Electric energy meter lead seal installation device and installation method thereof
By designing the lead seal installation device of the electric energy meter, the conveying mechanism, the lead seal feeding mechanism and the lead seal installation mechanism, including the press assembly and the positioning component, the problem of damage to the electric energy meter cover caused by the deviation of the lead seal is solved, and high efficiency is achieved , accurate lead seal installation improves processing efficiency.
Patent Information
- Application Number
- CN202411457752.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-18
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-10-18
AI Technical Summary
During the installation of the lead seal of the electric energy meter, the deviation of the lead seal position causes the meter cover to be damaged, and excessive pressure may cause deformation or damage.
A power meter lead seal installation device is designed, including a conveying mechanism, a lead seal feeding mechanism and a lead seal installation mechanism. It adopts a press assembly and a positioning assembly to disperse the pressure through a vacuum suction cup and auxiliary press assembly, and uses an infrared ranging sensor. Calibrate the lead seal position to ensure the accuracy and stability of the lead seal installation.
It improves the accuracy and stability of lead seal installation, avoids damage to the electricity meter cover, improves processing efficiency, and reduces program disorders caused by independent drive devices in multiple stations.
Smart Images

Figure CN119057430A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of electric energy meter assembly, and more specifically, to an electric energy meter lead seal installation device and an installation method thereof. Background Art
[0002] The electric energy meter is an instrument used to measure electric energy, also known as the watt-hour meter, fire meter, electric energy meter, kilowatt-hour meter, which refers to the instrument for measuring various electrical quantities. In the electric energy meter assembly industry, the lead seal is an important encryption device for the electric energy meter, so the electric energy meter needs to be installed with a lead seal when it leaves the factory. According to the requirements, some electric energy meters need to be installed with three lead seals, and some require two lead seals. These lead seals are installed in the corresponding holes of the electric energy meter.
[0003] In the prior art, when the electric energy meter is installed with a lead seal, a plurality of workstations are usually set up, and the electric energy meter is sealed with a plurality of lead sealing machines in turn on the lead seal holes on the electric energy meter. When the electric energy meter is sealed, the lead seal is adsorbed onto the electric energy meter by a vacuum suction cup and then pressed down for installation. During the feeding process of the lead seal feeder, the lead seal will be partially tilted when moving in the feeding channel of the lead seal feeder. When the vacuum suction cup is used for adsorption, it is easy to cause the position of the lead seal to be unstable, that is, the position is deviated and not centered. When the position deviation between the lead seal and the vacuum suction cup is too large, the contact position between the lead seal and the electric energy meter lead seal is also deviated, thereby causing damage to the electric energy meter cover. Moreover, when the lead seal is sealed, the electric energy meter lead seal holes may be deformed or damaged due to excessive pressure. Summary of the invention
[0004] In view of the shortcomings of the prior art, the purpose of the present invention is to provide an electric energy meter lead seal installation device to solve the following technical problem: the electric energy meter lead seal position contact also has deviations, thereby causing damage to the electric energy meter cover.
[0005] The purpose of the present invention can be achieved by the following technical solutions:
[0006] An electric energy meter lead seal installation device comprises a transmission mechanism, a lead seal feeding mechanism and a lead seal installation mechanism;
[0007] The conveying mechanism is used for the conveying operation of the electric energy meter, and the lead seal feeding mechanism is used for the lead seal feeding operation, and the lead seal feeding mechanism is arranged on one side of the lead seal installation mechanism;
[0008] The lead seal installation mechanism is arranged on the conveying mechanism, and the lead seal installation mechanism comprises a support frame, a press-fitting assembly for lead seal press-fitting operation, and an electric energy meter positioning assembly for positioning and shunting the electric energy meter;
[0009] The press-fitting assembly includes two symmetrically arranged press-fitting guns, which are mounted on a back plate through a fixed plate, the back plate is slidably mounted on a crossbeam bracket, a push cylinder is arranged on the back plate, a piston rod of the push cylinder is fixedly connected to the back plate, and the fixed plate is slidably mounted on the back plate;
[0010] The pressing gun comprises a pressing rod, a pressing tube is fixedly connected to the bottom of the pressing rod, a vacuum suction cup is connected to the bottom of the pressing tube, a connecting pipe connected to the pressing tube is arranged on the pressing rod, a fixing ring is fixedly provided on the pressing tube, auxiliary pressing parts are symmetrically arranged on both sides of the fixing ring, and the auxiliary pressing parts are used to disperse the pressure when the lead seal is pressed on the electric energy meter cover, the auxiliary pressing parts comprise a fixing rod, a telescopic rod is slidably installed in the fixing rod, an elastic part is arranged in the fixing rod, one end of the elastic part is connected to the inner wall of the fixing rod, and the other end is connected to the end of the telescopic rod, a pressing seat is installed at the bottom of the telescopic rod, a calibration rod is rotatably installed in a calibration groove provided in the pressing seat, a micro motor is also arranged on one side of the pressing seat, and the calibration rod is driven to rotate in the calibration groove by the micro motor, and an infrared ranging sensor is arranged on the side of the pressing seat facing the pressing tube, and the infrared ranging sensor is used to measure the distance between the lead seal and the pressing seat.
[0011] As a further solution of the present invention, the electric energy meter positioning assembly includes a baffle, positioning brackets are symmetrically arranged on both sides of the baffle, the positioning brackets are rotatably installed on the baffle, positioning clamps are arranged on opposite sides of the two positioning brackets, the positioning clamps are driven by positioning cylinders, the positioning cylinders are installed on one side of the positioning brackets, guide brackets are arranged on one side of the two positioning brackets, a driving cylinder is arranged on the support frame, and the piston rod of the driving cylinder is connected to the end of the baffle.
[0012] As a further solution of the present invention, a diverter plate is rotatably mounted on the flow guide bracket, and the diverter plate limits the electric energy meter on the transmission mechanism.
[0013] As a further solution of the present invention, a movable groove is provided on the guide bracket, the positioning bracket is slidably installed in the movable groove through a movable rod, the movable rod is rotatably installed on the end of the positioning bracket, a driven rod is rotatably installed on one side of the diverter plate, and the driven rod is rotatably installed on the moving rod.
[0014] As a further solution of the present invention, the height of the vacuum suction cup is higher than the height of the press-fitting seat.
[0015] As a further solution of the present invention, fixing grooves are symmetrically opened on both sides of the fixing ring, and the fixing rods of the auxiliary pressing parts are clamped in the fixing grooves. By adjusting the position of the auxiliary pressing parts on the fixing grooves, the rotation angle of the pressing seat can be adjusted to always contact the cover of the electric energy meter.
[0016] As a further solution of the present invention, a movable screw is rotatably mounted on the beam bracket, a movable motor for driving the movable screw to rotate is disposed on one side of the beam bracket, and one side of the back plate is threadedly connected to the movable screw.
[0017] As a further solution of the present invention, a connecting bracket is installed on the two pressing guns, a sliding groove is opened on the top of the fixed plate, and the two connecting brackets are slidably installed in the sliding groove and fixed by a locking bolt.
[0018] A method for installing an electric energy meter lead seal installation device comprises the following steps:
[0019] Step 1: Use the mobile motor to drive the back plate to move on the beam bracket, move the press gun on the back plate to the lead seal feeding mechanism, absorb the lead seal on the lead seal feeding mechanism through the press gun and move it to the transmission mechanism, and fix the electric energy meter with the positioning clamp;
[0020] Step 2: The press-fitting gun moves downward, and the press-fitting seat on the auxiliary press-fitting part contacts the meter cover first. The telescopic rod on the press-fitting seat abuts against the surface of the meter cover under the action of the elastic member, and the seal of the meter is pressed and fixed around. The infrared distance sensor on the press-fitting seat measures the distance between the seal and the sensor, and determines the position of the seal according to the measured distance.
[0021] Step 3: According to the position deviation result of the lead seal, when the measured lead seal distance exceeds the set value, the calibration rods on the two press-fit seats rotate synchronously, the lead seal at the bottom of the vacuum suction cup is clamped at the center position, and the vacuum suction cup then absorbs the lead seal and presses down to complete the installation of the lead seal;
[0022] Step 4: The baffle is driven upward by the driving cylinder, and the baffle drives the positioning brackets on both sides to move upward. The positioning end of the positioning bracket drives the driving rod to move, and the driving rod is used to drive the diverter plate to rotate, and the electric energy meter to be processed is released under the pressing gun. The processed electric energy meter moves out from the baffle side, the baffle moves down, and the two diverter plates move relative to each other to limit and divert the next electric energy meter to be processed.
[0023] Compared with the existing solutions, the present invention has the following beneficial effects:
[0024] The present invention realizes the multi-point lead seal installation operation of the electric energy meter by arranging a conveying mechanism, a lead seal feeding mechanism and a lead seal installation mechanism, and does not need to realize the sequential installation of the lead seal of the electric energy meter through multiple workstations, thereby improving the processing efficiency;
[0025] The auxiliary pressing piece is arranged at the bottom of the pressing gun on the lead seal installation mechanism, which presses and fixes the lead seal of the electric energy meter around during the pressing operation, which can disperse the pressure during the pressing of the lead seal and avoid damage to the holes in the electric energy meter cover. At the same time, the auxiliary pressing piece can detect the position of the lead seal, and then correct the position of the offset lead seal, reducing the damage to the electric energy meter cover caused by the tilt and deviation of the center point of the lead seal.
[0026] The electric energy meter positioning assembly arranged on the lead seal installation mechanism is used to position and fix the electric energy meter, thereby improving the accuracy and stability of the electric energy meter lead seal. The diverter plate on the electric energy meter positioning assembly cooperates with the baffle plate to realize the limit release of the electric energy meter to be processed and the release operation of the processed electric energy meter, thereby realizing the diversion operation of the electric energy meter, avoiding the disorder in the electric energy meter processing procedure caused by the independent driving devices of multiple workstations, and improving the processing efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 The present invention is a schematic structural diagram of an electric energy meter lead seal installation device.
[0028] Figure 2 It is a structural schematic diagram of the lead seal installation mechanism in the present invention.
[0029] Figure 3 It is a schematic structural diagram of the press-fit assembly in the present invention.
[0030] Figure 4 It is a structural schematic diagram of the pressure loading gun in the present invention.
[0031] Figure 5 It is a structural schematic diagram of the auxiliary press-fitting part in the present invention.
[0032] Figure 6 It is a schematic structural diagram of the press-fit assembly in the present invention from another angle.
[0033] Figure 7 It is a structural schematic diagram of the electric energy meter positioning component in the present invention.
[0034] In the figure: 1. conveying mechanism; 2. lead seal feeding mechanism; 3. lead seal installation mechanism; 10. press-fitting assembly; 110. press-fitting gun; 111. fixed plate; 112. back plate; 113. crossbeam bracket; 114. moving lead screw; 115. moving motor; 116. press-fitting rod; 117. press-fitting tube; 118. vacuum suction cup; 119. fixing ring; 120. auxiliary press-fitting part; 121. fixing rod; 122. telescopic rod; 123. Press-fit seat; 124, calibration groove; 125, calibration rod; 126, micro motor; 127, infrared ranging sensor; 128, fixing groove; 20, electric energy meter positioning assembly; 200, baffle; 201, positioning bracket; 202, positioning clamp; 203, positioning cylinder; 204, guide bracket; 205, driving cylinder; 206, diverter plate; 207, moving rod; 208, moving groove; 209, driven rod; 30, support frame. DETAILED DESCRIPTION
[0035] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The embodiments of the present invention are provided for the purpose of illustration and description, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention, and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.
[0036] Example 1
[0037] Reference Figure 1-Figure 7 As shown, the present invention is an electric energy meter lead seal installation device, comprising a conveying mechanism 1, a lead seal feeding mechanism 2 and a lead seal installation mechanism 3; the lead seal installation mechanism 3 is arranged on the conveying mechanism 1, and the lead seal feeding mechanism 2 is arranged on one side of the lead seal installation mechanism 3.
[0038] The lead seal installation mechanism 3 includes a press-fitting assembly 10 for lead seal press-fitting operation and an electric energy meter positioning assembly 20 for positioning and shunting the electric energy meter. The press-fitting assembly 10 is arranged on one side of the support frame 30, and the electric energy meter positioning assembly 20 is arranged on the other side of the support frame 30;
[0039] The press-fitting assembly 10 includes two symmetrically arranged press-fitting guns 110, the two press-fitting guns 110 are mounted on a back plate 112 via a fixed plate 111, and the back plate 112 is slidably mounted on a crossbeam bracket 113;
[0040] A push cylinder is provided on the back plate 112, the piston rod of the push cylinder is fixedly connected to the back plate 112, and the fixed plate 111 is slidably installed on the back plate 112;
[0041] The press-fitting gun 110 includes a press-fitting rod 116, a press-fitting tube 117 is fixedly connected to the bottom of the press-fitting rod 116, a vacuum suction cup 118 is connected to the bottom of the press-fitting tube 117, a connecting pipe connected to the press-fitting tube 117 is arranged on the press-fitting rod 116, and the connecting pipe is connected to the air pump through a connecting hose, a fixed ring 119 is fixedly sleeved on the press-fitting tube 117, and auxiliary press-fitting parts 120 are symmetrically arranged on both sides of the fixed ring 119, and the auxiliary press-fitting parts 120 are used to disperse the pressure during the press-fitting of the lead seal to avoid damage to the holes in the electric energy meter cover, and the auxiliary press-fitting parts 120 include a fixed rod 121, a telescopic rod 122 is slidably installed in the fixed rod 121, an elastic member is arranged in the fixed rod 121, and the elastic member is a spring, one end of the elastic member is connected to the inner wall of the fixed rod 121, and the other end is connected to the end of the telescopic rod 122, and a press-fitting seat 123 is installed at the bottom of the telescopic rod 122. A calibration groove 124 is provided in the press-fitting seat 123, and a calibration rod 125 is rotatably installed in the calibration groove 124. A micro motor 126 is also provided on one side of the press-fitting seat 123, and the calibration rod 125 is driven to rotate in the calibration groove 124 by the micro motor 126. An infrared distance sensor 127 is provided on the side of the press-fitting seat 123 facing the press-fitting tube 117. The infrared distance sensor 127 is used to measure the distance between the lead seal and the press-fitting seat 123 to avoid damage to the electric energy meter cover caused by the lead seal being not centered or tilted at the vacuum suction cup 118, resulting in the lead seal being installed in the wrong position. When the infrared distance sensor 127 measures the lead seal distance to exceed the set value, it means that the lead seal is not centered. The calibration rods 125 on the two press-fitting seats 123 are used, and the two calibration rods 125 rotate synchronously to clamp the lead seal at the center position, and the vacuum suction cup 118 then absorbs and moves the lead seal;
[0042] The height of the vacuum suction cup 118 is higher than that of the press-fit seat 123, so that when the lead seal is press-fitted, the press-fit seat 123 can first press and fix the electric energy meter, and at the same time, the distance between the lead seal and the press-fit seat 123 can be measured;
[0043] The fixing ring 119 is symmetrically provided with fixing grooves 128 on both sides, and the fixing rods 121 of the auxiliary pressing part 120 are engaged with the fixing grooves 128. By adjusting the position of the auxiliary pressing part 120 on the fixing grooves 128, the installation of the lead seal at the hole of the electric energy meter in different directions can be adapted;
[0044] A moving screw 114 is rotatably mounted on the crossbeam bracket 113, and a moving motor 115 is provided on one side of the crossbeam bracket 113 to drive the moving screw 114 to rotate. One side of the back plate 112 is threadedly connected to the moving screw 114, and the moving screw 114 drives the back plate 112 to move, thereby driving the press-fitting gun 110 on one side of the back plate 112 to move, so that the press-fitting gun 110 moves to the lead seal feeding mechanism 2, so as to realize the feeding of the lead seal;
[0045] Both pressing guns 110 are equipped with connecting brackets, and a sliding groove is provided on the top of the fixed plate 111. Both connecting brackets are slidably installed in the sliding groove and fixed by locking bolts. According to the installation position of the lead seal of the electric energy meter, the spacing between the two connecting brackets on the fixed plate is adjusted, so that the lead seal installation operations of different lead seal installation positions on the electric energy meter can be performed at the same time. When the lead seal installation positions on the electric energy meter are not in the same straight line, that is, the models of the electric energy meter are different, the length of the connecting bracket can be adjusted to realize the lead seal installation operations of the electric energy meter with different lead seal installation positions.
[0046] The electric energy meter positioning assembly 20 includes a baffle 200, and positioning brackets 201 are symmetrically arranged on both sides of the baffle 200. The positioning brackets 201 are rotatably installed on the baffle 200. Positioning clamps 202 are arranged on opposite sides of the two positioning brackets 201. The positioning clamps 202 are driven by positioning cylinders 203. The positioning clamps 202 realize the positioning and fixing of the electric energy meter during processing. The positioning cylinders 203 are installed on one side of the positioning brackets 201. A flow guide bracket 204 is arranged on one side of the two positioning brackets 201. The flow guide bracket 204 is fixedly installed on the conveying mechanism 1. The flow guide bracket 204 is inclined toward the direction in which the electric energy meter flows in, so that the electric energy meter can move between the flow guide brackets 204 to perform preliminary position limiting on the electric energy meter.
[0047] A driving cylinder 205 is provided on the support frame 30, and the piston rod of the driving cylinder 205 is connected to the end of the baffle 200. A diverter plate 206 is rotatably installed on the diverter bracket 204. A moving groove 208 is provided on the diverter bracket 204. The positioning bracket 201 is slidably installed in the moving groove 208 through a moving rod 207. The moving rod 207 is rotatably installed on the end of the positioning bracket 201. A driven rod 209 is rotatably installed on one side of the diverter plate 206, and the driven rod 209 is rotatably installed on the moving rod 207.
[0048] When the driving cylinder 205 drives the baffle 200 to move upward, the baffle 200 drives the positioning brackets 201 on both sides to move upward, and the moving rod 207 at the end of the positioning bracket 201 drives the driven rod 209 to move, and the driven rod 209 drives the diverter plate 206 to rotate on the guide bracket 204, and the diverter rod approaches one side of the guide bracket 204, thereby realizing the release of the electric energy meter to be processed; when the baffle 200 moves downward, the electric energy meter is clamped by the two separation rods to achieve the limitation of the electric energy meter to be processed; the driven rod 209 is used to drive the diverter plate 206 to rotate, and the electric energy meter is placed in the processing area, and the processed electric energy meter moves out from the side of the baffle 200 to achieve the diversion of the electric energy meter and the fixation of the electric energy meter during processing.
[0049] The conveying mechanism 1 is a conveyor belt device, which is used for conveying electric energy meters. By placing the electric energy meters on the conveying mechanism 1, the electric energy meters can be installed between subsequent mechanisms.
[0050] The lead seal feeding mechanism 2 is a ring-shaped feeding machine, which is mainly used for feeding small parts such as screws. It is a prior art. The present invention places the lead seal on the feeding and conveying channel of the ring-shaped feeding machine, and the lead seal is transported along the feeding and conveying channel to one side of the conveying mechanism 1, thereby realizing automatic feeding of the lead seal.
[0051] The installation method of an electric energy meter lead seal installation device of the present invention is as follows:
[0052] Step 1: The moving motor 115 drives the moving lead screw 114 to rotate, and the moving lead screw 114 drives the back plate 112 to move on the crossbeam support 113. When the pressing gun 110 on the back plate 112 moves to the lead seal feeding mechanism 2, the two pressing guns 110 absorb the lead seal on the lead seal feeding mechanism 2 and move to the conveying mechanism 1;
[0053] Step 2: When the press-fitting gun 110 moves downward, the press-fitting seat 123 on the auxiliary press-fitting part 120 first contacts the meter cover, and the telescopic rod 122 on the press-fitting seat 123 abuts against the surface of the meter cover under the action of the elastic member, and the electric energy meter lead seal is pressed and fixed around. At this time, the infrared distance sensor 127 on the press-fitting seat 123 measures the distance between the lead seal and the sensor, and determines whether the position of the lead seal is offset according to the measured distance. When the infrared distance sensor 127 measures the lead seal distance and does not exceed the set value, it means that the center position of the lead seal is not offset, and continue to press down to perform the lead seal installation operation;
[0054] When the distance of the seal measured by the infrared distance measuring sensor 127 exceeds the set value, it means that the seal position is not centered and the offset is large. The calibration rods 125 on the two press-fit seats 123 are used. The two calibration rods 125 rotate synchronously to clamp the seal at the center position. The vacuum suction cup 118 then absorbs the seal and presses down to perform the seal installation operation.
[0055] Step 3: After the installation of the electric energy meter is completed, when the driving cylinder 205 drives the baffle 200 to move upward, the baffle 200 drives the positioning brackets 201 on both sides to move upward, and the moving rod 207 at the end of the positioning bracket 201 drives the driven rod 209 to move, and the driven rod 209 is used to drive the diverter plate 206 to rotate, so that the electric energy meter to be processed is released and placed under the pressing gun 110, and the processed electric energy meter moves out from the side of the baffle 200, and the baffle 200 moves down. The two diverter plates 206 move relative to each other to limit the next electric energy meter to be processed, thereby realizing the diversion of the electric energy meter.
[0056] In the description of the present invention, it should be understood that the terms "upper", "lower", "left", "right", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, and a specific direction structure and operation, and therefore, cannot be understood as a limitation on the present invention. In addition, "first" and "second" are only for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0057] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", etc. should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0058] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.
Claims
1. An electric energy meter lead seal installation device, characterized in that: It comprises a conveying mechanism (1), a lead seal feeding mechanism (2) and a lead seal installing mechanism (3); The conveying mechanism (1) is used for the conveying operation of the electric energy meter, and the lead seal feeding mechanism (2) is used for the lead seal feeding operation. The lead seal feeding mechanism (2) is arranged on one side of the lead seal installation mechanism (3); The lead seal installation mechanism (3) is arranged on the conveying mechanism (1), and the lead seal installation mechanism (3) comprises a support frame (30), a press-fitting assembly (10) for lead seal press-fitting operation, and an electric energy meter positioning assembly (20) for positioning and shunting the electric energy meter; The press-fitting assembly (10) comprises two symmetrically arranged press-fitting guns (110), the two press-fitting guns (110) are mounted on a back plate (112) via a fixed plate (111), the back plate (112) is slidably mounted on a crossbeam bracket (113), a push cylinder is arranged on the back plate (112), a piston rod of the push cylinder is fixedly connected to the back plate (112), and the fixed plate (111) is slidably mounted on the back plate (112); The press-fitting gun (110) comprises a press-fitting rod (116), the bottom of the press-fitting rod (116) is fixedly connected to a press-fitting tube (117), the bottom of the press-fitting tube (117) is connected to a vacuum suction cup (118), the press-fitting rod (116) is provided with a connecting pipe connected to the press-fitting tube (117), a fixed sleeve is provided on the press-fitting tube (117), auxiliary press-fitting parts (120) are symmetrically provided on both sides of the fixed ring (119), the auxiliary press-fitting parts (120) are used to disperse the pressure when the lead seal is pressed on the electric energy meter cover, the auxiliary press-fitting parts (120) comprise a fixed rod (121), a telescopic rod (122) is slidably installed in the fixed rod (121), and the fixed rod (121) is provided with a connecting pipe connected to the press-fitting tube (117). An elastic member is arranged in the fixing rod (121), one end of the elastic member is connected to the inner wall of the fixing rod (121), and the other end is connected to the end of the telescopic rod (122); a press-fitting seat (123) is installed at the bottom of the telescopic rod (122); a calibration rod (125) is rotatably installed in a calibration groove (124) provided in the press-fitting seat (123); a micro motor (126) is also arranged on one side of the press-fitting seat (123); the calibration rod (125) is driven to rotate in the calibration groove (124) by the micro motor (126); an infrared distance sensor (127) is arranged on the side of the press-fitting seat (123) facing the press-fitting tube (117); the infrared distance sensor (127) is used to measure the distance between the lead seal and the press-fitting seat (123).
2. The electric energy meter lead seal installation device according to claim 1, characterized in that: The electric energy meter positioning assembly (20) comprises a baffle (200), positioning brackets (201) are symmetrically arranged on both sides of the baffle (200), the positioning brackets (201) are rotatably mounted on the baffle (200), and positioning clamps (202) are arranged on opposite sides of the two positioning brackets (201), the positioning clamps (202) are driven by positioning cylinders (203), the positioning cylinders (203) are mounted on one side of the positioning brackets (201), and flow guide brackets (204) are arranged on one side of the two positioning brackets (201), and a driving cylinder (205) is arranged on the support frame (30), and the piston rod of the driving cylinder (205) is connected to the end of the baffle (200).
3. The electric energy meter lead seal installation device according to claim 2, characterized in that: A flow diverter plate (206) is rotatably mounted on the flow guide bracket (204), and the flow diverter plate (206) limits the position of the electric energy meter on the transmission mechanism (1).
4. The electric energy meter lead seal installation device according to claim 3, characterized in that: The guide bracket (204) is provided with a movable groove (208), the positioning bracket (201) is slidably installed in the movable groove (208) via a movable rod (207), the movable rod (207) is rotatably installed on the end of the positioning bracket (201), and a driven rod (209) is rotatably installed on one side of the diverter plate (206), and the driven rod (209) is rotatably installed on the movable rod (207).
5. The electric energy meter lead seal installation device according to claim 1, characterized in that: The height of the vacuum suction cup (118) is higher than the height of the press-fit seat (123).
6. The electric energy meter lead seal installation device according to claim 1, characterized in that: The fixing ring (119) has fixing grooves (128) symmetrically formed on both sides, and the fixing rods (121) of the auxiliary pressing piece (120) are engaged with the fixing grooves (128). By adjusting the position of the auxiliary pressing piece (120) on the fixing grooves (128), the rotation angle of the pressing seat (123) can be adjusted to always contact the electric energy meter cover.
7. The electric energy meter lead seal installation device according to claim 1, characterized in that: A movable lead screw (114) is rotatably mounted on the crossbeam support (113); a movable motor (115) for driving the movable lead screw (114) to rotate is disposed on one side of the crossbeam support (113); and one side of the back plate (112) is threadedly connected to the movable lead screw (114).
8. The electric energy meter lead seal installation device according to claim 1, characterized in that: The two press-fitting guns (110) are both equipped with connecting brackets, the top of the fixing plate (111) is provided with a sliding groove, and the two connecting brackets are both slidably installed in the sliding groove and fixed by locking bolts.
9. A method for installing an electric energy meter lead seal, using an electric energy meter lead seal installation device according to any one of claims 1 to 7, characterized in that: The steps include: Step 1: Using a moving motor (115) to drive the back plate (112) to move on the crossbeam support (113), the pressing gun (110) on the back plate (112) moves to the lead seal feeding mechanism (2), the pressing gun (110) adsorbs the lead seal on the lead seal feeding mechanism (2) and moves it to the conveying mechanism (1), and the electric energy meter is fixed by using a positioning clamp (202); Step 2: The press-fitting gun (110) moves downward, and the press-fitting seat (123) on the auxiliary press-fitting member (120) first contacts the electric energy meter cover, and the telescopic rod (122) on the press-fitting seat (123) abuts against the surface of the electric energy meter cover under the action of the elastic member, and the electric energy meter lead seal is pressed and fixed around, and the infrared distance sensor (127) on the press-fitting seat (123) measures the distance between the lead seal and the sensor, and the position of the lead seal is determined according to the measured distance; Step 3: According to the result of the position deviation of the lead seal, when the measured lead seal distance exceeds the set value, the calibration rods (125) on the two press-fit seats (123) rotate synchronously, and the lead seal at the bottom of the vacuum suction cup (118) is clamped at the center position, and the vacuum suction cup (118) then absorbs the lead seal and presses down to complete the installation of the lead seal; Step 4: The baffle (200) is driven to move upward by driving the cylinder (205), and the baffle (200) drives the positioning brackets (201) on both sides to move upward, and the positioning end of the positioning bracket (201) drives the driving rod to move, and the driving rod drives the diverter plate (206) to rotate, and the electric energy meter to be processed is released to the bottom of the pressing gun (110), and the processed electric energy meter moves out from the side of the baffle (200), and the baffle (200) moves downward, and the two diverter plates (206) move relative to each other to limit and divert the next electric energy meter to be processed.
Citation Information
Patent Citations
lead seal, especially for electricity meters.
CH286550A
Point welding spattering-protection device and point welding machine
CN104107993A
Charging device with dust removal function
CN110723008A
Full-automatic lead sealing machine for electricity meter
CN113233111A
Clamping calibration device for manufacturing ultrathin wafer carrier substrate and use method
CN116525528A
Cited By
Automatic stopwatch device of electric energy meter
CN119527873A
