AI Technical Summary

Technical Problem

Magnesium alloys are prone to oxidation during melting and casting, leading to defects such as pores, cracks, and oxide inclusions due to incomplete protection against oxygen, particularly at the connection points between the pouring and mold processes, which existing methods fail to address effectively.

Method used

A magnesium alloy melting and casting integrated equipment with a sealed working chamber and multiple transition chambers, along with vacuum and inert gas systems, ensures an oxygen-free environment for melting and casting, using conveying mechanisms for automated operation and precise control of oxygen, temperature, and humidity.

Benefits of technology

The solution provides a high-quality casting process by preventing oxidation, reducing defects, and improving yield through unmanned automation and accurate parameter control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119057055A_ABST
    Figure CN119057055A_ABST
Patent Text Reader

Abstract

The invention discloses magnesium alloy casting integrated equipment and a magnesium alloy casting method. The magnesium alloy casting integrated equipment comprises a working cabin unit, a melting and pouring unit, a control unit and a conveying unit. The working cabin unit comprises a sealed working chamber, a first transition chamber, a second transition chamber and a third transition chamber, wherein the first transition chamber, the second transition chamber and the third transition chamber are arranged around the sealed working chamber, and any one of the first transition chamber, the second transition chamber and the third transition chamber and the sealed working chamber have two working states of mutual communication and sealed isolation. And the melting and pouring unit is arranged in the sealed working chamber and is used for performing melting and pouring. The control unit is used for operating the melting pouring unit. The conveying unit is used for conveying materials between the two transition chambers and between each transition chamber and the sealed working chamber. Through the transition chamber, materials before casting are conveyed into the working cabin unit under the anaerobic condition, magnesium alloy after casting is output under the anaerobic condition, it is guaranteed that the magnesium alloy is not oxidized, and the magnesium alloy yield is increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of magnesium alloy melting and casting, and in particular to magnesium alloy melting and casting integrated equipment and a magnesium alloy melting and casting method. Background Art

[0002] Magnesium alloy is a "green engineering material in the 21st century" with a density of only 1.73g / cm 3 , which is equivalent to 2 / 3 of aluminum and 1 / 4 of iron. Therefore, magnesium alloy products are widely used in aviation, aerospace, shipbuilding, weapons, automobiles, electronics and other fields. With the implementation of the national lightweight strategy, magnesium alloy, as the most ideal lightweight material, has a very broad application prospect, especially in the fields of aviation and aerospace. Magnesium or magnesium alloys are particularly easy to oxidize in the air to form magnesium oxide inclusions. When magnesium oxide inclusions flow into the casting, they will cause defects and affect the mechanical properties of the casting. Due to the low melting and boiling points and strong oxidizing properties of magnesium alloys (the oxidation process of magnesium alloys is an exothermic reaction, and the temperature after the reaction is as high as 2850°C), it is very easy to form defects such as pores, cracks, and oxide inclusions inside the components. In addition, magnesium alloys are prone to explosion risks at high temperatures. Therefore, it is very necessary to take measures to cut off the oxidation path of magnesium alloys.

[0003] The prior art adopts a single-point method to protect magnesium alloys, including melting furnace protection, pouring protection, and mold protection. Specifically, a protective cover is added to the crucible, and an inert gas is introduced to displace the oxygen, thereby achieving the purpose of preventing the oxidation of the magnesium alloy. In addition, although the oxygen in the crucible can be replaced by introducing an inert gas into the crucible, the crucible is not a closed container, and oxygen in the air can still enter the crucible, and the magnesium alloy in the crucible still has a chance to be oxidized. The point where the pouring process and the mold protection process are connected is a weak link, but the connection point of the above process has not been treated with anti-oxidation, and the probability of oxidation of the magnesium alloy is particularly large, which will lead to a large number of oxidation inclusion defects. Therefore, the prior art does not fundamentally cut off the oxidation path of the magnesium alloy, and the oxidation of the magnesium alloy cannot be avoided. Summary of the invention

[0004] The object of the present invention is to provide a magnesium alloy melting and casting integrated equipment and a magnesium alloy melting and casting method, so as to overcome the deficiencies in the prior art.

[0005] In order to achieve the above-mentioned invention object, the technical solution adopted by the present invention includes:

[0006] The first aspect of the present invention discloses a magnesium alloy melting and casting integrated equipment, comprising a working cabin unit, the working cabin unit comprising a sealed working room and at least one first transition chamber, at least one second transition chamber and at least one third transition chamber arranged around the sealed working room, any one of the first transition chamber, the second transition chamber and the third transition chamber has two working states of being interconnected with the sealed working room and being sealed and isolated from each other;

[0007] A melting and pouring unit is arranged in the sealed working chamber and is used at least to perform the magnesium alloy melting, refining and pouring processes;

[0008] A control unit, disposed in the sealed working chamber and used to control the melting and pouring unit;

[0009] The conveying unit is used at least to convey the material between the two transition chambers and to convey the material between each transition chamber and the sealed working chamber.

[0010] In this solution, the melting and pouring unit is arranged in the sealed working chamber of the working cabin unit, that is, the melting and pouring of the magnesium alloy are sealed as a whole to realize oxygen-free smelting and casting integration. In addition, at least a first transition chamber, a second transition chamber, and a third transition chamber are provided to feed the material before smelting and casting into the working cabin unit body in the absence of oxygen, and output the smelted magnesium alloy in the absence of oxygen to ensure that the magnesium alloy is not oxidized and to improve the yield of the magnesium alloy.

[0011] Furthermore, the conveying unit comprises:

[0012] A first conveying mechanism, movable between the first transition chamber and the sealed working chamber, and at least used for conveying charge into the melting and pouring unit;

[0013] The second conveying mechanism moves between the second transition chamber and the sealed working chamber, and is at least used to convey the mold into the melting and pouring unit; the second conveying mechanism also moves between the sealed working chamber and the third transition chamber, and is at least used to output the finished product.

[0014] Preferably, the second conveying mechanism comprises a motorized roller conveyor, which comprises a plurality of rollers, a bracket and a support, wherein the roller shaft is fixed in the bracket; and the upper portion of the bracket is connected to the support.

[0015] Furthermore, the magnesium alloy melting and casting integrated equipment also includes:

[0016] A vacuum pump cooperates with the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber, and is used to adjust the vacuum degree of any one of the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber.

[0017] More preferably, the vacuum extraction device includes a vacuum pump and an exhaust pipe; one end of the exhaust pipe is connected to the vacuum pump, and the other end cooperates with the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber, and is used to introduce inert gas into any one of the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber.

[0018] In a further solution, the vacuum pumping device can be used to evacuate any one of the sealed working chamber, the first transition chamber, the second transition chamber, and the third transition chamber, so that the vacuum degree reaches a preset value or above. In addition, the vacuum pumping device can be used together with the inert gas supply device to wash the working chamber unit body to more accurately control the oxygen content and ensure that the magnesium alloy is not oxidized during the entire melting and casting process.

[0019] Furthermore, the magnesium alloy melting and casting integrated equipment also includes:

[0020] An inert gas supply device cooperates with the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber, and is used to introduce inert gas into any one of the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber.

[0021] Preferably, the inert gas supply device includes a gas supply bottle and a gas supply pipe connected to the gas supply bottle; the gas supply pipe is connected to the working cabin unit.

[0022] Furthermore, the magnesium alloy melting and casting integrated equipment also includes:

[0023] An inert gas recovery device cooperates with the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber, and is used to extract inert gas from any one of the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber; the inert gas recovery device includes an inert gas recovery transition tank, an inert gas recovery tank, and a compressor; the compressor is used to compress and separate and purify the inert gas in the inert gas recovery transition tank, and input it into the inert gas recovery tank.

[0024] Furthermore, the magnesium alloy melting and casting integrated equipment also includes a dehumidification device connected to the working cabin unit, and the dehumidification device at least includes an evaporator for cooling and condensing moisture in the air and for maintaining the indoor temperature using recovered condensation heat.

[0025] Furthermore, the magnesium alloy melting and casting integrated equipment also includes a regulating device;

[0026] The regulating device comprises a collection module and an analysis module;

[0027] The acquisition module includes a temperature acquisition unit, a vacuum acquisition unit, and a humidity acquisition unit, which are respectively used to collect the temperature, vacuum, and humidity in the sealed working chamber; the analysis module is used to compare the collected temperature, vacuum, and humidity in the sealed working chamber with preset indicators to obtain the control results.

[0028] In a further solution, all casting parameters in the working cabin unit are collected and intelligently controlled to ensure the accuracy of the casting process parameters and subsequent quality statistics and improvements.

[0029] The second aspect of the present invention discloses a magnesium alloy melting and casting method, which is implemented based on the magnesium alloy melting and casting integrated equipment, and the method comprises:

[0030] The charge is conveyed from the first transition chamber into the melting and pouring unit by the first conveying mechanism;

[0031] The casting mold is transported from the second transition chamber into the sealed working chamber by the second transport mechanism;

[0032] The control unit controls the melting and pouring unit to perform the melting, refining and pouring processes, thereby obtaining a finished product;

[0033] The finished product is transported from the sealing working chamber into the third transition chamber by the second transporting mechanism.

[0034] Compared with the prior art, the advantages of the present invention include:

[0035] In a magnesium alloy melting and casting integrated equipment provided by the present invention, a melting and pouring unit is arranged in a sealed working chamber of a working cabin unit, that is, the melting and pouring of the magnesium alloy are sealed as a whole to achieve oxygen-free melting and casting integration. In addition, at least a first transition chamber, a second transition chamber, and a third transition chamber are provided to feed the material before melting and casting into the working cabin unit body in the absence of oxygen, and the magnesium alloy after melting and casting is output in the absence of oxygen, thereby ensuring that the magnesium alloy is not oxidized and improving the magnesium alloy yield.

[0036] In the magnesium alloy melting and casting integrated equipment provided by the present invention, by extending the two ends of the second conveying mechanism to the inside of the second transition chamber and the third transition chamber respectively, it can be ensured that the transportation process of the magnesium alloy is also in an oxygen-free environment, thereby improving the magnesium alloy yield. In addition, the melting and pouring unit can place the materials required for melting and casting or the magnesium alloy after melting and casting on the first conveying mechanism and the second conveying mechanism, which can realize unmanned automatic operation and reduce manpower and fluctuations in the production process.

[0037] In the magnesium alloy melting and casting integrated equipment provided by the present invention, any one of the sealed working chamber, the first transition chamber, the second transition chamber, and the third transition chamber can be evacuated by a vacuum pumping device to make the vacuum degree reach a preset value or above. In addition, the vacuum pumping device can be used simultaneously with the inert gas supply device to wash the working cabin unit body to more accurately control the oxygen content and ensure that the magnesium alloy is not oxidized during the entire melting and casting process.

[0038] In a magnesium alloy melting and casting integrated equipment provided by the present invention, the oxygen content, temperature, and humidity in the working cabin unit body can be accurately controlled through the regulating device, ensuring that the magnesium alloy is not oxidized during the melting and pouring process, eliminating the oxidation inclusion defects of the magnesium alloy, and achieving high-quality casting. At the same time, through the regulating device, all casting parameters in the working cabin unit are collected and intelligently controlled to ensure that the parameters of the casting process are accurate and subsequent quality statistics and improvements can be performed. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 is a top view of a magnesium alloy melting and casting integrated equipment provided by an embodiment of the present invention;

[0040] Figure 2 yes Figure 1 A is a front view of a magnesium alloy melting and casting integrated equipment.

[0041] Reference numerals:

[0042] 1. Sealed working room; 2. Melting furnace; 3. Ladle rack; 4. Manipulator; 5. First transition chamber 6. Second transition chamber 7. Third transition chamber; 8. Motorized roller; 9. Vacuum pump; 10. Argon cylinder; 11. Inert gas recovery tank; 12. Inert gas recovery transition tank; 13. Compressor; 14. First valve; 15. Second valve. DETAILED DESCRIPTION

[0043] In view of the deficiencies in the prior art, the inventor of this case has proposed the technical solution of the present invention after long-term research and extensive practice. The technical solution, its implementation process and principle will be further explained as follows.

[0044] like Figure 1-Figure 2 In a specific embodiment disclosed in the present invention, a magnesium alloy melting and casting integrated equipment includes a working cabin unit, a melting and pouring unit, a control unit, and a conveying unit.

[0045] The working cabin unit comprises a sealed working room 1 and at least one first transition chamber 5, at least one second transition chamber 6 and at least one third transition chamber 7 arranged around the sealed working room, wherein any one of the first transition chamber 5, the second transition chamber 6 and the third transition chamber 7 has two working states: being interconnected with the sealed working room 1 and being sealed and isolated from each other;

[0046] A melting and pouring unit is arranged in the sealed working room 1 and is used at least to perform the magnesium alloy melting, refining and pouring processes; a control unit is arranged in the sealed working room 1 and is used to control the melting and pouring unit; a conveying unit is used at least to convey materials between two transition chambers and between each transition chamber and the sealed working room 1.

[0047] Specifically, the first transition chamber 5 , the second transition chamber 6 , and the third transition chamber 7 adopt a double-layer door structure to surround the sealed working chamber 1 .

[0048] It is understandable that the melting and pouring unit at least includes a melting furnace 2 and a ladle stand 3. The control unit may be a manipulator 4. It should be noted that the casting mold in the working cabin unit is not limited to a sand casting mold, but may also be an investment casting mold, a metal mold, a gypsum mold, etc. The casting method may be gravity casting, low pressure, differential pressure, or other anti-gravity casting, which is not limited here.

[0049] In this solution, the melting and pouring unit is arranged in the sealed working room 1 of the working cabin unit, that is, the magnesium alloy is melted and poured and sealed as a whole to realize oxygen-free smelting and casting integration. In addition, at least a first transition chamber 5, a second transition chamber 6, and a third transition chamber 7 are provided to feed the material before smelting and casting into the working cabin unit body in the absence of oxygen, and output the smelted magnesium alloy in the absence of oxygen to ensure that the magnesium alloy is not oxidized and to improve the yield of the magnesium alloy.

[0050] In some embodiments, the delivery unit comprises:

[0051] A first conveying mechanism, which moves between the first transition chamber 5 and the sealed working chamber 1 and is at least used to convey the charge into the melting and pouring unit;

[0052] The second conveying mechanism moves between the second transition chamber 6 and the sealed working chamber 1, and is at least used to convey the mold into the melting and pouring unit; the second conveying mechanism also moves between the sealed working chamber 1 and the third transition chamber 7, and is at least used to output the finished product.

[0053] like Figure 1 Along the C direction, the first conveying mechanism moves between the first transition chamber 5 and the sealed working chamber 1 and is used to convey the charge to the melting furnace 2. The first conveying mechanism here can be a motorized roller conveyor.

[0054] Along the B-B' direction, the second conveying mechanism inputs the casting mold between the second transition chamber and the sealed working chamber. The robot 4 performs the melting, refining and pouring process on the input casting mold and furnace charge. After the melting and casting is completed, the second conveying mechanism outputs the finished product between the sealed working chamber and the third transition chamber.

[0055] In a further embodiment, by extending the two ends of the second conveying mechanism to the inside of the second transition chamber 6 and the third transition chamber 7, respectively, it can be ensured that the transportation process of the magnesium alloy is also in an oxygen-free environment, thereby improving the yield of the magnesium alloy. In addition, the control unit acts on the melting and pouring unit, and can place the materials required for smelting or the magnesium alloy after smelting and casting on the first conveying mechanism and the second conveying mechanism, so that unmanned automatic operation can be realized, reducing manpower and fluctuations in the production process.

[0056] Preferably, the second conveying mechanism comprises a motorized roller conveyor 8, and the motorized roller conveyor 8 comprises a plurality of rollers, a bracket and a support, and the roller shaft is fixed in the bracket; and the upper part of the bracket is connected to the bracket.

[0057] Please refer to Figure 2 In some embodiments, the magnesium alloy melting and casting integrated equipment further comprises:

[0058] The vacuum pump cooperates with the sealed working room 1, the first transition chamber 5, the second transition chamber 6, and the third transition chamber 7, and is used to adjust the vacuum degree of any one of the sealed working room 1, the first transition chamber 5, the second transition chamber 6, and the third transition chamber 7.

[0059] In a further embodiment, the vacuum pumping device can be used to evacuate any one of the sealed working chamber 1, the first transition chamber 5, the second transition chamber 6, and the third transition chamber 7, so that the vacuum degree reaches a preset value or above. In addition, the vacuum pumping device can be used together with the inert gas supply device to wash the working chamber unit body to more accurately control the oxygen content and ensure that the magnesium alloy is not oxidized during the entire melting and casting process.

[0060] Preferably, the vacuum extraction device includes a vacuum pump 9 and an exhaust pipe; one end of the exhaust pipe is connected to the vacuum pump 9, and the other end cooperates with the sealed working room 1, the first transition chamber 5, the second transition chamber 6, and the third transition chamber 7, and is used to introduce inert gas into any one of the sealed working room 1, the first transition chamber 5, the second transition chamber 6, and the third transition chamber 7.

[0061] In some embodiments, the magnesium alloy melting and casting integrated equipment further comprises:

[0062] The inert gas supply device cooperates with the sealed working room 1, the first transition chamber 5, the second transition chamber 6, and the third transition chamber 7, and is used to introduce inert gas into any one of the sealed working room 1, the first transition chamber 5, the second transition chamber 6, and the third transition chamber 7.

[0063] Preferably, the inert gas supply device comprises a gas supply bottle and a gas pipe connected to the gas supply bottle; the gas pipe is connected to the working cabin unit. The inert gas supply device can be an argon gas bottle 10 and a gas pipe. Compared with other inert gases, argon has high stability and inertness. It does not react chemically with other substances at room temperature, and is insoluble in liquid metal at high temperature. Its superiority is more evident when welding non-ferrous metals.

[0064] In some embodiments, the magnesium alloy melting and casting integrated equipment further comprises:

[0065] The inert gas recovery device cooperates with the sealed working room 1, the first transition chamber 5, the second transition chamber 6, and the third transition chamber 7, and is used to extract inert gas from any one of the sealed working room 1, the first transition chamber 5, the second transition chamber 6, and the third transition chamber 7. Preferably, the inert gas recovery device includes an inert gas recovery transition tank 12, a compressor 13, an inert gas recovery tank 11, a first valve 14, and a second valve 15. The second valve 15 is opened and the first valve 14 is closed to evacuate the working chamber. The second valve 15 is closed and the first valve 14 is opened to extract the protective gas in the working chamber into the gas storage tank for recycling and reuse. In a specific implementation scenario, the first valve 14 is opened and the second valve 15 is closed, and the vacuum pump 9 is used to extract the excess inert gas in the sealed working room 1, and transmit the extracted inert gas to the inert gas recovery transition tank 12. The compressor 13 is used to pressurize the inert gas in the inert gas recovery transition tank 12 and recover it into the inert gas recovery tank 11.

[0066] Preferably, the inert gas recovery device and the vacuum extraction device can be integrated.

[0067] Specifically, when the working cabin unit is gas-cleaned, the first valve 14 connected to the vacuum pump 9 is closed, and the second valve 15 is opened. At this time, the gas extracted by the vacuum pump 9 does not enter the inert gas recovery transition tank 12. The inert gas supply device introduces inert gas into the working cabin unit for protection. After the pouring work is completed, the vacuum pump 9 and the first valve 14 are opened, and the second valve 15 is closed, so that the inert gas enters the inert gas recovery transition tank 12, and then is further compressed and separated and purified by the compressor 13 to enter the inert gas recovery tank 11. The inert gas recovery tank 11 can be recycled.

[0068] In some embodiments, the magnesium alloy melting and casting integrated equipment further includes a dehumidification device connected to the working cabin unit.

[0069] The dehumidification device at least includes an evaporator, which is used to cool and condense moisture in the air and to maintain the indoor temperature using recovered condensation heat.

[0070] Specifically, the dehumidification device can be a dehumidifier. The dehumidifier includes at least an evaporator, a dehumidification sheet, and a water tank; the dehumidification sheet is provided with a plurality of pores for absorbing moisture, and the water tank is used to store the moisture adsorbed by the dehumidification sheet. The dehumidifier uses the refrigeration principle to reduce the humidity in the air. The dehumidifier includes at least an evaporator. When the air passes through the evaporator, the moisture in the air will condense and adsorb on the dehumidification sheet due to the cooling effect of the evaporator. The multiple pores on the dehumidification sheet can effectively adsorb the moisture in the air. Subsequently, the adsorbed moisture is transferred to the water tank inside the dehumidifier. In order to maintain the indoor temperature, the dehumidifier will also use the recovered condensation heat to heat the air, thereby keeping the indoor temperature stable while reducing the relative humidity.

[0071] In a preferred embodiment, the dehumidification device is arranged outside the working cabin unit. Since the temperature inside the working cabin unit is relatively high, a freezing method is used for dehumidification, and a dehumidification sheet is not required. The working principle is to draw the air inside the working cabin unit into the dehumidifier and freeze the drawn air. At this time, the moisture in the air will settle, and then the dry air will be heated and introduced into the working cabin unit. The dry air can be heated by the temperature of the casting operation, that is, a heat tracing pipe is drawn out from the working cabin unit to heat the dried air, saving energy consumption.

[0072] In some embodiments, the magnesium alloy melting and casting integrated equipment further includes a regulating device.

[0073] The regulating device comprises a collection module and an analysis module;

[0074] The acquisition module includes a temperature acquisition unit, a vacuum acquisition unit, and a humidity acquisition unit, which are respectively used to collect the temperature, vacuum, and humidity in the sealed working room 1; the analysis module is used to compare the collected temperature, vacuum, and humidity in the sealed working room 1 with preset indicators to obtain the control result.

[0075] Specifically, the preset indicators here include a preset temperature indicator, a preset vacuum indicator, and a preset humidity indicator. The vacuum degree acquisition unit here can also be set as an oxygen content sensor for collecting the oxygen content in the sealed studio 1. Therefore, the preset indicators also include a preset oxygen content indicator.

[0076] In some embodiments, the regulating device further includes an execution module for inputting the regulation result to the vacuuming device so that the vacuuming device operates; and for inputting the regulation result to the dehumidification device so that the dehumidification device operates.

[0077] Specifically, when the humidity is higher than the preset temperature index, the dehumidifier starts; when the temperature is lower than the preset temperature index, the heating device starts, and when the temperature is higher than the set index, the heating device stops. The heating device here can be understood as an electric hot air heating system installed inside the working cabin. At the same time, the electric furnace in the working cabin unit also has an auxiliary heating function when it is working. When the oxygen content is higher than the preset oxygen content index, the vacuum pumping device starts, and the vacuum pumping stops after reaching a certain vacuum degree. At the same time, the inert gas supply device starts, and inert gas is filled to balance the pressure in the working cabin unit, and the cycle is repeated until the oxygen content reaches the set value.

[0078] In a further implementation scheme, all casting parameters in the working cabin unit are collected and intelligently controlled to ensure the accuracy of the parameters of the casting process and the subsequent quality statistics and improvements.

[0079] This embodiment also discloses a magnesium alloy melting and casting method, which is implemented based on the magnesium alloy melting and casting integrated equipment, and includes:

[0080] The charge is conveyed from the first transition chamber into the melting and pouring unit by the first conveying mechanism;

[0081] The casting mold is transported from the second transition chamber into the sealed working chamber by the second transport mechanism;

[0082] The control unit controls the melting and pouring unit to perform the melting, refining and pouring processes, thereby obtaining a finished product;

[0083] The finished product is transported from the sealing working chamber into the third transition chamber by the second transport mechanism.

[0084] Specifically, the first transition chamber, the second transition chamber, and the third transition chamber are first distributed around the sealed working room, so that any of the first transition chamber, the second transition chamber, and the third transition chamber have two working states: interconnected with the sealed working room and sealed and isolated from each other. The melting and pouring unit is arranged in the sealed working room. The control unit is arranged in the sealed working room. Then, the charge is transported from the first transition chamber into the melting and pouring unit through the first conveying mechanism; and the casting is transported from the second transition chamber into the sealed working room through the second conveying mechanism. Then, the control unit operates the melting and pouring unit. The melting and pouring unit performs melting, refining, and pouring processes to obtain a finished product. Finally, the finished product is transported from the sealed working room into the third transition chamber through the second conveying mechanism.

[0085] In some embodiments, the magnesium alloy casting method further comprises:

[0086] Collect the temperature, vacuum degree and humidity in the sealed working room;

[0087] The collected temperature, vacuum degree and humidity in the sealed working chamber are compared with the preset indicators to obtain the control results.

[0088] In some embodiments, the magnesium alloy casting method further comprises:

[0089] A vacuum pump cooperates with the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber to adjust the vacuum degree of any one of the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber.

[0090] More preferably, the vacuum extraction device includes a vacuum pump and an exhaust pipe; one end of the exhaust pipe is connected to the vacuum pump, and the other end cooperates with the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber, and is used to introduce inert gas into any one of the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber.

[0091] In some embodiments, the magnesium alloy casting method further comprises:

[0092] An inert gas supply device cooperates with the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber to introduce inert gas into any one of the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber.

[0093] More preferably, the inert gas supply device includes a gas supply bottle and a gas supply pipe connected to the gas supply bottle; the gas supply pipe is connected to the working cabin unit.

[0094] Specifically, when the oxygen content is higher than the preset oxygen content index, the vacuum pumping device starts, and stops vacuum pumping after reaching a certain vacuum degree. At the same time, the inert gas supply device starts, and inert gas is filled to balance the pressure in the working cabin unit, and the cycle continues until the oxygen content reaches the set value.

[0095] In some embodiments, the magnesium alloy casting method further comprises:

[0096] An inert gas recovery device cooperates with the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber, and extracts inert gas from any one of the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber.

[0097] In some embodiments, the magnesium alloy casting method further comprises:

[0098] A dehumidification device is connected to the working cabin unit; the dehumidification device at least includes an evaporator, which cools and condenses moisture in the air and uses the recovered condensation heat to maintain the indoor temperature.

[0099] The dehumidifier can be installed separately outside the working cabin unit without being connected to other devices. The dehumidifier uses the refrigeration principle to reduce the humidity in the air. Specifically, when the humidity is higher than the preset temperature index, the dehumidifier starts. The dehumidifier includes at least an evaporator. When the air passes through the evaporator, the moisture in the air will condense and adsorb on the dehumidification sheet due to the cooling effect of the evaporator. The multiple pores on the dehumidification sheet can effectively absorb the moisture in the air. Subsequently, the adsorbed moisture is transferred to the water tank inside the dehumidifier. In order to maintain the indoor temperature, the dehumidifier will also use the recovered condensation heat to heat the air, thereby keeping the indoor temperature stable while reducing the relative humidity.

[0100] Embodiment 1: The working cabin unit has a low vacuum and low pressure inert gas. The magnesium alloy casting method comprises the following specific steps:

[0101] S1: First, push the pre-prepared furnace charge, casting mold and other auxiliary materials from the first transition chamber and the second transition chamber into the sealed working chamber respectively;

[0102] S2: The working cabin unit body is evacuated by a vacuum device, and the evacuation is stopped when the vacuum degree reaches -5Kpa;

[0103] S3: Fill the sealed working room with argon gas through the argon gas bottle and the gas pipe to make its pressure reach +5Kpa;

[0104] S4: Turn on the melting furnace and dehumidification device to make the temperature in the sealed working room greater than 50°C and the humidity less than 10%;

[0105] S5: The robot delivers the charge into the melting furnace for melting and refining;

[0106] S6: The robot places the melted and refined charge on the ladle rack for pouring;

[0107] S6: The poured mold is output between the sealed working chamber and the third transition chamber through the second conveying mechanism.

[0108] In this Example 1, the oxidation inclusion defect rate is 10%.

[0109] Embodiment 2: The working cabin unit has a high vacuum and low pressure inert gas. The magnesium alloy casting method comprises the following specific steps:

[0110] S1: First, push the pre-prepared furnace charge, casting mold and other auxiliary materials from the first transition chamber and the second transition chamber into the sealed working chamber respectively;

[0111] S2: The working cabin unit body is evacuated by a vacuum device, and the evacuation is stopped when the vacuum degree reaches -50Kpa;

[0112] S3: Fill the sealed working room with argon gas through the argon gas bottle and the gas pipe to make its pressure reach +5Kpa;

[0113] S4: Turn on the melting furnace and dehumidification device to make the temperature in the sealed working room greater than 50°C and the humidity less than 10%;

[0114] S5: The robot delivers the charge into the melting furnace for melting and refining;

[0115] S6: The robot places the melted and refined charge on the ladle rack for pouring;

[0116] S6: The poured mold is output between the sealed working chamber and the third transition chamber through the second conveying mechanism.

[0117] In this Example 2, the oxide inclusion defect rate is 7%.

[0118] Embodiment 3: The working chamber unit has a high vacuum and high pressure inert gas. The magnesium alloy casting method comprises the following specific steps:

[0119] S1: First, push the pre-prepared furnace charge, casting mold and other auxiliary materials from the first transition chamber and the second transition chamber into the sealed working chamber respectively;

[0120] S2: The working cabin unit body is evacuated by a vacuum device, and the evacuation is stopped when the vacuum degree reaches 50Kpa;

[0121] S3: Fill the sealed working chamber with argon gas through the argon gas bottle and gas pipe to make its pressure reach +500Kpa;

[0122] S4: Turn on the melting furnace and dehumidification device to make the temperature in the sealed working room greater than 50°C and the humidity less than 10%;

[0123] S5: The robot delivers the charge into the melting furnace for melting and refining;

[0124] S6: The robot places the melted and refined charge on the ladle rack for pouring;

[0125] S6: The poured mold is output between the sealed working chamber and the third transition chamber through the second conveying mechanism.

[0126] In this Example 3, the oxide inclusion defect rate is 2%.

[0127] Comparative Example 1: In the prior art, the magnesium alloy casting method specifically includes the following steps:

[0128] S1: First, push the prepared charge, mold and other auxiliary materials into the crucible;

[0129] S2: Then sprinkle the solvent on the charge for protection, and heat it with electricity to melt the charge;

[0130] S3: After the charge is melted, it is refined and adjusted to the pouring temperature, waiting for pouring. During the melting process, a solvent is used or protective gas is directly introduced on the surface of the melt;

[0131] S4: The melt crucible is hoisted into the ladle stand for pouring.

[0132] In this comparative example 1, the oxide inclusion defect rate is 20%.

[0133] In summary, embodiment 3 can provide a better oxygen-free environment. In specific real-time scenarios, different solutions can be selected according to the quality requirements of the castings.

[0134] It should be understood that the above embodiments are only for illustrating the technical concept and features of the present invention, and their purpose is to enable people familiar with the technology to understand the content of the present invention and implement it accordingly, and they cannot be used to limit the protection scope of the present invention. Any equivalent changes or modifications made according to the spirit of the present invention should be included in the protection scope of the present invention.

Claims

1. A magnesium alloy melting and casting integrated equipment, characterized in that: include: The working cabin unit comprises a sealed working room and at least one first transition room, at least one second transition room and at least one third transition room arranged around the sealed working room, wherein any one of the first transition room, the second transition room and the third transition room has two working states: being interconnected with the sealed working room and being sealed and isolated from each other; A melting and pouring unit is arranged in the sealed working chamber and is used at least to perform the magnesium alloy melting, refining and pouring processes; A control unit, disposed in the sealed working chamber and used to control the melting and pouring unit; The conveying unit is used at least to convey the material between the two transition chambers and to convey the material between each transition chamber and the sealed working chamber.

2. The magnesium alloy melting and casting integrated equipment according to claim 1, characterized in that: The conveying unit comprises: A first conveying mechanism, movable between the first transition chamber and the sealed working chamber, and at least used for conveying charge into the melting and pouring unit; The second conveying mechanism moves between the second transition chamber and the sealed working chamber, and is at least used to convey the mold into the melting and pouring unit; the second conveying mechanism also moves between the sealed working chamber and the third transition chamber, and is at least used to output the finished product.

3. The magnesium alloy melting and casting integrated equipment according to claim 1, characterized in that: Also includes: A vacuum pump cooperates with the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber, and is used to adjust the vacuum degree of any one of the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber.

4. The magnesium alloy melting and casting integrated equipment according to claim 3, characterized in that: Also includes: An inert gas supply device cooperates with the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber, and is used to introduce inert gas into any one of the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber.

5. The magnesium alloy melting and casting integrated equipment according to claim 4, characterized in that: Also includes: an inert gas recovery device, which cooperates with the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber, and is used to extract inert gas from any one of the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber; The inert gas recovery device comprises an inert gas recovery transition tank, an inert gas recovery tank, and a compressor; the compressor is used to compress and separate and purify the inert gas in the inert gas recovery transition tank, and input it into the inert gas recovery tank.

6. The magnesium alloy melting and casting integrated equipment according to claim 1, characterized in that: Also includes: A dehumidification device connected to the working cabin unit includes at least an evaporator for cooling and condensing moisture in the air and for maintaining indoor temperature using recovered condensation heat.

7. The magnesium alloy melting and casting integrated equipment according to claim 1, characterized in that: It also includes a regulating device; the regulating device includes a collection module and an analysis module; The acquisition module includes a temperature acquisition unit, a vacuum acquisition unit, and a humidity acquisition unit, which are respectively used to collect the temperature, vacuum, and humidity in the sealed working chamber; the analysis module is used to compare the collected temperature, vacuum, and humidity in the sealed working chamber with preset indicators to obtain the control results.

8. The magnesium alloy melting and casting integrated equipment according to claim 4, characterized in that: The inert gas supply device comprises a gas supply bottle and a gas supply pipe connected to the gas supply bottle; the gas supply pipe is connected to the working cabin unit.

9. The magnesium alloy melting and casting integrated equipment according to claim 3, characterized in that: The vacuum pumping device includes a vacuum pump and an exhaust pipe; one end of the exhaust pipe is connected to the vacuum pump, and the other end cooperates with the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber, and is used to introduce inert gas into any one of the sealed working room, the first transition chamber, the second transition chamber, and the third transition chamber.

10. A magnesium alloy melting and casting method, characterized in that: The method is implemented based on the magnesium alloy melting and casting integrated equipment according to any one of claims 1 to 9, and the method comprises: The charge is conveyed from the first transition chamber into the melting and pouring unit by the first conveying mechanism; The casting mold is transported from the second transition chamber into the sealed working chamber by the second transport mechanism; The control unit controls the melting and pouring unit to perform the melting, refining and pouring processes, thereby obtaining a finished product; The finished product is transported from the sealing working chamber into the third transition chamber by the second transport mechanism.