Connecting mode of geomembrane and asphalt concrete panel

By setting up a three-dimensional composite drainage net and geomembrane on the reinforced concrete panel, combined with bulging structure and anchoring unit, the problem of insufficient anchoring force in the connection between geomembrane and asphalt concrete panel is solved, achieving efficient seepage prevention and structural stability.

CN119041352AActive Publication Date: 2024-11-29STATE GRID XINYUAN GRP CO LTD +1

Patent Information

Application Number
CN202411382305.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-30
Publication Date
2024-11-29
Estimated Expiration
2044-09-30

AI Technical Summary

Technical Problem

In existing technologies, the connection between geomembrane and asphalt concrete panel is difficult to achieve the designed anchoring force, resulting in poor seepage prevention and easy tearing due to excessive restraint.

Method used

A three-dimensional composite drainage net and geomembrane are installed on the reinforced concrete panel, combined with a bulging structure and anchoring units, and fixed with SR plastic water-stopping material and HK edge sealing agent to form a double seepage barrier, reduce local stress concentration, and present a wavy line at the anchoring edge to counteract the clamping effect.

Benefits of technology

It improves the impermeability of the geomembrane and asphalt concrete panel, enhances the reliability of the connection and the overall stability, reduces the risk of tearing, and ensures that moisture does not penetrate into the reinforced concrete panel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041352A_ABST
    Figure CN119041352A_ABST
Patent Text Reader

Abstract

The invention discloses a connecting mode of a geomembrane and an asphalt concrete panel, and relates to the technical field of hydraulic engineering, the connecting mode comprises a reinforced concrete panel, the upper end of the reinforced concrete panel is arranged in a step shape, and the two sides of the reinforced concrete panel are made into arc-shaped structures; a geomembrane; the bulge is of a communicated double-peak-shaped structure and is manufactured and formed by arranging the SR plastic water stopping material on the three-dimensional composite drainage net, the geomembrane is laid on the bulge, and the geomembrane located between double peaks is fixed to the reinforced concrete panel through an anchoring unit; the geomembrane is laid on the outer side of the upper portion of the reinforced concrete panel, the three-dimensional composite drainage net is arranged below the geomembrane, and the at least three rows of external bumps are arranged on the outer side of the reinforced concrete panel through the cushion materials, so that the geomembrane is in a wavy line shape on the anchoring edge, the clamp effect can be effectively counteracted, and the anchoring quality is improved. The tearing risk caused by excessive constraint of the geomembrane is reduced, and the anti-seepage performance is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of water conservancy engineering, in particular to a connection method between a geomembrane and an asphalt concrete panel. Background Art

[0002] With the proposal and continuous advancement of the "dual carbon" goals, my country's non-hydro renewable energy power generation has shown a very rapid growth trend. However, the instability of new energy sources such as wind and light has exacerbated the fluctuations of the power grid. In this process, conventional hydropower stations and pumped-storage power stations play an important role. my country is also further promoting the construction of pumped-storage power stations. As an important resource for pumped-storage power stations, water resources have extremely high requirements for anti-seepage in the early stages of power station construction. In recent years, more and more projects have adopted geomembranes at the bottom of the reservoir and asphalt concrete panels on the reservoir bank for anti-seepage.

[0003] According to conventional design, geomembranes are usually directly anchored on concrete panels by bolts. However, asphalt panels are relatively soft and geomembranes are easily deformed, so it is difficult to achieve the designed anchoring force. How to connect the two is a key problem in the project.

[0004] Therefore, it is necessary to design a connection method between geomembrane and asphalt concrete panel to solve the above technical problems. Summary of the invention

[0005] In response to the above problems, the present application provides a connection method between geomembrane and asphalt concrete panel, wherein a geomembrane is laid on the upper outer side of the reinforced concrete panel, and a three-dimensional composite drainage net is arranged under the geomembrane. The geomembrane and the three-dimensional composite drainage net work together to provide a double anti-seepage barrier, effectively preventing moisture penetration and keeping the reinforced concrete panel dry. Below the three-dimensional composite drainage net is a cushion material formed by rolling fine materials with particle size increasing layer by layer in the seepage direction, which can evenly distribute stress, reduce local stress concentration, and improve the overall stability of the structure. At least three rows of external bulges are arranged on the outer side of the reinforced concrete panel through the cushion material, so that the geomembrane presents a wavy line at the anchoring edge, which can effectively offset the clamp effect, reduce the risk of tearing of the geomembrane due to excessive constraint, and improve the anti-seepage performance.

[0006] To achieve the above object, the present invention provides the following technical solution: a method for connecting a geomembrane and an asphalt concrete panel, comprising:

[0007] A reinforced concrete panel is arranged on the upper layer of the reservoir bank, and the upper end of the reinforced concrete panel is arranged in a stepped manner. Both sides of the reinforced concrete panel are made into arc structures. The reinforced concrete panel located on the higher side is used to connect the cushion material, and the reinforced concrete panel located on the lower side is used to connect the asphalt concrete panel. At least three rows of external bulges are arranged on the outer side of the reinforced concrete panel through the cushion material. An SR sliding layer is filled between the reinforced concrete panel and the asphalt concrete panel, and a groove is opened at the corner position of the lower side of the reinforced concrete panel, and the groove is filled with SR plastic water-stopping material;

[0008] A geomembrane, one side of which is laid on a three-dimensional composite drainage net, the cushion material is below the three-dimensional composite drainage net, and the other side of the geomembrane is extended and bonded to the asphalt concrete panel side; and

[0009] The bulge is a connected double-peak structure, which is formed by setting the SR plastic water-stopping material on the three-dimensional composite drainage net. The geomembrane is laid on the bulge, and the geomembrane located between the double peaks is fixed to the reinforced concrete panel through an anchoring unit.

[0010] Further, preferably, one end of the asphalt concrete panel is in conflict with the stepped surface of the reinforced concrete panel, and the other end of the asphalt concrete panel is located on the upper end of the wedge-shaped body of the cushion layer.

[0011] Furthermore, preferably, the asphalt concrete panel is divided into a mastic sealing layer, an anti-seepage layer and a leveling bonding layer from top to bottom, and a polyester grid is arranged in the leveling bonding layer.

[0012] Furthermore, preferably, the geomembrane and the asphalt concrete panel are bonded with butyl raw tape, and a porous base cloth with a width of at least 5 cm is adhered to the edges, and the edges are sealed with HK edge sealant.

[0013] Further, preferably, a plurality of sandbags and prefabricated blocks are evenly distributed and pressed on the geomembrane located at the upper end of the asphalt concrete panel.

[0014] Further, as a preference, the anchoring unit includes an anchoring hole corresponding to the bulge between the reinforced concrete panel and the double peaks, and a stainless steel anchoring screw is installed in the anchoring hole, a stainless steel flat steel is installed on the bulge at the upper end of the anchoring hole, a gasket is installed on the stainless steel flat steel, and a nut is provided on the gasket, the nut and the stainless steel anchoring screw are threadedly connected, the space between the stainless steel flat steel and the bulge is filled with the SR plastic water-stopping material, and the bonding parts between the stainless steel flat steel and the bulge, and between the nut and the gasket are coated with HK edge sealing agent 1.

[0015] Furthermore, preferably, the three-dimensional composite drainage net is a three-layer composite structure of geotextile, drainage net and geotextile.

[0016] Further, as a preference, the SR plastic water-stopping material located below the stainless steel flat steel is a five-layer composite material consisting of SR base glue 1, the SR sliding layer, SR anti-seepage rubber strip, SR anti-seepage protective cover sheet and SR base glue 2 from top to bottom.

[0017] Furthermore, preferably, the sandbag is a structure in which at least 30 kg of fine sand is filled in a non-woven woven composite fabric.

[0018] Compared with the prior art, the present invention provides a connection method between a geomembrane and an asphalt concrete panel, which has the following beneficial effects:

[0019] 1. In the present invention, a geomembrane is laid on the upper outer side of the reinforced concrete panel, and a three-dimensional composite drainage net is arranged under the geomembrane. The geomembrane and the three-dimensional composite drainage net work together to provide a double anti-seepage barrier, effectively preventing moisture penetration and keeping the reinforced concrete panel dry. Below the three-dimensional composite drainage net is a cushion material formed by rolling fine materials with particle sizes increasing layer by layer along the seepage direction, which can evenly distribute stress, reduce local stress concentration, and improve the overall stability of the structure. At least three rows of external bulges are arranged on the outer side of the reinforced concrete panel through the cushion material, so that the geomembrane presents a wavy line at the anchoring edge, which can effectively offset the clamp effect, reduce the risk of tearing of the geomembrane due to excessive constraint, and improve the anti-seepage performance.

[0020] 2. In the present invention, the double-peaked structure of the bulge is fixed to the reinforced concrete panel through an anchoring unit, and SR plastic water-stopping material and HK edge sealing agent 2 are filled between the stainless steel flat steel and the bulge. On the one hand, the fixing method is simple and efficient, ensuring the reliability of the connection between the geomembrane and the reinforced concrete panel. On the other hand, the bulge, SR plastic water-stopping material and HK edge sealing agent 2 can play a sealing role to prevent moisture from penetrating through the connection part, thereby enhancing the waterproof effect.

[0021] 3. The present invention adds an SR sliding layer between the reinforced concrete panel and the asphalt concrete panel, and opens a groove at the lower end of the stepped side of the reinforced concrete panel. The groove is filled with SR plastic water-stopping material, which can effectively ensure the airtightness of the connection between the two panels. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The accompanying drawings are used to provide a further understanding of the present application and constitute a part of the specification. Together with the embodiments of the present application, they are used to explain the present application and do not constitute a limitation to the present application.

[0023] Figure 1A construction schematic diagram of a connection method between a geomembrane and an asphalt concrete panel;

[0024] Figure 2 It is a schematic diagram of the cross-sectional structure of the anchor point in a connection method between a geomembrane and an asphalt concrete panel;

[0025] Figure numerals: 1, asphalt concrete panel; 101, mastic sealing layer; 102, anti-seepage layer; 103, leveling bonding layer; 104, polyester mesh; 2, prefabricated block; 3, HK edge sealer 1; 4, cushion layer wedge; 5, reinforced concrete panel; 501, groove; 6, sandbag; 7, geotextile; 8, geomembrane; 801, butyl raw tape; 802, porous tire base fabric; 9, bulge; 10, stainless steel flat steel ; 11. Anchoring unit; 1101. Nut; 1102. Gasket; 1103. Stainless steel anchoring screw; 12. SR plastic water-stopping material; 1201. SR anti-seepage protection cover; 1202. SR primer one; 1203. SR anti-seepage rubber strip; 1204. SR sliding layer; 1205. SR primer two; 13. HK edge sealing agent two; 14. Three-dimensional composite drainage net; 15. Cushion material; 16. External bulge. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical solutions and advantages of this application clearer, the technical solutions in this application will be clearly and completely described below in conjunction with the drawings in this application. Obviously, the described embodiments are part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0027] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features; in the description of this application, unless otherwise specified, "plurality" means two or more.

[0028] See also Figure 1-Figure 2 The embodiment of the present invention provides a connection method between a geomembrane and an asphalt concrete panel, which includes:

[0029] A reinforced concrete panel 5 is arranged on the upper layer of the reservoir bank, and the upper end of the reinforced concrete panel 5 is arranged in a stepped manner. Both sides of the reinforced concrete panel 5 are made into an arc structure. The reinforced concrete panel 5 located on the higher side is used to connect the cushion material 15, and the reinforced concrete panel 5 located on the lower side is used to connect the asphalt concrete panel 1, and at least three rows of external bulges 16 are arranged on the outer side of the reinforced concrete panel 5 through the cushion material 15. An SR sliding layer 1204 is filled between the reinforced concrete panel 5 and the asphalt concrete panel 1, and a groove 501 is opened at the corner position of the lower side of the reinforced concrete panel 5, and the groove 501 is filled with SR plastic water-stopping material 12, which can effectively ensure the airtightness of the connection between the two panels;

[0030] A geomembrane 8, one side of which is laid on a three-dimensional composite drainage net 14, the cushion material 15 is below the three-dimensional composite drainage net 14, and the other side of the geomembrane 8 is extended and bonded to the asphalt concrete panel 1; and

[0031] The bulge 9 is a connected double-peak structure, which is formed by setting the SR plastic water-stopping material 12 on the three-dimensional composite drainage net 14. The geomembrane 8 is laid on the bulge 9, and the geomembrane 8 located between the double peaks is fixed to the reinforced concrete panel 5 through the anchor unit 11.

[0032] Based on the above technical solution, holes are drilled every 30 cm around the reservoir bank on the reinforced concrete panel 5, with a hole depth of 10-15 cm. Chemical agents and screws are added to fix them, and the spilled chemicals are cleaned in time. The reinforced concrete panel 5 must be dry and clean during laying, and a cushion material 15 formed by rolling fine materials with a particle size that decreases layer by layer according to the seepage direction is laid on the stepped upper side of the reinforced concrete panel 5, and then a three-dimensional composite drainage net 14 is laid on the cushion material 15, and the SR sliding layer 1204 is filled on the stepped lower side of the reinforced concrete panel 5, and the SR plastic water-stopping material is filled in the groove 501. Material 12, and then place the asphalt concrete panel 1 on the stepped lower side of the reinforced concrete panel 5, and then use SR plastic water-stop material 12 to make bulges 9 of about 5 cm and 10 cm on the left and right sides of the anchor point, and fix the bulge 9 between the double peaks to the reinforced concrete panel 5 through the anchor unit 11, and then cover the geomembrane 8 thereon, and arrange at least three rows of external bulges 16 on the outside of the reinforced concrete panel 5 through cushion material 15, so that the geomembrane 8 presents a wavy line at the anchoring edge, which can effectively offset the clamp effect, reduce the risk of tearing of the geomembrane 8 due to excessive constraint, and improve the anti-seepage performance.

[0033] On the basis of the above technical solution, the combined effect of the geomembrane 8 and the three-dimensional composite drainage net 14 provides a double anti-seepage barrier, effectively preventing moisture penetration and keeping the reinforced concrete panel 5 dry; the cushion material 15 can evenly distribute stress, reduce local stress concentration, and improve the overall stability of the structure.

[0034] In a possible implementation, one end of the asphalt concrete panel 1 is in conflict with the stepped surface of the reinforced concrete panel 5, and the other end of the asphalt concrete panel 1 is located on the upper end of the cushion layer wedge 4, which can effectively increase the contact area between the asphalt concrete panel 1 and the reinforced concrete panel 5, ensure that the asphalt concrete panel 1 and the reinforced concrete panel 5 are reliably connected through the SR sliding layer 1204 and the SR plastic water-stopping material 12, and effectively ensure the airtightness of the connection between the two panels.

[0035] In a possible implementation, the asphalt concrete panel 1 is divided into a mastic sealing layer 101 , an anti-seepage layer 102 and a leveling bonding layer 103 from top to bottom, and a polyester grid 104 is arranged in the leveling bonding layer 103 .

[0036] It needs to be explained that, through the provision of the mastic sealing layer 101 and the anti-seepage layer 102, a multiple waterproof barrier is formed, which effectively prevents moisture from penetrating into the interior of the asphalt concrete panel 1, and the leveling bonding layer 103 can evenly distribute stress, reduce stress concentration, and improve the overall stability of the structure. The arrangement of the polyester grid 104 can enhance the crack resistance of the leveling bonding layer 103 and prevent the generation and expansion of cracks.

[0037] In a possible embodiment, the geomembrane 8 and the asphalt concrete panel 1 are bonded with butyl tape 801, and a porous base fabric 802 with a width of at least 5 cm is adhered to the edge, and the edge is sealed with HK edge sealer 3. The butyl tape 801 has good adhesion and waterproof properties, and the porous base fabric 802 can absorb excess moisture. The combination of butyl tape 801 and porous base fabric 802 provides a double sealing effect and enhances the waterproof performance.

[0038] In a possible implementation, a plurality of sandbags 6 and prefabricated blocks 2 are evenly distributed and pressed on the geomembrane 8 located at the upper end of the asphalt concrete panel 1. The geomembrane 8 is pasted on the butyl raw tape 801 and compacted. The sandbags 6 are permanently pressed on the geomembrane 8 at intervals of about 1.5 m. The edge of the geomembrane 8 can be replaced with prefabricated blocks 2 or covered with sandbags 6 without gaps. The covering of sandbags 6 and prefabricated blocks 2 can prevent the geomembrane 8 from generating wrinkles during the laying process, further improve the anti-seepage performance, and can also effectively prevent the geomembrane 8 from shifting under external forces (such as wind, water flow, etc.).

[0039] In a possible embodiment, the anchoring unit 11 includes an anchoring hole corresponding to the bulge 9 between the reinforced concrete panel 5 and the double peaks, and a stainless steel anchoring screw 1103 is installed in the anchoring hole, a stainless steel flat steel 10 is installed on the bulge 9 at the upper end of the anchoring hole, a gasket 1102 is installed on the stainless steel flat steel 10, and a nut 1101 is provided on the gasket 1102, the nut 1101 and the stainless steel anchoring screw 1103 are threadedly connected, the SR plastic water-stopping material 12 is filled between the stainless steel flat steel 10 and the bulge 9, and the bonding parts between the stainless steel flat steel 10 and the bulge 9 and between the nut 1101 and the gasket 1102 are coated with HK edge sealing agent 13.

[0040] By adopting the above technical scheme, SR plastic water-stopping material 12 is used to make bulges 9 of about 5 cm and 10 cm on the left and right sides of the anchor point respectively, and the geomembrane 8 is covered thereon, the stainless steel anchor screw 1103 is passed through, and the stainless steel flat steel 10 is placed, and then the gasket 1102 is placed on the stainless steel flat steel 10, the nut 1101 and the stainless steel anchor screw 1103 are anchored, and SR plastic water-stopping material 12 is applied between the stainless steel flat steel 10 and the bulge 9, and finally, HK edge sealing agent 13 is applied to the bonding areas between the stainless steel flat steel 10 and the bulge 9 and between the nut 1101 and the gasket 1102.

[0041] On the basis of the above technical scheme, the double-peaked structure of the bulge 9 is fixed to the reinforced concrete panel 5 through the anchor unit 11, and the SR plastic water-stopping material 12 and the HK edge sealing agent 13 are filled between the stainless steel flat steel 10 and the bulge 9. On the one hand, the fixing method is simple and efficient, ensuring the reliability of the connection between the geomembrane 8 and the reinforced concrete panel 5. On the other hand, the bulge 9, the SR plastic water-stopping material 12 and the HK edge sealing agent 13 can play a sealing role to prevent moisture from penetrating into the anchor hole through the connection part, thereby enhancing the waterproof effect.

[0042] In a possible implementation, the three-dimensional composite drainage net 14 is a three-layer composite structure of geotextile 7, drainage net and geotextile 7. The three-dimensional composite drainage net 14 in the three-layer composite structure can quickly drain the infiltrated water and improve drainage efficiency.

[0043] In a possible embodiment, the SR plastic waterproofing material 12 located below the stainless steel flat steel 10 is a composite material of five layers from top to bottom, namely, SR base glue 1 1202 , the SR sliding layer 1204 , the SR anti-seepage rubber strip 1203 , the SR anti-seepage protective cover sheet 1201 and SR base glue 2 1205 .

[0044] Through the above technical scheme, SR plastic water-stopping material 12 is used to make bulges 9 of about 5 cm and 10 cm on the left and right sides of the anchor point respectively, and SR primer 1205 is brushed on the contact surface, and SR sliding layer 1204 is laid on the primer, and SR anti-seepage rubber strip 1203 is set, and SR primer 2 1202 is brushed again, and SR anti-seepage protective cover sheet 1201 is placed thereon, and geomembrane 8 is covered thereon, stainless steel anchor screw 1103 is passed through, and stainless steel flat steel 10 is placed, and then SR plastic water-stopping material 12 is brushed on the stainless steel flat steel 10 and gasket 1102 is placed, and nut 1101 is anchored to stainless steel anchor screw 1103.

[0045] In a possible implementation, the sandbag 6 is a structure in which at least 30 kg of fine sand is filled in a non-woven woven composite fabric, which can make the geomembrane 8 fit closely with the asphalt concrete panel 1, reduce gaps, and improve the anti-seepage effect.

[0046] In the specific implementation, during the anchoring construction: holes are drilled every 30 cm around the bank of the reinforced concrete panel 5, with a hole depth of 10-15 cm being appropriate, and chemicals and screws are added to fix them, and the spilled chemicals are cleaned up in time;

[0047] During the construction process: the reinforced concrete panel 5 must be dry and clean during laying, and a cushion material 15 formed by rolling fine materials with a particle size that decreases layer by layer according to the seepage direction is laid on the stepped upper side of the reinforced concrete panel 5, and then a three-dimensional composite drainage net 14 is laid on the cushion material 15, and an asphalt concrete panel 1 is placed on the stepped lower side of the reinforced concrete panel 5, and then 5cm and 10cm bulges 9 are made on the left and right sides of the anchor point with SR plastic water-stopping material 12 respectively, SR primer 1 1205 is applied on the contact surface, SR sliding layer 1204 is laid on the primer, and SR anti-seepage rubber strip 1203 is set, SR primer 2 1202 is applied again, SR anti-seepage protective cover sheet 1201 is placed thereon, and geomembrane 8 is covered on it, stainless steel anchor screw 1103 is passed through, stainless steel flat steel 10 is placed, and then on the stainless steel flat Apply SR plastic water-stop material 12 on the steel 10 and place gasket 1102, anchor the nut 1101 with the stainless steel anchor screw 1103; clean the asphalt concrete panel 1, try to ensure that the construction surface is free of dust and gravel, lay 8m wide butyl raw tape 801, and continue to cover the asphalt panel for about 6m after passing the connection position of the reinforced concrete panel 5 and the asphalt concrete panel 1, paste the geomembrane 8 on it and press it tightly, and permanently cover the geomembrane 8 with sandbags 6 at intervals of about 1.5m. The edge of the geomembrane 8 can be replaced with prefabricated blocks 2 or covered with sandbags 6 without gaps; finally, apply HK edge sealant 2 13 at the bonding between the stainless steel flat steel 10 and the bulge 9, and between the nut 1101 and the gasket 1102, and apply HK edge sealant 3 at the bonding between the geomembrane 8 and the asphalt concrete panel 1.

[0048] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A method for connecting a geomembrane and an asphalt concrete panel, characterized in that: It includes: A reinforced concrete panel (5) is arranged on the upper layer of the reservoir bank, and the upper end of the reinforced concrete panel (5) is arranged in a stepped manner. Both sides of the reinforced concrete panel (5) are made into arc structures. The reinforced concrete panel (5) located on the higher side is used to connect to a cushion material (15), and the reinforced concrete panel (5) located on the lower side is used to connect to an asphalt concrete panel (1), and at least three rows of external bulges (16) are arranged on the outer side of the reinforced concrete panel (5) through the cushion material (15), an SR sliding layer (1204) is filled between the reinforced concrete panel (5) and the asphalt concrete panel (1), and a groove (501) is opened at the corner position of the lower side of the reinforced concrete panel (5), and the groove (501) is filled with an SR plastic water-stopping material (12); A geomembrane (8), one side of which is laid on a three-dimensional composite drainage net (14), the cushion material (15) being located below the three-dimensional composite drainage net (14), and the other side of the geomembrane (8) extending and bonding to the asphalt concrete panel (1); as well as The bulge (9) is a connected double-peak structure, which is formed by arranging the SR plastic water-stopping material (12) on the three-dimensional composite drainage net (14). The geomembrane (8) is laid on the bulge (9), and the geomembrane (8) located between the double peaks is fixed to the reinforced concrete panel (5) through an anchor unit (11).

2. The method for connecting a geomembrane and an asphalt concrete panel according to claim 1 is characterized in that: One end of the asphalt concrete panel (1) is in contact with the stepped surface of the reinforced concrete panel (5), and the other end of the asphalt concrete panel (1) is located on the upper end of the cushion layer wedge (4).

3. The connection method of a geomembrane and an asphalt concrete panel according to claim 2 is characterized in that: The asphalt concrete panel (1) is divided from top to bottom into a mastic sealing layer (101), an anti-seepage layer (102) and a leveling bonding layer (103), and a polyester mesh (104) is arranged in the leveling bonding layer (103).

4. The connection method of a geomembrane and an asphalt concrete panel according to claim 3 is characterized in that: The geomembrane (8) and the asphalt concrete panel (1) are bonded together using butyl raw tape (801), and a porous base fabric (802) with a width of at least 5 cm is adhered to the edges, and the edges are sealed using HK edge sealing agent 1 (3).

5. The connection method of a geomembrane and an asphalt concrete panel according to claim 4 is characterized in that: The geomembrane (8) located at the upper end of the asphalt concrete panel (1) is evenly distributed and pressed with a plurality of sandbags (6) and prefabricated blocks (2).

6. The connection method of a geomembrane and an asphalt concrete panel according to claim 5 is characterized in that: The anchoring unit (11) comprises an anchoring hole correspondingly opened on the bulge (9) between the reinforced concrete panel (5) and the double peaks, and a stainless steel anchoring screw (1103) is installed in the anchoring hole, a stainless steel flat steel (10) is installed on the bulge (9) located at the upper end of the anchoring hole, a gasket (1102) is installed on the stainless steel flat steel (10), and a nut (1101) is arranged on the gasket (1102), the nut (1101) and the stainless steel anchoring screw (1103) are connected by threads, the SR plastic water-stopping material (12) is filled between the stainless steel flat steel (10) and the bulge (9), and the bonding parts between the stainless steel flat steel (10) and the bulge (9) and between the nut (1101) and the gasket (1102) are all coated with HK edge sealing agent 1 (13).

7. The connection method of a geomembrane and an asphalt concrete panel according to claim 6 is characterized in that: The three-dimensional composite drainage net (14) is a three-layer composite structure of a geotextile (7), a drainage net and a geotextile (7).

8. The connection method of a geomembrane and an asphalt concrete panel according to claim 7 is characterized in that: The SR plastic waterproofing material (12) located below the stainless steel flat steel (10) is a composite material of five layers, from top to bottom, namely, SR base glue 1 (1202), the SR sliding layer (1204), SR anti-seepage rubber strip (1203), SR anti-seepage protective cover sheet (1201) and SR base glue 2 (1205).

9. The connection method of a geomembrane and an asphalt concrete panel according to claim 7 is characterized in that: The sandbag (6) is a structure in which at least 30 kg of fine sand is filled in a non-woven woven composite fabric.

Citation Information

Patent Citations

  • Horizontal sliding anti-seepage connecting structure for geomembrane and asphalt concrete panel

    CN112900365A

  • Geomembrane anchor structure

    CN205314058U

  • Geomembrane and asphalt concrete panel double-anchoring anti-seepage structure

    CN215210869U

  • River embankment reinforcing and protecting system for river-facing open caisson construction

    CN221589465U

  • Method and device for the laying down of a geomembrane

    US20190085522A1

Cited By

  • Sand bag and method for pressing geomembrane with sand bag

    CN119706063A