Steel pipe pile foundation pile body segmented connecting structure and construction method

Through the segmented connection structure and construction method of steel pipe pile foundation, the problems of large concrete pouring workload and difficult to control quality in the construction of micro pile foundations in mountainous areas are solved, and efficient and reliable pile body connection and construction quality are achieved, which is suitable for mechanization in mountainous areas. Construction requirements.

CN119061886APending Publication Date: 2024-12-03CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411497603.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-25
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The construction of existing micro pile foundations in mountainous areas has problems such as large on-site concrete pouring workload and difficult to control the construction quality.

Method used

The sectional connection structure and construction method of steel pipe pile foundation are connected in sequence through several sectional pile sections, and the top cover plate and the bottom seal plate are closed. Combined with the cross plug plate and the stiffening plate, the strength of the pile body segments and Reliability and grouting with anchoring agent to reduce construction difficulty and improve accuracy.

Benefits of technology

It reduces the on-site construction workload, improves the construction quality and the efficiency of mechanized construction, ensures that anchoring agent can be infused inside and outside the steel pipe, and meets the requirements of mechanized construction in mountainous areas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119061886A_ABST
    Figure CN119061886A_ABST
Patent Text Reader

Abstract

The invention discloses a steel pipe pile foundation pile body sectional connecting structure and a construction method, a plurality of sequentially connected sectional pile section structures are adopted, a top cover plate is arranged at the upper end of the plurality of sequentially connected uppermost sectional pile sections, the upper ends of the sectional pile sections are closed through the top cover plate, and an anchoring agent is poured through an orifice for solidification; the structure that a plurality of subsection pile sections are connected through the pile body connecting sections is adopted, the connecting strength and reliability of the pile body sections can be guaranteed, on the other hand, the dead weight of each section of pile body is reduced, and transportation, installation and construction in the mountainous area are facilitated; and meanwhile, anchoring agents can be poured inside and outside the steel pipe, on-site construction is simple, convenient and rapid, and the requirement for mechanical construction in mountainous areas is met. A segmented structure is gradually inserted into a pile foundation hole, the trouble of on-site manufacturing is avoided, the workload is reduced, and the problem of construction precision errors caused by uncontrolled pile foundation construction elevation is solved by grouting with an anchoring agent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of overhead power transmission line engineering, and in particular to a steel pipe pile foundation pile body segment connection structure and a construction method. Background Art

[0002] In order to comprehensively promote mechanized construction, "mechanization" is taken as an important starting point to promote the fundamental change of ideas to "mechanization is required", the construction method is advancing towards "mechanized construction", and the on-site operation is continuously advancing towards "mechanized replacement of people". Each design unit is encouraged to combine its own reality and design the foundation of the line in mountainous terrain with poor transportation conditions and difficulty for large-scale construction equipment to enter the site, and give priority to the use of rock anchors, micro piles and other foundation types that are convenient for mechanized construction according to local conditions.

[0003] The micro pile foundation is a foundation composed of a small diameter pile and a cap connected to the top of the pile. The pile body diameter is generally 150mm to 400mm according to the pile forming method. The pile body can be a cast-in-place pile, a steel pipe pile, or a PHC pipe pile. At present, considering the difficulty in transporting materials in mountainous areas, most of the pile bodies of the mountain micro pile foundations of overhead power lines are cast-in-place piles. The problem is that the workload of on-site concrete pouring is still too large, and the construction quality is difficult to control. The present invention aims at the difficulties and pain points of the construction of micro pile foundations in mountainous areas, and focuses on minimizing the workload of on-site concrete pouring construction, and proposes a pre-drilled embedded micro steel pipe pile foundation structure in mountainous areas and a method for connecting the pile body in sections. Summary of the invention

[0004] The purpose of the present invention is to provide a steel pipe pile foundation pile body segment connection structure and a construction method, so as to overcome the problems of the prior art pile foundation being difficult to construct on site and difficult to control the construction quality.

[0005] To achieve the above purpose, the technical solution adopted by the present invention is as follows: A steel pipe pile foundation pile body segmented connection structure comprises a pile body connection section and segmented pile sections, wherein a plurality of segmented pile sections are connected in sequence, and two adjacent segmented pile sections are connected via the pile body connection section, a bottom sealing plate is provided at the lower end of a plurality of segmented pile sections connected in sequence to the lowest end, and the lower end of the segmented pile section is sealed by the bottom sealing plate, a top cover plate is provided at the upper end of a plurality of segmented pile sections connected in sequence to the highest end, and the upper end of the segmented pile section is sealed by the top cover plate.

[0006] Preferably, the side surfaces of the segmented pile sections are connected to the bottom of the top cover plate via a stiffening plate.

[0007] Preferably, the stiffening plates are respectively connected to the segmented pile sections and the top cover plate by welding, a plurality of stiffening plates are evenly distributed around the segmented pile sections, and lifting holes are provided on the stiffening plates.

[0008] Preferably, the pile body connecting section includes two cross-arranged plug-in plates, the ends of which are provided with plug-in connecting plates, and a cross groove is provided on the end pile body of the segmented pile section along its axial direction, and the cross-arranged plug-in plates can be inserted into the cross groove of the segmented pile body.

[0009] Preferably, the slot depth is the plug-in depth of the plug-in plates arranged in a cross shape; the slot depth dimension is the diameter of the pile body of the segmented pile section 1, and the slot width is greater than the thickness of the plug-in plates arranged in a cross shape.

[0010] Preferably, the exposed length of the cross-shaped plug-in boards is 140-160 mm.

[0011] A second aspect of the present invention is a construction method for the above-mentioned steel pipe pile foundation pile body segment connection structure, comprising the following steps: S1, prefabricate a plurality of pile body connection sections and segmented pile sections, weld and fix the pile body connection sections on the segmented pile sections, weld a top cover plate on one of the segmented pile sections, and weld a bottom cover plate at the bottom of another segmented pile section; S2, insert one end of the segmented pile section with the welded bottom cover plate into the pile foundation hole and fix it, then fix and connect the segmented pile section at the upper end, after completion, drop the connected segmented pile section, and fix and connect other segmented pile sections in turn; S3, after the last segmented pile section is installed, the anchoring agent is poured from the hole mouth and after solidification, the construction of the segmented connection structure of the steel pipe pile foundation is completed.

[0012] According to a third aspect of the present invention, a pipe pile foundation structure comprises a column structure, a pedestal structure and a steel pipe pile foundation pile body segmented connection structure, wherein the steel pipe pile foundation pile body segmented connection structure comprises a plurality of segmented pile sections connected in sequence, two adjacent segmented pile sections are connected via a pile body connection section, a plurality of segmented pile sections connected in sequence to the lowest end are provided with a bottom sealing plate at the lower end, and the lower end of the segmented pile section is closed by the bottom sealing plate, a plurality of segmented pile sections connected in sequence to the highest end are provided with a top cover plate at the upper end, and the upper end of the segmented pile section is closed by the top cover plate; the top cover plate of the highest segmented pile section and the lower end of the column structure are located within the pedestal structure.

[0013] Preferably, the cap structure includes cap main reinforcement, which is wrapped around the upper end of the segmented pile section. The cap main reinforcement and the outer ring of the segmented pile section are formed by filling with an anchor. The lower end of the column structure is located in the cap structure, and the lower end of the column structure and the cap structure are integrally formed by filling with an anchor.

[0014] A fourth aspect of the present invention is a construction method for the above-mentioned pipe pile foundation structure, comprising the following steps: S1, prefabricated steel pipe pile foundation pile body segmented connection structure: prefabricate a number of pile body connection segments and segmented pile sections, weld and fix the pile body connection segments on the segmented pile sections, weld a top cover plate on one of the segmented pile sections, and weld a bottom cover plate on the bottom of another segmented pile section; insert one end of the segmented pile section welded with the bottom cover plate into the pile foundation hole and fix it, then fix and connect the segmented pile section at its upper end, and after completion, drop the connected segmented pile section, and fix and connect other segmented pile sections in turn; after the last segmented pile section is installed, pour an anchoring agent from the hole mouth and wait for it to solidify to complete the construction of the steel pipe pile foundation pile body segmented connection structure; S3, the main reinforcement of the base structure and the main reinforcement and stirrups of the column structure are arranged on the periphery of the last segmented pile section, and then the anchoring agent is used for pouring and forming to complete the construction of the pipe pile foundation structure.

[0015] Compared with the prior art, the present invention has the following beneficial technical effects: The present invention provides a steel pipe pile foundation pile body segment connection structure, which adopts a segmented pile section structure that is connected in sequence with several sections. A top cover plate is provided at the upper end of the segmented pile section that is connected in sequence with the uppermost end of the several sections. The upper end of the segmented pile section is closed by the top cover plate, and an anchoring agent is poured through a hole for solidification, thereby realizing the construction of a pre-drilled buried pipe pile foundation in a mountainous area. The present application adopts a structure that connects several segmented pile sections through a pile body connecting section, which can ensure the connection strength and reliability of the pile body segments. On the other hand, it also reduces the dead weight of each pile body section, which is convenient for transportation and installation construction in mountainous areas. At the same time, it can also ensure that the anchoring agent can be poured into both the inside and outside of the steel pipe. The on-site construction is simple, convenient and fast, and meets the requirements of mechanized construction in mountainous areas.

[0016] The steel pipe pile foundation segmented connection structure method provided by the present invention adopts the segmented structure to be gradually inserted into the pile foundation hole, thus avoiding the trouble of on-site production and reducing the workload. The use of anchoring agent for grouting solves the problem of construction accuracy error of uncontrolled pile foundation construction elevation.

[0017] The present application adopts a structure in which several segmented pile sections are connected through the pile body connecting sections, which can ensure the connection strength and reliability of the pile body segments. On the other hand, it also reduces the dead weight of each pile body section, making it convenient for transportation and installation construction in mountainous areas. By simultaneously casting the segmented connection structure of the steel pipe pile foundation pile body with the pedestal structure and the column structure, it is ensured that the anchor agent can be poured into the inside and outside of the steel pipe, and at the same time, the consistency of the overall structure can be ensured, ensuring the construction quality. The on-site construction is simple, convenient and fast, meeting the requirements of mechanized construction in mountainous areas. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the segmented connection structure of the steel pipe pile foundation in an embodiment of the present invention.

[0019] Figure 2It is a schematic diagram of the construction structure of the pipe pile foundation structure in an embodiment of the present invention.

[0020] Figure 3 It is a schematic diagram of the structure of the pile body connecting section in an embodiment of the present invention.

[0021] In the figure, 1. Segmented pile section; 2. Pile body connection section; 3. Bottom sealing plate; 4. Top cover plate; 5. Stiffening plate; 6. Lifting hole; 7. Positioning steel bar; 8. Plug-in plate; 9. Plug-in connecting plate; 10. Fastening bolts; 11. Column structure; 12. Base structure; 13. Anchoring agent. DETAILED DESCRIPTION

[0022] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0023] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0024] Example 1 To achieve the above-mentioned purpose, the present invention provides a pre-drilled embedded micro steel pipe pile foundation structure for transmission lines in mountainous areas and a pile body segment connection method thereof; Figure 1 , Figure 2As shown, the steel pipe pile foundation pile body segmented connection structure comprises a pile body connection section 2 and a segmented pile section 1, a plurality of segmented pile sections 1 are connected in sequence, two adjacent segmented pile sections 1 are connected via the pile body connection section 2, a plurality of segmented pile sections 1 connected in sequence to the lowest end are provided with a bottom sealing plate 3 at the lower end, the lower end of the segmented pile section 1 is sealed by the bottom sealing plate 3, a plurality of segmented pile sections 1 connected in sequence to the highest end are provided with a top cover plate 4 at the upper end, the upper end of the segmented pile section 1 is sealed by the top cover plate 4, and a plurality of segmented pile sections 1 connected in sequence are buried in the pile hole of the pipe pile foundation, Then pour fine stone concrete, cement mortar, grouting material and other anchoring agents 13 from the hole. The strength grade of the anchoring agent is not less than C30, and the slump is not less than 180mm. The construction of pre-drilled buried pipe pile foundation in mountainous areas can be realized. The application adopts a structure in which several segmented pile sections are connected through the pile body connecting section. The connection strength and reliability of the pile body segments can be ensured. On the other hand, the dead weight of each pile body is reduced to facilitate transportation and installation construction in mountainous areas. At the same time, it can also ensure that the anchoring agent can be poured into the inside and outside of the steel pipe. The on-site construction is simple, convenient and fast, meeting the requirements of mechanized construction in mountainous areas.

[0025] In a specific implementation of the present application, the side of the segmented pile section 1 is connected to the bottom of the top cover plate 4 by a stiffening plate 5. The stiffening plate is utilized to improve the connection strength between the segmented pile section 1 and the top cover plate 4. The stiffening plate 5 is respectively connected to the segmented pile section 1 and the top cover plate 4 by welding. When in use, the segmented pile section 1, the pile body connecting section 2, and the top cover plate 4 can be transported to the site and then welded together, thereby solving the problem of difficulty in transporting the overall foundation pile structure.

[0026] A plurality of stiffening plates 5 are evenly distributed around the segmented pile section 1, and lifting holes 6 are arranged on the stiffening plates 5. The lifting holes are symmetrically arranged on both sides of the segmented pile section for easy transportation and installation. In order to ensure that the segmented pile section 1 can be located in the center of the pile hole and facilitate the lifting and installation process, positioning steel bars 7 are arranged on the outside of the segmented pile section 1 to facilitate the adjustment of the segmented position of the assembled integral steel pipe pile foundation during the construction process.

[0027] Preferably, the segmented pile section 1, the bottom sealing plate 3 and the top cover plate 4 in the present application are made of the same material, specifically Q235 or Q355B material.

[0028] In the specific implementation mode of this application, Figure 1 , Figure 3As shown, the pile body connecting section 2 includes two plug-in plates 8 arranged in a cross shape, and a plug-in connecting plate 9 is arranged at the end of the plug-in plate 8. At the same time, a cross groove is opened on the end pile body of the segmented pile section 1 along its axial direction. The cross-shaped plug-in plate 8 can be inserted into the cross groove of the pile body of the segmented pile section 1, and then the plug-in plate 8 is welded and fixed to the segmented pile section 1 by welding. The two segmented pile sections 1 are connected through the plug-in plate 8, and a connecting hole is opened on the plug-in connecting plate 9 arranged at the end of the plug-in plate 8. The plug-in plates 8 on the two segmented pile sections 1 are fastened and connected by fastening bolts 10.

[0029] The mechanical connection and installation method of the segmented pile section 1 is as follows: a cross groove is made at the end of the pile body of the segmented pile section 1 in advance, and the groove depth is the plug-in depth of the cross-set plug-in plate 8; the groove depth dimension is set to the diameter of the pile body of the segmented pile section 1, and the groove width is greater than the thickness of the cross-set plug-in plate 8, and the difference between the groove width and the thickness of the plug-in plate 8 is about 1.5-3mm. The cross-set plug-in plate 8 is composed of two vertically welded steel plates, and the plug-in connecting plate 9 is orthogonally arranged with the two vertically welded steel plates, and the three are welded together. The outer size of the cross-set plug-in plate 8 is greater than the diameter of the segmented pile section 1, and the outer size of the cross-set plug-in plate 8 is greater than the diameter of the segmented pile section 1 by 1.5-3cm. The cross-set plug-in plate 8 is inserted into the cross groove of the pile body, and the two are welded and connected, and the weld height is not less than 6mm. The exposed length of the cross-set plug-in plate 8 is 140-160mm, which is convenient for the bolt punching operation of the upper and lower pile bodies. The diameter and material of the plug-in connecting plate 9 are consistent with those of the segmented pile section 1 , and four bolt holes with a diameter of 26 mm are symmetrically arranged on the plug-in connecting plate 9 .

[0030] During construction, first lower the lower segmented pile section 1 into the pile hole at the hole mouth and fix it, then connect the upper segmented pile section 1 with the segmented pile section 1 and fix and lock it with connecting bolts, then lower the connected pile body, and so on to complete the connection and placement of all pile sections.

[0031] Example 2 The present application conducts experimental tests on the above structure, adopts the above cross plug plate to connect the pile body in sections, and conducts field tests on the pull-out and push-down bearing characteristics of several 2×2 arranged pile group foundations; several segmented pile sections 1 are connected in sequence through the pile body connecting section 2, the segmented pile section 1 is made of Q235 steel, the pile body connecting section 2 is made of Q235 steel, the diameter of the segmented pile section 1 is 203mm, the wall thickness of the segmented pile section 1 is 6mm, the plug plate 8 on the pile body connecting section 2 is 6mm thick, and the plug-in The length of the plate 8 is 350mm, the width of the cross slot on the segmented pile section 1 is 8mm, the depth of the cross slot on the segmented pile section 1 is 203mm, the plug-in plate 8 and the plug-in connecting plate 9 are pre-welded, four symmetrically arranged bolt holes with a diameter of 26mm are opened on the plug-in connecting plate 9, and then the plug-in plate 8 on the pile body connecting section 2 is inserted into the cross slot on the segmented pile section 1 for welding, and then the two pile body connecting sections 2 are connected using M24 connecting bolts, and the material of the M24 connecting bolts is specifically 45# carbon structural steel. The bottom sealing plate 3 made of Q235 steel is welded at the bottom to seal the bottom segmented pile section 1. At the hole mouth, the segmented pile section 1 provided with a bottom sealing plate 3 is lowered into the pile hole and fixed, and then the segmented pile section of the upper section is connected with the segmented pile section of the lower section and fixed and locked with connecting bolts. Secondly, the connected pile body is lowered, and the connection and placement of all pile sections are completed by analogy. Finally, fine stone concrete, cement mortar, grouting material and other anchoring agents are poured from the hole mouth. The strength grade of the anchoring agent is not less than C30, and the slump is not less than 180mm. The use of anchoring agents for grouting solves the problem of construction accuracy error of uncontrolled pile foundation construction elevation.

[0032] For the above-mentioned pre-buried steel pipe pile foundation segmented connection structure, field tests on the pull-out and compressive bearing characteristics of several 2×2 arranged pile groups were carried out. The bearing capacity test results were good, and the project was piloted and promoted for application, with generally good feedback from construction units.

[0033] Example 3 The present invention provides a construction method of a steel pipe pile foundation pile body segmented connection structure based on the above-mentioned steel pipe pile foundation pile body segmented connection structure, wherein the steel pipe pile foundation pile body segmented connection structure comprises a plurality of segmented pile sections 1 connected in sequence, two adjacent segmented pile sections 1 are connected through a pile body connection section 2, a plurality of segmented pile sections 1 connected in sequence to the lowest end are provided with a bottom sealing plate 3 at the lower end, the lower end of the segmented pile section 1 is sealed by the bottom sealing plate 3, a plurality of segmented pile sections 1 connected in sequence to the highest end are provided with a top cover plate 4 at the upper end, the upper end of the segmented pile section 1 is sealed by the top cover plate 4. Specifically, the following steps are included: S1, according to the requirements of pre-drilling and embedding construction in mountainous areas, prefabricate a number of pile body connection sections 2 and segmented pile sections 1, and open a cross slot on the segmented pile section 1, so that the pile body connection section 2 and the segmented pile section 1 can be welded and connected through the plug-in plate 8 and the cross slot; weld and fix the pile body connection section 2 on all segmented pile sections 1, weld the top cover plate 4 on the last segmented pile section, and weld the bottom cover plate 3 at the bottom of the first segmented pile section 1; In a specific implementation, the pile body connecting section 2, the segmented pile section 1, the bottom sealing plate 3 and the top cover plate 4 can all be processed in a prefabrication factory according to construction requirements, and then transported to the site in sections for assembly, avoiding the difficulty of on-site processing and the difficulty of overall transportation.

[0034] S2, insert one end of the first segmented pile section 1 provided with the bottom sealing plate 3 into the pile foundation hole and fix it, the upper end of the first segmented pile section 1 is located at the upper end of the construction plane, so as to facilitate the fixed connection between the first segmented pile section 1 and the segmented pile section to be connected thereto, after completion, the connected segmented pile section is dropped, and the other segmented pile sections are fixedly connected in turn; S3, after the last segmented pile section is installed, the anchoring agent is poured from the hole mouth and after solidification, the construction of the segmented connection structure of the steel pipe pile foundation is completed.

[0035] Example 4 In another embodiment of the present application, a pipe pile foundation structure with a steel pipe pile foundation pile body segment connection structure is provided, such as Figure 2 As shown, it includes a column structure 11, a cap structure 12 and a steel pipe pile foundation pile body segment connection structure, wherein the steel pipe pile foundation pile body segment connection structure includes a plurality of segmented pile sections 1 connected in sequence, two adjacent segmented pile sections 1 are connected via a pile body connection section 2, a bottom sealing plate 3 is provided at the lower end of a plurality of segmented pile sections 1 connected in sequence to the lowest end, the lower end of the segmented pile section 1 is closed by the bottom sealing plate 3, a top cover plate 4 is provided at the upper end of a plurality of segmented pile sections 1 connected in sequence to the highest end, The upper end of the segmented pile segment 1 is closed by a top cover plate 4, and several segmented pile segments 1 connected in sequence are buried in the pile hole of the pipe pile foundation; the uppermost segmented pile segment 1 is located in a cap structure 12, and the cap structure 12 includes a cap main reinforcement, and the cap main reinforcement is wrapped around the upper end of the segmented pile segment 1. The cap main reinforcement and the outer ring of the segmented pile segment 1 are filled and formed by an anchor, and the lower end of the column structure 11 is located in the cap structure 12, and the lower end of the column structure 11 and the cap structure 12 are filled and formed as a whole by an anchor.

[0036] The cap structure 12 and the steel pipe pile foundation segmented connection structure are located below the designed ground, and the lower end of the column structure 11 is located on the cap structure 12 and the steel pipe pile foundation segmented connection structure.

[0037] Example 5 In another embodiment of the present application, a construction method of a pipe pile foundation structure is provided, wherein the pipe pile foundation structure comprises a column structure 11, a cap structure 12 and a steel pipe pile foundation pile body segmented connection structure, wherein the steel pipe pile foundation pile body segmented connection structure comprises a plurality of segmented pile sections 1 connected in sequence, wherein two adjacent segmented pile sections 1 are connected via a pile body connection section 2, wherein a plurality of segmented pile sections 1 connected in sequence to the lowest segmented pile section 1 are provided with a bottom sealing plate 3 at the lower end, wherein the lower end of the segmented pile section 1 is closed via the bottom sealing plate 3, wherein a plurality of segmented pile sections 1 connected in sequence to the highest segmented pile section 1 are provided with a bottom sealing plate 3 at the lower end, wherein the ... The upper end of the segmented pile section 1 is provided with a top cover plate 4, and the upper end of the segmented pile section 1 is closed by the top cover plate 4. Several segmented pile sections 1 connected in sequence are buried in the pile hole of the pipe pile foundation; the uppermost segmented pile section 1 is located in the cap structure 12, and the cap structure 12 includes the cap main reinforcement, which is wrapped around the upper end of the segmented pile section 1. The cap main reinforcement and the outer ring of the segmented pile section 1 are filled and formed by an anchoring agent, and the lower end of the column structure 11 is located in the cap structure 12, and the lower end of the column structure 11 and the cap structure 12 are integrally formed by filling an anchoring agent. Specifically, the following steps are included: S1, prefabricated steel pipe pile foundation pile body segment connection structure: according to the construction requirements, prefabricate a number of pile body connection segments 2 and segmented pile sections 1, and open a cross slot on the segmented pile section 1, the pile body connection segment 2 and the segmented pile section 1 can be welded and connected through the plug-in plate 8 and the cross slot; weld and fix the pile body connection segment 2 on all segmented pile sections 1, weld the top cover plate 4 on the last segmented pile section, and weld the bottom cover plate 3 on the bottom of the first segmented pile section 1; the above can be processed in a prefabrication factory, and then transported to the site in sections for assembly; S2, install one end of the first segmented pile section 1 with the bottom sealing plate 3 into the pile foundation hole and fix it, the upper end of the first segmented pile section 1 is located at the upper end of the construction plane, which is convenient for the fixed connection between the first segmented pile section 1 and the segmented pile section to be connected, and after completion, the connected segmented pile section is dropped, and the other segmented pile sections are fixedly connected in turn; after the installation of the last segmented pile section is completed, the anchoring agent is poured from the hole mouth and solidified to complete the construction of the segmented connection structure of the steel pipe pile foundation pile body; S3, main reinforcement of the base structure 12 and main reinforcement and stirrups of the column structure 11 are arranged on the periphery of the last segmented pile section, and then an anchoring agent is used for pouring and forming to complete the construction of the pipe pile foundation structure.

[0038] The present application adopts a structure in which several segmented pile sections are connected through the pile body connecting sections, which can ensure the connection strength and reliability of the pile body segments. On the other hand, it also reduces the dead weight of each pile body section, making it convenient for transportation and installation construction in mountainous areas. By simultaneously casting the segmented connection structure of the steel pipe pile foundation pile body with the pedestal structure and the column structure, it is ensured that the anchor agent can be poured into the inside and outside of the steel pipe, and at the same time, the consistency of the overall structure can be ensured, ensuring the construction quality. The on-site construction is simple, convenient and fast, meeting the requirements of mechanized construction in mountainous areas.

[0039] Other embodiments of the invention will be apparent to those skilled in the art after considering the specification and disclosure of the invention.

[0040] This application is intended to cover any variation, use or adaptation of the present invention, which follows the general principles of the present invention and includes common knowledge or customary technical means in the art that are not disclosed in the present invention. The description and examples are to be regarded as exemplary only, and the true scope and spirit of the present invention are indicated by the following claims.

[0041] It should be understood that the present invention is not limited to the exact construction that has been described above and shown in the drawings and that various modifications and changes may be made without departing from the scope thereof. The scope of the present invention is limited only by the appended claims.

[0042] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any way. Any simple modification, change and equivalent structural change made to the above embodiment based on the technical essence of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A steel pipe pile foundation pile body segment connection structure, characterized in that: The invention comprises a pile body connecting section (2) and a segmented pile section (1), wherein a plurality of segmented pile sections (1) are connected in sequence, and two adjacent segmented pile sections (1) are connected via the pile body connecting section (2); a bottom sealing plate (3) is provided at the lower end of the segmented pile section (1) connected in sequence to the lowest end, and the lower end of the segmented pile section (1) is sealed by the bottom sealing plate (3); a top cover plate (4) is provided at the upper end of the segmented pile section (1) connected in sequence to the highest end, and the upper end of the segmented pile section (1) is sealed by the top cover plate (4).

2. A steel pipe pile foundation segmented connection structure according to claim 1, characterized in that: The side surface of the segmented pile section (1) and the bottom of the top cover plate (4) are connected via a stiffening plate (5).

3. A steel pipe pile foundation pile body segmented connection structure according to claim 2, characterized in that: The stiffening plates (5) are respectively connected to the segmented pile section (1) and the top cover plate (4) by welding. A plurality of stiffening plates (5) are evenly distributed around the segmented pile section (1). The stiffening plates (5) are provided with lifting holes (6).

4. The steel pipe pile foundation segmented connection structure according to claim 1, characterized in that: The pile body connecting section (2) comprises two plug-in plates (8) arranged in a cross shape, and a plug-in connecting plate (9) is arranged at the end of the plug-in plate (8). A cross slot is arranged on the end pile body of the segmented pile section (1) along its axial direction, and the plug-in plates (8) arranged in a cross shape can be inserted into the cross slot of the pile body of the segmented pile section (1).

5. A steel pipe pile foundation segmented connection structure according to claim 4, characterized in that: The slot depth is the insertion depth of the plug-in plates (8) arranged in a cross shape; the slot depth dimension is the diameter of the pile body of the segmented pile section (1), and the slot width is greater than the thickness of the plug-in plates (8) arranged in a cross shape.

6. The steel pipe pile foundation segmented connection structure according to claim 4, characterized in that: The exposed length of the plug board (8) arranged in a cross is 140-160 mm.

7. A construction method for the steel pipe pile foundation pile body segmented connection structure according to claim 1, characterized in that: The following steps are involved: S1, prefabricate a plurality of pile body connection sections and segmented pile sections, weld and fix the pile body connection sections on the segmented pile sections, weld a top cover plate on one of the segmented pile sections, and weld a bottom cover plate at the bottom of another segmented pile section; S2, insert one end of the segmented pile section with the welded bottom cover plate into the pile foundation hole and fix it, then fix and connect the segmented pile section at the upper end, after completion, drop the connected segmented pile section, and fix and connect other segmented pile sections in turn; S3, after the last segmented pile section is installed, the anchoring agent is poured from the hole mouth and after solidification, the construction of the segmented connection structure of the steel pipe pile foundation is completed.

8. A pipe pile foundation structure based on the steel pipe pile foundation pile body segmented connection structure according to claim 1, characterized in that: The invention comprises a column structure (11), a cap structure (12) and a steel pipe pile foundation pile body segment connection structure, wherein the steel pipe pile foundation pile body segment connection structure comprises a plurality of segmented pile sections (1) connected in sequence, two adjacent segmented pile sections (1) being connected via a pile body connection section (2), a bottom sealing plate (3) being provided at the lower end of the segmented pile section (1) connected in sequence to the lowermost end of the plurality of segments, the lower end of the segmented pile section (1) being sealed by the bottom sealing plate (3), a top cover plate (4) being provided at the upper end of the segmented pile section (1) connected in sequence to the uppermost end of the plurality of segments, the upper end of the segmented pile section (1) being sealed by the top cover plate (4); the top cover plate (4) of the segmented pile section (1) at the uppermost end and the lower end of the column structure (11) are located within the cap structure (12).

9. A pipe pile foundation structure according to claim 8, characterized in that: The cap structure (12) comprises a cap main reinforcement, the cap main reinforcement is wrapped around the upper end of the segmented pile section (1), the cap main reinforcement and the outer ring of the segmented pile section (1) are formed by filling with an anchoring agent, the lower end of the column structure (11) is located in the cap structure (12), and the lower end of the column structure (11) and the cap structure (12) are integrally formed by filling with an anchoring agent.

10. A construction method for the pipe pile foundation structure according to claim 8, characterized in that: The following steps are involved: S1, prefabricated steel pipe pile foundation pile body segmented connection structure: prefabricate a number of pile body connection segments and segmented pile sections, weld and fix the pile body connection segments on the segmented pile sections, weld a top cover plate on one of the segmented pile sections, and weld a bottom cover plate on the bottom of another segmented pile section; insert one end of the segmented pile section welded with the bottom cover plate into the pile foundation hole and fix it, then fix and connect the segmented pile section at its upper end, and after completion, drop the connected segmented pile section, and fix and connect other segmented pile sections in turn; after the last segmented pile section is installed, pour an anchoring agent from the hole mouth and wait for it to solidify to complete the construction of the steel pipe pile foundation pile body segmented connection structure; S3, the main reinforcement of the base structure and the main reinforcement and stirrups of the column structure are arranged on the periphery of the last segmented pile section, and then the anchoring agent is used for pouring and forming to complete the construction of the pipe pile foundation structure.