Prestressed high-strength concrete (PHC) pipe pile hammering method construction initial parameter adjusting method
By adjusting the initial parameters of trial pile driving during the construction of PHC pipe pile hammering method, we ensure that the average hammering energy and hammer penetration degree of single pile are within the design value range of 1.05-1.20 times, the hammering energy is insufficient or over-pressed. The problem has improved the quality of pile driving and reduced costs and construction period.
Patent Information
- Application Number
- CN202411102180.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-11-29
AI Technical Summary
There are situations in the construction of the existing PHC pipe pile hammering method where the hammering capacity is insufficient or overdrive, resulting in insufficient bearing capacity of the pile foundation or damage to the integrity of the pile body, resulting in waste of pipe piles and extended construction period.
By setting and adjusting the initial parameters during the trial pile driving stage, including the hammer weight, hammer drop distance, single pile hammer number and hammer penetration degree, the pile body integrity and vertical bearing capacity are detected, and the average of single piles is calculated. The hammering energy and average hammer penetration degree are used as parameters for formal construction to ensure that the pile foundation bearing capacity is within the design value range of 1.05-1.20 times, and prevent overshoot and damage.
It effectively guarantees the bearing capacity of the pile foundation, reduces construction costs, shortens construction period, and prevents excessive damage and waste of the pile body.
Abstract
Description
Technical Field
[0001] The invention relates to pipe pile construction, in particular to a method for adjusting initial parameters in PHC pipe pile hammering construction. Background Art
[0002] PHC piles, or prestressed high-intensity concrete piles, are hollow cylindrical members of equal cross-section. During construction, they are sunk into the ground by hammering or static pressure as the foundation of the building. In the process of pile construction using the hammering method, multiple PHC piles need to be driven into the ground in sequence, end to end, until the requirements of bearing capacity and penetration are met. At the same time, in order to ensure the quality of construction, pile driving tests are usually carried out during formal construction to adjust the construction parameters, calculate the number of hammer blows and hammer drop distance of each pile, form a pile test report, and then carry out construction according to the initial parameters of the pile test report, or fine-tune individual initial parameters and use them as construction parameters for construction. However, the current pile driving tests generally have insufficient or over-hammering energy, which leads to insufficient bearing capacity of the pile foundation, or damages the integrity of the pile body, and causes waste of piles and extended construction period. Summary of the invention
[0003] The purpose of the present invention is to provide a method for adjusting initial parameters of a PHC pipe pile hammering method construction, which can effectively ensure the bearing capacity of the pile foundation and prevent over-driving, so as to improve the pile driving quality, reduce the construction cost and shorten the construction period.
[0004] The method for adjusting initial parameters of the PHC pile hammer construction method of the present invention comprises the following steps: A. Set the initial parameters of the trial pile driving according to the construction requirements: hammer weight m, drop distance h, number of single pile hammer blows N, and penetration λ of the hammer; B. Conduct vertical bearing capacity and pile integrity tests on the pile foundation during the trial driving stage; C. Count the number of piles X whose pile body integrity meets specific requirements and whose single pile vertical bearing capacity is within the range of 1.05-1.20 times; at the same time, count the single pile hammer number N and single pile hammer kinetic energy Ek, the total hammer number ∑N and total hammer energy ∑Ek, and the total hammer penetration ∑λ of these piles; D. Calculate the average hammer energy of the pile in step C, EK = ∑Ek / X, and the average hammer penetration of the pile `λ = ∑λ / X; E. The average hammer energy of a single pile and the average hammer penetration of a single pile are used as the initial parameters for the PHC pipe pile hammer construction method.
[0005] Furthermore, the pile integrity meets the requirements of Class I piles.
[0006] Furthermore, the drop distance h of the pile hammer is 0.6 m.
[0007] Alternatively, the drop distance h of the pile hammer includes a first drop distance h1 and a second drop distance h2 with different drop distances. The number of hammering times with the first drop distance is N1, and the number of hammering times with the second drop distance is N2. The kinetic energy of single pile hammering Ek=N*mv² / 2=N1*mgh1+N2*mgh2.
[0008] Furthermore, each pipe pile is first hammered with a first drop distance and then hammered with a second drop distance.
[0009] Furthermore, the first drop distance h1 is 0.4 meters, and the second drop distance h2 is 0.6 meters.
[0010] The method for adjusting the initial parameters of the PHC pile hammering method of the present invention is to first perform a construction trial pile driving according to the construction parameters provided by the construction drawing before the formal construction. The number of the construction trial pile driving can be determined according to the importance of the building and the total number of engineering piles, which is generally 50-60. After the trial piling is completed, all single pile vertical bearing capacity and pile body integrity tests are carried out; after the test is completed, the number of piles X with pile body integrity of Class I and single pile vertical compressive bearing capacity characteristic value of (1.05-1.20) Ra (Ra- is the designed single pile vertical bearing capacity characteristic value) is counted; at the same time, the single pile hammer number N and single pile hammer kinetic energy Ek=N*mv² / 2=N1*mgh1+N2*mgh2, total hammer number ∑N and total hammer energy ∑Ek, and hammer penetration ∑λ of these piles are counted; the average hammer energy of single pile `EK=∑Ek / X and the average hammer penetration of single pile `λ=∑λ / X of this batch of piles are calculated; finally, the pile foundation construction is carried out according to the adjusted parameters `EK and `λ as the main construction parameters. Experiments have shown that the setting of the (1.05-1.20) Ra characteristic value can more effectively ensure that the bearing capacity of the pile foundation meets the design requirements and prevent over-impact from damaging the integrity of the pile body; using 1.20Ra and 1.05Ra as the upper and lower limit areas of the calculation, the total hammer energy of the pile foundation and the average hammer energy of a single pile are calculated, which can effectively ensure that the bearing capacity of the pile foundation meets the design requirements, limit the redundancy of the pile foundation bearing capacity, and prevent the PHC pipe pile from damaging the integrity of the pile body due to excessive hammer energy. DETAILED DESCRIPTION
[0011] For a certain project, the φ600AB pile has a designed vertical compressive bearing capacity characteristic value of Ra=3000kN. Construction parameters: pile hammer weight m=160kN, drop distance h=0.60m, hammer penetration λ=25mm.
[0012] According to the above initial parameters, 50 trial piles were driven.
[0013] The trial piles were tested using the low-strain and high-strain methods. There were 48 piles whose pile integrity was Class I and whose characteristic value of vertical compressive bearing capacity of single pile was in the range of (1.05-1.20)Ra (i.e. 1.05*3000-1.20*3000kN).
[0014] The statistics are as follows: The first pile: 600 hits (N) at a drop distance of 0.40m (h), 900 hits at a drop distance of 0.60m, and the hammer penetration is 28. The hammer energy of this pile is Ek=N*mgh=600×160×0.4+900×160×0.6=124800 (KJ).
[0015] Similarly, calculate the hammer energy of the 2nd, 3rd, 4th ... 48th piles respectively.
[0016] Calculate the average hammer energy `EK=∑Ek / X and the average penetration `λ of these 48 piles.
[0017] The pile foundation is officially under construction. The total number of hammers for a single pile in the construction is controlled according to the above `EK, and the penetration of the hammer is controlled according to `λ.
[0018] The invention provides a method for adjusting initial parameters of a PHC pipe pile hammer construction method.
[0019] The method for adjusting the initial parameters of the PHC pile hammering construction method of this embodiment comprises the following steps: The approval process is carried out in the form of a project contact form (proposed by the construction party → supervision → design → owner).
[0020] A special meeting was held to discuss and confirm the construction parameters - hammer weight m, pile hammer drop distance h, hammer number N, average hammer energy of a single pile `EK=∑Ek / X and average penetration `λ.
[0021] Explanation of piling parameters.
[0022] The initial parameter adjustment method for the PHC pipe pile hammering method construction is that the characteristic values of the vertical bearing capacity of a single pile are N1=1.05 and N2=1.2. Experiments have shown that this can more effectively ensure that the bearing capacity of the pile foundation meets the design requirements and prevent over-driving from damaging the integrity of the pile body.
[0023] The initial parameter adjustment method for the PHC pipe pile hammer construction method uses the single pile hammer energy with a single pile vertical bearing capacity characteristic value of 1.05-1.20 times the design bearing capacity characteristic value as the lower and upper limit hammer energy of the hammering method for piling analysis and statistical data; the total hammer energy of the pile foundation and the average hammer energy of the single pile within the upper and lower limit range are calculated, thereby ensuring that the pile foundation bearing capacity meets the design requirements and limiting the redundancy of the pile foundation bearing capacity, preventing the PHC pipe pile from destroying the integrity of the pile body due to excessive hammer energy.
[0024] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification under the inventive concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.
Claims
1. The initial parameter adjustment method of PHC pile hammer construction is characterized by The following steps are involved: A. Set the initial parameters of the trial pile driving according to the construction requirements: hammer weight m, drop distance h, number of single pile hammer blows N, and penetration λ of the hammer; B. Conduct vertical bearing capacity and pile integrity tests on the pile foundation during the trial driving stage; C. Count the number of piles X whose pile body integrity meets specific requirements and whose single pile vertical bearing capacity is within the range of 1.05-1.20 times; at the same time, count the single pile hammer number N and single pile hammer kinetic energy Ek, the total hammer number ∑N and total hammer energy ∑Ek, and the total hammer penetration ∑λ of these piles; D. Calculate the average hammer energy of the pile in step C, EK = ∑Ek / X, and the average hammer penetration of the pile `λ = ∑λ / X; E. The average hammer energy of a single pile and the average hammer penetration of a single pile are used as the initial parameters for the PHC pipe pile hammer construction method.
2. The method for adjusting initial parameters of PHC pile hammering construction according to claim 1, characterized in that: The pile body integrity meets the requirements of Class I piles.
3. The method for adjusting initial parameters of PHC pile hammering construction according to claim 1, characterized in that: The drop distance h of the pile hammer is 0.6m.
4. The method for adjusting initial parameters of PHC pile hammer construction according to claim 1, characterized in that: The drop distance h of pile hammering includes a first drop distance h1 and a second drop distance h2 with different drop distances. The number of hammering times with the first drop distance is N1, and the number of hammering times with the second drop distance is N2. The kinetic energy of single pile hammering Ek=N*mv² / 2=N1*mgh1+N2*mgh2.
5. The method for adjusting initial parameters of PHC pile hammer construction according to claim 4, characterized in that: Each pile is first hammered with a first drop distance and then hammered with a second drop distance.
6. The method for adjusting initial parameters of PHC pile hammer construction according to claim 4, characterized in that: The first drop distance h1 is 0.4 meters, and the second drop distance h2 is 0.6 meters.