Multifunctional precast pile cap for pile-net composite foundation and construction method of multifunctional precast pile cap

By introducing a connecting device and a bias-load adjustment device into the prefabricated pile cap, the problems of poor connecting performance and model limitation in the prior art are solved, and the rapid connection and stability improvement of pile caps of different models and pile bodies are achieved. It has leveraged the advantages of assembly construction.

CN119041398APending Publication Date: 2024-11-29CCCC SECOND HARBOR ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411246368.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The connection performance of existing prefabricated pile caps and pile tops is poor, it is easy to disengage when the load is eccentric, and it is impossible to use different types of pile caps and pile bodies, which limits the advantages of assembly construction.

Method used

A multi-functional prefabricated pile cap is designed, using a connecting device and a biased load adjustment device. Through grouting connection and hydraulic telescopic rod adjustment, the rapid connection between pile caps and pile bodies of different models is realized, and the load is balanced through pressure sensors and controllers. .

Benefits of technology

The connection quality between pile caps and pile tops is improved, fully assembled construction is achieved, and different models of pile caps and pile bodies are allowed to be used together, enhancing the convenience and stability of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041398A_ABST
    Figure CN119041398A_ABST
Patent Text Reader

Abstract

The invention discloses a multifunctional precast pile cap for a pile-net composite foundation and a construction method thereof. The multifunctional precast pile cap comprises a connecting device and a pile cap body. The connecting device is fixedly arranged on the outer side of the top of the pile body in a sleeving mode, the top face of the connecting device is flush with the top face of the pile top, a plurality of protrusions are arranged on the upper portion of the connecting device, and a plurality of connecting grouting holes with threads inside are formed in the upper portion of the connecting device. Corresponding grooves are formed in the positions, corresponding to the protrusions of the connecting devices, of the bottom face of the pile cap body, pile cap grouting connecting holes are formed in the positions, corresponding to the connecting grouting holes, of the pile cap body, and the connecting grouting holes and the pile cap grouting connecting holes are in one-to-one correspondence and communicate. And after grouting is conducted through the pile cap grouting connecting hole, the pile cap body and the connecting device are connected through a bolt, and sealing treatment is conducted on the top of the bolt. The connecting quality of the prefabricated pile cap and the pile top is effectively improved, full-assembly construction is achieved, and quick connection of different types of pile bodies and the pile cap is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of pile-net composite foundation, and more specifically, to a multifunctional prefabricated pile cap for pile-net composite foundation. Background Art

[0002] The pile-net composite foundation should be composed of rigid piles, pile caps, reinforcement layers and cushion layers, and can be used for foundation reinforcement and treatment of structures such as fill embankments, flexible surface yards and airport runways. In recent years, the pile-net composite foundation technology has been widely used in foundation treatment and has achieved good treatment results. The pile-net composite foundation needs to be connected to a pile cap at the top of the pile to transfer more load to the pile body, and then from the pile body to the foundation, so as to give full play to the advantages of the high strength of the pile material.

[0003] Prefabricated pile caps are produced in factories, which makes the utilization efficiency of labor and resources higher, avoids more waste of resources, and has guaranteed product quality. On-site installation is convenient, the construction speed is fast, and no later maintenance is required. Its disadvantages are: the installation quality of the pile cap is crucial. If the pile cap and the pile top cannot be effectively connected, the pile cap will tilt during the construction process, and the fill load cannot be effectively transmitted to the pile body, which greatly affects the foundation treatment effect; at the same time, in the existing connection technology between the prefabricated pile cap and the pile top, a vertical non-through hole corresponding to the pile cross-section is often set at the bottom of the prefabricated pile cap. The hole size is slightly larger than the size of the pile. When installing, the pile top is placed in the hole. This installation method is simple to operate, but the depth of the pile top embedded in the pile cap is small, and the integrity of the pile cap and the pile is poor. If the operation is not standardized during filling, it is easy to cause the pile cap to rotate along the pile top; in addition, the prefabricated pile cap must be matched with the pile body. Only a specific prefabricated pile cap can be used for a type of pile. The combination of different types of pile caps and pile bodies is not achieved, and the advantages of prefabrication and assembly cannot be fully utilized.

[0004] As mentioned above, the problems of existing prefabricated pile cap technology in engineering practice mainly include: (1) the connection performance between the prefabricated pile cap and the pile top is poor. When the load is eccentric, the pile cap is easy to be detached or partially detached from the pile cap; (2) the connection between the prefabricated pile cap and the pile top has not been fully realized in assembly construction, and part of it still needs to be cast in place; (3) the prefabricated pile cap and the pile body must match the model, and different models of pile caps and pile bodies have not been used together, which cannot give full play to the advantages of prefabrication and assembly. Summary of the invention

[0005] The purpose of the present invention is to provide a multifunctional prefabricated pile cap for a pile-net composite foundation and a construction method thereof, which can effectively improve the connection quality between the prefabricated pile cap and the pile top, and realize full assembly construction and rapid connection between pile bodies of different models and pile caps.

[0006] The technical solution adopted by the present invention to solve this technical problem is: a multifunctional prefabricated pile cap for a pile-net composite foundation, comprising: a connecting device and a pile cap body;

[0007] The connecting device is sleeved and fixed on the outer side of the top of the pile body, the top surface of the connecting device is flush with the top surface of the pile top, a plurality of protrusions are arranged above the connecting device, and a plurality of connecting grouting holes with internal threads are arranged above the connecting device;

[0008] The bottom surface of the pile cap body has a corresponding groove at the protrusion of the connecting device, and the pile cap body is provided with a pile cap grouting connection hole corresponding to the connection grouting hole. The connection grouting hole and the pile cap grouting connection hole correspond to each other and are connected. After grouting through the pile cap grouting connection hole, the pile cap body and the connecting device are connected by bolts, and the top of the bolt is sealed.

[0009] As a further solution of the present invention, a plurality of mutually connected grooves are provided on the inner wall of the connecting device along the height direction, and the connecting grouting holes are connected to the grooves.

[0010] As a further solution of the present invention, the connecting device has an appearance of a circular ring, a square ring or a polygonal ring.

[0011] As a further solution of the present invention, a sealing ring is provided at the bottom end of the inner wall of the connecting device, and the sealing ring is bonded or embedded in the bottom end of the inner wall of the connecting device.

[0012] As a further solution of the present invention, the protrusion is a hemispherical or conical protrusion.

[0013] As a further solution of the present invention, it also includes an eccentric load adjustment device, which includes:

[0014] A pair of card seats, the card seats are semicircular ring structures, the pair of card seats are detachably installed on the outside of the connecting device, and the tops are flush with the top of the connecting device;

[0015] Four groups of pressure sensors are installed in grooves around the top surface of the card holder at equal intervals, and the top surface of the pressure sensor is flush with the top of the connecting device;

[0016] Four groups of hydraulic telescopic rods are installed at equal intervals on the outer sides of the top surface of the card seat, and the hydraulic telescopic rods correspond to the pressure sensors one by one;

[0017] Alarm;

[0018] A controller, used to receive information from the pressure sensor and control the extension and retraction of the hydraulic telescopic rod and the alarm of the alarm;

[0019] A connecting piece is arranged at the bottom of the pile cap body corresponding to the hydraulic telescopic rod, and the hydraulic telescopic rod is connected to the pile cap body through the connecting piece.

[0020] The present invention also provides a construction method of the multifunctional prefabricated pile cap for the pile-net composite foundation, comprising the following steps:

[0021] 1) Install the connection device on the top of the pile, and make sure the sealing ring fits the pile body;

[0022] 2) Apply adhesive to the top of the pile and the top of the connecting device;

[0023] 3) Hoist the pile cap body to the corresponding position of the connecting device and the pile top, align the protrusion of the connecting device with the groove below the pile cap body, and align the grouting connection hole of the pile cap with the grouting connection hole of the connecting device;

[0024] 4) Use the grouting holes to carry out grouting. After the grouting is completed, the bolt connection is carried out and the top of the bolt is sealed to complete the connection between the connecting device, the pile cap body and the pile body.

[0025] As a further solution of the present invention, when the prefabricated pile cap includes an eccentric load adjustment device, the controller is configured as follows:

[0026] The relative pressure sensors in the four groups of pressure sensors are grouped in pairs. When the pressure difference detected by the two pressure sensors in the same group is greater than the set value F, the controller controls the hydraulic telescopic rods corresponding to the two pressure sensors to push up or pull down, and controls the alarm to sound.

[0027] Specifically, the hydraulic telescopic rod corresponding to the pressure sensor on the side with a larger pressure value pushes up the pile cap body, and the hydraulic telescopic rod corresponding to the pressure sensor on the side with a smaller pressure value pulls down the pile cap body.

[0028] The present invention has at least the following beneficial effects: (1) the pile cap structure is simplified, and different types of pile caps and pile bodies can be used in combination, and different types of pile bodies and pile caps can be quickly connected through the connecting device; (2) the connection device, the prefabricated pile cap and the pile top are connected to fully realize the assembly construction, which is fast and convenient.

[0029] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a schematic diagram of the structure of the connection device of the present invention;

[0031] Figure 2 is a top view of the circular connecting device of the present invention;

[0032] Figure 3 yes Figure 2 Middle AA section;

[0033] Figure 4 yes Figure 2 Middle BB section;

[0034] Figure 5 is a top view of the square connection device of the present invention;

[0035] Figure 6 This is a structural diagram of a multifunctional prefabricated pile cap in another embodiment of the present invention.

[0036] Among them, 1-connecting device, 2-connecting grouting hole, 3-protrusion, 4-sealing ring, 5-pile body, 6-pile cap body, 7-protrusion, 8-connecting grouting hole, 9-groove, 10-pile cap grouting connecting hole, 11-bolt, 12-seat, 13-pressure sensor, 14-hydraulic telescopic rod. DETAILED DESCRIPTION

[0037] The present invention is described in detail and completely below in conjunction with the accompanying drawings. A person of ordinary skill in the art will be able to implement the present invention based on these descriptions. Before describing the present invention in conjunction with the accompanying drawings, it should be particularly pointed out that the technical solutions and technical features provided in each part of the present invention, including the following description, can be combined with each other without conflict.

[0038] In addition, the embodiments of the present invention involved in the following description are generally only a part of the embodiments of the present invention, rather than all the embodiments. Therefore, based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0039] The present invention is further described in detail below in conjunction with the accompanying drawings and implementations, and its specific implementation process is as follows:

[0040] like Figures 1 to 5 As shown, the present invention provides a multifunctional prefabricated pile cap for a pile-net composite foundation, comprising: a connecting device 1 and a pile cap body 6;

[0041] The connecting device 1 is sleeved and fixed on the outer side of the top of the pile body 5, the top surface of the connecting device 1 is flush with the top surface of the pile top, a plurality of protrusions 73 are provided on the top of the connecting device 1, and a plurality of connecting grouting holes 82 with internal threads are provided on the top of the connecting device 1;

[0042] The bottom surface of the pile cap body 6 has a corresponding groove 9 at the protrusion 73 of the connecting device 1, and the pile cap body 6 is provided with a pile cap grouting connection hole 10 at the corresponding connection grouting hole 82. The connection grouting hole 82 and the pile cap grouting connection hole 10 correspond to each other and are connected. After grouting through the pile cap grouting connection hole 10, the pile cap body 6 and the connecting device 1 are connected by bolts 11, and the top of the bolt 11 is sealed.

[0043] The technical solution may also include the following technical details to better achieve the technical effect: a plurality of mutually connected grooves 9 are provided on the inner wall of the connecting device 1 along the height direction, and the connecting grouting holes 82 are connected to the grooves 9 .

[0044] The technical solution may also include the following technical details to achieve better technical effects: the appearance of the connecting device 1 is a circular ring, a square ring or a polygonal ring. The appearance of the pile cap body 6 is circular or square.

[0045] The technical solution may also include the following technical details to better achieve the technical effect: a sealing ring 4 is provided at the bottom end of the inner wall of the connecting device 1 , the sealing ring 4 is bonded or embedded at the bottom end of the inner wall of the connecting device 1 , and the sealing ring 4 is consistent with the pile body 5 .

[0046] The technical solution may further include the following technical details to better achieve the technical effect: the protrusion 73 is a hemispherical or conical protrusion 73.

[0047] This technical solution may also include the following technical details to better achieve the technical effect: Figure 6 As shown, it also includes an eccentric load adjustment device, which includes:

[0048] A pair of card seats 12, wherein the card seats 12 are semicircular ring structures, and the pair of card seats 12 are in a circular ring shape after being connected, and the pair of card seats 12 are detachably installed on the outside of the connecting device 1, and the tops are flush with the top of the connecting device 1;

[0049] Four groups of pressure sensors 13 are installed in the grooves 9 around the top surface of the card holder 12 at equal intervals, and the top surface of the pressure sensors 13 is flush with the top of the connecting device 1;

[0050] Four groups of hydraulic telescopic rods 14 are installed at equal intervals on the outer sides of the top surface of the card holder 12. The hydraulic telescopic rods 14 correspond to the pressure sensors 13 one by one. In this embodiment, the hydraulic telescopic rods 14, the pressure sensors 13 and the center of the connecting device 1 are connected on the same straight line;

[0051] Alarm;

[0052] A controller, used to receive information from the pressure sensor 13, and control the extension and retraction of the hydraulic telescopic rod 14 and the alarm of the alarm;

[0053] A connecting piece is provided at the bottom of the pile cap body 6 corresponding to the hydraulic telescopic rod 14 , and the hydraulic telescopic rod 14 is connected to the pile cap body 6 via the connecting piece.

[0054] In another technical solution, a construction method of a multifunctional prefabricated pile cap for a pile-net composite foundation is provided, comprising the following steps:

[0055] 1) Install the connecting device 1 on the pile top, the sealing ring 4 is matched with the pile body 5, and the sealing ring 4 is selected according to the pile diameter or side length;

[0056] 2) Apply adhesive to the top of the pile and the top of the connecting device 1;

[0057] 3) hoisting the pile cap body 6 to the corresponding position of the connecting device 1 and the pile top, aligning the protrusion 73 of the connecting device 1 with the groove 9 below the pile cap body 6, and aligning the pile cap grouting connection hole 10 with the grouting connection hole 82 of the connecting device 1;

[0058] 4) Grouting is performed using the grouting holes. After the grouting is completed, the bolts 11 are connected and the tops of the bolts 11 are sealed to complete the connection between the connecting device 1, the pile cap body 6 and the pile body 5.

[0059] The present invention can be applied to the connection between a prefabricated pile cap and a pile body 5. Compared with the traditional connection between a prefabricated pile cap and a pile body 5, the present invention can realize the connection between prefabricated pile caps and pile bodies 5 of different sizes and types by adjusting the shape and size of the sealing ring 4 and the connecting device 1, thereby reducing the weight of the prefabricated pile cap, and the construction method is simple. The connection between the pile cap and the pile body 5 can be quickly realized, and the advantages of prefabrication and assembly can be fully utilized.

[0060] The technical solution may also include the following technical details to better achieve the technical effect: when the prefabricated pile cap includes an eccentric load adjustment device, the controller is set to:

[0061] The relative pressure sensors 13 in the four groups of pressure sensors 13 are grouped in pairs. When the pressure difference detected by the two pressure sensors 13 in the same group is greater than the set value F, the controller controls the hydraulic telescopic rods 14 corresponding to the two pressure sensors 13 to push up or pull down, and controls the alarm to sound.

[0062] Specifically, the hydraulic telescopic rod 14 corresponding to the pressure sensor 13 on the side with a larger pressure value pushes the pile cap body 6, and the hydraulic telescopic rod 14 corresponding to the pressure sensor 13 on the side with a smaller pressure value pulls down the pile cap body 6, thereby balancing the force on the pile cap body 6 and preventing the pile cap body 6 from falling off.

[0063] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes. They can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the embodiments shown and described herein.

Claims

1. A multifunctional prefabricated pile cap for a pile-net composite foundation, characterized in that: include: Connecting device and pile cap body; The connecting device is sleeved and fixed on the outer side of the top of the pile body, the top surface of the connecting device is flush with the top surface of the pile top, a plurality of protrusions are arranged above the connecting device, and a plurality of connecting grouting holes with internal threads are arranged above the connecting device; The bottom surface of the pile cap body has a corresponding groove at the protrusion of the connecting device, and the pile cap body is provided with a pile cap grouting connection hole corresponding to the connection grouting hole. The connection grouting hole and the pile cap grouting connection hole correspond to each other and are connected. After grouting through the pile cap grouting connection hole, the pile cap body and the connecting device are connected by bolts, and the top of the bolt is sealed.

2. The multifunctional prefabricated pile cap for pile-net composite foundation according to claim 1, characterized in that: The inner wall of the connecting device is provided with a plurality of mutually connected grooves along the height direction, and the connecting grouting holes are connected with the grooves.

3. The multifunctional prefabricated pile cap for pile-net composite foundation according to claim 1 or 2, characterized in that: The connecting device has an appearance of a circular ring, a square ring or a polygonal ring.

4. The multifunctional prefabricated pile cap for pile-net composite foundation according to claim 1, characterized in that: A sealing ring is arranged at the bottom end of the inner wall of the connecting device, and the sealing ring is bonded or embedded at the bottom end of the inner wall of the connecting device.

5. The multifunctional prefabricated pile cap for pile-net composite foundation according to claim 1, characterized in that: The protrusion is a hemispherical or conical protrusion.

6. The multifunctional prefabricated pile cap for pile-net composite foundation according to claim 1, characterized in that: Also included is an eccentric load adjustment device, which includes: A pair of card seats, the card seats are semicircular ring structures, the pair of card seats are detachably installed on the outside of the connecting device, and the tops are flush with the top of the connecting device; Four groups of pressure sensors are installed in grooves around the top surface of the card holder at equal intervals, and the top surface of the pressure sensor is flush with the top of the connecting device; Four groups of hydraulic telescopic rods are installed at equal intervals on the outer sides of the top surface of the card seat, and the hydraulic telescopic rods correspond to the pressure sensors one by one; Alarm; A controller, used to receive information from the pressure sensor and control the extension and retraction of the hydraulic telescopic rod and the alarm of the alarm; A connecting piece is arranged at the bottom of the pile cap body corresponding to the hydraulic telescopic rod, and the hydraulic telescopic rod is connected to the pile cap body through the connecting piece.

7. A construction method using the multifunctional prefabricated pile cap for the pile-net composite foundation according to any one of claims 1 to 6, characterized in that: The following steps are involved: 1) Install the connection device on the top of the pile, and make sure the sealing ring fits the pile body; 2) Apply adhesive to the top of the pile and the top of the connecting device; 3) Hoist the pile cap body to the corresponding position of the connecting device and the pile top, align the protrusion of the connecting device with the groove below the pile cap body, and align the grouting connection hole of the pile cap with the grouting connection hole of the connecting device; 4) Use the grouting holes to carry out grouting. After the grouting is completed, the bolt connection is carried out and the top of the bolt is sealed to complete the connection between the connecting device, the pile cap body and the pile body.

8. The construction method of the multifunctional prefabricated pile cap for the pile-net composite foundation according to claim 7, characterized in that: When the prefabricated pile cap includes an eccentric load adjustment device, the controller is configured as follows: The relative pressure sensors in the four groups of pressure sensors are grouped in pairs. When the pressure difference detected by the two pressure sensors in the same group is greater than the set value F, the controller controls the hydraulic telescopic rods corresponding to the two pressure sensors to push up or pull down, and controls the alarm to sound. Specifically, the hydraulic telescopic rod corresponding to the pressure sensor on the side with a larger pressure value pushes up the pile cap body, and the hydraulic telescopic rod corresponding to the pressure sensor on the side with a smaller pressure value pulls down the pile cap body.