or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory 500, and the processor 501 reads the information in the memory 500 and completes the steps of the method of the above embodiment in combination with its hardware.
[0100] An embodiment of the present invention further provides a computer-readable storage medium, which stores computer-executable instructions. When the computer-executable instructions are called and executed by a processor, the computer-executable instructions prompt the processor to implement the above-mentioned excess loss allocation method. The specific implementation can be found in the method embodiment, which will not be repeated here.
[0101] The computer program product for the excess loss allocation method provided in the embodiment of the present invention includes a computer-readable storage medium storing a non-volatile program code executable by a processor. The instructions included in the program code can be used to execute the method described in the previous method embodiment. The specific implementation can be found in the method embodiment, which will not be repeated here.
[0102] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0103] In the several embodiments provided by the present invention, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. The device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some communication interfaces, and the indirect coupling or communication connection of devices or units can be electrical, mechanical or other forms.
[0104] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0105] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
[0106] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a non-volatile computer-readable storage medium that is executable by a processor. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art, or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for enabling a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.
[0107] Finally, it should be noted that the above-described embodiments are only specific implementations of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them. The protection scope of the present invention is not limited thereto. Although the present invention is described in detail with reference to the above-mentioned embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-mentioned embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.
Claims
1. A method for allocating excess compensation. It is characterized in that The method for determining a target excess compensation amount corresponding to a catastrophe includes: Obtaining the code of the excess loss contract, and determining the time interval of the occurrence of the catastrophe based on the code; Determining an excess loss time combination based on the time interval and the maximum compensation duration corresponding to the excess loss contract; The target excess compensation amount is determined based on the excess compensation amount corresponding to the excess compensation time combination.
2. The method according to claim 1, It is characterized in that The determining of the excess compensation time combination based on the time interval and the maximum compensation duration corresponding to the excess compensation contract includes: Determining a catastrophe duration of the catastrophe based on the time interval; Determine a time slice based on the maximum compensation duration; the time slice represents a continuous time unit corresponding to the maximum compensation duration; The duration of the catastrophe is divided based on the time slices to obtain the excess compensation time combination.
3. The method according to claim 2, It is characterized in that The step of dividing the catastrophe duration based on the time slices to obtain the excess compensation time combination includes: If the continuous time unit is one type, the duration of the catastrophe is divided according to the continuous time unit to obtain a set of time combinations; Using the set of time combinations as the excess compensation time combination; If there are multiple types of continuous time units, the duration of the catastrophe is divided according to the multiple types of continuous time units to obtain multiple groups of time combinations; An excess compensation time combination is determined based on the multiple groups of time combinations.
4. The method according to claim 3, It is characterized in that When the continuous time unit is one type, determining the target excess compensation amount based on the excess compensation amount corresponding to the excess compensation time combination includes: Determine a first maximum excess compensation amount among the excess compensation amounts corresponding to the excess compensation time combination; the first maximum excess compensation amount is the maximum excess compensation amount among the excess compensation amounts corresponding to the excess compensation time combination; Determining whether the first maximum excess compensation amount exceeds a preset first-tier limit; If the first layer limit is not exceeded, the first maximum excess compensation amount will be used as the target excess compensation amount.
5. The method according to claim 3, It is characterized in that When the continuous time units are multiple, determining the target excess compensation amount based on the excess compensation amount corresponding to the excess compensation time combination includes: Determine the second maximum excess compensation amount among the excess compensation amounts corresponding to each time combination in the excess compensation time combination; the second maximum excess compensation amount is the maximum excess compensation amount among the excess compensation amounts corresponding to each time combination in the excess compensation time combination; Determine a third maximum excess compensation amount among the second maximum excess compensation amounts; the third maximum excess compensation amount is the largest excess compensation amount among the second maximum excess compensation amounts; Determining whether the third maximum excess compensation amount exceeds the preset second layer limit; If the second layer limit is not exceeded, the third maximum excess compensation amount will be used as the target excess compensation amount.
6. The method according to claim 3, It is characterized in that The excess compensation time combination includes at least one excess compensation time interval, and determining the excess compensation time combination based on the multiple groups of time combinations includes: Determine the overlapping time in the excess compensation time interval, and screen the time combinations based on the overlapping time to determine a candidate time combination including the overlapping time; The time combination with the largest continuous time unit among the candidate time combinations is retained, and the remaining time combinations are deleted to obtain the target time combination; The target time combination and the time combination not including the overlapping time are used as the excess compensation time combination.
7. The method according to claim 1, It is characterized in that After determining the target excess compensation amount based on the excess compensation amount corresponding to the excess compensation time combination, the method further includes: Determine and export a case list under the excess compensation time combination corresponding to the target excess compensation amount; the case list includes: excess compensation case number, target excess compensation amount, accident date and case closing date.
8. An excess compensation apportionment device, It is characterized in that The device is used to determine a target excess compensation amount corresponding to a catastrophic disaster, and comprises: A time interval determination module, used to obtain the code of the excess compensation contract and determine the time interval of the occurrence of the catastrophe based on the code; An excess compensation time combination determination module, used to determine an excess compensation time combination based on the time interval and the maximum compensation duration corresponding to the excess compensation contract; The target excess compensation amount determination module is used to determine the target excess compensation amount based on the excess compensation amount corresponding to the excess compensation time combination.
9. An electronic device, It is characterized in that The invention comprises a processor and a memory, wherein the memory stores computer executable instructions that can be executed by the processor, and the processor executes the computer executable instructions to implement the excess loss allocation method according to any one of claims 1 to 7.
10. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores computer-executable instructions. When the computer-executable instructions are called and executed by the processor, the computer-executable instructions prompt the processor to implement the excess loss allocation method according to any one of claims 1 to 7.