Switching platform car for replacing large wind tunnel test section and mounting and using method thereof

By designing a transfer platform vehicle with air float components and thrust cylinder, combined with the connection between the redirecting component and the resident door, the complexity and automation problems of large wind tunnel replacement test sections are solved, and efficient and intelligent test section replacement is achieved. process.

CN119043640APending Publication Date: 2024-11-29CHINA AERODYNAMIC RES & DEV CENT EQUIP DESIGN & TESTING TECH INST
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411405878.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-10
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

When replacing test sections of large wind tunnels, the existing methods are complex and difficult to achieve automation, resulting in cumbersome installation of support tracks with high weight, which cannot meet the intelligent needs of modern wind tunnel design, construction, operation and maintenance.

Method used

A 6×5 support matrix adapter platform vehicle consisting of 30 supports is designed, equipped with air float assembly and thrust cylinder, which lifts the platform vehicle through the air float assembly, and uses the thrust cylinder to drive the platform vehicle forward or backward, and The method of automatically replacing the test section is realized by connecting the repillar assembly to the resident door frame.

Benefits of technology

The automation level of the replacement test section of large wind tunnels has been improved, the installation and use process has been simplified, and the intelligent needs of large wind tunnels have been met, and the efficient and precise control of the replacement test section has been achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119043640A_ABST
    Figure CN119043640A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of large wind tunnel tests, and discloses a switching platform car for replacing a large wind tunnel test section and a mounting and using method thereof. An air floating assembly is installed on the bottom face of a support of the transfer platform car, the air floating assembly floats the transfer platform car, and a thrust oil cylinder pushes the transfer platform car. Guide wheels are installed on the two sides of the transfer platform car, limiting stop blocks are installed on the wall faces on the two sides of the advancing route, and the transfer platform car is kept to move along the straight line; a rotating pin assembly is arranged on the lower left portion of a main beam of the transfer platform car, and a rotating pin is driven by an electric push rod to rotate by 90 degrees, so that the rotating pin is engaged and locked with a rotating pin hole in a door frame of the parking chamber, reliable connection between the transfer platform car and the parking chamber is guaranteed, and it is guaranteed that a test section stably walks on a traveling track. The mounting method and the using method can automatically control the operation of the transfer platform car, realize the floating, driving, landing and locking of the transfer platform car, and meet the intelligent requirements in the design, construction, operation and maintenance process of the large wind tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of large-scale wind tunnel tests, and in particular relates to a transfer platform vehicle for replacing a large-scale wind tunnel test section and an installation and use method thereof. Background Art

[0002] In order to meet the needs of different test types, large wind tunnels are usually equipped with multiple types of test sections. When conducting different types of wind tunnel tests, different types of test sections need to be replaced. The test section of a large wind tunnel can weigh thousands of tons, which is far more than the lifting weight of a general crane. Therefore, at present, when replacing the test section of a large wind tunnel, wheel groups are usually used for transportation, and the wheel groups must run on customized and reinforced driving tracks.

[0003] The test section of a large wind tunnel is generally located inside the chamber, so the test section needs to enter and exit from the chamber door. Due to the wind tunnel's requirements for sealing, sealing components are installed around the chamber door. The size of this sealing component is usually large, and a groove must be dug on the ground for the passage and sealing of the chamber door, resulting in the disconnection of the driving track. The conventional method is to make another set of support tracks, fill the support tracks into the grooves after the chamber door is opened, and then take out the support tracks after the test section passes, and the chamber door can be closed. Because the thickness of the chamber door of a large wind tunnel is extremely large, up to 2 to 3 meters, the required support track size is also large, and the weight can reach several tons. It must rely on mechanized handling and installation, and the process is complicated and difficult to automate. The design, construction, and operation and maintenance processes of modern large-scale advanced wind tunnels all have intelligent requirements, and the conventional method of replacing the test section cannot achieve this goal.

[0004] Currently, there is an urgent need to develop a transfer platform vehicle for replacing a large wind tunnel test section and a method for installing and using the same. Summary of the invention

[0005] One technical problem to be solved by the present invention is to provide a transfer platform vehicle for replacing a large wind tunnel test section. Another technical problem to be solved by the present invention is to provide an installation method for a transfer platform vehicle for replacing a large wind tunnel test section. Still another technical problem to be solved by the present invention is to provide a method for using a transfer platform vehicle for replacing a large wind tunnel test section, so as to overcome the defects of the prior art.

[0006] The transfer platform vehicle for replacing a large wind tunnel test section of the present invention has a 6×5 support matrix composed of 30 supports, with 6 supports in the horizontal direction and 5 supports in the vertical direction; each adjacent support is connected by a crossbeam located at the lower section of the support, all the crossbeams form a grid, and the supports constitute grid nodes; an air flotation component is assembled on the bottom surface of each support; Five parallel transverse main beams are installed on the top of the support matrix, which are the first, second, third, fourth and fifth main beams from top to bottom. A driving track is installed on the symmetrical center line of the top surface of each main beam; each main beam extends to the left to form a cantilever, and each cantilever has the same length; a rotation pin assembly is installed on the bottom surface of each main beam and on the left side of the first support on the left side; A longitudinal load-bearing beam is installed below the middle sections of the first, second, fourth and fifth main beams respectively. A thrust support is fixed at the center of the left side of each load-bearing beam. A thrust cylinder is fixed on the left side of the thrust support. The left end of the thrust cylinder is connected to the frame of the door of the wind tunnel station room. The cantilevers of adjacent main beams are connected by a plurality of parallel left-end connecting beams which are distributed in the transverse direction in the same number and at equal distances; the adjacent main beams are connected by a plurality of parallel right-end connecting beams which are distributed in the transverse direction in the same number and at equal distances; On the outer side surfaces of the first main beam and the fifth main beam, side long beams are respectively installed at the left and right ends, and between the two side long beams, a number of side short beams are sequentially installed in the transverse direction; on the left and right ends of the opposite sides of two adjacent main beams, middle long beams are respectively installed, and between the two middle long beams, a number of middle short beams are sequentially installed in the transverse direction; A plurality of cantilever beams corresponding to the left end connecting beams are installed on the outer side surface of the cantilever of the first main beam, and a plurality of cantilever beams corresponding to the left end connecting beams are installed on the outer side surface of the cantilever of the fifth main beam; A plurality of middle cover plates are sequentially laid horizontally on top of a plurality of parallel left end connecting beams and right end connecting beams; a plurality of side cover plates are sequentially laid horizontally on top of a plurality of parallel cantilever beams, side long beams, and side short beams; the upper surfaces of the middle cover plate and the side cover plates are flush with the upper surface of the driving track; Guide wheels evenly distributed laterally are installed on the outer sides of the side long beams and the side short beams; and limit blocks matching the guide wheels are installed on the walls on both sides of the travel route of the transfer platform vehicle.

[0007] Furthermore, the mounting seat of the swivel pin assembly is horizontally fixed to the bottom surface of the main beam by means of screw connection, a right-angle adapter is fixed to the left end surface of the mounting seat, an L-shaped adapter is fixed to the horizontal surface of the right-angle adapter, and the swivel pin, rocker arm, connecting beam, front pin seat, electric push rod and tail pin seat are connected in sequence between the side surface of the mounting seat and the vertical surface of the L-shaped adapter.

[0008] The installation method of the transfer platform vehicle for replacing a large wind tunnel test section of the present invention comprises the following steps: S31. Establishing a support matrix; An air flotation assembly is assembled on the bottom surface of each support, and then 30 supports are arranged into a 6×5 support matrix, with adjacent supports connected by a crossbeam located at the lower section of the support; S32. Install the main beam and the driving track; Install 5 parallel transverse main beams on the top of the support matrix, and install a driving track on the symmetrical center line of the top surface of each main beam, debug the installation position of the driving track, and ensure that the driving track meets the position accuracy requirements; S33. Install the thrust cylinder; Install the two load-bearing beams at the corresponding bolt holes below the middle sections of the first and second, fourth and fifth main beams respectively, and fix the thrust support and thrust cylinder to the left in sequence, and then connect and fix the left end of the thrust cylinder to the corresponding bolt hole on the door frame of the station room; S34. Install the transfer pin assembly; Install the rotating pin assembly at the corresponding bolt hole position on the lower left side of each main beam, adjust the rotating pin assembly so that it can rotate 90 degrees without obstacles, and the rotating pin can smoothly engage or disengage with the rotating pin hole on the door frame of the resident room; S35. Install the accessories of the transfer platform vehicle; A cantilever beam, a left end connecting beam, a side long beam, a side short beam, a middle short beam, a middle long beam and a right end connecting beam are installed on the main beam; guide wheels are installed on the outer sides of the side long beam and the side short beam; a middle cover plate and two side cover plates are laid to allow staff and conventional vehicles to walk on the transfer platform vehicle; The method for using the transfer platform vehicle for replacing a large wind tunnel test section of the present invention comprises the following steps: S41. Floating transfer platform vehicle; Normally, the transfer platform vehicle is stationary at the preparation station outside the door of the resident room; When preparing for the test, open the door of the station room, inflate the air flotation assembly, and the transfer platform vehicle floats up under the action of the air flotation assembly, with a floating height of 30mm to 50mm. The rotation pin of the rotation pin assembly is vertically aligned with the rotation pin hole on the frame of the station room door; S42. Mobile transfer platform vehicle; The thrust cylinder is loaded, and the thrust cylinder drives the transfer platform vehicle to move forward in a straight line under the constraints of the guide wheel and the limit block, and moves into the door of the station room. The cantilever of the main beam of the transfer platform vehicle is overlapped on the frame of the door of the station room, and the transfer pin is inserted into the transfer pin hole on the frame of the door of the station room; S43. Positioning transfer platform vehicle; After the transfer platform vehicle is moved into position, the transfer platform vehicle fits into the frame of the station door, the thrust cylinder is unloaded, the air flotation assembly stops inflating, the transfer platform vehicle lands on the ground, and the support supports the transfer platform vehicle; S44. Lock the transfer platform vehicle; The electric push rod pushes the rotation pin to rotate about 90° in the positive direction, so that the rotation pin fits tightly with the rotation pin hole on the door frame of the station room, realizing the limit locking of the transfer platform vehicle, and the test section moves to the specified position on the transfer platform vehicle, completing the replacement of the test section; S45. Return transfer platform vehicle; The electric push rod pushes the transfer pin to rotate about 90° in the opposite direction, cancels the limit lock of the transfer platform vehicle, inflates the air float component, and the transfer platform vehicle floats 30mm to 50mm. The thrust cylinder drives the transfer platform vehicle to move in a straight line in the opposite direction under the constraints of the guide wheels and the limit block to the preparation station outside the door of the station room, unloads the thrust cylinder, stops inflating the air float component, and the transfer platform vehicle lands and stops at the preparation station.

[0009] The transfer platform vehicle for replacing a large wind tunnel test section and the installation and use method thereof of the present invention have the following technical features: 1. An air flotation component is installed on the bottom of the support of the transfer platform vehicle. After the air flotation component is inflated, the transfer platform vehicle can float off the ground, and then it can be easily pushed using a thrust cylinder; 2. Guide wheels are installed on both sides of the transfer platform vehicle, and limit blocks are installed on the walls on both sides of the transfer platform vehicle's route to keep the transfer platform vehicle moving in a straight line and effectively position the transfer platform vehicle, thereby ensuring that the driving track on the transfer platform vehicle is effectively connected with the driving track inside the station room; 3. A rotating pin assembly is provided at the lower left of the main beam of the transfer platform vehicle. The rotating pin is rotated 90° by an electric push rod, so that the rotating pin is engaged and locked with the rotating pin hole on the door frame of the station room, ensuring a reliable connection between the transfer platform vehicle and the station room, and ensuring that the test section runs smoothly on the driving track; 4. The transfer platform vehicle’s floating, driving, landing, locking and other operating processes are orderly and tight, and the transfer platform vehicle’s operation can be automatically controlled, which can meet the intelligent needs of the design, construction, operation and maintenance of large wind tunnels.

[0010] In short, the transfer platform vehicle for replacing a large wind tunnel test section of the present invention and the installation and use method thereof, by lifting the test section through an air flotation component and driving the test section forward or backward through a thrust cylinder, improves the automation level of replacing the test section of a large wind tunnel, solves the difficult problem of replacing the test section of a large wind tunnel, and has practical engineering value. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a front view of the transfer platform vehicle for replacing a large wind tunnel test section of the present invention; Figure 2 It is a left view of the transfer platform vehicle for replacing a large wind tunnel test section according to the present invention; Figure 3 A top view of a transfer platform vehicle for replacing a large wind tunnel test section according to the present invention; Figure 4 It is a top view of the transfer platform vehicle for replacing a large wind tunnel test section of the present invention with the cover plate assembly hidden; Figure 5 A bottom view of a transfer platform vehicle for replacing a large wind tunnel test section according to the present invention; Figure 6 It is a front view of the transfer pin assembly of the transfer platform vehicle for replacing a large wind tunnel test section of the present invention; Figure 7 A top view of a transfer pin assembly of a transfer platform vehicle for replacing a large wind tunnel test section according to the present invention.

[0012] In the figure, 1. support; 2. cross beam; 3. main beam; 4. guide wheel; 5. load-bearing beam; 6. thrust support; 7. thrust cylinder; 8. swivel pin assembly; 9. middle cover plate; 10. two side cover plates; 11. driving track; 12. cantilever beam; 13. left end connecting beam; 14. side long beam; 15. side short beam; 16. middle short beam; 17. middle long beam; 18. right end connecting beam; 19. air flotation assembly; 8-1. Rotating pin; 8-2. Rocker arm; 8-3. Connecting beam; 8-4. Front pin seat; 8-5. Electric push rod; 8-6. Tail pin seat; 8-7. Right angle adapter seat; 8-8. L-type adapter seat; 8-9. Mounting seat. DETAILED DESCRIPTION

[0013] The present invention is described in detail below with reference to the accompanying drawings and embodiments.

[0014] Example: Figure 1 to Figure 7 As shown, the transfer platform vehicle for replacing the large wind tunnel test section of this embodiment has a 6×5 support matrix composed of 30 supports 1, and the support matrix has 6 supports 1 in the horizontal direction and 5 supports 1 in the vertical direction; each adjacent support 1 is connected by a crossbeam 2 located at the lower section of the support 1, all the crossbeams 2 form a grid, and the support 1 constitutes a grid node; an air flotation component 19 is installed on the bottom surface of each support 1; Five parallel transverse main beams 3 are installed on the top of the support 1 of the support matrix, which are the first, second, third, fourth and fifth main beams 3 from top to bottom, and a driving track 11 is installed on the symmetrical center line of the top surface of each main beam 3; each main beam 3 extends to the left to form a cantilever, and each cantilever has the same length; a rotation pin assembly 8 is installed on the bottom surface of each main beam 3 and on the left side of the first support 1 on the left side; A longitudinal load-bearing beam 5 is installed below the middle sections of the first, second, fourth and fifth main beams 3, respectively. A thrust support 6 is fixed at the center of the left side of each load-bearing beam 5. A thrust cylinder 7 is fixed to the left side of the thrust support 6. The left end of the thrust cylinder 7 is connected to the frame of the door of the wind tunnel station chamber. The cantilevers of adjacent main beams 3 are connected by a plurality of parallel left end connecting beams 13 which are distributed in the transverse direction in the same number and at the same distance; the adjacent main beams 3 are connected by a plurality of parallel right end connecting beams 18 which are distributed in the transverse direction in the same number and at the same distance; On the outer side surfaces of the first main beam 3 and the fifth main beam 3, side long beams 14 are respectively installed at the left and right ends, and between the two side long beams 14, a plurality of side short beams 15 are sequentially installed in the transverse direction; on the left and right ends of the opposite sides of two adjacent main beams 3, a middle long beam 17 is respectively installed, and between the two middle long beams 17, a plurality of middle short beams 16 are sequentially installed in the transverse direction; A plurality of cantilever beams 12 corresponding to the left end connecting beam 13 are installed on the outer side surface of the cantilever of the first main beam 3, and a plurality of cantilever beams 12 corresponding to the left end connecting beam 13 are installed on the outer side surface of the cantilever of the fifth main beam 3; A plurality of middle cover plates 9 are sequentially laid horizontally on top of a plurality of parallel left end connecting beams 13 and right end connecting beams 18; a plurality of side cover plates 10 are sequentially laid horizontally on top of a plurality of parallel cantilever beams 12, side long beams 14, and side short beams 15; the upper surfaces of the middle cover plate 9 and the side cover plates 10 are flush with the upper surface of the vehicle track 11; Guide wheels 4 evenly distributed laterally are installed on the outer sides of the side long beams 14 and the side short beams 15; and limit blocks matching the guide wheels 4 are installed on the walls on both sides of the travel route of the transfer platform vehicle.

[0015] Furthermore, the mounting seat 8-9 of the swing pin assembly 8 is horizontally fixed to the bottom surface of the main beam 3 by means of screw connection, a right-angle adapter seat 8-7 is fixed to the left end surface of the mounting seat 8-9, an L-shaped adapter seat 8-8 is fixed to the horizontal surface of the right-angle adapter seat 8-7, and a swing pin 8-1, a rocker arm 8-2, a connecting beam 8-3, a front pin seat 8-4, an electric push rod 8-5 and a tail pin seat 8-6 are sequentially connected between the side surface of the mounting seat 8-9 and the vertical surface of the L-shaped adapter seat 8-8.

[0016] The installation method of the transfer platform vehicle for replacing a large wind tunnel test section in this embodiment includes the following steps: S31. Establishing a support matrix; An air flotation assembly 19 is assembled on the bottom surface of each support 1, and then 30 supports 1 are arranged into a 6×5 support matrix, and each adjacent support 1 is connected by a crossbeam 2 located at the lower section of the support 1; S32. Install the main beam 3 and the driving track 11; Five parallel transverse main beams 3 are installed on the top of the support 1 of the support matrix, and a driving track 11 is installed on the symmetrical center line of the top surface of each main beam 3, and the installation position of the driving track 11 is debugged to ensure that the driving track 11 meets the position accuracy requirements; S33. Install the thrust cylinder 7; Install the two load-bearing beams 5 at the corresponding bolt holes below the middle sections of the first and second, fourth and fifth main beams 3, respectively, and fix the thrust support 6 and the thrust cylinder 7 to the left in sequence, and then connect and fix the left end of the thrust cylinder 7 to the corresponding bolt hole on the frame of the station room door; S34. Install the transfer pin assembly 8; Install the rotation pin assembly 8 at the corresponding bolt hole position at the lower left of each main beam 3, adjust the rotation pin assembly 8, so that the rotation pin assembly 8 can rotate 90 degrees without obstacles, and the rotation pin 8-1 can smoothly engage or disengage with the rotation pin hole on the door frame of the station room; S35. Install the accessories of the transfer platform vehicle; A cantilever beam 12, a left end connecting beam 13, a side long beam 14, a side short beam 15, a middle short beam 16, a middle long beam 17 and a right end connecting beam 18 are installed on the main beam 3; guide wheels 4 are installed on the outer sides of the side long beam 14 and the side short beam 15; a middle cover plate 9 and two side cover plates 10 are laid to allow staff and conventional vehicles to walk on the transfer platform vehicle; The method for using the transfer platform vehicle for replacing a large wind tunnel test section in this embodiment includes the following steps: S41. Floating transfer platform vehicle; Normally, the transfer platform vehicle is stationary at the preparation station outside the door of the resident room; When preparing for the test, the door of the station room is opened, the air flotation assembly 19 is inflated, and the transfer platform vehicle floats up under the action of the air flotation assembly 19, with a floating height of 30mm to 50mm, and the rotation pin 8-1 of the rotation pin assembly 8 is aligned with the rotation pin hole on the frame of the station room door in the vertical direction; S42. Mobile transfer platform vehicle; The thrust cylinder 7 is loaded, and the thrust cylinder 7 drives the transfer platform vehicle to move forward in a straight line under the constraints of the guide wheel 4 and the limit block, and moves into the door of the station room. The cantilever of the main beam 3 of the transfer platform vehicle is overlapped on the frame of the station room door, and the transfer pin 8-1 is inserted into the transfer pin hole on the frame of the station room door; S43. Positioning transfer platform vehicle; After the transfer platform vehicle is moved into position, the transfer platform vehicle fits into the frame of the station door, the thrust cylinder 7 is unloaded, the air flotation assembly 19 stops inflating, the transfer platform vehicle falls to the ground, and the support 1 supports the transfer platform vehicle; S44. Lock the transfer platform vehicle; The electric push rod 8-5 pushes the rotation pin 8-1 to rotate about 90 degrees in the positive direction, so that the rotation pin 8-1 fits tightly with the rotation pin hole on the door frame of the station room, realizing the limit locking of the transfer platform vehicle, and the test section moves to the specified position on the transfer platform vehicle, completing the replacement of the test section; S45. Return transfer platform vehicle; The electric push rod 8-5 pushes the transfer pin 8-1 to rotate in the opposite direction by about 90°, canceling the limit lock of the transfer platform vehicle, inflating the air flotation component 19, and the transfer platform vehicle floats 30mm to 50mm. The thrust cylinder 7 drives the transfer platform vehicle to move in a straight line in the opposite direction under the constraints of the guide wheel 4 and the limit block to the preparation station outside the door of the station, unloading the thrust cylinder 7, stopping the inflation of the air flotation component 19, and the transfer platform vehicle lands and stops at the preparation station.

[0017] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and implementation modes, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional improvements and modifications can be easily implemented without departing from the principles of the present invention. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described herein.

Claims

1. Replace the transfer platform vehicle of the large wind tunnel test section, characterized in that: The transfer platform vehicle has a 6×5 support matrix composed of 30 supports (1), wherein the support matrix has 6 supports (1) in the horizontal direction and 5 supports (1) in the vertical direction; each adjacent support (1) is connected by a crossbeam (2) located at the lower section of the support (1), all the crossbeams (2) form a grid, and the supports (1) constitute grid nodes; an air flotation component (19) is installed on the bottom surface of each support (1); Five parallel transverse main beams (3) are installed on the top of the support (1) of the support matrix, which are the first, second, third, fourth and fifth main beams (3) from top to bottom, and a driving track (11) is installed on the symmetrical center line of the top surface of each main beam (3); each main beam (3) extends to the left to form a cantilever, and each cantilever has the same length; a rotation pin assembly (8) is installed on the bottom surface of each main beam (3) and on the left side of the first support (1) on the left side; A longitudinal load-bearing beam (5) is installed below the middle sections of the first, second, fourth and fifth main beams (3), respectively. A thrust support (6) is fixed at the center of the left side of each load-bearing beam (5). A thrust cylinder (7) is fixed to the left side of the thrust support (6), and the left end of the thrust cylinder (7) is connected to the frame of the door of the wind tunnel station chamber. The cantilevers of adjacent main beams (3) are connected by a plurality of parallel left end connecting beams (13) which are distributed in the transverse direction in the same number and at the same distance; the adjacent main beams (3) are connected by a plurality of parallel right end connecting beams (18) which are distributed in the transverse direction in the same number and at the same distance; On the outer side surfaces of the first main beam (3) and the fifth main beam (3), side long beams (14) are respectively installed at the left and right ends, and between the two side long beams (14), a plurality of side short beams (15) are sequentially installed in the transverse direction; on the left and right ends of the opposite side surfaces of two adjacent main beams (3), a middle long beam (17) is respectively installed, and between the two middle long beams (17), a plurality of middle short beams (16) are sequentially installed in the transverse direction; A plurality of cantilever beams (12) corresponding one-to-one to the left end connecting beam (13) are installed on the outer side surface of the cantilever of the first main beam (3), and a plurality of cantilever beams (12) corresponding one-to-one to the left end connecting beam (13) are installed on the outer side surface of the cantilever of the fifth main beam (3); A plurality of middle cover plates (9) are sequentially laid in the transverse direction on top of a plurality of parallel left end connecting beams (13) and right end connecting beams (18); a plurality of side cover plates (10) are sequentially laid in the transverse direction on top of a plurality of parallel cantilever beams (12), side long beams (14), and side short beams (15); the upper surfaces of the middle cover plate (9) and the side cover plates (10) are flush with the upper surface of the vehicle track (11); Guide wheels (4) evenly distributed in the transverse direction are installed on the outer side surfaces of the side long beam (14) and the side short beam (15); and limit blocks matching the guide wheels (4) are installed on the walls on both sides of the travel route of the transfer platform vehicle.

2. The transfer platform vehicle for replacing a large wind tunnel test section according to claim 1 is characterized in that: The mounting seat (8-9) of the rotating pin assembly (8) is horizontally fixed to the bottom surface of the main beam (3) by means of screw connection, a right-angle adapter seat (8-7) is fixed to the left end surface of the mounting seat (8-9), an L-shaped adapter seat (8-8) is fixed to the horizontal surface of the right-angle adapter seat (8-7), and a rotating pin (8-1), a rocker arm (8-2), a connecting beam (8-3), a front pin seat (8-4), an electric push rod (8-5) and a rear pin seat (8-6) are sequentially connected between the side surface of the mounting seat (8-9) and the vertical surface of the L-shaped adapter seat (8-8).

3. A method for installing a transfer platform vehicle for replacing a large wind tunnel test section, which is used for a transfer platform vehicle for replacing a large wind tunnel test section as claimed in any one of claims 1 to 2, characterized in that: The following steps are involved: S31. Establishing a support matrix; An air flotation assembly (19) is assembled on the bottom surface of each support (1), and then 30 supports (1) are arranged into a 6×5 support matrix, wherein adjacent supports (1) are connected via a crossbeam (2) located at the lower section of the support (1); S32. Installing the main beam (3) and the driving track (11); Installing five parallel transverse main beams (3) on the top of the support (1) of the support matrix, installing a running track (11) on the symmetrical center line of the top surface of each main beam (3), and debugging the installation position of the running track (11) to ensure that the running track (11) meets the position accuracy requirements; S33. Install the thrust cylinder (7); The two load-bearing beams (5) are respectively installed at the corresponding bolt holes below the middle sections of the first and second, fourth and fifth main beams (3), and the thrust support (6) and the thrust cylinder (7) are fixed to the left in sequence, and the left end of the thrust cylinder (7) is connected and fixed to the corresponding bolt hole on the frame of the station room door; S34. Install the transfer pin assembly (8); Install the rotating pin assembly (8) at the corresponding bolt hole position at the lower left of each main beam (3), adjust the rotating pin assembly (8) so that the rotating pin assembly (8) can rotate 90 degrees without obstacles, and the rotating pin (8-1) can smoothly engage or disengage with the rotating pin hole on the door frame of the station room; S35. Install the accessories of the transfer platform vehicle; A cantilever beam (12), a left end connecting beam (13), a side long beam (14), a side short beam (15), a middle short beam (16), a middle long beam (17) and a right end connecting beam (18) are installed on the main beam (3); guide wheels (4) are installed on the outer sides of the side long beam (14) and the side short beam (15); and a middle cover plate (9) and two side cover plates (10) are laid to allow staff and conventional vehicles to walk on the transfer platform vehicle.

4. A method for using a transfer platform vehicle for replacing a large wind tunnel test section, which is used for a transfer platform vehicle for replacing a large wind tunnel test section as claimed in any one of claims 1 to 2, characterized in that: The following steps are involved: S41. Floating transfer platform vehicle; Normally, the transfer platform vehicle is stationary at the preparation station outside the door of the resident room; When preparing for the test, the door of the station room is opened, the air flotation assembly (19) is inflated, and the transfer platform vehicle floats up under the action of the air flotation assembly (19), with a floating height of 30 mm to 50 mm, and the rotation pin (8-1) of the rotation pin assembly (8) is aligned with the rotation pin hole on the frame of the station room door in the vertical direction; S42. Mobile transfer platform vehicle; The thrust cylinder (7) is loaded, and the thrust cylinder (7) drives the transfer platform vehicle to move forward in a straight line under the constraints of the guide wheel (4) and the limit block, and moves into the door of the resident room, and the cantilever of the main beam (3) of the transfer platform vehicle is overlapped on the frame of the resident room door, and the transfer pin (8-1) is inserted into the transfer pin hole on the frame of the resident room door; S43. Positioning transfer platform vehicle; After the transfer platform vehicle is moved into position, the transfer platform vehicle fits into the frame of the station door, the thrust cylinder (7) is unloaded, the air flotation assembly (19) stops inflating, the transfer platform vehicle falls to the ground, and the support (1) supports the transfer platform vehicle; S44. Lock the transfer platform vehicle; The electric push rod (8-5) pushes the rotating pin (8-1) to rotate forward by about 90 degrees, so that the rotating pin (8-1) fits and presses against the rotating pin hole on the door frame of the station room, thereby realizing the limit locking of the transfer platform vehicle, and the test section moves to the specified position on the transfer platform vehicle, completing the replacement of the test section; S45. Return transfer platform vehicle; The electric push rod (8-5) pushes the rotating pin (8-1) to rotate in the opposite direction by about 90 degrees, canceling the limit lock of the transfer platform vehicle, and the air flotation assembly (19) is inflated, and the transfer platform vehicle floats 30 mm to 50 mm. The thrust cylinder (7) drives the transfer platform vehicle to move in the opposite direction along a straight line to the preparation position outside the station room door under the constraint of the guide wheel (4) and the limit stopper, and the thrust cylinder (7) is unloaded. The air flotation assembly (19) stops inflating, and the transfer platform vehicle descends and stops at the preparation position.