FLNG ship, SPB type LNG storage tank base and assembly precision control method thereof

Through segmented assembly and three-dimensional digital simulation technology, high-precision assembly of the SPB type LNG storage tank base of the FLNG ship is achieved, solving the problems of extended base installation and deterioration of construction environment in ship construction, shortening the dock cycle and reducing construction cost.

CN119058910APending Publication Date: 2024-12-03WISON (NANTONG) HEAVY INDUSTRY CO LTD
0 Cites 2 Cited by

Patent Information

Application Number
CN202411377625.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-30
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

During the ship construction process, the installation accuracy requirements of the FLNG ship SPB type LNG storage tank base are high, but the existing technology is difficult to install in advance while ensuring accuracy, resulting in extended dock cycle, deterioration of construction environment and increased construction costs.

Method used

Using the segmented assembly method, the segmented base line is used to accurately position and size control through the steps of supporting seat main body assembly, base segmented assembly, assembly of support seat and base segmentation, base assembly and gasket thickness simulation calculation, and other steps to ensure the base. The seat is assembled with high precision, and the thickness of the gasket is added through three-dimensional digital simulation to meet the requirements of lifting accuracy.

Benefits of technology

It effectively shortens the dock cycle, reduces construction costs, improves construction efficiency, and reduces assembly errors caused by inconsistent reference lines, solving the problems of base installation extension and segmented paint damage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119058910A_ABST
    Figure CN119058910A_ABST
Patent Text Reader

Abstract

The invention relates to an FLNG ship, an SPB type LNG storage tank base and an assembly precision control method thereof in the technical field of ship construction. The assembly precision control method comprises the steps of supporting seat body assembly, base segmented assembly, supporting seat and base segmented assembly, base assembly and gasket thickness simulation calculation and installation. According to the invention, the base formed by assembling by uniformly adopting the segmented datum line as the datum in each link can greatly reduce or even eliminate the assembling error caused by non-uniform datum lines in each link, and meanwhile, the adding and placing thickness of the gasket is simulated through three-dimensional digitalization when the SPB type LNG storage tank is installed, and the gasket is installed in place in advance; the precision requirement for one-time lifting of the LNG storage tank is met, the problems that the dock period is long, segmented paint is seriously damaged and the like due to the fact that a supporting base is assembled on a base after the base is built in the dock are solved, the dock period is effectively shortened, the building efficiency is improved, and meanwhile the building cost is greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of shipbuilding, and in particular to an FLNG ship, an SPB-type LNG storage tank base and an assembly precision control method thereof. Background Art

[0002] Typically, for large-scale equipment foundations with a large number of foundations, a large construction area, and high installation precision requirements, in order to ensure installation and adaptation accuracy, the foundation structure is often assembled and painted, and then the foundation is installed after the dock hull structure is completed. However, due to the large number of foundations and the wide coverage, the welding and related post-weld inspection and processing work during installation will be concentrated, which will take up a lot of dock time, making it impossible to carry out other project work and will cause extensive damage to the dock section paint. In addition, equipment installation is often in the middle and late stages of the project and the stage of project acceleration and rapid integration. If the foundation welding deformation, poor precision control, and the inability to simulate and warn in advance the precision deviation during installation will seriously affect the project construction period and construction cost, and the construction environment is extremely poor.

[0003] Currently, there are no examples of staged installation of SPB-type LNG tank foundations on FLNG vessels, a shorthand for floating liquefied natural gas production, storage and offloading (FLNG). The urgent challenge is to ensure the required precision while also moving the foundation installation process forward, shortening the docking period, and improving the construction environment. Summary of the Invention

[0004] In view of the defects in the prior art, the purpose of the present invention is to provide a FLNG ship, an SPB type LNG storage tank base and an assembly precision control method thereof.

[0005] According to the present invention, a method for controlling the assembly accuracy of an SPB-type LNG storage tank base of an FLNG ship comprises:

[0006] S1. Assembly of the support base body: The overall structure of the support base is designed according to the structure of the SPB type LNG storage tank. The overall structure of the support base includes a horizontal support plate, a load-bearing plate and a rib plate connected to the lower surface of the support plate, and a limit plate and a bracket connected to the upper surface of the support plate. The support base body is cut and welded according to the structural parameters of the support base to form the support base body. The support base body refers to the structure on the upper surface of the support plate without the limit plate and bracket installed;

[0007] S2, Sub-assembly of the base: Divide the base into multiple sections according to assembly accuracy requirements. The sections include reference sections and closure sections. During the construction of each section, a unified reference line is used: 100M.K line is used in the length and width directions, and BL.4300 benchmark line is used in the height direction. During the production of each section, the double-sided structural lines of the section deck are marked and permanently marked according to the section reference lines. The assembly position of the support seat is determined by the front structural lines of the section deck.

[0008] S3, assemble the support seat and the base segment: mark and verify the center line of the support seat installation position according to the segment reference line, and perform a pre-position welding inspection on the support seat body with the segment reference line as the analysis reference when installing the support seat body in the installation position. Adjust the installation position of the support seat body to ensure the support seat body's requirements for the ribs and the installation size accuracy. Then, weld all welds according to the welding process requirements. After the support seat body is fixed to the surface of the segmented deck according to the layout requirements, perform a post-position welding inspection on the support seat body with the segment reference line as the analysis reference. Then, mark the front vertical center line on the upper surface of the support plate according to the positioning state of the support seat body. Mark the installation line according to the front vertical center line, and then complete the welding and fixation of the limit plate and the bracket according to the installation line.

[0009] S4, base assembly: After the sub-section reference line of the reference section is aligned with the dock reference line, it is fixed by positioning welding. Then, the closing section is welded to the reference section to form the base. When closing the sections, the construction principle is to align the sub-section reference line and the front vertical center line of the support base. When welding each section, the sub-section closing size and the support base positioning size are controlled according to the sub-section reference line. After completion, the longitudinal, transverse and horizontal dimensions of all sections are rechecked and recorded;

[0010] S5, gasket thickness simulation calculation and installation: measure the horizontal data of the pressure-bearing wood at the bottom of the SPB type LNG storage tank and the base after welding, simulate the gasket thickness in three dimensions according to the horizontal data, and install the prepared gasket on the support seat.

[0011] In some embodiments, in step S1, in the structural parameters of the support seat, the support seat adds a 3-7mm compensation amount in the height direction, and the compensation amount is compensated at the lower end where the support seat contacts the segment. The support seat is set to add a welding shrinkage amount in the width direction, and the welding shrinkage amount is added at 0.3-0.6mm per level. The so-called each level refers to one level between adjacent load-bearing plates and adjacent rib plates.

[0012] In some embodiments, in step S1, the support seat body installation step is: draw a vertical center line on the reverse side of the lower surface of the support plate, draw a structural installation line based on the vertical center line on the reverse side as a reference, spot weld and fix the load-bearing plate and the rib plate in sequence according to the structural installation line, and then weld all structural welds according to the welding process requirements.

[0013] In some embodiments, in step S2, the method for marking the front and back structures of the block deck is as follows: 100M.K reference lines are drawn in both the length and width directions on the back of the block deck structure. The 100M.K reference lines are projected onto the front of the deck structure using a double-sided ruler. The 100M.K reference lines are then connected to form a closed frame. The back structure positions are then marked according to the 100M.K reference lines and the structure marking diagram. After the position lines have been inspected and passed, they are permanently marked.

[0014] In some embodiments, in step S2, the specific operation process of marking the front and back structures of the segmented deck is as follows: assembling the panels to form the deck surface → passing the inspection after welding → marking the 100M.K reference line on the back of the structure → passing the inspection for marking → installing the components on the back → adjusting the dimensions → passing the inspection for component installation → inspection after component welding → correcting the 100M.K reference line on the back → marking the front according to the corrected 100M.K reference line → passing the inspection for the front marking → making a permanent mark → marking and protecting the mark.

[0015] In some embodiments, in step S3, the rib alignment requirements of the support base body are as follows: assuming that the plate thicknesses on both sides of the rib position are t1 and t2, respectively, where t1 ≥ t2, and the misalignment of the plates on both sides of the rib position is a, the relationship satisfied is:

[0016] When the member at the reinforcement position is the main load-bearing member: 1 / 4t2≤a≤1 / 3t2;

[0017] When the component at the reinforcement position is a non-primary load-bearing component: 1 / 3t2≤a≤1 / 2t2.

[0018] In some embodiments, in step S4, the segmented closure operation is performed according to the baseline alignment construction principle, and the baseline alignment includes the segmented baseline alignment setting and the alignment setting of the vertical center line of the front of the support seat.

[0019] In some embodiments, in step S5, the method for adding thickness of gaskets based on three-dimensional digital simulation of horizontal data is as follows: during data simulation, the first contact point between the pressure-bearing wood at the bottom of the SPB-type LNG storage tank and the support seat is calculated, and the thickness of the gasket at the first contact point is recorded as 0, and the gaps between the remaining non-contact points are calculated by the difference between the horizontality of the support seat and the horizontality of the bottom of the SPB-type LNG storage tank.

[0020] The present invention also provides an FLNG ship SPB type LNG storage tank base, which is formed by using the FLNG ship SPB type LNG storage tank base assembly precision control method.

[0021] The present invention also provides an FLNG ship, which is formed by using the FLNG ship SPB type LNG storage tank base.

[0022] Compared with the prior art, the present invention has the following beneficial effects:

[0023] In the present application, the installation position of the support seat on the segment is precisely positioned based on the front and back lines of the segment reference line. The assembly position of the limit plate on the support seat for limiting the pressure-bearing wooden block at the bottom of the LNG storage tank is also determined based on the segment reference line. At the same time, during the segment closing and assembly process, the closing size is precisely controlled based on the segment reference line, so that the base used to support the LNG storage tank after assembly is formed by uniformly using the segment reference line as the reference assembly in each link. The base can greatly reduce or even eliminate the assembly error caused by the inconsistency of the reference line in each link. At the same time, the thickness of the gasket added during the installation of the SPB type LNG storage tank is simulated by three-dimensional digitalization and installed in place in advance, which meets the accuracy requirements of the one-time lifting of the LNG storage tank, and solves the problems of long dock period and serious damage to the segment paint caused by assembling the support seat on the base after the base is built in the dock. It effectively shortens the dock period, improves construction efficiency and greatly reduces construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Other features, objects and advantages of the present invention will become more apparent upon reading the detailed description of non-limiting embodiments with reference to the following drawings:

[0025] Figure 1 This is a schematic diagram of the control accuracy of the height dimension parameters of the support seat of the present invention;

[0026] Figure 2 This is a schematic diagram of the control accuracy of the width direction dimension parameters of the support seat of the present invention;

[0027] Figure 3 This is a schematic diagram of the overall structure of the support base of the present invention;

[0028] Figure 4 A schematic diagram showing the dimensional control accuracy of the support seat of the present invention;

[0029] Figure 5 This is a schematic diagram of the assembly process of the support base body of the present invention;

[0030] Figure 6 This is a schematic diagram of the double-sided marking structure of the segmented deck of the present invention;

[0031] Figure 7 Schematic diagram of the return line position and inner bottom level inspection after double-sided marking of the segmented deck of the present invention;

[0032] Figure 8 A marking diagram showing the revised 100M.K reference line and horizontal reference points after the segmented construction of the present invention;

[0033] Figure 9 This is a schematic diagram of the process of assembling the support base body on the segment of the present invention;

[0034] Figure 10 A schematic diagram of the process of installing the upper limit plate and rib plate on the support base of the present invention;

[0035] Figure 11 This is a schematic diagram of the rib alignment structure during the installation of the support base of the present invention;

[0036] Figure 12 This is a schematic diagram of the rib structure welding control during the installation of the support base of the present invention;

[0037] Figure 13 This is a schematic diagram of the base assembly structure of the present invention;

[0038] Figure 14 This is a schematic diagram of the structure of the gasket installation of the present invention;

[0039] Figure 15 This is a schematic diagram of the structure in which the center lines of the BVT / BVL type support base of the present invention are aligned horizontally and vertically in sections;

[0040] Figure 16 This is a schematic structural diagram of different types of support seats arranged on segments according to the present invention. DETAILED DESCRIPTION

[0041] The present invention will be described in detail below with reference to specific embodiments. The following examples will help those skilled in the art to further understand the present invention, but are not intended to limit the present invention in any form. It should be noted that, for those skilled in the art, several changes and improvements can be made without departing from the scope of the present invention. These all fall within the scope of protection of the present invention.

[0042] The present invention provides a method for controlling the assembly accuracy of the SPB type LNG storage tank base of an FLNG ship. Figure 1-16 As shown, it mainly includes the following steps:

[0043] S1, Support Base Body Assembly: First, design the overall structure of the support base according to the structure of SPB type LNG storage tank. The overall structure of the support base mainly consists of a support plate in the middle position in a horizontal state, a load-bearing plate and a rib plate connected to the lower surface of the support plate, and a limit plate and a bracket installed on the upper surface of the support plate, which form a trapezoidal frame structure. Figure 1 The lower surface of the bearing plate is connected to the base in sections, mainly serving as a support. The two limit plates on the upper surface of the support plate are welded and fixed in parallel to both sides of the support plate. They are mainly used to limit the bearing wood below the SPB type LNG storage tank. The rib plate and bracket mainly play a role in structural reinforcement.

[0044] Secondly, given that the support seat will have various welding deformations, shrinkage and dimensional assembly deviations during the production process, it is necessary to standardize the control of the entire process from design, cutting to assembly.

[0045] In terms of the overall structural dimensional accuracy control of the support base, according to the horizontal accuracy requirements of the support base and considering the horizontal accuracy of the inner bottom of the base segment, a 5mm compensation amount is added in the height direction of the support base, such as Figure 1 As shown. According to the support seat structure and plate thickness specifications, the principle of increasing the welding shrinkage in the width direction of the support seat is 0.5mm per level. Figure 2 As shown, each gear refers to the gear position between adjacent bearing plates and adjacent rib plates installed on the lower surface of the support plate.

[0046] In terms of dimensional accuracy control of blanking plate structure: In order to ensure the production accuracy of the base, the dimensional accuracy control standards of the blanking plate are as follows, see Figure 3 As shown:

[0047]

[0048] Then, the cut plate is welded and assembled into the support base body according to the assembly procedure and precision requirements. The so-called support base body refers to the structure on the upper surface of the support plate without the limit plate and toggle plate installed. The precision control requirements for the support base assembly are shown in the following table. Figure 4 As shown:

[0049]

[0050]

[0051] When assembling the support body, in order to reduce assembly deviation and welding shrinkage deformation, it is necessary to standardize the assembly production control process. Figure 5 As shown, the assembly control process in this embodiment is: a reverse vertical reference line is drawn on the lower surface of the support plate, and the reverse vertical reference line is a reference line formed by the vertical intersection of the two center lines in the length and width directions of the support plate. Then the structural installation line is drawn based on the reverse vertical reference line, and the load-bearing plate and the rib plate are installed based on the structural installation line. The marking size needs to be well controlled during the marking process. During the installation process, the rib plate and the load-bearing plate are first connected to the lower surface of the support plate by spot welding in sequence. During the spot welding process, the centering control of the rib plate, the load-bearing plate and the structural line needs to be well done. After all the rib plates and load-bearing plates are spot welded and fixed, all structural welds are welded according to the welding process requirements, following the principle of welding from the middle to both sides, first vertical welding and then flat welding. The heat input and welding filling amount are minimized during welding, and all deformations are eliminated after welding.

[0052] S2, assembly of base sections: First, the base is divided into multiple sections according to the assembly accuracy requirements. Multiple sections can be constructed at the same time, which is conducive to improving construction efficiency and shortening the docking period. The divided sections include one reference section and several closing sections. The so-called reference section refers to the reference base point when the sections are closed. Other closing sections are closed and connected in sequence based on the reference points. Secondly, in order to improve the assembly accuracy of the section assembly, support seat assembly and dock loading during the construction of the sections, the unified section reference line is: 100M.K line is used in the length and width directions, and BL.4300 benchmark line is used in the height direction. Thirdly, since it is difficult to identify the actual assembly position of the reverse structure of the section when the support seat is assembled, in order to ensure the installation accuracy, the double-sided structure of the section deck is marked and permanently marked when the sections are made. The so-called section deck is the top plate used to install the support seat, and the front of the section deck is the installation surface of the support seat. See Figure 6 As shown, the implementation method of marking the front and back of the segmented structure is: make 100M.K reference lines in the length direction and width direction on the back of the segmented deck structure respectively, use a double-sided ruler to project the 100M.K reference lines to the front of the deck structure, connect the 100M.K reference lines in series to form a closed frame line, and then draw the back structure position according to the 100M.K reference lines and the structure marking diagram, and make permanent marks after the position line is inspected and qualified. The specific operation process of double-sided marking is: assemble the panels to form the deck surface → pass the inspection after welding → draw the 100M.K reference line on the back of the structure → pass the marking inspection → install the back components → adjust the size → pass the component installation inspection → inspect the components after welding → correct the 100M.K reference line on the back → mark the front according to the corrected 100M.K reference line → pass the front marking inspection → make permanent marks → mark and protect. As shown Figure 7 The figure shows the return line position and inner bottom level inspection formed on the front of the block deck structure after the double-sided marking of the block structure is completed. Each block is constructed according to the design structure drawings and construction process. The constructed block is corrected with the 100M.K reference line and horizontal reference point based on the three-dimensional precision measurement data of the block, and the reference line is marked. Figure 8 The horizontal reference point is marked by erecting BL.4300 horizontal poles at the strong frame positions around the segment.

[0053] S3, assemble the support seat and the base segment: First, weld the support seat body to each segment of the base. The welding and fixing process refers to Figure 9As shown, after checking the installation position line of the support seat to be installed according to the segmented reference line, the support seat body to be installed is inspected before positioning welding based on the segmented reference line, and the installation position of the support seat body is adjusted. After ensuring the support seat body's requirements for the ribs and the installation size accuracy, all welds are welded according to the welding process requirements. During the welding process, the principle of symmetrical welding from the middle to both sides is followed to control the deformation during the welding process. After the welding is completed, the support seat is inspected after positioning welding based on the segmented reference line as the analysis reference, and the size of the unqualified base is adjusted and reviewed. Secondly, the limit plate and rib plate are assembled on the support seat body. For the specific assembly steps, see Figure 10 As shown, according to the positioning state of the support seat body, the front vertical center line formed by the vertical intersection of the length direction center line and the width direction center line is drawn on the upper surface of the support plate of the support seat body with the segmented reference line as the reference. The front vertical center line is parallel to the 100M.K lines in two directions of the segmented reference line. Then, the installation lines of the upper limit plate and the elbow plate on the upper surface of the support plate are drawn according to the front vertical center line. The assembly process of the limit plate and the elbow plate is also to first fix the spot welding and then implement full weld welding to fix it, and eliminate the corresponding deformation after welding. By drawing the front vertical center line of the support plate with the segmented reference line as the analysis reference, it can be ensured that after the support seat is fixed on the segment, the front vertical center line of the support seat and the segmented reference line form a unified reference, and the assembly error is reduced by improving the consistency of the reference.

[0054] In this embodiment, when the support base body is welded to the segment, the reinforcement requirements of the structural plate body located on the inner and outer sides of the segment deck are as follows: Figure 11 As shown, the plate thicknesses on both sides of the rib position are t1 and t2 respectively, where t1 ≥ t2, and the offset of the plates on both sides of the rib position is a, and the relationship satisfied is:

[0055] When the member at the reinforcement position is the main load-bearing member: 1 / 4t2≤a≤1 / 3t2. The control method is: (1) When a>1 / 2t2, it should be reassembled and the disassembly distance should be at least 50a; (2) When 1 / 3t2≤a≤1 / 2t2, such as Figure 12 As shown, the weld can be improved by increasing the weld foot (10%).

[0056] When the component at the reinforcement position is not the main load-bearing component: 1 / 3t2≤a≤1 / 2t2. The control method is: when a>1 / 2t2, it should be reassembled and the disassembly distance should be at least 30a.

[0057] S4, Base Assembly: See Figure 13As shown, first, the segment baseline of the benchmark segment is aligned with the dock baseline. After the benchmark segment is positioned and fixed, the closing segment and the benchmark segment are welded to form a base. The segment closing operation is carried out in accordance with the baseline alignment construction principle. The baseline alignment includes the segment baseline alignment setting and the alignment setting of the front vertical center line of the support seat. When welding each segment, the segment closing size and the support seat positioning size are controlled according to the segment baseline. The position of the support seat has been determined and fixed when the segment is made. At this time, the closing between segments only requires the 100M.K line spacing of the adjacent segments to be 200mm, then there is no cumulative error in the support seat. After the segment closing operation of the base is completed, the longitudinal and transverse dimensions and horizontal levelness of all segments are checked again and recorded.

[0058] S5, gasket thickness simulation and installation: measure the horizontal data of the pressure-bearing wood at the bottom of the SPB type LNG storage tank and the support base welded on the base. Each support base has no less than 6 measurement points. According to the horizontal data, three-dimensional digital simulation of the gasket thickness is performed and the prepared gasket is installed on the support base. Figure 14 shown.

[0059] During data simulation, the first contact point between the pressure-bearing wood at the bottom of the tank and the support base is calculated. The gasket thickness at the first contact point is recorded as 0. The gasket thickness is calculated by the difference between the horizontality of the support base and the horizontality of the bottom of the SPB type LNG storage tank. For example, if the support base is level -4mm and the tank is level +3mm, then a gasket of 4+3=7mm is added; or if the hull is level +3mm and the tank is level +5mm, then a gasket of 5-3=2mm is added.

[0060] In the present application, the installation position of the support seat on the segment is precisely positioned based on the front and back lines of the segment reference line. The assembly position of the limit plate on the support seat for limiting the pressure-bearing wooden block at the bottom of the LNG storage tank is also determined based on the segment reference line. At the same time, during the segment closing and assembly process, the closing size is precisely controlled based on the segment reference line, so that the base used to support the LNG storage tank after assembly is formed by uniformly using the segment reference line as the reference assembly in each link. The base can greatly reduce or even eliminate the assembly error caused by the inconsistency of the reference line in each link. At the same time, the thickness of the gasket added during the installation of the SPB type LNG storage tank is simulated by three-dimensional digitalization and installed in place in advance, which meets the accuracy requirements of the one-time lifting of the LNG storage tank, and solves the problems of long dock period and serious damage to the segment paint caused by assembling the support seat on the base after the base is built in the dock. It effectively shortens the dock period, improves construction efficiency and greatly reduces construction costs.

[0061] In the description of this application, it should be understood that the terms "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on this application.

[0062] The above describes specific embodiments of the present invention. It should be understood that the present invention is not limited to the specific embodiments described above, and those skilled in the art may make various changes or modifications within the scope of the claims, which do not affect the essence of the present invention. The embodiments of this application and the features in the embodiments may be combined with each other in any manner unless there is a conflict.

Claims

1. A method for controlling the assembly accuracy of a SPB type LNG tank base of a FLNG ship, characterized in that: include: S1, assembly of the support seat body: the overall structure of the support seat is designed according to the structure of the SPB type LNG storage tank. The overall structure of the support seat includes a horizontal support plate, a load-bearing plate and a rib plate connected to the lower surface of the support plate, and a limit plate and a toggle plate connected to the upper surface of the support plate. The support seat body is cut and welded according to the structural parameters of the support seat to form the support seat body. The support seat body refers to the structure on the upper surface of the support plate without the limit plate and the toggle plate installed; S2, sub-assembly of the base: the base is divided into multiple sub-sections according to the assembly accuracy requirements, including reference sub-sections and closure sub-sections. The sub-section reference lines are unified during the sub-section construction process: 100M.K line is used in the length and width directions, and BL.4300 benchmark line is used in the height direction. During the sub-section production, the double-sided structure of the sub-section deck is marked and permanently marked according to the sub-section reference line. The assembly position of the support seat is determined by marking the front structure of the sub-section deck; S3, assemble the support seat and the base segment: according to the segment reference line, check and verify the center line of the support seat installation position. When the support seat body is installed at the installation position, use the segment reference line as the analysis reference to perform a pre-position welding inspection on the support seat body. Adjust the installation position of the support seat body. After ensuring the support seat body's requirements for the ribs and the installation size accuracy, weld all welds according to the welding process requirements. After the support seat body is fixed on the surface of the segment deck according to the layout requirements, use the segment reference line as the analysis reference to perform a post-position welding inspection on the support seat body. Then, according to the positioning state of the support seat body, draw the front vertical center line on the upper surface of the support plate. According to the front vertical center line, draw the installation line, and then complete the welding and fixing of the limit plate and the bracket according to the installation line. S4, base assembly: After the segment reference line of the reference segment is aligned with the dock reference line, it is fixed by positioning welding. Then, the closing segment and the reference segment are welded together to form a base. When closing the segments, the construction principle of aligning the segment reference line and the front vertical center line of the support seat is followed. When welding each segment, the closing size of the segment and the positioning size of the support seat are controlled according to the segment reference line. After completion, the longitudinal, transverse and horizontal dimensions of all segments are checked again and recorded; S5, gasket thickness simulation calculation and installation: measure the horizontal data of the pressure-bearing wood at the bottom of the SPB type LNG storage tank and the base after closing and welding, and simulate the thickness of the gasket in three dimensions according to the horizontal data, and install the prepared gasket on the support seat.

2. The FLNG ship SPB type LNG tank base assembly accuracy control method according to claim 1 is characterized in that: In the step S1, in the structural parameters of the support seat, the support seat adds a compensation amount of 3-7mm in the height direction, and the compensation amount is compensated at the lower end where the support seat contacts the segment. The support seat is set with a welding shrinkage amount in the width direction, and the welding shrinkage amount is added in each level of 0.3-0.6mm. The so-called each level refers to one level between adjacent load-bearing plates and between adjacent rib plates.

3. The FLNG ship SPB type LNG tank base assembly accuracy control method according to claim 2 is characterized in that: In step S1, the support seat body installation steps are: draw the reverse vertical center line on the lower surface of the support plate, draw the structural installation line based on the reverse vertical center line as a reference, spot weld the load-bearing plate and the rib plate in sequence according to the structural installation line, and then weld all the structural welds according to the welding process requirements.

4. The FLNG ship SPB type LNG tank base assembly accuracy control method according to claim 1, characterized in that: In step S2, the method for marking the front and back structures of the block deck is as follows: 100M.K reference lines are made in the length direction and width direction of the back of the block deck structure respectively, the 100M.K reference lines are projected onto the front of the deck structure using a double-sided ruler, the 100M.K reference lines are connected in series to form a closed frame line, and then the back structure position is drawn according to the 100M.K reference lines and the structure marking diagram, and a permanent mark is made after the position line is checked and qualified.

5. The method for controlling the assembly accuracy of the SPB type LNG tank base of the FLNG ship according to claim 4, characterized in that: In step S2, the specific operation flow of marking the front and back structures of the segmented deck is as follows: assembling the panels to form the deck surface → passing the inspection after welding → marking the 100M.K reference line on the back of the structure → passing the marking inspection → installing the components on the back → adjusting the size → passing the inspection of component installation → inspection after component welding → correcting the 100M.K reference line on the back → marking the front according to the corrected 100M.K reference line → passing the marking inspection on the front → making permanent marks → marking protection.

6. The FLNG ship SPB type LNG tank base assembly accuracy control method according to claim 1, characterized in that: In step S3, the support seat body has the following requirements for the ribs: the plate thicknesses on both sides of the rib position are t1 and t2, respectively, where t1≥t2, and the misalignment of the plates on both sides of the rib position is a, and the relationship satisfied is: When the member at the reinforcement position is the main load-bearing member: 1 / 4t2≤a≤1 / 3t2; When the component at the reinforcement position is a non-main load-bearing component: 1 / 3t2≤a≤1 / 2t2.

7. The FLNG ship SPB type LNG tank base assembly accuracy control method according to claim 1, characterized in that: In step S4, the segment closing operation is performed according to the construction principle of the reference line alignment, and the reference line alignment includes the segment reference line alignment setting and the alignment setting of the front vertical center line of the support seat.

8. The FLNG ship SPB type LNG tank base assembly accuracy control method according to claim 1, characterized in that: In step S5, the method of adding thickness of gaskets according to three-dimensional digital simulation of horizontal data is as follows: during data simulation, the first contact point between the pressure-bearing wood at the bottom of the SPB type LNG storage tank and the support seat is calculated, and the thickness of the gasket at the first contact point is recorded as 0, and the gaps between the remaining non-contact points are calculated by the difference between the horizontality of the support seat and the horizontality of the bottom of the SPB type LNG storage tank.

9. An FLNG ship SPB type LNG tank base, characterized in that: The method for controlling the assembly accuracy of the SPB type LNG tank base of an FLNG ship is adopted as described in any one of claims 1 to 8.

10. A FLNG ship, characterized in that: It is formed by using the FLNG ship SPB type LNG tank base as described in claim 9.

Citation Information

Cited By

  • Ship supporting box mounting method

    CN120621620A

  • Alignment detection method and system for watertight structure of ship

    CN121247007A