Overpass existing line large-span large-section steel box girder and construction method
By using the combination method of steel box girder positioning, precise beam falling, elevation precision adjustment and lifting and shaping operation platform in the construction of upper span existing wire bridges, the stability and accuracy in the construction of large span large section steel box girders is solved. Controlling difficult problems has achieved efficient and safe construction results.
Patent Information
- Application Number
- CN202411235085.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-12-03
AI Technical Summary
In the construction of an existing line bridge with upper span, it is difficult for the existing technology to effectively improve construction efficiency, quality and safety, especially in the lifting and installation of large span and large section steel box girders, there are problems of difficulty in controlling stability and accuracy in the lifting and installation of large-span steel box girders. .
The construction method including the steel box girder positioning guide device, the precise beam positioning device, the elevation precision adjustment device and the hoisting shaped operation platform is adopted. The precision of the steel box girder is achieved through the combination of the fine adjustment device and the rough adjustment device. Adjust the position and elevation to reduce operational difficulty and improve construction safety.
It improves construction efficiency and quality, reduces the difficulty of horizontal position adjustment and elevation adjustment, ensures the precise positioning and welding quality of steel box girders, and enhances the safety of the construction process.
Smart Images

Figure CN119061794A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of large-span and large-section steel box girder hoisting construction, and in particular relates to a large-span and large-section steel box girder spanning an existing line and a construction method. Background Art
[0002] With the acceleration of urbanization and the continuous improvement of transportation networks, the demand for bridge construction over existing lines is increasing. Such bridges not only need to meet the structural requirements of large spans and large sections, but also need to ensure that the normal operation of existing lines is minimally affected during construction. Steel box girders have become the preferred solution for the construction of bridges over existing lines due to their large span capacity, high steel strength, fast installation speed, and light weight.
[0003] The hoisting and installation of large-span steel box girders is a key link in the construction process. It is necessary to select a suitable hoisting scheme to ensure stability and safety during the hoisting process. At the same time, the accuracy must be strictly controlled during the installation process to ensure that the line shape and elevation of the bridge meet the design requirements.
[0004] Based on the actual requirements of complex construction conditions, high construction quality and tight construction period of engineering projects, an innovative large-span and large-section steel box girder and construction method that spans over existing lines with high construction efficiency, excellent construction quality and low safety risk is of great significance for improving the construction quality of large-span and large-section steel box girders that span over existing lines. Summary of the invention
[0005] The purpose of the present invention is to overcome the deficiencies in the prior art and to provide a large-span and large-section steel box girder that crosses an existing line and a construction method.
[0006] This large-span and large-section steel box girder construction device that crosses over an existing line includes a steel box girder positioning guide device, a steel box girder precise beam placement device, a steel box girder elevation fine-tuning device, and a steel box girder jacking and shaping operation platform;
[0007] The steel box girder segment is placed on the temporary support, and the steel box girder positioning guide device is arranged above the steel box girder segment that has been in place, including a fine adjustment device and a rough adjustment device, both of which are used to pull the steel box girder to be placed in place;
[0008] The steel box girder precise beam placement device and the steel box girder elevation fine adjustment device are arranged at intervals on different temporary supports;
[0009] The steel box girder precise placement device comprises a horizontal adjustment group, horizontal jacks are arranged around the horizontal adjustment group, and the top contacts the steel box girder through a contact position;
[0010] The steel box girder elevation fine-adjusting device comprises a corner adjustment group, a middle adjustment group and a jack with a sleeve, the corner adjustment group comprises a wedge group, and a tensioning column is arranged in the middle adjustment group.
[0011] Preferably, the fine-adjustment device includes a steel base and an electric hoist, the coarse-adjustment device includes an electric winch, a stiffening steel is arranged on one side of the temporary support, a side drop plate is arranged on the stiffening steel, a positioning steel is arranged on the steel box girder to be in place, a reinforcing pull ring is arranged on the positioning steel, the reinforcing pull ring is connected to the pull rope of the electric winch, the electric winch is fixed to the steel box girder segment that has been in place through a detachable base, a special-shaped pull ring is arranged on the steel box girder to be in place, the pull rope of the electric hoist is arranged on the special-shaped pull ring, the electric hoist is arranged on the steel base, an upper limit plate is arranged on the upper part of the steel base, a reserved hole is arranged on the upper limit plate, for the pull rope of the electric hoist to pass through, a pull rod is arranged at the rear part of the steel base, a force seat is arranged at the end of the pull rod, and the force seat is fixed on the steel box girder segment that has been in place.
[0012] Preferably, the device for accurately dropping the steel box girder into place comprises a horizontal adjustment group and a base, the base comprises a pair of clamps, a V-shaped support and a lifting lug, a circular slide groove is provided on the surface of the base, the horizontal adjustment group is placed in the circular slide groove of the base, a lower steel stiffening ring is provided on the edge of the circular slide groove, a horizontal jack is provided on the inner side of the lower steel stiffening ring, the horizontal jack is supported around the horizontal adjustment group, and a contact position is provided on the top of the horizontal adjustment group.
[0013] Preferably, the steel box girder elevation fine-tuning device includes a clamp base, a corner adjustment group, a middle adjustment group and a sleeve jack, a load-bearing I-beam is arranged on the upper part of the sleeve jack, the clamp base is placed on a temporary support, double-piece I-beams are arranged on both sides, corner adjustment groups are arranged at the four corners of the double-piece I-beam, a fixed pipe column is arranged at the bottom of the corner adjustment group, a flange with a slide groove is arranged on the fixed pipe column, a short column and a slide groove are arranged on the flange with a slide groove, a wedge group is arranged on the short column, the wedge group includes an upper wedge block and a lower wedge block, an upper column is arranged on the upper wedge block, a sliding column is arranged between the bottom of the lower wedge block and the flange with the slide groove, and the sliding column moves back and forth in the slide groove with the movement of the lower wedge block, the middle adjustment group is arranged in the middle of the double-piece I-beam, a tensioning column is arranged inside the middle adjustment group, and rotating plates with rotating rods are arranged on both sides of the tensioning column.
[0014] The construction method of the large-span and large-section steel box girder over the existing line comprises the following steps:
[0015] Step 1: Install the steel box girder positioning guide device on the already positioned steel box girder segment and connect the steel box girder segment to be positioned; after the positioned steel box girder segment is hoisted, adjust the horizontal position through the fine adjustment device and the coarse adjustment device;
[0016] Step 2: Install the horizontal adjustment group on the temporary support, place the steel box girder on the contact position, and adjust the horizontal position by the horizontal jack;
[0017] Step 3: Install the steel box girder elevation fine adjustment device on the temporary support, lift the steel box girder segment to the elevation with a sleeve jack, support it with a wedge group and tensioning columns, and weld the steel box girder segment;
[0018] Step 4: Remove the precise placement device for the steel box girder and the fine adjustment device for the elevation of the steel box girder, install platforms on both sides of the pier, install lifting jacks on the top surface of the pier, and lift the steel box girder in sections.
[0019] Preferably, a limiting cylinder is arranged on the pier column, the limiting cylinder comprises a triangular plate and a lifting jack, the lifting jack is arranged on the triangular plate, the bottom of the lifting jack is an inclined surface, which fits with the triangular plate, a platform fixing clamp is arranged on the pier column, the platform fixing clamp is used to fix the platform plate, the platform plate is hung on both sides of the pier column, a guardrail is arranged on the platform plate, an oblique brace is arranged at the lower part of the platform plate, the bottom of the oblique brace is placed on the embedded steel of the pier column, a ladder is arranged on the temporary support, a fixed limiting angle steel is arranged on the top surface, a box beam bottom rear plate is arranged on the bottom surface of the steel box beam, and replacement square steels of different heights are arranged between the fixed limiting angle steel and the box beam bottom rear plate.
[0020] Preferably, in step four, after reaching the first stage of jacking, a replacement square steel of corresponding height is set between the fixed limiting angle steel and the rear plate added at the bottom of the beam, then the jacking jack is taken out, and several layers of triangular plates are placed in the limiting cylinder. The number of triangular plates is determined according to the jacking height, and the jacking jack is placed on the triangular plate to continue jacking; after reaching the second height, the square steel is replaced with a square steel corresponding to the second height; the jacking jack is taken out, and a triangular plate is added in the limiting cylinder. The jacking jack is placed on the triangular plate to continue jacking, and after reaching the third height, the replacement square steel corresponding to the final height is replaced, and the jacking jack is unloaded.
[0021] The beneficial effects of the present invention are:
[0022] 1) The present invention adopts a steel box girder positioning guide device, which uses the steel box girder segments that have been in place to tow and guide the steel box girder segments to be placed, thereby reducing the operational difficulty of the temporary positioning operation of the steel box girder and the workload of subsequent horizontal position adjustment of the steel box girder, thereby improving construction efficiency.
[0023] 2) The present invention adopts a device for accurately dropping the steel box beam into position, and adjusts the horizontal position of the steel box beam segment through a horizontal jack, thereby improving the construction effect of adjusting the horizontal position of the steel box beam and reducing the difficulty of adjusting the horizontal position.
[0024] 3) The present invention adopts a steel box girder elevation fine-tuning device. After the steel box girder segment is lifted to the elevation with a sleeve jack, it is supported by a wedge group and a tensioning column. Through multiple adjustment devices, the accuracy of the steel box girder elevation adjustment is improved and the welding quality is guaranteed.
[0025] 4) The present invention has developed a standardized operation platform for jacking up steel box girders. Through the cooperation of triangular plates, jacking jacks and replacement of square steels, the steel box girders are jacked up in sections, which provides safety guarantees for the jacking construction of the steel box girders and thus improves the safety of the entire construction process. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a three-dimensional schematic diagram of the steel box girder positioning guide device;
[0027] Figure 2 This is the schematic diagram of electric hoist installation;
[0028] Figure 3 This is a schematic diagram of the installation of an electric winch;
[0029] Figure 4 This is a schematic diagram of the installation of the steel box girder elevation fine adjustment device;
[0030] Figure 5 It is the detailed structural drawing of the steel box girder elevation fine adjustment device;
[0031] Figure 6 is a schematic diagram of a corner adjustment assembly;
[0032] Figure 7 It is a schematic diagram of the middle adjustment component;
[0033] Figure 8 This is a schematic diagram of the installation of the precise beam placement device;
[0034] Fig. 9 It is a detailed structural diagram of the precise beam placement device;
[0035] Fig.10 is a schematic diagram of a level adjustment component;
[0036] Fig.11 This is a schematic diagram of the standardized operation platform for jacking up steel box beams;
[0037] Fig.12 This is a schematic diagram of the pier.
[0038] Description of reference numerals: 1. Steel box girder 2. Temporary support 3. Reinforced steel 4. Side drop plate 5. Positioning steel 6. Fine adjustment device 7. Coarse adjustment device 8. Pull rod 9. Steel base 10. Special-shaped pull ring 11. Reserved hole 12. Electric hoist 13. Force bearing seat 14. Removable base 15. Electric winch 16. Reinforced pull ring 17. Elevation adjustment group 18. Hoop base 19. Corner adjustment assembly 20. Force bearing I-beam 21. Middle adjustment assembly 22. Jack with sleeve 23. Flange with slide 24. Short column 25. Upper column 26. Wedge group 27. Sliding column 28. Slide 29. Horizontal adjustment group 30. Lifting ear 31. V-shaped support 32. Hoop pair 33. Vertical pole 34. Upper steel ring 35. Lower steel stiffening ring 36. Horizontal jack 37. Contact position 38. Pier 39. Diagonal support 40. Platform plate 41. Guardrail 42. Platform fixing hoop 43. Lifting jack 44. Limit cylinder 45. Ladder 46. Box beam bottom rear plate 47. Replacement of square steel 48. Fixed limit angle steel 49. Embedded steel 50. Triangle plate 51. Rotating plate 52. Rotating rod 53. Tensioning column. DETAILED DESCRIPTION
[0039] The present invention is further described below in conjunction with embodiments. The description of the following embodiments is only used to help understand the present invention. It should be noted that for ordinary persons in the art, without departing from the principle of the present invention, the present invention can also be modified in some ways, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.
[0040] Embodiment 1
[0041] As an example, Figures 1 to 10 As shown, this large-span and large-section steel box girder construction device that crosses over an existing line includes a steel box girder positioning guide device, a steel box girder precise beam placement device and a steel box girder elevation fine-tuning device; the steel box girder precise beam placement device and the steel box girder elevation fine-tuning device are arranged at intervals on a temporary support 2.
[0042] like Figures 1 to 3 As shown, the steel box girder positioning guide device is composed of two fine adjustment devices 6 and a coarse adjustment device 7. The steel box girder 1 is placed on a temporary support 2. A stiffening steel 3 is arranged on one side of the temporary support 2. A side drop plate 4 is arranged on the stiffening steel. A positioning steel 5 is arranged on the steel box girder to be positioned. A reinforcing pull ring 16 is arranged on the positioning steel 5. A pull rope of an electric winch 15 is arranged on the reinforcing pull ring 16. The electric winch 15 is fixed to the steel box girder 1 through a detachable base 14. A special-shaped pull ring 10 is arranged on the steel box girder to be positioned. A pull rope of an electric hoist 12 is arranged on the special-shaped pull ring. The electric hoist is arranged on a steel base 9. A reserved hole 11 is arranged on the upper limit plate. A pull rod 8 is arranged at the rear of the steel base. A force-bearing seat is arranged at the end of the pull rod.
[0043] like Figures 8 to 10 As shown, the device for accurately dropping the steel box beam into place includes a horizontal adjustment group 29 and a base. The base includes a pair of clamps 32, a V-shaped support 31, and a lifting lug 30. The horizontal adjustment group 29 is placed in a circular slide groove of the base. A lower steel stiffening ring 35 is arranged on the upper part, a horizontal jack 36 is arranged on the inner side, and a contact position 37 is arranged on the top.
[0044] like Figures 4 to 7 As shown, the steel box girder elevation fine-tuning device includes a clamp base 18, a corner adjustment group 19, a middle adjustment group 21, and a sleeve jack 22. A load-bearing I-beam 20 is arranged on the upper part of the sleeve jack 22. The clamp base 18 is placed on a temporary support 2, and double I-beams are arranged on both sides. The corner adjustment group 19 is arranged at the four corners of the double I-beams. A flange plate 23 with a slide groove is arranged on the fixed pipe column at the bottom, and a short column 24 is arranged on the flange plate 23 with a slide groove. A wedge group 26 is arranged on the short column, an upper column is arranged on the upper wedge block, and a sliding column 27 is arranged on the lower wedge block. The sliding column 27 can move forward and backward in the slide groove 28. A tensioning column 53 is arranged inside the middle adjustment group, and a rotating plate 51 with a rotating rod 52 is arranged on both sides of the tensioning column.
[0045] Embodiment 2
[0046] As another embodiment, this embodiment 2 proposes, based on the embodiment 1, a method for constructing a large-span and large-section steel box girder over an existing line using the large-span and large-section steel box girder construction device over an existing line, comprising the following steps:
[0047] Step 1, temporary placement of steel box girder: install fine adjustment device 6 and coarse adjustment device 7 on the already placed steel box girder 1 segment, debug electric hoist 12 and electric winch 15, install 5 pull rods in sequence on the rear of the steel base 9 and fix them with force seats 13, install special-shaped pull rings 10, positioning steel 5 and reinforcing pull rings 16 on the steel box girder segment to be placed, then install pull ropes respectively, finally lift the steel box 1 segment, turn on the electric winch 15 and electric hoist 12 after the steel box girder 1 segment to be placed is close to the already placed steel box girder 1 segment, and adjust the horizontal position of the steel box girder 1 to be placed.
[0048] Step 2, horizontal position adjustment of steel box girder: lift the base of the horizontal adjustment group through the lifting lug 30, install the base of the horizontal adjustment group 29 on the temporary support 2, fix it on the temporary support 2 through the clamp pair 32, then install the horizontal adjustment group 29, and place the steel box girder 1 section on the contact position 37. By adjusting the horizontal jack 36, the horizontal adjustment group slides in the circular cauliflower of the base to adjust the horizontal position of the steel box girder 1 section.
[0049] Step 3, steel box girder elevation adjustment: first install two double I-beams on the clamp base, then install the middle adjustment group 21 in the middle of the two double I-beams, then install the sleeve jack 22, the flange 23 with slide groove and the pipe column, after the horizontal position of the steel box girder 1 segment is adjusted, lift it through the ear plate, install the clamp base 18 on the temporary support 2, then install the wedge group 26 with sliding column and the stressed I-beam 20, start the jack, so that the stressed I-beam 20 presses the steel box girder 1 segment upward, after reaching the designed elevation, adjust the sliding column 27 to make the wedge group 26 press the steel box girder 1 segment, then adjust the tensioning column 53, and weld the steel box girder 1 segment after the sleeve jack 22 is unloaded.
[0050] It should be noted that the parts in this embodiment that are the same or similar to those in the first embodiment can be referenced to each other and will not be described in detail in this application.
[0051] Embodiment 3
[0052] As another embodiment, this embodiment 3 proposes, on the basis of the embodiments 1 and 2, a more specific large-span and large-section steel box girder construction device for crossing an existing line, further comprising a steel box girder jacking and shaping operation platform provided on the pier 38, such as Fig.11 and Fig.12 shown.
[0053] A limiting cylinder 44 is arranged on the pier 38, a triangular plate 50 is arranged in the limiting cylinder, a lifting jack 43 is arranged on the triangular plate, the bottom of the lifting jack 43 is an inclined surface, which fits with the triangular plate 50, a limiting cylinder 44 is arranged on the top surface, a platform fixing hoop 42 is arranged on the pier, the platform fixing hoop is used to fix the platform plate 40, a guardrail 41 is arranged on the platform plate 40, an oblique brace is arranged at the lower part of the platform plate, and the bottom of the oblique brace is placed on the embedded steel 49 of the pier 38, a ladder 45 is arranged on the temporary support 2, a fixed limiting angle steel 48 is arranged on the top surface, a box beam bottom rear plate 46 is arranged on the bottom surface of the steel box beam, and a replacement square steel 47 is arranged between the two.
[0054] Using this steel box girder jacking and shaping operation platform, this embodiment proposes that, based on the method of the second embodiment, step four is implemented after step three, and step four is specifically as follows:
[0055] Lifting of steel box girder: remove the precise beam placement device or the steel box girder elevation fine-tuning device on the temporary support, then install the fixed limiting angle steel 48 on the temporary support 2, install the beam bottom back plate 46 on the steel box girder, install the platform plate on the pier through the platform fixed clamp 43, then install the guardrail 41, then install the diagonal brace between the platform plate and the embedded steel, install the limiting cylinder 44, a triangular plate 50 and the lifting jack 43 on the top surface of the pier, then start the lifting jack 43 for jacking, after reaching the first stage of jacking, set the replacement square steel 47 between the fixed limiting angle steel and the beam bottom back plate, then take out the lifting jack 43, place the triangular plate 50 in the limiting cylinder, the number of which is determined according to the jacking height, then place the lifting jack 43 to continue jacking, after reaching the second height, replace the square steel with the replacement square steel 47 of the second height. Then take out the lifting jack 43, place the triangle plate 50 in the limit tube, the number of which is determined according to the lifting height, then place the lifting jack 43 to continue lifting, and after reaching the third height, replace the square steel 47 and unload the lifting jack 43.
[0056] It should be noted that the parts in this embodiment that are the same or similar to those in the first embodiment can be referenced to each other and will not be described in detail in this application.
[0057] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
Claims
1. A construction device for a large-span and large-section steel box girder that crosses an existing line, characterized in that: It includes a steel box girder positioning guide device, a steel box girder precise beam placement device, a steel box girder elevation fine-tuning device and a steel box girder jacking and shaping operation platform; The steel box girder segment is placed on the temporary support, and the steel box girder positioning guide device is arranged above the steel box girder segment that has been in place, including a fine adjustment device and a rough adjustment device, both of which are used to pull the steel box girder to be placed in place; The steel box girder precise beam placement device and the steel box girder elevation fine adjustment device are arranged at intervals on different temporary supports; The steel box girder precise placement device comprises a horizontal adjustment group, horizontal jacks are arranged around the horizontal adjustment group, and the top contacts the steel box girder through a contact position; The steel box girder elevation fine-adjusting device comprises a corner adjustment group, a middle adjustment group and a jack with a sleeve, the corner adjustment group comprises a wedge group, and a tensioning column is arranged in the middle adjustment group.
2. The construction device for a large-span and large-section steel box girder over an existing line according to claim 1 is characterized in that: The fine-adjustment device includes a steel base and an electric hoist, the coarse-adjustment device includes an electric winch, a stiffening steel is arranged on one side of the temporary support, a side drop plate is arranged on the stiffening steel, a positioning steel is arranged on the steel box girder to be in place, a reinforcing pull ring is arranged on the positioning steel, the reinforcing pull ring is connected to the pull rope of the electric winch, the electric winch is fixed to the steel box girder segment that has been in place through a detachable base, a special-shaped pull ring is arranged on the steel box girder to be in place, the pull rope of the electric hoist is arranged on the special-shaped pull ring, the electric hoist is arranged on the steel base, an upper limit plate is arranged on the upper part of the steel base, a reserved hole is arranged on the upper limit plate for the pull rope of the electric hoist to pass through, a pull rod is arranged at the rear of the steel base, a force seat is arranged at the end of the pull rod, and the force seat is fixed on the steel box girder segment that has been in place.
3. The construction device for a large-span and large-section steel box girder over an existing line according to claim 1 is characterized in that: The device for accurately dropping a steel box girder into place comprises a horizontal adjustment group and a base. The base comprises a pair of clamps, a V-shaped support and a lifting lug. A circular slide groove is provided on the surface of the base. The horizontal adjustment group is placed in the circular slide groove of the base. A lower steel stiffening ring is provided on the edge of the circular slide groove. A horizontal jack is provided on the inner side of the lower steel stiffening ring. The horizontal jack is supported around the horizontal adjustment group, and a contact position is provided on the top of the horizontal adjustment group.
4. The construction device for a large-span and large-section steel box girder over an existing line according to claim 1 is characterized in that: The steel box girder elevation fine-tuning device comprises a clamp base, a corner adjustment group, a middle adjustment group and a jack with a sleeve. A load-bearing I-beam is arranged on the upper part of the jack with a sleeve, the clamp base is placed on a temporary support, double-piece I-beams are arranged on both sides, corner adjustment groups are arranged at the four corners of the double-piece I-beams, a fixed pipe column is arranged at the bottom of the corner adjustment group, a flange with a slide groove is arranged on the fixed pipe column, a short column and a slide groove are arranged on the flange with a slide groove, a wedge group is arranged on the short column, the wedge group comprises an upper wedge block and a lower wedge block, an upper column is arranged on the upper wedge block, a sliding column is arranged between the bottom of the lower wedge block and the flange with the slide groove, and the sliding column moves forward and backward in the slide groove as the lower wedge block moves, the middle adjustment group is arranged in the middle of the double-piece I-beam, a tensioning column is arranged inside the middle adjustment group, and rotating plates with rotating rods are arranged on both sides of the tensioning column.
5. The construction method of a large-span and large-section steel box girder over an existing line as claimed in claim 1, characterized in that: The following steps are involved: Step 1: Install the steel box girder positioning guide device on the already positioned steel box girder segment and connect the steel box girder segment to be positioned; after the positioned steel box girder segment is hoisted, adjust the horizontal position through the fine adjustment device and the coarse adjustment device; Step 2: Install the horizontal adjustment group on the temporary support, place the steel box girder on the contact position, and adjust the horizontal position by the horizontal jack; Step 3: Install the steel box girder elevation fine adjustment device on the temporary support, lift the steel box girder segment to the elevation with a sleeve jack, support it with a wedge group and tensioning columns, and weld the steel box girder segment; Step 4: Remove the precise placement device for the steel box girder and the fine adjustment device for the elevation of the steel box girder, install platforms on both sides of the pier, install lifting jacks on the top surface of the pier, and lift the steel box girder in sections.
6. The construction method of a large-span and large-section steel box girder over an existing line according to claim 5 is characterized in that: A limiting cylinder is arranged on the pier column, and the limiting cylinder includes a triangular plate and a lifting jack. The lifting jack is arranged on the triangular plate, and the bottom of the lifting jack is an inclined surface, which fits with the triangular plate. A platform fixing hoop is arranged on the pier column, and the platform fixing hoop is used to fix the platform plate. The platform plate is hung on both sides of the pier column, and a guardrail is arranged on the platform plate. An inclined brace is arranged at the lower part of the platform plate, and the bottom of the inclined brace is placed on the embedded steel of the pier column. A ladder is arranged on the temporary support, and a fixed limiting angle steel is arranged on the top surface. A box beam bottom rear plate is arranged on the bottom surface of the steel box beam, and replacement square steels of different heights are arranged between the fixed limiting angle steel and the box beam bottom rear plate.
7. The construction method of a large-span and large-section steel box girder over an existing line according to claim 6 is characterized in that: In step four, after reaching the first stage of jacking, a replacement square steel of corresponding height is set between the fixed limit angle steel and the rear plate added at the bottom of the beam, then the jacking jack is taken out, and several layers of triangular plates are placed in the limit cylinder. The number of triangular plates is determined according to the jacking height, and the jacking jack is placed on the triangular plate to continue jacking; after reaching the second height, the square steel is replaced with the square steel corresponding to the second height; the jacking jack is taken out, and a triangular plate is added in the limit cylinder. The jacking jack is placed on the triangular plate to continue jacking. After reaching the third height, the replacement square steel corresponding to the final height is replaced, and the jacking jack is unloaded.