Red mudstone filled high embankment waterproof structure and construction method thereof
By using layered filling technology of red mudstone filler and waterproof material in high embankments, the problem of red mudstone filling being susceptible to rainwater infiltration is solved, efficient waterproofing effect and optimized utilization of material resources are achieved, and the high embankments are extended Service life.
Patent Information
- Application Number
- CN202411411782.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-10
- Publication Date
- 2024-11-29
AI Technical Summary
During the construction of high embankments in mountainous areas, red mudstone filling is susceptible to rainwater infiltration, resulting in structural instability and road cracking. The existing vibration rolling and impact rolling have limited effect on improving particle size grading, making it difficult to ensure long-term stability and use life.
Red mudstone filler is used to fill in layers with waterproof materials prepared in specific proportions with fly ash, mineral powder, sodium silicate and polydimethylsiloxane to form a waterproof mixture, combining vibration rolling and impact rolling technology , build a multi-layer road embankment waterproof layer and roadbed waterproof layer to improve the waterproof effect.
Effectively prevent rainwater from infiltration, enhance the waterproof performance and service life of high embankments, reduce material costs, flexibly respond to waterproofing needs in different parts, and reduce material waste and engineering costs.
Smart Images

Figure CN119041256A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of road engineering, and in particular to a red mudstone-filled high embankment waterproof structure and a construction method thereof. Background Art
[0002] In the construction of roads in mountainous areas, due to the mountainous terrain and large-scale excavation, in order to achieve a balance between excavation and filling, a large number of roads pass through the mountain valleys by means of high embankments. The height of the high embankments in this area generally exceeds 30 meters, and even super-high embankments of 40 meters and 50 meters or more appear. Due to the inconvenience of transportation in mountainous areas, the filling of high embankments generally uses the waste slag generated by the excavation of the project itself. However, the geological conditions in some mountainous areas are relatively special. The waste slag excavated from the project contains a large amount of red mudstone, which has the engineering characteristics of disintegration and softening after encountering water. Under the action of extreme rainfall, long-term dry-wet cycles, and vehicle loads, it is very easy to reduce the strength and stiffness, causing the instability and damage of the high embankment and cracking of the road surface, endangering driving safety.
[0003] The particle size distribution of natural red mudstone weathering materials is generally discontinuous. In engineering, vibration rolling and impact rolling are generally used to crush its large particle components, thereby improving the continuity of its particle size distribution and increasing its density, thereby enhancing its strength and stiffness to a certain extent and reducing its permeability. However, in recent years, it has also been found in engineering practice that conventional vibration rolling and impact rolling have limited effect on improving the particle size distribution of red mudstone fillers. Usually, the content of fine particles is low. Therefore, in the skeleton formed by coarse particles after filling, the pores between coarse particles are difficult to be filled, and the soil still has a large porosity, so the filling body still has a large permeability. After the construction of the high embankment, the roadbed area directly bears various loads from the ground and disperses the load to the deeper roadbed. For the roadbed area and the embankment slope area, under the condition of long-term traffic load and rainwater infiltration, uneven settlement and even shallow damage are very likely to occur; therefore, it is necessary to take waterproofing and reinforcement measures for these key areas. Summary of the invention
[0004] At least one of the purposes of the present invention is to provide a red mudstone-filled high embankment waterproof structure and a construction method thereof, in order to overcome the problems existing in the above-mentioned prior art, so as to reinforce the parts of the high embankment that are susceptible to erosion by rainwater infiltration, ensure the long-term stability of the high embankment, and improve the service life of the high embankment.
[0005] In order to achieve the above-mentioned purpose, the technical solution adopted by the present invention includes the following aspects.
[0006] A red mudstone-filled high embankment waterproof structure comprises: a central fill body, wherein the side slope surfaces of the central fill body are respectively provided with embankment waterproof layers, a roadbed waterproof layer is provided on the top of the central fill body, and the two sides of the roadbed waterproof layer extend to the embankment waterproof layer respectively; the central fill body comprises a red mudstone layer, and the embankment waterproof layer is formed by layered filling and layered compaction of a waterproof mixture of red mudstone filler and waterproof material; the roadbed waterproof layer is formed by layered filling and layered compaction of a waterproof mixture of red mudstone filler and waterproof material; the waterproof material is prepared from fly ash, mineral powder, sodium silicate and polydimethylsiloxane.
[0007] Preferably, the embankment waterproof layer comprises multiple embankment waterproof sub-layers sequentially stacked on the slope of the central fill body, and the dosage of waterproof material in adjacent embankment waterproof sub-layers from the inside to the outside of the embankment waterproof layer increases sequentially.
[0008] Preferably, the waterproof material is prepared from fly ash, mineral powder, sodium silicate and polydimethylsiloxane in a mass ratio of 5:10:5:1.
[0009] Preferably, in the waterproof layer of the embankment, the amount of waterproof material in each cubic meter of the red mudstone filler is 80 kg / m 3 ~120kg / m 3 In the roadbed waterproof layer, the amount of waterproof material in each cubic meter of the red mudstone filler is 120kg / m 3 ; The water content of the red mudstone filler is within ±2% of the optimal water content.
[0010] The present invention also provides a construction method for a high embankment waterproof structure filled with red mudstone, the construction method comprising the following steps:
[0011] Step S1: Obtain the maximum dry density, optimal moisture content, soil-water characteristic curve and saturated permeability coefficient k of the red mudstone filler in the construction area s parameter;
[0012] Step S2, obtaining rainfall data in the construction area for many years, and combining the slope of each level of the designed high embankment slope to obtain the transverse paving width B of the embankment waterproof layer of each level of the slope;
[0013] Step S3, preparing a waterproof material; the waterproof material is prepared from fly ash, mineral powder, sodium silicate and polydimethylsiloxane in a mass ratio of 5:10:5:1;
[0014] Step S4, treating the substrate; compacting the substrate by vibrating and rolling, so that the compaction degree of the substrate is not less than 90%;
[0015] Step S5, constructing a central filling body; using lime powder to mark the range of the central filling body on the working surface of the base, and using red mudstone filler to fill the red mudstone layer within the marked range of the central filling body;
[0016] Step S6, constructing a waterproof layer of the embankment; after the central fill body is filled to a preset height, the waterproof layer of the embankment is constructed on the slopes on both sides of the central fill body; the waterproof layer of the embankment is constructed using a waterproof mixture of red mudstone filler and waterproof material;
[0017] Step S7, repeating step S5 and step S6, constructing in stages from bottom to top, until the central filling body and the embankment waterproof layer are filled to a preset height of the high embankment;
[0018] Step S8, constructing a roadbed waterproof layer; the roadbed waterproof layer is constructed using a waterproof mixture of red mudstone filler and waterproof material.
[0019] Preferably, in step S2, the process of obtaining the transverse paving width B of the embankment waterproof layer of each level of slope includes:
[0020] Assuming that no water accumulates on the slope surface during rainfall, and assuming that all soils within the depth range affected by rainfall are saturated, according to Darcy's law, we can obtain:
[0021]
[0022] Where: i represents the infiltration rate of the embankment slope surface; k s represents the saturated permeability coefficient of red mudstone filler; h w represents the depth of rainfall impact; α represents the angle between the embankment slopes at all levels and the horizontal position; S w It indicates the matrix suction of red mudstone at the impact depth;
[0023] Obtain rainfall data for the construction area within 10 years, perform statistical analysis on the rainfall data within 10 years, and obtain the upper limit of the confidence interval at a 95% confidence level, which is used as the representative value RI of the rainfall intensity of rainfall events in the area. r :
[0024]
[0025] In the formula, RI r represents the representative value of the rainfall intensity of the rainfall event in the region; b represents the upper limit of the confidence interval of the rainfall intensity data sample of the rainfall event in the region at the 95% confidence level; represents the arithmetic mean of the rainfall intensity data samples; σ represents the standard deviation of the rainfall intensity data samples. Calculation, RI iis the rainfall intensity of the i-th rainfall event in the sample; n represents the total number of rainfall events in the rainfall intensity data sample;
[0026] Assuming that in extreme rainfall events, rainfall can completely infiltrate, that is, the infiltration rate of the embankment slope surface is equal to the rainfall intensity, then:
[0027] i=RI r
[0028] According to the above formula, the calculation formula for rainfall impact depth is obtained:
[0029]
[0030] according to:
[0031] The transverse paving width B of the waterproof layer of each level of embankment is calculated.
[0032] Preferably, in step S6, the construction process of the embankment waterproof layer specifically includes:
[0033] According to the designed dosage, fly ash, mineral powder, sodium silicate and polydimethylsiloxane are weighed. The mass of fly ash, mineral powder, sodium silicate and polydimethylsiloxane required for each cubic meter of red mudstone filler is: Mf (fly ash) = 0.238c, Mk (mineral powder) = 0.476c, Mg (sodium silicate) = 0.238c, Mj (polydimethylsiloxane) = 0.048c, where c represents the total mass of the required waterproof material;
[0034] The embankment waterproof layer is equally divided into three layers of embankment waterproof sub-layers. In the horizontal paving width B direction of the embankment waterproof layer, the embankment waterproof sub-layers are recorded as Z3 layer, Z2 layer and Z1 layer from inside to outside respectively; the dosage of waterproof material in Z3 layer is 80kg / m 3 The dosage of waterproof material in Z2 layer is 100kg / m 3 The dosage of waterproof material in Z1 layer is 120kg / m 3 ;
[0035] According to the dosage of waterproof material in each layer of embankment waterproof sub-layer, the red mudstone filler, fly ash and mineral powder are mixed evenly;
[0036] On the slopes on both sides of the central compact, the embankment waterproofing layer is divided, and the mixed mixture is spread in sequence on the slopes of the central compact using corresponding fillers. After spreading to a preset thickness, the fillers are compacted;
[0037] After each layer of filler is compacted, sodium silicate, polydimethylsiloxane and water are prepared into a solution in a mass ratio of 5:1:5, and the solution is evenly sprayed onto the surface of the compacted layer to allow the solution to penetrate into the filler.
[0038] Preferably, in step S6, the paving thickness of each layer of the filler is not more than 200 mm; the filler is compacted by a 26t roller, and the compaction process includes: static compaction once, weak vibration six times, and strong vibration twice, and the driving speed of the 26t roller is ensured to be no more than 5 km / h during the vibration rolling process; every three layers of filling, a triangular roller is used for impact rolling, and the impact rolling process is: impact power 25 kJ, impact rolling four times, and the impact rolling speed is not less than 10 km / h.
[0039] Preferably, in step S7, the construction process of the roadbed waterproof layer includes: uniformly mixing the red mudstone filler with fly ash and mineral powder according to the designed dosage to form a mixture, and then evenly spreading it on the entire working surface, with a paving thickness of 300 mm for each layer; after the paving is completed, compacting the mixture; after each layer of the mixture is compacted, sodium silicate, polydimethylsiloxane and water are prepared into a solution in a mass ratio of 5:1:5, and the solution is evenly sprayed on the surface of the compacted layer to allow the solution to penetrate into the filler.
[0040] Preferably, in step S6, after the embankment waterproof layer is constructed to a preset height, a layer of bidirectional geogrid is laid on the top surface of the embankment waterproof layer; in step S7, during the process of filling the mixture, when the mixture is filled to a depth of 800 mm below the top surface of the roadbed waterproof layer, a layer of bidirectional geogrid is laid on the surface of the mixture, and when the mixture is filled to a depth of 300 mm below the top surface of the roadbed waterproof layer, a layer of bidirectional geogrid is laid on the surface of the mixture.
[0041] In summary, due to the adoption of the above technical solution, the present invention has at least the following beneficial effects:
[0042] Red mudstone filler is a special rock and soil that is easy to disintegrate and soften when it comes into contact with water. After being filled into a high embankment, the high embankment is prone to instability and damage under the influence of environmental factors such as rainfall. To address this problem, the traditional approach is to crush the red mudstone filler to improve the continuity of the particle size distribution, and then set up a cement edging structure or other edging structure on the surface of the high embankment to prevent rainwater or surface water from seeping into the embankment. These practices not only increase the construction cost, but also different parts of the high embankment are affected differently by rainwater or surface water. The aforementioned practices cannot be flexibly applied to different parts of the roadbed. The present invention utilizes the excavated red mudstone filler as the main filler for high embankment filling, and adds a waterproof material prepared by fly ash, mineral powder, sodium silicate and polydimethylsiloxane in a preset proportion into the red mudstone filler. The red mudstone filler and the waterproof material form a waterproof mixture. The waterproof mixture is used for waterproofing the high embankment, which can effectively prevent rainwater or surface water from infiltrating into the embankment, thereby improving the waterproof effect and service life of the high embankment. Compared with traditional cement materials, the present invention also realizes the resource utilization of industrial waste and reduces material costs.
[0043] The present invention also adopts differentiated waterproofing measures according to the different situations in which different parts of the high embankment are affected by rain or surface water. Full-range waterproofing treatment is adopted in the roadbed parts with gentle slope and large infiltration influence. In the slope area of the high embankment, the lateral paving width of the embankment waterproof layer is determined according to the rainfall impact depth and the slope of each level of the slope, and the embankment waterproof layer is divided into multiple layers of embankment waterproof sub-layers. In the lateral paving width direction of the embankment waterproof layer, the dosage of waterproof material in the embankment waterproof sub-layer of adjacent layers is increased layer by layer. As the number of rainfalls experienced by the slope increases, the hydration reaction of the waterproof material gradually occurs from the outside to the inside, and the waterproof effect is gradually improved. Compared with the traditional embankment edging structure, the waterproofing measures of the present invention are not only flexible in waterproofing, but also effectively reduce the amount of waterproofing material used, thereby reducing the project cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 It is a schematic diagram of a red mudstone-filled high embankment waterproofing structure according to an exemplary embodiment of the present invention.
[0045] Figure 2 It is a schematic diagram of a red mudstone-filled high embankment waterproofing structure according to another exemplary embodiment of the present invention.
[0046] Figure 3 It is a schematic diagram of the layered structure of the embankment waterproof layer according to an exemplary embodiment of the present invention.
[0047] Figure 4 It is a schematic diagram of calculating the transverse paving width of the embankment waterproofing layer according to an exemplary embodiment of the present invention.
[0048] Figure 5 It is a construction flow chart of a red mudstone-filled high embankment waterproof structure according to an exemplary embodiment of the present invention.
[0049] Figure 6 It is a schematic diagram comparing the waterproof effects of the waterproof material of the exemplary embodiment of the present invention and the traditional cement material.
[0050] Figure 7 It is a schematic diagram of the change in permeability coefficient of the waterproof material of an exemplary embodiment of the present invention at different dosages and different curing ages. DETAILED DESCRIPTION
[0051] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments to make the purpose, technical solutions and advantages of the present invention more clearly understood. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0052] refer to Figure 1The red mudstone-filled high embankment waterproof structure of the exemplary embodiment of the present invention includes a central fill body 1, and embankment waterproof layers 3 are respectively arranged on the slope surfaces on both sides of the central fill body 1, and a roadbed waterproof layer 2 is arranged on the top of the central fill body 1, and both sides of the roadbed waterproof layer 2 extend to the embankment waterproof layer 3 respectively.
[0053] The central fill body 1 is filled on the base. The central fill body 1 is made of red mudstone filler by layered filling and layered compaction. The maximum dry density and optimal moisture content of the central fill body 1 are determined by the heavy compaction test specified in the "Highway Geotechnical Test Code" (JTG3430-2020); the moisture content of the red mudstone filler is controlled within ±2% of the optimal moisture content, and its compaction degree is controlled according to design requirements.
[0054] The roadbed waterproof layer 2 is formed by layered filling and layered compaction of a waterproof mixture of red mudstone filler and waterproof material. The roadbed waterproof layer is located within a height range of 0 to 1.2 m below the top of the high embankment; the compaction degree of the roadbed waterproof layer 2 is determined according to the design requirements. In the waterproof mixture of red mudstone filler and waterproof material, the water content of the red mudstone filler is within ±2% of the optimal water content, and the waterproof material is prepared by fly ash: mineral powder: sodium silicate: polydimethylsiloxane in a mass ratio of 5:10:5:1; in the waterproof mixture of red mudstone filler and waterproof material, the waterproof material adopts a fixed dosage; the preferred dosage of the waterproof material is 120 kg / m 3 , that is, 120kg of waterproof material is mixed in every cubic meter of red mudstone filler.
[0055] The embankment waterproof layer 3 is formed by layered filling and layered compaction of a waterproof mixture of red mudstone filler and waterproof material; the compaction degree of the embankment waterproof layer 3 is determined according to design requirements.
[0056] The embankment waterproof layer 3 includes multiple embankment waterproof sub-layers sequentially stacked on the slope of the central fill body 1, and the amount of waterproof material in the adjacent embankment waterproof sub-layers from the inside to the outside of the embankment waterproof layer 3 increases layer by layer.
[0057] The central compacted body 1 includes multiple slopes, and the slope rate of the slope gradually decreases from the top to the bottom. In one embodiment, the central compacted body 1 includes five slopes from top to bottom, the slope rate of the first slope is 1:1.5, the slope rate of the second slope is 1:1.75, the slope rate of the third slope is 1:1.75, the slope rate of the fourth slope is 1:2, and the slope rate of the fifth slope is 1:2. The vertical height of each slope is 8 to 12 meters; the embankment waterproof layer 2 is correspondingly arranged on the slope of the central compacted body 1.
[0058] A bidirectional geogrid is provided between the embankment waterproof layer 3 and the roadbed waterproof layer 2, and a bidirectional geogrid is provided at the junction of adjacent slopes of the embankment waterproof layer 3 to enhance the overall structural strength and stability of the high embankment and prevent deformation and damage of the high embankment soil. In one embodiment, both sides of the roadbed waterproof layer 2 extend to the edge of the embankment waterproof layer 3 respectively.
[0059] One or more layers of bidirectional geogrids are arranged in the height direction of the roadbed waterproof layer 2 to improve the structural strength of the roadbed waterproof layer 2, improve the anti-deformation ability of the roadbed waterproof layer 2 under the action of ground load, and enhance the structural stability of the high embankment. In one embodiment, two layers of bidirectional geogrids are arranged in the roadbed waterproof layer 2, the first layer of geogrid is arranged 300 mm below the top surface of the roadbed waterproof layer, and the second layer of geogrid is arranged 800 mm below the top surface of the roadbed waterproof layer.
[0060] The present invention also provides a construction method for a high embankment waterproof structure filled with red mudstone, referring to Figure 5 , the construction method comprises the following steps:
[0061] Step S1: Obtain the maximum dry density, optimal moisture content, soil-water characteristic curve (SWCC) and saturated permeability coefficient k of the red mudstone filler in the construction area s Among them, the maximum dry density and the optimal moisture content are obtained through indoor compaction tests, the soil-water characteristic curve is obtained by preparing samples with corresponding compaction degrees and measuring them with a pressure plate instrument, and the saturated permeability coefficient k s The test result is obtained by preparing samples with corresponding compaction degree indoors and measuring them by constant water head penetration test.
[0062] Step S2: Obtain rainfall data in the construction area over the past years, and combine the designed slope of each level of the high embankment to obtain the lateral paving width B of the embankment waterproof layer of each level of the slope.
[0063] Since the high embankment slope has a certain slope rate, rainfall can be discharged along the slope. Therefore, it is assumed that no water accumulates on the slope surface during rainfall, and that all soil within the depth range affected by rainfall reaches saturation. According to Darcy's law, it can be obtained:
[0064]
[0065] Where: i represents the infiltration rate of the embankment slope surface; k s represents the saturated permeability coefficient of red mudstone filler; h w represents the depth of rainfall impact; α represents the angle between the embankment slopes at all levels and the horizontal position; S w Represents the matrix suction of red mudstone at the impact depth.
[0066] During the implementation process, rainfall data in the construction area within 10 years were obtained. The rainfall data within 10 years were statistically analyzed to obtain the upper limit of the confidence interval at the 95% confidence level, which was used as the representative value of the rainfall intensity of rainfall events in the area. The calculation process is as follows:
[0067]
[0068] In the formula, RI r represents the representative value of the rainfall intensity of the rainfall event in the region; b represents the upper limit of the confidence interval of the rainfall intensity data sample of the rainfall event in the region at the 95% confidence level; represents the arithmetic mean of the rainfall intensity data samples; σ represents the standard deviation of the rainfall intensity data samples. Calculation, RI i is the rainfall intensity of the i-th rainfall event in the sample; n represents the total number of rainfall events in the rainfall intensity data sample.
[0069] Assuming that in extreme rainfall events, rainfall can completely infiltrate, that is, the infiltration rate of the embankment slope surface is equal to the rainfall intensity, then:
[0070] i=RI r
[0071] According to the above formula, the calculation formula for rainfall impact depth is obtained:
[0072]
[0073] refer to Figure 4 ,according to:
[0074]
[0075] The transverse paving width B of the waterproof layer of each level of embankment is calculated.
[0076] Step S3, preparing waterproof material; the waterproof material is prepared from fly ash, mineral powder, sodium silicate and polydimethylsiloxane in a mass ratio of 5:10:5:1.
[0077] The traditional waterproof material is cement material, which has a high saturated permeability coefficient at different curing ages. When waterproofing the high embankment filled with red mudstone, it cannot play a good waterproofing effect, resulting in the risk of collapse of the high embankment filled with red mudstone. Compared with cement materials, the saturated permeability coefficient of waterproof materials prepared with fly ash, mineral powder, sodium silicate and polydimethylsiloxane at different curing ages is significantly reduced. Figure 6When the curing age is 28 days, the saturated permeability coefficient of the material of the present invention (a waterproof material prepared by fly ash, mineral powder, sodium silicate and polydimethylsiloxane) is 84% to 88% lower than that of the cement material. When the curing age is 90 days, the saturated permeability coefficient of the material of the present invention is 84% to 90% lower than that of the cement material. When waterproofing the high embankment filled with red mudstone, as the waterproofing time increases, the use of the waterproof material of the present invention can effectively improve the waterproof performance and reduce the risk of collapse of the high embankment filled with red mudstone.
[0078] In the process of determining the components of the waterproof material of the present invention, in order to determine the optimal ratio of the components of the waterproof material, waterproof materials with different ratios were mixed with red mudstone fillers and cured for 90 days, and the saturated permeability coefficient of the waterproof mixture was determined by orthogonal test, so as to determine the optimal ratio; the orthogonal test adopts L9(3 4 ) orthogonal table, permeability test was carried out for each level combination, saturated permeability coefficient was measured, and range analysis was performed on the orthogonal test data to determine the optimal level of each influencing factor. In the orthogonal test, the number of influencing factors was 4, namely the content of fly ash, mineral powder, sodium silicate and polydimethylsilane, and 3 levels were set for each influencing factor, as shown in Table 1. L9(3 4 )The orthogonal table is shown in Table 2.
[0079] Table 1 Level setting table of each influencing factor
[0080]
[0081] Table 2L9(3 4 )Orthogonal array
[0082]
[0083]
[0084] In Table 2, K i (i=1, 2, 3) represents the sum of the saturated permeability coefficients at the level i of a certain influencing factor, (i=1, 2, 3) represents the average value of the saturated permeability coefficient under the level of a certain influencing factor i. The lower the saturated permeability coefficient measured by the orthogonal test, the lower the permeability of the waterproof material and the better the waterproof performance. As can be seen from Table 2, for the four influencing factors A, B, C, and D, The minimum values are respectively obtained when i=2, 3, 2, and 2. Therefore, the optimal combination of the four influencing factors A, B, C, and D is A2, B3, C2, and D2, that is, the optimal ratio of the waterproof material is: fly ash: mineral powder: sodium silicate: polydimethylsilane = 1.3%: 2.6%: 1.3%: 0.26%. In the application process, in order to facilitate the use of on-site construction personnel, the ratio of the above components is simplified to 5:10:5:1.
[0085] It can also be seen from Table 2 that too high or too low fly ash content has an adverse effect on permeability. When the fly ash content is too low, the hydration product is difficult to completely fill the pores inside the red mudstone filler. When the content is too high, the shrinkage of the hydration product in the later stage is likely to cause cracks inside the red mudstone filler. There is an optimal value for their ratio; sodium silicate is used to stimulate the activity of fly ash and mineral powder. If its content is too low, it will lead to insufficient hydration reaction and difficulty in filling the filler pores. As the content increases, the degree of hydration reaction gradually deepens and finally reaches a limit. After reaching the optimal content, continuing to increase its ratio is likely to cause material waste; the effect of polydimethylsilane on waterproofing effect also has a limit. When its content exceeds a certain level, the waterproofing effect will no longer improve. Combining the test results and theoretical analysis, the optimal ratio of the aforementioned waterproofing materials is obtained.
[0086] Step S4, treat the base; compact the base by vibration rolling, and the compaction degree of the base is not less than 90%; when the soil of the base is cultivated land, loose soil, rice field, lake pond, soft soil, over-wet soil, etc., the base is reinforced by excavation and replacement or lime soil reinforcement method, cement soil reinforcement method, concrete reinforcement method and other soft foundation treatment methods.
[0087] Step S5, constructing the central filling body; using lime powder to mark the scope of the central filling body on the working surface of the base, evenly spreading red mudstone filler from the center line of the roadbed to both sides, filling the red mudstone layer, the spreading thickness of the red mudstone filler is not more than 500mm, after the spreading is completed, using a 26t vibratory roller for compaction and pre-disintegration, the compaction process is: static compaction once, weak vibration six times, strong vibration twice, during the vibration rolling process, ensure that the roller travel speed is not more than 5KM / h; every three layers of filling, use a triangular roller for impact rolling, so as to further disintegrate the large particle components in the filler and improve the density of the filling layer, the impact rolling process is: impact power 25KJ, impact rolling four times, and the impact rolling speed is not less than 10KM / h.
[0088] Before filling the red mudstone layer, a base waterproof layer 4 can also be set on the base surface (refer to Figure 2 ) to prevent groundwater from penetrating upward into the roadbed and affecting the stability of the roadbed structure. The base waterproof layer 4 can be made of high-density polyethylene geomembrane, waterproof roll material and other materials; it can also be made of waterproof mixture, the waterproof mixture is a mixture of red mudstone and waterproof material, the waterproof material is the waterproof material prepared in step S3, when filling the waterproof mixture, the amount of waterproof material is 120kg / m 3 , that is, 120kg of waterproof material is mixed in every cubic meter of red mudstone filler; reference Figure 6 , Figure 7With the increase of the dosage of waterproof material, the saturated permeability coefficient decreases continuously, and the waterproof performance improves. When the curing age is 28 days, when the dosage of waterproof material is ≥100kg / m 3 When the saturated permeability coefficient is stable, when the curing age is 90 days, when the dosage of waterproof material is ≥120kg / m 3 When the saturated permeability coefficient is stable, the effect of increasing the dosage of waterproof materials on waterproof performance has a marginal decreasing effect. After exceeding a certain value, further increasing the dosage will not significantly improve the waterproof performance and will greatly increase the project cost. Considering that the high embankment filled with red mudstone may be in a long-term rainfall environment, the dosage of waterproof materials is preferably the stable value of 120kg / m under the 90d curing age. 3 .
[0089] When the base waterproof layer 4 uses a waterproof mixture, the paving thickness of the waterproof mixture is not more than 200mm. After paving, the waterproof mixture is compacted by the same method as the red mudstone filler. After filling three layers, the waterproof mixture is impact-rolled by the same method as the red mudstone filler; the number of filling layers of the waterproof mixture is 3 to 6 layers, and the thickness of each layer is 100 to 200mm. When setting the base waterproof layer 4, after laying a high-density polyethylene geomembrane and / or waterproof coiled material on the surface of the base, 3 to 6 layers of waterproof mixture can be filled on the high-density polyethylene geomembrane and / or waterproof coiled material to improve the anti-seepage performance of the roadbed bottom and improve the stability of the roadbed structure.
[0090] Step S6, constructing a waterproof layer of the embankment; after the central filling body is filled to a preset height, constructing a waterproof layer of the embankment in sections from the inside to the outside at the side slopes on both sides of the central filling body.
[0091] The construction process of the embankment waterproof layer specifically includes: weighing fly ash, mineral powder, sodium silicate and polydimethylsiloxane according to the designed dosage. The masses of fly ash, mineral powder, sodium silicate and polydimethylsiloxane required for each cubic meter of red mudstone filler are: Mf (fly ash) = 0.238c, Mk (mineral powder) = 0.476c, Mg (sodium silicate) = 0.238c, Mj (polydimethylsiloxane) = 0.048c, where c represents the total mass of the required waterproofing materials.
[0092] According to the transverse paving width B of the embankment waterproof layer of each level of slope determined in step S2, the embankment waterproof layer is equally divided into multiple layers of embankment waterproof sub-layers. In the direction of the transverse paving width B of the embankment waterproof layer, the dosage of waterproof material in adjacent embankment waterproof sub-layers from the inside to the outside increases layer by layer.
[0093] In one embodiment, the embankment waterproof layer is equally divided into three embankment waterproof sub-layers. In the transverse paving width B direction of the embankment waterproof layer, the embankment waterproof sub-layers are respectively recorded as Z3 layer, Z2 layer and Z1 layer from inside to outside (refer to Figure 3 ); The dosage of waterproof material in Z3 layer is 80kg / m 3 The dosage of waterproof material in Z2 layer is 100kg / m 3 The dosage of waterproof material in Z1 layer is 120kg / m 3 The outermost embankment waterproof sublayer is in direct contact with surface water. Increasing the dosage of waterproof materials can effectively prevent surface water infiltration. Surface water infiltration gradually penetrates from the surface to the inside. Setting different dosages of waterproof materials in different waterproof sublayers is not only beneficial to improving the waterproof effect of the slope, but also beneficial to saving waterproof materials and improving the economy of embankment waterproof layer construction.
[0094] After dividing the embankment waterproof sub-layer, according to the dosage of waterproof materials in each layer of the embankment waterproof sub-layer, the red mudstone filler, fly ash and mineral powder are evenly mixed on site by using an excavator or loader. Then, according to the divided embankment waterproof sub-layer, the mixed mixture is spread on the slopes of the central fill body on both sides of the central fill body with the corresponding filler in sequence. The spreading thickness is not more than 200mm, and a 26t roller is used for compaction. The compaction process is: static pressure once, weak vibration six times, strong vibration twice, and the roller speed is ensured to be no more than 5KM / h during the vibration rolling process; every three layers of filling, a triangular roller is used for impact rolling, so as to further disintegrate the large particle components in the filler and improve the density of the filling layer. The impact rolling process is: impact power 25KJ, impact rolling four times, and impact rolling speed not less than 10KM / h. After each layer is compacted, sodium silicate, polydimethylsiloxane and water are prepared into a solution in a mass ratio of 5:1:5, and evenly sprayed on the surface of the compacted layer to allow it to penetrate into the filler. Each layer of the embankment waterproof sublayer is filled and compacted in the same way as mentioned above. After the embankment waterproof layer is constructed to the preset height, a layer of bidirectional geogrid is laid on the top surface of the embankment waterproof layer to improve the overall stability of the embankment waterproof layer. The longitudinal and transverse ultimate tensile strength of the bidirectional geogrid shall not be less than 80kN / m, the elongation under the longitudinal and transverse ultimate tensile strength shall not be greater than 3%, the ultimate separation force of the connection point shall not be less than 500N, and the bidirectional geogrid shall have good corrosion resistance and aging resistance.
[0095] When the embankment is a multi-level embankment, the method further includes step S7, repeating steps S5 and S6, and constructing in stages from bottom to top until the central filling body and the embankment waterproof layer are filled to a preset height of the high embankment.
[0096] Step S8, constructing a roadbed waterproof layer. Weigh fly ash, mineral powder, sodium silicate and polydimethylsiloxane according to the designed dosage. The masses of fly ash, mineral powder, sodium silicate and polydimethylsiloxane required per cubic meter of red mudstone filler are: Mf (fly ash) = 0.238c, Mk (mineral powder) = 0.476c, Mg (sodium silicate) = 0.238c, Mj (polydimethylsiloxane) = 0.048c, where c represents the total mass of the required waterproof material.
[0097] The red mudstone filler, fly ash and mineral powder are mixed evenly, and the mixed mixture is evenly spread on the entire working surface at the top of the central filling body, and the mixture is spread to the edge of the embankment waterproof layer. The thickness of the mixture is 300mm per layer; then a 26t roller is used for compaction. The compaction process is: static pressure once, weak vibration six times, strong vibration twice, and the roller speed is ensured to be no more than 5KM / h during the vibration rolling process; every three layers of filling, a triangular roller is used for impact rolling, so that the large particle components in the filler are further disintegrated and the density of the filling layer is improved. The impact rolling process is: impact power 25KJ, impact rolling four times, and the impact rolling speed is not less than 10KM / h. After each layer is compacted, sodium silicate, polydimethylsiloxane and water are prepared into a solution in a mass ratio of 5:1:5, and evenly sprayed on the surface of the compacted layer to make it penetrate into the mixture. During the process of filling the mixture, when the mixture is filled to a depth of 800mm below the top surface of the roadbed waterproof layer, a layer of bidirectional geogrid is laid on the surface of the mixture. When the mixture is filled to a depth of 300mm below the top surface of the roadbed waterproof layer, a layer of bidirectional geogrid is laid on the surface of the mixture.
[0098] In the above process, when filling the embankment waterproof layer and the roadbed waterproof layer, the designed amount of fly ash, mineral powder, sodium silicate, polydimethylsiloxane and red mudstone filler can be directly mixed evenly to form a waterproof mixture, and then the waterproof mixture is used for filling, and the filled waterproof mixture is compacted; similarly, in the process of constructing the base waterproof layer, when the waterproof mixture is used in the base waterproof layer, the designed amount of red mudstone filler, fly ash and mineral powder can be mixed evenly into a mixture. After each layer of the mixture is spread and compacted, sodium silicate, polydimethylsiloxane and water are prepared into a solution in a mass ratio of 5:1:5, and evenly sprayed on the surface of the compacted layer to allow it to penetrate into the mixture.
[0099] The above is only a detailed description of the specific implementation of the present invention, rather than a limitation of the present invention. Various substitutions, modifications and improvements made by those skilled in the relevant art without departing from the principle and scope of the present invention should be included in the protection scope of the present invention.
Claims
1. A red mudstone-filled high embankment waterproof structure, characterized in that: include: A central compacted body, wherein the slope surfaces on both sides of the central compacted body are respectively provided with embankment waterproof layers, a roadbed waterproof layer is provided on the top of the central compacted body, and both sides of the roadbed waterproof layer extend to the embankment waterproof layer respectively; The central filling body includes a red mudstone layer, and the embankment waterproof layer is formed by layered filling and layered compaction of a waterproof mixture of red mudstone filler and waterproof material; the roadbed waterproof layer is formed by layered filling and layered compaction of a waterproof mixture of red mudstone filler and waterproof material; the waterproof material is prepared from fly ash, mineral powder, sodium silicate and polydimethylsiloxane.
2. The red mudstone-filled high embankment waterproof structure according to claim 1 is characterized in that: The embankment waterproof layer comprises multiple embankment waterproof sub-layers sequentially stacked on the side slope of the central filling body, and the dosage of waterproof material in adjacent embankment waterproof sub-layers from the inside to the outside of the embankment waterproof layer increases sequentially.
3. The red mudstone-filled high embankment waterproof structure according to claim 1 or 2, characterized in that: The waterproof material is prepared from fly ash, mineral powder, sodium silicate and polydimethylsiloxane in a mass ratio of 5:10:5:
1.
4. The red mudstone-filled high embankment waterproof structure according to claim 3 is characterized in that: In the waterproof layer of the embankment, the dosage of waterproof material in each cubic meter of the red mudstone filler is 80kg / m 3 ~120kg / m 3 In the roadbed waterproof layer, the amount of waterproof material in each cubic meter of the red mudstone filler is 120kg / m 3 ; The water content of the red mudstone filler is within ±2% of the optimal water content.
5. A construction method for red mudstone-filled high embankment waterproof structure, characterized in that: The construction method comprises the following steps: Step S1: Obtain the maximum dry density, optimal moisture content, soil-water characteristic curve and saturated permeability coefficient k of the red mudstone filler in the construction area s parameter; Step S2, obtaining rainfall data in the construction area for many years, and combining the slope of each level of the designed high embankment slope to obtain the transverse paving width B of the embankment waterproof layer of each level of the slope; Step S3, preparing a waterproof material; the waterproof material is prepared from fly ash, mineral powder, sodium silicate and polydimethylsiloxane in a mass ratio of 5:10:5:1; Step S4, treating the substrate; compacting the substrate by vibrating and rolling, so that the compaction degree of the substrate is not less than 90%; Step S5, constructing a central filling body; using lime powder to mark the range of the central filling body on the working surface of the base, and using red mudstone filler to fill the red mudstone layer within the marked range of the central filling body; Step S6, constructing a waterproof layer of the embankment; after the central fill body is filled to a preset height, the waterproof layer of the embankment is constructed on the slopes on both sides of the central fill body; the waterproof layer of the embankment is constructed using a waterproof mixture of red mudstone filler and waterproof material; Step S7, repeating step S5 and step S6, constructing in stages from bottom to top, until the central filling body and the embankment waterproof layer are filled to a preset height of the high embankment; Step S8, constructing a roadbed waterproof layer; the roadbed waterproof layer is constructed using a waterproof mixture of red mudstone filler and waterproof material.
6. The construction method of red mudstone-filled high embankment waterproof structure according to claim 5 is characterized in that: In step S2, the process of obtaining the transverse paving width B of the embankment waterproof layer of each level of slope includes: Assuming that no water accumulates on the slope surface during rainfall, and assuming that all soils within the depth range affected by rainfall are saturated, according to Darcy's law, we can obtain: Where: i represents the infiltration rate of the embankment slope surface; k s represents the saturated permeability coefficient of red mudstone filler; h w represents the depth of rainfall impact; α represents the angle between the embankment slopes at all levels and the horizontal position; S w It indicates the matrix suction of red mudstone at the impact depth; Obtain rainfall data for the construction area within 10 years, perform statistical analysis on the rainfall data within 10 years, and obtain the upper limit of the confidence interval at a 95% confidence level, which is used as the representative value RI of the rainfall intensity of rainfall events in the area. r : In the formula, RI r represents the representative value of the rainfall intensity of the rainfall event in the region; b represents the upper limit of the confidence interval of the rainfall intensity data sample of the rainfall event in the region at the 95% confidence level; represents the arithmetic mean of the rainfall intensity data samples; v represents the standard deviation of the rainfall intensity data samples, according to Calculation, RI i is the rainfall intensity of the i-th rainfall event in the sample; n represents the total number of rainfall events in the rainfall intensity data sample; Assuming that in extreme rainfall events, rainfall can completely infiltrate, that is, the infiltration rate of the embankment slope surface is equal to the rainfall intensity, then: i = RI r According to the above formula, the calculation formula for rainfall impact depth is obtained: according to: The transverse paving width B of the waterproof layer of each level of embankment is calculated.
7. The construction method of red mudstone-filled high embankment waterproof structure according to claim 6 is characterized in that: In step S6, the construction process of the embankment waterproof layer specifically includes: According to the designed dosage, fly ash, mineral powder, sodium silicate and polydimethylsiloxane are weighed. The mass of fly ash, mineral powder, sodium silicate and polydimethylsiloxane required for each cubic meter of red mudstone filler is: Mf (fly ash) = 0.238c, Mk (mineral powder) = 0.476c, Mg (sodium silicate) = 0.238c, Mj (polydimethylsiloxane) = 0.048c, where c represents the total mass of the required waterproof material; The embankment waterproof layer is equally divided into three layers of embankment waterproof sub-layers. In the horizontal paving width B direction of the embankment waterproof layer, the embankment waterproof sub-layers are recorded as Z3 layer, Z2 layer and Z1 layer from inside to outside respectively; the dosage of waterproof material in Z3 layer is 80kg / m 3 The dosage of waterproof material in Z2 layer is 100kg / m 3 The dosage of waterproof material in Z1 layer is 120kg / m 3 ; According to the dosage of waterproof material in each layer of embankment waterproof sub-layer, the red mudstone filler, fly ash and mineral powder are mixed evenly; On the slopes on both sides of the central compact, the embankment waterproofing layer is divided, and the mixed mixture is spread in sequence on the slopes of the central compact using corresponding fillers. After spreading to a preset thickness, the fillers are compacted; After each layer of filler is compacted, sodium silicate, polydimethylsiloxane and water are prepared into a solution in a mass ratio of 5:1:5, and the solution is evenly sprayed onto the surface of the compacted layer to allow the solution to penetrate into the filler.
8. The construction method of red mudstone-filled high embankment waterproof structure according to claim 7, characterized in that: In step S6, the paving thickness of each layer of the filler is not more than 200mm; the filler is compacted by a 26t roller, and the compaction process includes: static compaction once, weak vibration six times, and strong vibration twice. During the vibration rolling process, the driving speed of the 26t roller is ensured to be no more than 5KM / h; after every three layers of filling, a triangular roller is used for impact rolling, and the impact rolling process is: impact power 25KJ, impact rolling four times, and the impact rolling speed is not less than 10KM / h.
9. The construction method of a high embankment waterproof structure filled with red mudstone according to any one of claims 5 to 8, characterized in that: In the step S7, the construction process of the roadbed waterproof layer includes: uniformly mixing the red mudstone filler with fly ash and mineral powder according to the designed dosage to form a mixture, and then evenly spreading it on the entire working surface, with a paving thickness of each layer of 300 mm; after the paving is completed, compacting the mixture; after each layer of the mixture is compacted, sodium silicate, polydimethylsiloxane and water are prepared into a solution in a mass ratio of 5:1:5, and the solution is evenly sprayed on the surface of the compacted layer to allow the solution to penetrate into the filler.
10. The construction method of red mudstone-filled high embankment waterproof structure according to claim 9, characterized in that: In the step S6, after the embankment waterproof layer is constructed to a preset height, a layer of bidirectional geogrid is laid on the top surface of the embankment waterproof layer; in the step S7, during the process of filling the mixture, when the mixture is filled to a depth of 800 mm below the top surface of the roadbed waterproof layer, a layer of bidirectional geogrid is laid on the surface of the mixture, and when the mixture is filled to a depth of 300 mm below the top surface of the roadbed waterproof layer, a layer of bidirectional geogrid is laid on the surface of the mixture.