Pulverized coal and hydrogen coupling injection system for tuyere of blast furnace
By designing a coal powder and hydrogen coupled injection system at the blast furnace air outlet, a spray gun with a tilted insertion of a small sleeve and a spiral rifle structure can be achieved to separate and uniformly burn the coal powder and hydrogen combustion areas, which solves the problem of low fuel burnout rate and easy burning of the spray gun The problem of loss reduces carbon and NOX emissions, improves the efficiency and control accuracy of steel smelting.
Patent Information
- Application Number
- CN202411299672.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-18
- Publication Date
- 2024-12-03
AI Technical Summary
The existing blast furnace air outlet coal powder and hydrogen injection systems have problems such as low fuel burnout rate, easy burning of the spray gun, and increased viscosity of unburned ash coal powder adhesion, and high carbon and NOX emissions.
A coupled injection system of coal powder and hydrogen gas at blast furnace air outlet was designed. By tiltingly inserting a small set of spray guns, spiral rifles and end necking structures, the separation and uniform combustion of coal powder and hydrogen gas combustion areas were achieved, and through temperature and pressure sensors Adjust the spray amount and oxygen enrichment rate in real time to optimize the combustion state.
It improves combustion efficiency and furnace temperature control accuracy, extends the service life of the spray gun, reduces carbon and NOX emissions, and achieves a more efficient steel smelting process.
Smart Images

Figure CN119061220A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of steel smelting, in particular to a blast furnace tuyere coal powder and hydrogen coupled injection system. The present invention optimizes the combustion process of the tuyere by improving the coupled injection system of coal powder and hydrogen, realizes MILD combustion of fuel, improves the combustion efficiency of fuel, reduces carbon emissions, reduces NOX emissions, and realizes green and sustainable development of the steel industry. Background Art
[0002] my country's emission limits for various pollutants in the energy industry are becoming increasingly stringent. Traditional industries, especially the steel industry, will move towards green and low-carbon development and industrial transformation. In this context, hydrogen metallurgy technology, as an innovative solution, uses hydrogen as a reducing agent to replace traditional carbon-based reducing agents, alleviating the blast furnace's dependence on fossil energy such as coke and coal powder, and significantly reducing carbon emissions in the steelmaking process. At the same time, MILD (mild combustion) technology, with its low NO X Characteristics such as emission, efficient combustion stability and uniform heat flux density distribution show great application potential in the energy field and provide technical support for the green transformation of blast furnace tuyere combustion.
[0003] One of the current technical routes of hydrogen metallurgy is to blow hydrogen or hydrogen-rich gas into the blast furnace through the tuyere hydrogen injection device on the basis of the original blast furnace. However, as a highly flammable gas, hydrogen will compete fiercely with the injected coal powder when it is directly injected in the direct blowing pipe, resulting in a decrease in the burnout rate of the coal powder, affecting the smelting efficiency of the blast furnace; at the same time, in the highly oxidizing atmosphere of the hot blast direct blowing pipe, hydrogen will burn quickly at the outlet of the spray gun and release a large amount of heat, causing the hydrogen spray gun nozzle and the small sleeve area to be easily burned; in addition, if the coal powder injected into the blast furnace cannot be completely burned before the tuyere, the unburned coal powder will be carried out of the cyclone area by the rising coal gas flow, and adhere to the primary slag when it reaches the slag zone, increasing the viscosity of the primary slag, deteriorating the permeability of the material column, causing the blast furnace to run unsmoothly, and even some unburned coal powder will be carried out of the furnace to cause waste.
[0004] Therefore, how to improve the existing pulverized coal and hydrogen injection system of the blast furnace, and combine the corresponding fuel injection control method to ensure that the spray gun and tuyere components are not easily deformed or burned in the high-temperature and high-oxidizing tuyere and maintain a long service life, while improving the fuel burnout rate and reducing carbon and NO X Emission is a key technical problem that needs to be urgently solved in blast furnace hydrogen-rich smelting. Summary of the invention
[0005] In order to solve the above problems, the present invention proposes a blast furnace tuyere coal powder and hydrogen coupling injection system and method. In this system, the coal powder spray gun is obliquely inserted into the small sleeve from the straight blowing pipe, the coal powder spray gun is obliquely inserted into the small sleeve from the straight blowing pipe, and the hydrogen spray gun is obliquely inserted into the tuyere whirlpool area from the small sleeve. The coal powder spray gun outlet is arranged in the central air supply channel of the small sleeve, and the hydrogen spray gun penetrates the entire small sleeve into the whirlpool area, so that the coal powder and hydrogen spray outlets are designed with sufficient intervals to achieve the spatial separation of the two combustion areas to reduce combustion competition and ensure uniform distribution of airflow; hydrogen is directly sprayed into the whirlpool area to prevent hydrogen combustion from damaging the small sleeve, and the water cooling pipe of the small sleeve provides cooling for the spray gun. In addition, the spray gun of the system is embedded with spiral rifling and has a terminal necking, which increases the jet velocity of the fuel, expands the combustion area of the fuel and evenly distributes the fuel, so that the fuel reaches the conditions of MILD combustion. The system monitors the actual combustion temperature through the straight blowing pipe temperature sensor, and compares it with the theoretical combustion temperature, adjusts the injection amount of coal powder and hydrogen and the oxygen enrichment rate of the blast furnace in real time, and optimizes the combustion state. At the same time, the gas pressure sensor can monitor the injection pressure and automatically adjust the flow controller once an abnormality is detected to keep the injection pressure stable.
[0006] To achieve the above-mentioned purpose, the present invention provides a blast furnace tuyere coal powder and hydrogen coupled injection system, including an injection device, a fuel supply system and a control system; the injection device includes a straight blowing pipe, a small sleeve and a spray gun; the front end of the straight blowing pipe is connected to the rear end of the small sleeve, the straight blowing pipe body includes a central air supply channel and a coal injection channel, the small sleeve includes a central air supply channel, a spiral surrounding water cooling channel and a hydrogen injection channel, the spray gun is embedded with spiral rifling and has a terminal necking; the coal powder spray gun is obliquely inserted into the small sleeve from the straight blowing pipe, and the hydrogen spray gun is obliquely inserted into the tuyere whirlpool area from the small sleeve; the coal powder spray gun outlet is arranged in the central air supply channel of the small sleeve The hydrogen spray gun penetrates the entire small sleeve and enters the cyclotron zone, 40 to 80 mm away from the front end of the small sleeve; the coal injection channel is inclined downward by 10° to 15°, and the hydrogen injection channel is inclined downward by 5° to 8°; the spiral rifling can guide the fuel to produce axial rotation, and the end necking can accelerate the fuel jet by gradually reducing the flow area; the pulverized coal supply unit includes a pulverized coal bin, a blowing tank, a coal conveying pipeline, a distributor, a nitrogen pipeline and a control valve group; the pulverized coal bin is connected to the blowing tank through a feeding device, and the outlet of the blowing tank is connected to the coal conveying pipeline through a pipeline, and the coal conveying pipeline transfers the coal The pulverized coal is transported to the distributor, and the distributor then evenly distributes the pulverized coal to each tuyere of the blast furnace. The nitrogen pipelines are respectively connected to the pulverized coal bin and the injection tank to provide inerting and power support; the hydrogen supply unit includes a hydrogen pipeline, an inert gas pipeline and a control valve group; the hydrogen source is connected to the hydrogen control valve group through a pipeline, the inert gas source is connected to the inert gas control valve group through a pipeline, and the hydrogen and the inert gas are connected by a three-way pipeline to spray the inert gas or hydrogen; the hot air supply unit includes an air pipeline, a blower, an oxygen pipeline and a hot air furnace; low-pressure oxygen is mixed in from the suction side of the blower, so that the oxygen in the blower The gas content is increased to achieve oxygen-enriched blast in the blast furnace; the control system includes a direct blowing pipe temperature sensor, a gas pressure sensor, a coal powder flow controller and a gas flow controller, and the control system is configured to calculate the theoretical combustion temperature according to the blast furnace operating parameters; the actual measured temperature of the blast furnace tuyere is obtained by using the temperature sensor, and the actual measured temperature is compared with the theoretical combustion temperature to determine whether the combustion state in the blast furnace is optimal: if the actual temperature is lower than the theoretical temperature, indicating that the combustion is not sufficient, the control system increases the injection amount or increases the oxygen enrichment rate; conversely, if the actual temperature is too high, the injection amount is reduced or the oxygen enrichment rate is reduced.
[0007] In a preferred embodiment of the present invention, the coal powder and hydrogen injection channels are single-port injection or double-port injection, and a 30° to 60° cut is opened on the end face of the coal powder and hydrogen spray gun.
[0008] In another preferred embodiment of the present invention, the spray gun tube is a seamless steel tube lined with ceramic material that is wear-resistant, oxidation-resistant, high-temperature-resistant and has good sealing properties.
[0009] In another preferred embodiment of the present invention, the control valve group includes a stop valve, a regulating valve, a cut-off valve and a check valve.
[0010] In another preferred embodiment of the present invention, the control system is configured to automatically adjust the gas flow controller to restore normal blowing pressure when the pressure sensor detects that the blowing gas pressure is abnormally too high or too low.
[0011] In another preferred embodiment of the present invention, the calculation formula of the theoretical combustion temperature of the blast furnace tuyere is as follows:
[0012]
[0013] Where:
[0014] T f ——Theoretical combustion temperature, °C;
[0015] Q C_coke ——The heat released by the combustion of carbon in coke to generate CO, kJ;
[0016] Q C_coal ——Heat released by the combustion of carbon in pulverized coal to generate CO, kJ;
[0017] Q B ——Sensible heat brought in by blast, kJ;
[0018] Q coke ——Sensible heat brought in by coke, kJ;
[0019] Q coal ——Sensible heat brought in by coal powder, kJ;
[0020] Q H ——Sensible heat brought in by hydrogen injection, kJ;
[0021] Q X ——endothermic reaction of water and C in coke, kJ;
[0022] Q D ——heat absorption of coal powder decomposition, kJ;
[0023] Q ash ——Heat removed by ash in coke and coal, kJ;
[0024] V g ——bosh gas volume, m 3 ;
[0025] ——Boshi gas in T f Specific heat capacity at temperature, kJ / (m 3 ℃);
[0026] m non_coal ——mass of unburned coal powder, kg;
[0027] ——Unburned coal powder in T f Specific heat capacity at temperature, kJ / (kg·℃);
[0028] m ash ——Amount of ash remaining after the combustion of coke and coal powder, kg;
[0029] ——Ash content in coal and coke is T f Specific heat capacity at temperature, kJ / (kg·℃).
[0030] The blast furnace tuyere coal powder and hydrogen coupled injection system of the present invention has at least the following technical effects:
[0031] Improve combustion efficiency and furnace temperature control accuracy: The use of pulverized coal and hydrogen coupled injection can improve the combustion efficiency and furnace temperature control accuracy of the blast furnace. The pulverized coal and hydrogen are fully mixed and burned in the blast furnace tuyere area. The high reactivity of hydrogen can promote the full combustion of pulverized coal, thereby improving thermal efficiency and furnace temperature control.
[0032] Structural design of the injection device: The injection device has a unique structural design. Through the coordination of the straight blow pipe, the small sleeve and the spray gun, the precise coupling injection of coal powder and hydrogen is realized. The cutout design and spiral rifling structure of the spray gun end face can improve the atomization and rotation of the fuel and promote the combustion process.
[0033] Perfect fuel supply and control system: The system is equipped with a perfect fuel supply and control system. The pulverized coal supply is uniformly sprayed through nitrogen pushing, distribution and other steps. The hydrogen supply adopts the method of inert gas mixing, which is highly controllable. The control system can automatically adjust the spraying parameters according to the actual temperature of the blast furnace to optimize the combustion state. The concept, specific structure and technical effects of the present invention will be further explained in conjunction with the accompanying drawings below to fully understand the purpose, characteristics and effects of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 It is a process flow chart of the blast furnace tuyere coal powder and hydrogen coupled injection system of the present invention;
[0035] Figure 2 It is a schematic diagram of the structure of the blowing device in the present invention;
[0036] Figure 3 It is a left view of the small set device of the present invention;
[0037] Figure 4 It is a schematic diagram of the motion trajectory of the injected fuel;
[0038] Figure 5 It is a schematic diagram of the structure of the spray gun.
[0039] In the figure: 1. pulverized coal bin, 2. injection tank, 3. distributor, 4. blast furnace, 5. compressor, 6. hot blast furnace, 7. blower, 8. pulverized coal supply unit, 9. hydrogen supply unit, 10. hot blast supply unit, 11. stop valve 1, 12. first check valve, 13. second check valve, 14. cutting valve, 15. regulating valve, 16. stop valve 2, 17. straight blowing pipe, 18. pulverized coal channel, 19. small sleeve, 20. hydrogen channel, 21. water inlet, 22. water outlet, 23. pulverized coal spray gun, 24. hydrogen spray gun, 25. pulverized coal movement trajectory, 26. hydrogen movement trajectory, 27. tuyere swirl area, 28. spiral rifling, 29. end necking. DETAILED DESCRIPTION
[0040] The following describes several preferred embodiments of the present invention with reference to the drawings in the specification, so that the technical content is clearer and easier to understand. The present invention can be embodied in many different forms of embodiments, and the protection scope of the present invention is not limited to the embodiments mentioned in the text.
[0041] In the drawings, components with the same structure are indicated by the same numerical reference numerals, and components with similar structures or functions are indicated by similar numerical reference numerals. The size and thickness of each component shown in the drawings are arbitrarily shown, and the present invention does not limit the size and thickness of each component. In order to make the illustration clearer, the thickness of the components is appropriately exaggerated in some places in the drawings.
[0042] See also Figure 1-5 .
[0043] The system includes a spraying device, a fuel supply system and a control system.
[0044] The injection device is composed of a direct blowing pipe 17, a small sleeve 19, a coal powder injection gun 23 and a hydrogen injection gun 24.
[0045] The pulverized coal spray gun is inserted into the small sleeve from the straight blowing pipe at an angle, and the hydrogen spray gun is inserted into the tuyere whirlpool area from the small sleeve. The pulverized coal spray gun outlet is set in the central air supply channel of the small sleeve, 100 to 200 mm away from the front end of the small sleeve, and the hydrogen spray gun penetrates the entire small sleeve and enters the whirlpool area, 40 to 80 mm away from the front end of the small sleeve; the coal spray channels are all tilted downward by 10° to 15°, and the hydrogen spray channels are all tilted downward by 5° to 8°.
[0046] The spray gun is embedded with spiral rifling 28 and end necking 29. The spiral rifling is distributed along the axis of the spray gun, which can guide the fuel to produce axial rotation; while the end necking structure accelerates the fuel jet by gradually reducing the flow area. This combination can improve the uniformity, dispersion and speed of fuel injection, thereby improving combustion performance. The jet velocity of coal powder needs to be controlled at 100-200m / s, and the jet velocity of hydrogen is greater than Mach 1, so that the fuel can reach the conditions of MILD combustion.
[0047] The fuel supply system consists of a pulverized coal supply unit 8 , a hydrogen supply unit 9 and a hot air supply unit 10 .
[0048] The pulverized coal supply unit consists of a pulverized coal bin 1, an injection tank 2, a distributor 3 and a coal injection pipeline. The pulverized coal bin is connected to the injection tank through a feeding device (such as a rotary feeder or a vibrating feeder), and the outlet of the injection tank is connected to the coal conveying pipeline through a pipeline. The coal conveying pipeline transports the pulverized coal to the distributor, and the distributor evenly distributes the pulverized coal to each tuyere of the blast furnace. The nitrogen pipeline is connected to the pulverized coal bin and the injection tank to provide inerting and power support.
[0049] The hydrogen supply unit consists of a compressor and a gas control valve group (check valve, cutting valve, regulating valve and shut-off valve). The hydrogen source is connected to the hydrogen control valve group through a pipeline, and the inert gas source is connected to the inert gas control valve group through a pipeline. The hydrogen and the inert gas are connected by a three-way pipeline, and then the inert gas or hydrogen is injected according to the blast furnace operation requirements.
[0050] The hot air supply unit adopts the method of pre-machine oxygen enrichment, and is composed of a hot blast furnace 6 and a blower 7. The system maintains the blast volume of the blast furnace blower unchanged, mixes low-pressure oxygen (from the air separation tower or pressure swing adsorption) from the blower suction side, realizes the pre-mixing of oxygen and air, thereby increasing the oxygen content of the gas injected into the blast furnace to achieve oxygen-enriched blast in the blast furnace.
[0051] The control system includes a direct blowpipe temperature sensor, a gas pressure sensor, a pulverized coal flow controller and a gas flow controller. According to the blast furnace operating parameters (such as blast temperature, humidity, oxygen enrichment rate, pulverized coal injection amount, etc.), the theoretical combustion temperature can be calculated. The actual measured temperature of the blast furnace tuyere is obtained by using a temperature sensor, and by comparing it with the theoretical combustion temperature, it can be determined whether the combustion state in the blast furnace is optimal. If the actual temperature is lower than the theoretical temperature, it may indicate that the combustion is insufficient, and the injection amount or oxygen enrichment rate needs to be increased; conversely, if the actual temperature is too high, it may cause nodules in the blast furnace or damage the equipment, and the injection amount or oxygen enrichment rate needs to be reduced.
[0052] When the pressure sensor detects an abnormal injection gas pressure (such as too high or too low), the control system will automatically adjust the gas flow controller to restore normal injection pressure. In addition, by setting a reasonable pressure threshold, the automatic switching and fault alarm functions of the injection system can be realized, thereby improving the safety and stability of blast furnace operation.
[0053] In the injection system, pulverized coal injection and hydrogen injection are two independent injection mechanisms, which are controlled separately without interfering with or affecting each other. When injecting fuel into the blast furnace, one fuel can be injected alone, or two fuels can be injected in a coupled manner, and the injection amounts of each can be jointly adjusted according to the requirements of the blast furnace smelting process.
[0054] Before the pulverized coal, hydrogen and inert gas in the injection pipe enter the tuyere, the pressure should be 0.05MPa higher than the hot air pressure of the blast furnace, and the speed of hydrogen leaving the spray gun should be greater than 100m / s. The pressure of the inert gas used should not be less than 0.8MPa, and the theoretical combustion temperature of the blast furnace tuyere should be greater than 2000℃.
[0056] In blast furnace smelting production, the reasonable theoretical combustion temperature range is used as the benchmark to determine the amount of pulverized coal and hydrogen injection. The calculation formula for the theoretical combustion temperature of the blast furnace tuyere is as follows:
[0057]
[0058] Where:
[0059] T f ——Theoretical combustion temperature, °C;
[0060] Q C_coke ——The heat released by the combustion of carbon in coke to generate CO, kJ;
[0061] Q C_coal ——Heat released by the combustion of carbon in pulverized coal to generate CO, kJ;
[0062] Q B ——Sensible heat brought in by blast, kJ;
[0063] Q coke ——Sensible heat brought in by coke, kJ;
[0064] Q coal ——Sensible heat brought in by coal powder, kJ;
[0065] Q H ——Sensible heat brought in by hydrogen injection, kJ;
[0066] Q X ——endothermic reaction of water and C in coke, kJ;
[0067] QD ——heat absorption of coal powder decomposition, kJ;
[0068] Q ash ——Heat removed by ash in coke and coal, kJ;
[0069] V g ——bosh gas volume, m 3 ;
[0070] ——Boshi gas in T f Specific heat capacity at temperature, kJ / (m 3 ℃);
[0071] m non_coal ——mass of unburned coal powder, kg;
[0072] ——Unburned coal powder in T f Specific heat capacity at temperature, kJ / (kg·℃);
[0073] m ash ——Amount of ash remaining after the combustion of coke and coal powder, kg;
[0074] ——Ash content in coal and coke is T f Specific heat capacity at temperature, kJ / (kg·℃);
[0075] From the specific perspective of patent implementation, the blast furnace tuyere coal powder and hydrogen coupled injection system of the present invention is implemented as follows: First, in the blast furnace preparation stage, the injection device is installed in the order of the straight blowing pipe, the small sleeve, the hydrogen spray gun, and the coal powder spray gun, and the injection device is ensured to be closely connected with the gas supply system. As the blast furnace starts to supply air, the coal powder spray gun and the hydrogen spray gun are pre-purged with inert gas to prevent hot air backflow and protect the steel pipe.
[0076] Subsequently, according to the descent of blast furnace charge (fuel injection can only be started after the blast furnace charge begins to descend), the injection of pulverized coal and hydrogen is started in stages. After the pulverized coal injection volume is increased to an appropriate level (>200kg / t), the pulverized coal injection is reduced and the hydrogen injection is increased according to a certain replacement ratio. When the hydrogen injection volume is <60Nm 3 / t, press 1.1~1.3Nm 3 The principle of replacing 1kg of coal powder with hydrogen reduces the amount of coal injection; when the gas injection is greater than 60Nm 3 / t, press 1.3~1.5Nm 3 The principle of replacing 1kg of coal powder with hydrogen reduces the amount of coal injection. 3 / t hydrogen injection volume) gradually increase the mixed gas injection volume until the hydrogen injection target value (>120Nm 3 / t). After each injection plan adjustment, it is necessary to wait for 0.5 to 1.0 hours to allow the blast furnace to maintain stable operation during the adjustment process before adjusting the injection plan accordingly.
[0077] Changing the injection plan will affect the theoretical combustion temperature and total pressure difference of the blast furnace. After replacing pulverized coal with hydrogen, the theoretical combustion temperature of the blast furnace will decrease. The oxygen enrichment rate, wind temperature and blast humidity should be increased in time to maintain the theoretical combustion temperature not lower than 2000°C. When pulverized coal is replaced with hydrogen, the air permeability of the blast furnace is improved, which will reduce the total pressure difference of the blast furnace. At this time, the air volume can be reduced, the oxygen enrichment rate can be increased, and the amount of gas in the furnace can be controlled. The total pressure difference of the blast furnace is maintained within a reasonable range (140-155kPa) through dynamic adjustment of the air volume and oxygen volume. If the material speed is faster, the furnace temperature is lowered, and the coke ratio is increased when the hydrogen injection volume is increased, the coal ratio should be appropriately increased and the gas fuel injection volume should be reduced.
[0078] The preferred specific embodiments of the present invention are described in detail above. It should be understood that ordinary technicians in the field can make many modifications and changes based on the concept of the present invention without creative work. Therefore, all technical solutions that can be obtained by technicians in the technical field based on the concept of the present invention through logical analysis, reasoning or limited experiments on the basis of the prior art should be within the scope of protection determined by the claims.
Claims
1. A blast furnace tuyere coal powder and hydrogen coupled injection system, It is characterized in that The invention comprises a blowing device, a fuel supply system and a control system; the blowing device comprises a straight blowing pipe, a small sleeve and a spray gun; the front end of the straight blowing pipe is connected to the rear end of the small sleeve, the straight blowing pipe body comprises a central air supply channel and a coal spraying channel, the small sleeve comprises a central air supply channel, a spirally surrounding water cooling channel and a hydrogen spraying channel, the spray gun is embedded with spiral rifling and has a terminal necking; the pulverized coal spray gun is obliquely inserted into the small sleeve from the straight blowing pipe, and the hydrogen spray gun is obliquely inserted into the tuyere whirlpool area from the small sleeve; the outlet of the pulverized coal spray gun is arranged in the central air supply channel of the small sleeve, 100 to 200 mm away from the front end face of the small sleeve, and the outlet of the hydrogen spray gun is arranged in the central air supply channel of the small sleeve, 100 to 200 mm away from the front end face of the small sleeve, and the outlet of the hydrogen spray gun is arranged in the central air supply channel of the small sleeve, 100 to 200 mm away from the front end face of the small sleeve, and the outlet of the pulverized coal ... pulverized coal spray gun is arranged in the central air supply channel of the small sleeve, 100 to 200 mm away from the front end face of the small sleeve, and the outlet of the pulverized coal spray gun is arranged in the central air supply channel of the small sleeve, 100 to 200 mm away from the front end face of After penetrating the entire small sleeve, it enters the whirlpool area, 40 to 80 mm away from the front end face of the small sleeve; the coal injection channel is inclined downward by 10° to 15°, and the hydrogen injection channel is inclined downward by 5° to 8°; the spiral rifling can guide the fuel to produce axial rotation, and the end necking accelerates the fuel jet by gradually reducing the flow area; the coal powder supply unit includes a coal powder bin, a blowing tank, a coal conveying pipeline, a distributor, a nitrogen pipeline and a control valve group, the coal powder bin is connected to the blowing tank through a feeding device, the outlet of the blowing tank is connected to the coal conveying pipeline through a pipeline, the coal conveying pipeline conveys the coal powder to the distributor, and the distributor then evenly distributes the coal powder The nitrogen pipelines are connected to the pulverized coal bunker and the injection tank respectively to provide inerting and power support; the hydrogen supply unit includes a hydrogen pipeline, an inert gas pipeline and a control valve group; the hydrogen source is connected to the hydrogen control valve group through a pipeline, the inert gas source is connected to the inert gas control valve group through a pipeline, and the hydrogen and the inert gas are connected by a three-way pipeline to inject the inert gas or hydrogen; the hot air supply unit includes an air pipeline, a blower, an oxygen pipeline and a hot air furnace; low-pressure oxygen is mixed into the blower from the suction side to increase the oxygen content in the blower to achieve to the blast furnace for oxygen-enriched blast; the control system includes a direct blowing pipe temperature sensor, a gas pressure sensor, a coal powder flow controller and a gas flow controller, and the control system is configured to calculate the theoretical combustion temperature according to the blast furnace operating parameters; the temperature sensor is used to obtain the actual measured temperature of the blast furnace tuyere, and the actual measured temperature is compared with the theoretical combustion temperature to determine whether the combustion state in the blast furnace has reached the best: if the actual temperature is lower than the theoretical temperature, indicating that the combustion is not sufficient, the control system increases the injection amount or increases the oxygen enrichment rate; conversely, if the actual temperature is too high, the injection amount is reduced or the oxygen enrichment rate is reduced.
2. The blast furnace tuyere pulverized coal and hydrogen coupled injection system according to claim 1, in, The coal powder and hydrogen injection channels are single-port injection or double-port injection, and a 30° to 60° cut is opened on the end face of the coal powder and hydrogen spray gun.
3. The blast furnace tuyere pulverized coal and hydrogen coupled injection system according to claim 1, in, The spray gun tube is a seamless steel tube lined with ceramic material that is wear-resistant, oxidation-resistant, high-temperature-resistant and has good sealing properties.
4. The blast furnace tuyere pulverized coal and hydrogen coupled injection system according to claim 1, in, The control valve group includes a stop valve, a regulating valve, a cut-off valve and a check valve.
5. The blast furnace tuyere pulverized coal and hydrogen coupled injection system according to claim 1, in, The control system is configured so that when the pressure sensor detects that the pressure of the blowing gas is abnormally too high or too low, the control system automatically adjusts the gas flow controller to restore the normal blowing pressure.
6. The blast furnace tuyere pulverized coal and hydrogen coupled injection system according to claim 1, in, The calculation formula of the theoretical combustion temperature of blast furnace tuyere is as follows: Where: T f ——Theoretical combustion temperature, °C; Q C_coke ——The heat released by the combustion of carbon in coke to generate CO, kJ; Q C_coal ——Heat released by the combustion of carbon in pulverized coal to generate CO, kJ; Q B ——Sensible heat brought in by blast, kJ; Q coke ——Sensible heat brought in by coke, kJ; Q coal ——Sensible heat brought in by coal powder, kJ; Q H ——Sensible heat brought in by hydrogen injection, kJ; Q X ——endothermic reaction of water and C in coke, kJ; Q D ——heat absorption of coal powder decomposition, kJ; Q ash ——Heat removed by ash in coke and coal, kJ; V g ——bosh gas volume, m 3 ; ——Boshi gas in T f Specific heat capacity at temperature, kJ / (m 3 ℃); m non_coal ——mass of unburned coal powder, kg; ——Unburned coal powder in T f Specific heat capacity at temperature, kJ / (kg·℃); m ash ——Amount of ash remaining after the combustion of coke and coal powder, kg; ——Ash content in coal and coke is T f Specific heat capacity at temperature, kJ / (kg·℃).
Citation Information
Cited By
Method for improving combustion rate of blast furnace injection pulverized coal by using hydrogen-rich gas
CN120425094A
Blowing device for reducing gas of low-carbon blast furnace
CN120485453A
Blast furnace, method for operating blast furnace, and tuyere
WO2026203485A1
Blowing structure and method for attaching and detaching blowing structure
WO2026220929A1