Rapid replacement method for water beam assembly of oversize sintering mixer
Through the method of combining cranes and reverse chains, the problems of underwire rope deflection and instability of water beams during the installation of water beams are solved, ensuring stable installation of water beams, avoiding equipment damage, and improving construction efficiency and production efficiency.
Patent Information
- Application Number
- CN202410949801.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-16
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-07-16
AI Technical Summary
The existing water beam replacement methods of sintering mixers have problems such as wire rope deflection, water beam towing bottom and wire rope instability, which leads to collapse and overturning of the water beam, affecting the production efficiency and equipment safety of the mixer.
Using crane and reverse chain, by welding the lifting points and hanging points, the water beam is gradually lifted slowly and translated along the axis of the cylinder to ensure that the water beam enters the mixing cylinder stably, and the mixing cylinder is securely locked with four points to prevent rotation. , and reinforce bolts and welding after installation is completed.
The safety and reliability of the water beam installation process is achieved, the water beam damages the inner cylinder of the mixer is avoided, construction time is significantly saved, and the efficiency of sintered ore production is improved.
Smart Images

Figure CN119057409A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of sintered ore production, and in particular relates to a method for quickly replacing a water beam assembly of an extra-large sintering mixer. Background Art
[0002] In the production of sintered ore, the sintering mixer is a device that receives the materials prepared in the batching room of the previous process, mixes and granulates them effectively, and is one of the main line equipment for sintered ore production. The water beam serves as the skeleton support of the nozzle of the sintering mixer, and provides stable and reliable support for the water injection of the nozzle. Due to the high temperature, high humidity, high corrosion and high wear conditions of the water beam, the current service life of the mixer water beam is 3-5 years. During regular maintenance of the sintering process material line, the mixer water beam needs to be statically inspected. When irreversible corrosive cracks appear in the mixer water beam, the mixer water beam needs to be quickly replaced during the annual maintenance time.
[0003] At present, the replacement method of the mixer water beam is to use a crane and a wire rope to hang and pull in coordination. Since the length of the mixer water beam is close to 30m, the diameter of the mixer cylinder is only 5m, and the mixer is an inclined structure, the height difference between the head and tail centers is 1.7m, and the internal space is small, the existing replacement method of the mixer water beam is: use a wire rope to pass through the cylinder, fix the wire rope on both sides through the support, and evenly set multiple pulley rings on the steel wire. By connecting the pulley ring and the top hanging point of the water beam, the mixer is gradually moved from the beginning to the end. This method inevitably causes the wire rope to deflect. When the water beam enters the cylinder, it is easy for the water beam to drag the bottom and the wire rope to become unstable, and even cause the water beam to collapse and overturn, causing serious damage to the strength of the mixer cylinder and its internal lining, and seriously restricting the annual maintenance progress of the entire sintering production line, affecting the stable production of sintered ore.
[0004] Therefore, it is urgent to study and practice a method for quickly installing the water beam assembly of a super-large sintering mixer. Summary of the invention
[0005] The purpose of the present invention is to provide a method for quickly replacing a water beam assembly of an extra-large sintering mixer.
[0006] The technical solution adopted by the present invention to solve the technical problem is: a method for quickly replacing a water beam assembly of an extra-large sintering mixer, comprising the following steps:
[0007] 1) At least three lining plates are evenly removed from the bottom of the inner surface of the mixer cylinder, and are evenly distributed in the axial direction of the inner surface of the mixer cylinder. At least three hanging points are welded at the center of the lower lining plate, which are numbered as hanging point 1, hanging point 2 and hanging point 3 from left to right. At the same time, three hanging points are welded at the positions above the water beam corresponding to the three hanging points, and the hanging points are numbered as hanging point 1, hanging point 2 and hanging point 3;
[0008] 2) Connect the crane hook to the second hanging point, connect the first hanging point to the third hanging point through the first fall chain, and fine-tune the direction of the water beam in time through the direction rope to ensure that the water beam is along the axis of the cylinder. By pulling the first fall chain and cooperating with the crane, slowly lift the water beam and gradually enter the mixer cylinder from left to right;
[0009] 3) When the hanging point 3 of the water beam reaches the position below the hanging point 1 of the mixer cylinder, the hanging point 2 of the mixer cylinder and the hanging point 3 of the water beam are connected by the second fall chain, the hanging point 1 is disconnected from the hanging point 3, and the second crane is used to connect the hanging point 1 of the mixer water beam;
[0010] 4) Through the cooperation of the second fall chain and the second crane, the water beam continues to be translated along the axis direction of the mixer. When the hanging point 3 of the water beam reaches the vicinity below the hanging point 2 of the mixer cylinder, the hanging point 3 of the mixer cylinder and the hanging point 3 of the water beam are reliably connected through the third fall chain, and then the hanging point 2 is disconnected from the hanging point 3;
[0011] 5) Through the cooperation of the third fall chain and the second crane, the water beam continues to be translated along the axis direction of the mixer. When the water beam hanging point 1 is about to enter the cylinder, the first fall chain connects the mixer hanging point 1 with the hanging point 1, and then the crane hook is disconnected from the water beam hanging point 1, and the crane hook is connected to the water beam tail hook;
[0012] 6) Through the cooperation of the first fall chain, the third fall chain and the second crane, the water beam continues to be translated along the axis of the mixer. Through fine-tuning, the lower planes of the left and right bases of the water beam are aligned with the bolt holes on the upper surfaces of the first support and the second support respectively.
[0013] Specifically, the step 1) also includes starting the mixer with micro-transmission, rotating the three welded hanging points to just above the central axis of the mixer barrel; then stopping the machine, welding two hanging points at the front and back of the upper middle outer surface of the mixer barrel, and locking the mixer at four points for safety through a fall chain to ensure that the mixer barrel does not rotate during the construction process.
[0014] Specifically, the step 6) also includes installing a mixer water beam protection cover, installing a mixer nozzle assembly, cutting off the mixer barrel hanging points, resetting the liner, cleaning the site, testing the machine, and completing the installation of the water beam assembly.
[0015] The present invention has the following beneficial effects:
[0016] 1) The problem of water beam dragging and wire rope instability caused by the downward deflection of the wire rope in the original water beam installation method is solved;
[0017] 2) The entire installation process of the water beam is safe and reliable, effectively preventing damage to the inner cylinder of the mixer during the installation of the water beam;
[0018] 3) This construction method effectively saves construction time and utilizes the overhaul time of the sintering machine, so the construction time is sufficient and controllable. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a structural schematic diagram of the present invention.
[0020] Figure 2 It is a schematic diagram of the structure of the cylinder.
[0021] Figure 3 This is a schematic diagram of the structure of the water beam.
[0022] Figure 4 This is a schematic diagram of the structure for fixing the mixer barrel.
[0023] Figure 5 This is a structural diagram of the water beam installation (I).
[0024] Figure 6 This is a structural diagram of the water beam installation (II).
[0025] Figure 7 This is a structural diagram of the water beam installation (III).
[0026] Figure 8 This is a structural diagram of the water beam installation (IV).
[0027] Fig. 9 Structural schematic diagram of water beam installation (V).
[0028] Fig.10 It is a structural schematic diagram of the prior art.
[0029] In the figure: 1- water beam, 101- hanging point one, 102- hanging point two, 103- hanging point three, 104- tail hook; 2- cylinder, 201- hanging point one, 202- hanging point two, 203- hanging point three; 3- support one; 4- support two; 5- water beam protection cover; 6- nozzle assembly; 7- first crane; 8- direction rope; 9- second crane. DETAILED DESCRIPTION
[0030] The present invention will now be described in further detail with reference to the accompanying drawings.
[0031] like Figure 1-5 A method for quickly replacing a water beam assembly of an extra-large sintering mixer comprises the following steps:
[0032] S1: Coordinate the maintenance time and prepare the water beam spare parts and tools.
[0033] S2: Power off and sign posted, the mixer shuts down, and construction personnel and spare parts and tools enter the mixer cylinder.
[0034] S3: Take off three lining plates (or more than one lining plate, not limited to three) from the bottom of the inner surface of the mixer barrel 2 and evenly distribute them in the axial direction of the inner surface of the mixer barrel 2. And weld three (not limited to three) firm hanging points at the center of the lower lining plate. Figure 2 As shown, the hanging points are numbered from left to right as hanging point 1 201, hanging point 2 202, and hanging point 3 203; at the same time, three hanging points are welded above the water beam 1 at the same interval as the three hanging points, such as Figure 3 As shown, the hanging points are numbered as hanging point one 101, hanging point two 102, and hanging point three 103.
[0035] S4: Maintenance personnel, spare parts and tools are withdrawn, and the mixer is started with micro-transmission; the three welded hanging points are rotated to the top of the central axis of the mixer barrel 2.
[0036] S5: Figure 4 As shown, the machine is stopped, two hanging points are welded at the front and rear of the upper middle outer surface of the mixer cylinder 2, and the mixer is safely locked at four points by a fall chain to ensure that the mixer cylinder does not rotate during the construction process.
[0037] S6: Figure 5 As shown, the construction workers enter the mixer cylinder 2, reliably connect the crane hook with the hanging point 2 102, connect the hanging point 1 201 with the hanging point 3 103 through the first fall chain, and have two people in the front and rear start working to the two direction ropes 8 at the tail of the water beam to fine-tune the direction of the water beam in time to ensure that the water beam 1 is along the axis of the cylinder 2, and slowly lift the water beam 1 by pulling the first fall chain and cooperating with the first crane 7, and gradually enter the mixer cylinder 2 from left to right.
[0038] S7: As shown in Figure 6, when the hanging point 3 103 of the water beam 1 reaches the position below the hanging point 1 201 of the mixer cylinder 2, the mixer cylinder hanging point 2 202 and the water beam hanging point 3 103 are connected by the second fall chain. Then the hanging point 1 201 is disconnected from the hanging point 3 103, and the mixer water beam hanging point 1 101 is connected by the second crane 9, and then the first crane 7 is evacuated from the scene.
[0039] S8: Figure 7 As shown, through the cooperation of the second fall chain and the second crane 9, the water beam 1 continues to be translated along the axis direction of the mixer. When the hanging point three 103 of the water beam reaches near the bottom of the mixer barrel hanging point two 202, the mixer barrel hanging point three 203 and the water beam hanging point three 103 are connected through the third fall chain, and then the connection between the hanging point two 202 and the hanging point three 103 is released.
[0040] S9: Figure 8As shown, through the cooperation of the third fall chain and the second crane 9, the water beam 1 continues to be translated along the axis direction of the mixer. When the hanging point 101 of the water beam 1 is about to enter the cylinder 2, the first fall chain connects the mixer hanging point 201 with the hanging point 101, and then the crane hook is disconnected from the water beam hanging point 101, and the crane hook is connected to the water beam tail hook 104.
[0041] S10: Fig. 9 As shown, through the cooperation of the first fall chain, the third fall chain and the second crane 9, the water beam 1 continues to be translated along the axis direction of the mixer, and through fine-tuning, the lower planes of the left and right bases of the water beam 1 are aligned with the bolt holes on the upper surfaces of support 1 3 and support 2 4 respectively, the second crane 9 is released, the water beam 1 is bolted and welded to support 1 3 and support 2 4, and the first fall chain and the second fall chain are released.
[0042] S11: Install the mixer water beam protection cover 5 and install the water beam nozzle assembly 6.
[0043] S12: Cut off the hanging points of the mixer barrel 2 and reset the liner.
[0044] S12: Clean up the site and the construction workers withdraw from the mixer cylinder 2.
[0045] S13: Test run, completing the installation of the water beam assembly.
[0046] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0047] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A method for quickly replacing the water beam assembly of an extra-large sintering mixer. It is characterized in that The following steps are involved: 1) At least three lining plates are evenly removed from the bottom of the inner surface of the mixer cylinder, and are evenly distributed in the axial direction of the inner surface of the mixer cylinder. At least three hanging points are welded at the center of the lower lining plate, which are numbered as hanging point 1, hanging point 2 and hanging point 3 from left to right. At the same time, three hanging points are welded at the positions above the water beam corresponding to the three hanging points, and the hanging points are numbered as hanging point 1, hanging point 2 and hanging point 3; 2) Connect the crane hook to the second hanging point, connect the first hanging point to the third hanging point through the first fall chain, and fine-tune the direction of the water beam in time through the direction rope to ensure that the water beam is along the axis of the cylinder. By pulling the first fall chain and cooperating with the crane, slowly lift the water beam and gradually enter the mixer cylinder from left to right; 3) When the hanging point 3 of the water beam reaches the position below the hanging point 1 of the mixer cylinder, the hanging point 2 of the mixer cylinder and the hanging point 3 of the water beam are connected by the second fall chain, the hanging point 1 is disconnected from the hanging point 3, and the second crane is used to connect the hanging point 1 of the mixer water beam; 4) Through the cooperation of the second fall chain and the second crane, the water beam continues to be translated along the axis direction of the mixer. When the hanging point 3 of the water beam reaches the vicinity below the hanging point 2 of the mixer cylinder, the hanging point 3 of the mixer cylinder and the hanging point 3 of the water beam are reliably connected through the third fall chain, and then the hanging point 2 is disconnected from the hanging point 3; 5) Through the cooperation of the third fall chain and the second crane, the water beam continues to be translated along the axis direction of the mixer. When the water beam hanging point 1 is about to enter the cylinder, the first fall chain connects the mixer hanging point 1 with the hanging point 1, and then the crane hook is disconnected from the water beam hanging point 1, and the crane hook is connected to the water beam tail hook; 6) Through the cooperation of the first fall chain, the third fall chain and the second crane, the water beam continues to be translated along the axis of the mixer. Through fine-tuning, the lower planes of the left and right bases of the water beam are aligned with the bolt holes on the upper surfaces of the first support and the second support respectively.
2. A method for quickly replacing a water beam assembly of an extra-large sintering mixer according to claim 1, It is characterized in that The step 1) also includes starting the mixer with micro-transmission, rotating the three welded hanging points to the top of the central axis of the mixer barrel; then stopping the mixer, welding two hanging points at the front and back of the upper middle outer surface of the mixer barrel, and locking the mixer at four points by a fall chain to ensure that the mixer barrel does not rotate during the construction process.
3. A method for quickly replacing a water beam assembly of an extra-large sintering mixer according to claim 1, It is characterized in that The step 6) also includes installing a mixer water beam protection cover, installing a mixer nozzle, cutting off the mixer barrel hanging points, resetting the liner, cleaning the site, testing the machine, and completing the installation of the water beam assembly.
Citation Information
Patent Citations
Ship screw shaft mounting tool
CN103128534A
Transportation and installation method of shear-resistant steel plate wall
CN116946613A
Device and method for movably disassembling and assembling shield screw conveyor in tunnel
CN117697367A
Water bar's supplementary lifting device is changed to heating furnace
CN206799702U
Sleeve crystallizer tubular shaft core-pulling reloading machine
CN211991684U