Construction method of trestle or platform suitable for high-flow-velocity deepwater complex water area
By processing into frame-type steel trestle or platform unit in advance, combined with water transportation and positioning technology, the simultaneous construction of multiple working surfaces is achieved, which solves the problems of low craftsmanship and waste of materials in traditional methods. It is suitable for high-flow speed deep water complex waters, improving the Construction efficiency and structural reliability.
Patent Information
- Application Number
- CN202411241477.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2024-12-03
AI Technical Summary
In complex waters with high flow rates, traditional anchor pile method and prestressed steel anchor drawing method have problems such as low craft efficiency, long construction period and waste of materials, and can only be carried out on a single working surface and cannot adapt to the construction needs of complex waters. .
Using a steel trest or platform unit that is processed into a frame in advance, it is transported to the operating position through water transportation equipment, and is positioned and lowered by floating cranes, barges and tugs, and posture adjustments are made in combination with floating boxes and traction equipment to realize multiple operating surfaces. Construction is carried out simultaneously.
It improves construction efficiency, optimizes material use, and is suitable for complex waters with high flow rates, deep waters without cover, shortens construction period, reduces material waste, and improves the safety and reliability of the structure.
Smart Images

Figure CN119061857A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of bridge and hydraulic trestle platform construction, and specifically relates to a construction method of a trestle or platform suitable for use in high-velocity, deep-water, and complex waters. Background Art
[0002] In complex, deep waters with high velocity and shallow overburden, or in areas without overburden, the primary construction methods for trestles and platforms are fishing or floating cranes. After the pile foundation is driven, anchor piles are drilled or anchor reinforcement is installed. In extreme cases, cast-in-place piles may also be required.
[0003] At present, there are two main methods for the construction of steel trestles and platforms in high-velocity shallow cover or deep water complex waters without cover:
[0004] (1) Anchor pile method: This method mainly uses lifting equipment to set up a part of the trestle and platform, and then uses drilling equipment such as impact drills to drill holes using existing steel pipe piles as casings. The steel cage is then lowered and concrete is poured. This method is the most mainstream operation method at present. The construction technology is mature and the structure is reliable. However, the entire building generally has only one working surface, which makes the construction efficiency slow and the construction period long.
[0005] (2) Prestressed steel anchor method: This method mainly uses lifting equipment to set up a part of the trestle and platform, and then uses core drilling equipment to drill holes, and then installs and tensions the anchor bars. The construction process is similar to the anchor rods or anchor bars of retaining walls. Compared with the anchor pile method, this method has a shorter construction period and higher construction efficiency, but there is only one working surface and it can only be applied to still water areas where large horizontal forces cannot occur or areas where water level changes little, such as reservoirs.
[0006] Traditional approaches place high demands on the design of trestles and platforms for these situations, requiring greater material reserves than conventional trestles and platforms. This is particularly true in complex areas with deep water and high flow rates. Because the support system is affected by the water level, the steel pipe piles are designed with long cantilever lengths, resulting in generally larger steel pipes and a certain degree of steel waste. Summary of the Invention
[0007] The purpose of this application is to provide a construction method for a pier or platform suitable for deep water with high flow rate and complex water area, which is more efficient, more economical and has higher structural reliability than anchor pile and anchor pulling method.
[0008] The purpose of this application is achieved through the following technical solutions:
[0009] A construction method for a pier or platform suitable for use in high-velocity, deep-water, and complex waters comprises the following steps: step S01, pre-processing a steel pier or steel platform into a plurality of frame-type platform units; step S02, transporting the platform units to an operating position by means of water transport equipment; step S03, lowering the platform units from the water transport equipment, and positioning the platform units after lowering into position; step S04, releasing the lower pontoon of the platform unit, adjusting the posture of the platform unit, and controlling the platform unit to begin structural sinking; step S05, releasing the upper pontoon, maintaining the posture of the platform unit, and completing the structural sinking of the platform unit; step S06, setting up a temporary working surface on the platform unit, and performing reinforcement construction on the steel pipe piles of the platform unit; and step S07, setting up an operating bridge deck on the platform unit.
[0010] Furthermore, the method is applicable to complex waters with high flow rates and deep waters with shallow cover or no cover.
[0011] Furthermore, in the step S01, the platform unit includes steel pipe piles, flat joints, horizontal diagonal braces, vertical diagonal braces, beams and pontoons that are processed and connected as a whole. The flat joints, horizontal diagonal braces, vertical diagonal braces and beams are connected between the steel pipe piles, and upper and lower pontoons are set on the steel pipe piles.
[0012] Furthermore, in step S02, the water transportation method is barge transportation or self-floating consignment.
[0013] Furthermore, in barge transportation, the platform unit is placed on a barge, and the barge carries the platform unit to travel on the water; in self-floating transportation, the platform unit floats on the water, and is pushed and pulled by a tugboat to realize the platform unit's own travel on the water.
[0014] Furthermore, in step S03, the platform unit is lowered by a floating crane, a barge, or a tugboat.
[0015] Furthermore, floating crane lifting and lowering is to directly lift the platform unit by a floating crane, separate the platform unit from the water transportation equipment and move it to the water surface; barge sliding lowering is to push the platform unit along the slide rail on the barge through the pushing equipment on the barge after the barge transports the platform unit to the working position, separate the platform unit from the barge and move it to the water surface; tugboat positioning lowering is to separate the tugboat from the platform unit after the tugboat transports the platform unit to the working position, and temporarily position the platform unit by the barge.
[0016] Furthermore, in step S03, the positioning method of the platform unit is floating crane positioning, anchor pier positioning or traction positioning.
[0017] Furthermore, floating crane positioning is to locate the control point of the platform unit through the positioning system of the floating crane; anchor pier positioning is to set up anchor piers upstream and downstream, and use anchor cables on the shore and in the middle of the river to position the platform unit; traction positioning is to set up traction equipment on the shore, and locate the platform unit through the traction equipment and monitoring conditions.
[0018] Furthermore, in the steps S04 and S05, the posture adjustment is carried out by jointly controlling the posture of the platform unit through the water injection of the pontoon and the steel wire rope of the traction equipment, so that the platform unit can overcome the influence of the water flow force and be lowered vertically at the designed position.
[0019] Furthermore, in step S06, a temporary working surface is set up on the platform unit, and a drilling rig is used to punch holes in the steel pipe piles. After the drilling is completed, the steel cage is lowered and the pile foundation concrete is poured. After the concrete curing is completed, the temporary working surface is removed.
[0020] Beneficial effects of this application:
[0021] (1) This method is suitable for the construction of piers and platforms in complex waters with high flow rates and deep waters with shallow or no covering layers. Its assembly manufacturing is conducive to ensuring the full utilization of material properties and the safety and reliability of the structure.
[0022] (2) This method adopts an overall sinking installation, which allows multiple working surfaces to be deployed simultaneously. It is no longer limited to a single construction working surface, and work efficiency is improved rapidly.
[0023] (3) This method has wide applicability and can be used in both inland waters and ocean waters.
[0024] The aforementioned main solution of this application and its further options can be freely combined to form multiple solutions, all of which are solutions that can be adopted and protected by this application; and in this application, (non-conflicting options) can also be freely combined with each other and with other options. After understanding the solution of this application, those skilled in the art will understand that there are many combinations based on existing technology and common knowledge, all of which are technical solutions to be protected by this application, and they are not exhaustive here. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 This is the main structural view of the platform unit of this application.
[0026] Figure 2 It is a top view of the structure of the platform unit of this application.
[0027] Figure 3 It is a structural side view of the platform unit of this application.
[0028] Figure 4 It is a schematic diagram of the barge transportation of this application.
[0029] Figure 5 This is a schematic diagram of the self-floating consignment of this application.
[0030] Figure 6 It is a schematic diagram of the floating crane hoisting and lowering of this application.
[0031] Figure 7 It is a schematic diagram of the sliding lowering of the barge in this application.
[0032] Figure 8 This is a schematic diagram of the anchor pier positioning in this application Figure 1 .
[0033] Figure 9 This is a schematic diagram of the anchor pier positioning in this application Figure 2 .
[0034] Figure 10 This is a schematic diagram of the anchor pier positioning in this application Figure 3 .
[0035] Figure 11 This is the temporary work area for this application
[0036] In the figure: 1-steel pipe pile, 2-flat joint, 3-horizontal diagonal brace, 4-vertical diagonal brace, 5-crossbeam, 6-pontoon, 7-platform unit, 8-barge, 9-slide rail, 10-tugboat, 11-floating crane, 12-floating crane anchor chain, 13-floating crane anchor point, 14-positioning area, 15-anchor pier, 16-main anchor cable, 17-side anchor cable, 18-shore baseline, 19-impact drill, 20-temporary working surface. DETAILED DESCRIPTION
[0037] The following non-limiting examples illustrate the present application.
[0038] Example 1
[0039] A construction method for a pier or platform suitable for use in complex, deep, and high-velocity waters. For deep waters with shallow or no cover, the method eliminates the traditional single-pile construction method during pier and platform construction. The specific steps are as follows.
[0040] Step S01: Pre-process the steel trestle platform into several frame-like platform units. By pre-processing the steel trestle or steel platform into several frame-like platform units, the platform can be pre-formed onshore, thereby reducing the time and steps required for operations on the water. The frame-like platform units are also more stable and have better stability before reinforcement.
[0041] refer to Figure 1 、 Figure 2 and Figure 3As shown, the platform unit 7 includes steel pipe piles 1, flat joints 2, horizontal diagonal braces 3, vertical diagonal braces 4, crossbeams 5 and pontoons 6 that are processed and connected as a whole. The flat joints 2, horizontal diagonal braces 3, vertical diagonal braces 4 and crossbeams 5 are connected between the steel pipe piles 1, and an upper pontoon 6 and a lower pontoon 6 are set on the steel pipe piles 1.
[0042] Step S02: transporting the platform unit to a designated operation location by water transportation equipment, wherein the water transportation mode is barge transportation or self-floating consignment.
[0043] refer to Figure 4 As shown, the barge transport is that the platform unit 7 is placed and fixed on the barge 8 as a whole, and the barge 8 carries (transports) the platform unit 7 on the water. The required barge 8 needs to have storage space for accommodating several platform units 7 and also needs to have the transportation capacity to carry several platform units 7.
[0044] refer to Figure 5 As shown, self-floating transport is when the platform unit 7 floats on the water and is pushed and pulled by a tugboat 10, thereby enabling the platform unit to move on the water. The required tugboat 10 does not need to consider storage space and transportation capacity too much, but only needs to provide the pushing and pulling force required for the platform unit 7 to move forward.
[0045] Step S03: Lower the platform unit from the water transport equipment. Once lowered into position, position the platform unit, keeping its top end facing upstream. The platform unit can be lowered by a floating crane, lowered by a barge, or lowered by a tugboat. The platform unit can be positioned by a floating crane, anchored, or towed.
[0046] refer to Figure 6 As shown, the floating crane hoisting and lowering is to directly hoist the platform unit 7 by the floating crane 11, separate the platform unit 7 from the water transportation equipment and move it to the positioning area 14 on the water surface, and the floating crane 11 is anchored at the floating crane anchor point 13 by the floating crane anchor chain 12 on all sides.
[0047] refer to Figure 7 As shown, the barge sliding lowering is that after the barge 8 transports the platform unit 7 to the working position, the pushing equipment on the barge 8 pushes the platform unit 7 to slide along the slide rail 9 on the barge, so that the platform unit 7 is detached from the barge and moved to the water surface.
[0048] Tugboat positioning and lowering is to transport the platform unit to the operating position by the tugboat, separate the tugboat from the platform unit, and temporarily position the platform unit by barge.
[0049] When a floating crane is available for lifting, the platform unit can be directly positioned and installed using the floating crane. When large lifting equipment is not available, the platform unit is lowered into place and positioned using anchor cables at shore-based anchor points or anchor points in the water (anchoring in the water can also be replaced by a tugboat).
[0050] refer to Figure 6 As shown, the floating crane positioning is to locate the control point of the platform unit 7 through the positioning system of the floating crane 11. This method requires first positioning the floating crane 11 and then positioning the platform unit 7 with the help of the floating crane.
[0051] refer to Figure 8 、 Figure 9 and Figure 10 As shown, anchor piers 15 are positioned upstream and downstream, and anchor cables are used on the shore and in the river center to position the platform unit. The upstream and downstream anchor piers 15 are arranged on the shore and / or in the water and connected to the platform unit 7 via main anchor cables 16. Auxiliary anchoring is provided to the sides of the platform unit 7 using side anchor cables 17, which are also anchored on the shore and / or in the water.
[0052] Towing positioning is to set up a towing device (such as a winch) on the shore, and to position the platform unit through the towing device in conjunction with monitoring conditions.
[0053] Step S04: Release the lower pontoon of the platform unit to fill the pontoon with water, adjust the posture of the platform unit, and control the platform unit to start sinking. Step S05: Release the upper pontoon of the platform unit to fill the pontoon with water, maintain the posture of the platform unit, and complete the sinking of the structure inside the platform unit.
[0054] Attitude adjustment is achieved by controlling the attitude of the platform unit through the injection of water into the pontoon and the steel wire rope of the traction equipment. The length of the steel wire rope is adjusted according to the monitoring instructions to achieve the effect of precise positioning, so that the platform unit can be vertically lowered at the designed position to overcome the influence of water flow force.
[0055] Step S06: construct a temporary working surface on the platform unit and perform reinforcement construction on the steel pipe piles of the platform unit.
[0056] refer to Figure 11 As shown, a temporary working surface 20 is set up on the platform unit. The temporary working surface 20 can be prefabricated or installed later. The drilling equipment is installed through the temporary working surface 20. It is preferred to use a small floating crane or other equipment to lift the drilling rig or use a mobile drilling rig to punch holes. For shallow covering layers, impact drills 19 or rotary drilling drills are mostly used to punch holes in the steel pipe piles.
[0057] After the drilling is completed, the steel cage is lowered into the steel pipe pile and the pile foundation concrete is poured. After the concrete curing is completed, the temporary working surface is removed.
[0058] Step S07: constructing an operating bridge deck on the platform unit. The operating bridge deck is a structure such as Bailey or steel.
[0059] The aforementioned basic examples and their further selected examples can be freely combined to form multiple embodiments, all of which are embodiments that can be adopted and claimed for protection in this application. In this application, each selected example can be arbitrarily combined with any other basic examples and selected examples.
[0060] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present application should be included in the scope of protection of the present application.
Claims
1. A construction method for a pier or platform suitable for high-velocity, deep-water and complex waters, characterized in that: The steps include: Step S01, pre-processing the steel trestle or steel platform into a plurality of frame-type platform units; Step S02, transporting the platform unit to the operation location by water transport equipment; Step S03, lowering the platform unit from the water transport equipment, and positioning the platform unit after lowering it into place; Step S04, releasing the lower buoyancy box of the platform unit, adjusting the posture of the platform unit, and controlling the platform unit to start structural sinking; Step S05, releasing the upper buoyancy box, maintaining the posture of the platform unit, and completing the sinking of the structure in the platform unit; Step S06, setting up a temporary working surface on the platform unit and reinforcing the steel pipe piles of the platform unit; Step S07, constructing a working bridge deck on the platform unit.
2. The construction method of a pier or platform suitable for high-velocity, deep-water and complex waters according to claim 1, characterized in that: In step S01, the platform unit includes steel pipe piles, flat links, horizontal diagonal braces, vertical diagonal braces, cross beams and pontoons that are processed and connected as a whole. The flat links, horizontal diagonal braces, vertical diagonal braces and cross beams are connected between the steel pipe piles, and upper and lower pontoons are arranged on the steel pipe piles.
3. The construction method of a pier or platform suitable for high-velocity, deep-water and complex waters according to claim 1, characterized in that: In the step S02, the water transportation method is barge transportation or self-floating consignment.
4. The construction method of a pier or platform suitable for high-velocity, deep-water and complex waters according to claim 3, characterized in that: Barge transportation means that the platform unit is placed on a barge, and the barge carries the platform unit to travel on the water; self-floating transportation means that the platform unit floats on the water, and the platform unit is pushed and pulled by a tugboat to realize the movement of the platform unit itself on the water.
5. The construction method of a pier or platform suitable for high-velocity, deep-water and complex waters according to claim 1, characterized in that: In the step S03, the platform unit is lowered by floating crane, barge sliding or tugboat positioning.
6. The construction method of a pier or platform suitable for high-velocity, deep-water and complex waters according to claim 5, characterized in that: Floating crane lifting and lowering is to directly lift the platform unit by a floating crane, separate the platform unit from the water transportation equipment and move it to the water surface; barge sliding lowering is to push the platform unit along the slide rail on the barge through the pushing equipment on the barge after the barge transports the platform unit to the working position, separate the platform unit from the barge and move it to the water surface; tugboat positioning lowering is to separate the tugboat from the platform unit after the tugboat transports the platform unit to the working position, and temporarily position the platform unit by the barge.
7. The construction method of a pier or platform suitable for high-velocity, deep-water and complex waters according to claim 1, characterized in that: In the step S03, the platform unit is positioned by floating crane positioning, anchor pier positioning or traction positioning.
8. The construction method of a pier or platform suitable for high-velocity, deep-water and complex waters according to claim 7, characterized in that: Floating crane positioning is to locate the control point of the platform unit through the positioning system of the floating crane; anchor pier positioning is to set up anchor piers upstream and downstream, and use anchor cables on the shore and in the middle of the river to position the platform unit; traction positioning is to set up traction equipment on the shore, and locate the platform unit through the traction equipment and monitoring conditions.
9. The construction method of a pier or platform suitable for high-velocity, deep-water and complex waters according to claim 1, characterized in that: In the step S04 and step S05, the posture adjustment is carried out by injecting water into the pontoon and using the steel wire rope of the traction equipment to jointly control the posture of the platform unit, so that the platform unit can overcome the influence of the water flow force and be lowered vertically at the designed position.
10. The construction method of a pier or platform suitable for high-velocity, deep-water and complex waters according to claim 1, characterized in that: In step S06, a temporary working surface is set up on the platform unit, and a drilling rig is used to punch holes in the steel pipe piles. After the drilling is completed, the steel cage is lowered and the pile foundation concrete is poured. After the concrete curing is completed, the temporary working surface is removed.