Construction method of foundation pit support structure in karst area building
By using symmetrical support steel plates and plug columns to fix the foundation pit enclosure structure inside the karst area building, combined with the dual support technology of adjusting screws and hydraulic cylinders, the problem of poor stability of the foundation pit enclosure structure is solved and high strength is achieved Support and simplify the construction effect.
Patent Information
- Application Number
- CN202411446732.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-16
- Publication Date
- 2024-12-03
AI Technical Summary
The support stability of the foundation pit enclosure structure inside the karst area buildings is poor, resulting in the risk of foundation collapse, tilt or deformation, and the existing construction methods are complex and costly.
The foundation pit enclosure structure including the first to fourth support plate components is adopted, and the support steel plate and the insert column are fixed to the side wall of the foundation pit by symmetrically arranged support steel plates and insert columns, and the adjustment screw and hydraulic cylinder are combined to achieve double support, thereby improving support stability.
It realizes high-strength support for foundation pits, simplifies construction methods, reduces manual construction costs, and improves the stability and firmness of foundation pit enclosure structure.
Smart Images

Figure CN119061909A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of foundation pit retaining structures, in particular to a construction method of a foundation pit retaining structure inside a building in a karst area. Background Art
[0002] In karst areas, there is little surface runoff, but groundwater is very abundant, which is an ideal water supply source. In many areas of North China, karst water has become an important water source for industrial and agricultural production. However, funnels, sinkholes, caves, dissolution fissures, etc. in karst areas can often cause foundation collapse, tilt or deformation. In capital construction, underground construction and tunnel construction are difficult. In order to ensure the construction quality of underground projects and make the bearing capacity and deformation of the foundation structure meet the requirements, the treatment of karst engineering geological problems mainly includes clearing and filling methods, beam spanning methods, strong tamping methods, injection methods, deep foundation methods, and rotary grouting reinforcement methods. The purpose of these methods is to seal and reinforce the surrounding karst chambers to reduce the risks of foundation collapse, foundation tilt, and foundation deformation after construction. At present, the support stability of the foundation pit retaining structure inside the building in the karst area is poor, and it is necessary to improve it. Summary of the invention
[0003] The purpose of the present invention is to provide a construction method for a foundation pit retaining structure inside a building in a karst area, so as to solve the problems raised in the above-mentioned background technology.
[0004] To achieve the above-mentioned objectives, the present invention provides the following technical solutions: a foundation pit retaining structure inside a building in a karst area, the foundation pit retaining structure comprising a first support plate assembly, a second support plate assembly, a third support plate assembly and a fourth support plate assembly, the first support plate assembly and the second support plate assembly are symmetrically arranged, the third support plate assembly and the fourth support plate assembly are symmetrically arranged, and the first support plate assembly, the second support plate assembly, the third support plate assembly and the fourth support plate assembly are supported around the foundation pit in the karst area.
[0005] Preferably, the present application provides a foundation pit retaining structure inside a building in a karst area, wherein the first support plate mechanism includes a first support steel plate, a first fixed block, a first support column and a second support column, a plurality of first plug columns are installed on the outer side of the first support steel plate, the first plug columns are inserted into the side wall of the foundation pit, and the first support columns and the second support columns are installed between the first support steel plate and the first fixed block.
[0006] Preferably, the present application provides a foundation pit retaining structure inside a building in a karst area, wherein the second support plate mechanism includes a second support steel plate, a second fixed block, a third support column and a fourth support column, a plurality of second plug columns are installed on the outer side of the second support steel plate, the second plug columns are inserted into the side wall of the foundation pit, and the third support column and the fourth support column are installed between the second support steel plate and the second fixed block.
[0007] Preferably, in the foundation pit retaining structure inside a building in a karst area provided by the present application, the first fixing block and the second fixing block are connected by an adjusting screw.
[0008] Preferably, the foundation pit retaining structure inside the building in the karst area provided by the present application, wherein the third support plate assembly includes a third support steel plate, a first fixed plate, two first support ribs, and two groups of first tightening hydraulic cylinders, the two first support ribs are installed between the third support steel plate and the first fixed plate, one group of first tightening hydraulic cylinders is installed between the first fixed block and the first fixed plate, and the other group of first tightening hydraulic cylinders is installed between the second fixed block and the first fixed plate.
[0009] Preferably, the foundation pit retaining structure inside the building in the karst area provided by the present application, wherein the fourth support plate assembly includes a fourth support steel plate, a second fixed plate, two second support ribs, and two groups of second tightening hydraulic cylinders, the two second support ribs are installed between the fourth support steel plate and the second fixed plate, one group of the second tightening hydraulic cylinders is installed between the first fixed block and the second fixed plate, and the other group of the second tightening hydraulic cylinders is installed between the second fixed block and the second fixed plate.
[0010] Preferably, in the foundation pit retaining structure inside a building in a karst area provided by the present application, the first fixed block and the second fixed block are respectively supported on the foundation pit ground through support frames.
[0011] Preferably, the construction method of the foundation pit retaining structure inside the karst area building comprises the following steps:
[0012] A. First, install the first fixing block and the second fixing block on the support frame, and the support frame is supported and fixed on the foundation pit ground;
[0013] B. Then, insert the first plug column on the first supporting steel plate into the side wall of the foundation pit, and insert the second plug column on the second supporting steel plate into the side wall of the foundation pit;
[0014] C. Weld the first support column and the second support column between the first support steel plate and the first fixing block, and weld the third support column and the fourth support column between the second support steel plate and the second fixing block;
[0015] D. Install the adjusting screw between the first fixing block and the second fixing block;
[0016] E. Then, two first supporting ribs are welded between the third supporting steel plate and the first fixing plate, and the first tightening hydraulic cylinder is installed between the first fixing plate and the first fixing block and the second fixing block, and the first tightening hydraulic cylinder is controlled to work to support the third supporting steel plate on the foundation pit wall;
[0017] F. Finally, weld the two second supporting ribs between the fourth supporting steel plate and the second fixed plate, install the second tightening hydraulic cylinder between the second fixed plate and the first fixed block and the second fixed block, control the second tightening hydraulic cylinder to work, and support the fourth supporting steel plate on the foundation pit wall.
[0018] Compared with the prior art, the present invention has the following beneficial effects:
[0019] (1) The construction method of the present invention is simple, can provide high-strength support for the foundation pit inside the building in the karst area, can play a role in protecting the foundation pit, and is also convenient for disassembly and assembly, thereby reducing the cost of manual construction.
[0020] (2) The present invention adopts a symmetrically arranged first support plate assembly and a second support plate assembly, wherein the first support steel plate and the second support steel plate are fixed to the inner wall of the foundation pit by means of inserted columns and are tightened and fixed by adjusting screws, thereby achieving good support stability.
[0021] (3) The third support plate assembly and the fourth support plate assembly used in the present invention can achieve the purpose of double support by pressing the support steel plate against the wall through the tightening hydraulic cylinder, thereby further improving the firmness of the foundation pit support. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the structure of the present invention;
[0023] Figure 2 This is a schematic diagram of the installation of the fixing block of the present invention;
[0024] Figure 3 It is a flow chart of the construction method of the present invention;
[0025] In the figure: the first supporting steel plate 1, the first fixed block 2, the first supporting column 3, the second supporting column 4, the first plug column 5, the second supporting steel plate 6, the second fixed block 7, the third supporting column 8, the fourth supporting column 9, the second plug column 10, the adjusting screw 11, the third supporting steel plate 12, the first fixed plate 13, the first supporting rib 14, the first tightening hydraulic cylinder 15, the fourth supporting steel plate 16, the second fixed plate 17, the second supporting rib 18, the second tightening hydraulic cylinder 19, and the supporting frame 20. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] It should be noted that when an element is referred to as being "fixed on" or "set on" another element, it can be directly on the other element or indirectly set on the other element; when an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0028] It should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0029] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, "multiple" and "several" mean two or more, unless otherwise clearly and specifically defined.
[0030] It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions that can be implemented in this application, so they have no substantial technical significance. Any modification of the structure, change in the proportional relationship, or adjustment of the size should still fall within the scope of the technical content disclosed in this application without affecting the effects that can be produced by this application and the purposes that can be achieved. At the same time, the terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of narration, and are not used to limit the scope of the implementation of this application. The change or adjustment of their relative relationship should also be regarded as the scope of the implementation of this application without substantial change in the technical content.
[0031] See also Figure 1-3 The present invention provides a technical solution: a foundation pit retaining structure inside a building in a karst area, the foundation pit retaining structure comprising a first support plate assembly, a second support plate assembly, a third support plate assembly and a fourth support plate assembly, the first support plate assembly and the second support plate assembly are symmetrically arranged, the third support plate assembly and the fourth support plate assembly are symmetrically arranged, and the first support plate assembly, the second support plate assembly, the third support plate assembly and the fourth support plate assembly are supported around the foundation pit in the karst area.
[0032] In the present invention, the first support plate mechanism includes a first support steel plate 1, a first fixed block 2, a first support column 3 and a second support column 4, a plurality of first plug columns 5 are installed on the outer side of the first support steel plate 1, the first plug columns 5 are inserted into the side wall of the foundation pit, and the first support column 3 and the second support column 4 are installed between the first support steel plate 1 and the first fixed block 2; the second support plate mechanism includes a second support steel plate 6, a second fixed block 7, a third support column 8 and a fourth support column 9, a plurality of second plug columns 10 are installed on the outer side of the second support steel plate 6, the second plug columns 10 are inserted into the side wall of the foundation pit, and the third support column 8 and the fourth support column 9 are installed between the second support steel plate 6 and the second fixed block 7; the first fixed block 2 and the second fixed block 7 are connected by an adjusting screw 11. The first fixed block 2 and the second fixed block 7 are supported on the foundation pit ground by a supporting frame 20 respectively. The present invention adopts a symmetrically arranged first support plate assembly and a second support plate assembly, wherein the first support steel plate and the second support steel plate are fixed to the inner wall of the foundation pit by plug columns, and are tightened and fixed by adjusting screws, and the support stability is good.
[0033] In the present invention, the third support plate assembly includes a third support steel plate 12, a first fixed plate 13, two first support ribs 14, and two groups of first tightening hydraulic cylinders 15. The two first support ribs 14 are installed between the third support steel plate 12 and the first fixed plate 13, one group of first tightening hydraulic cylinders 15 is installed between the first fixed block 2 and the first fixed plate 13, and the other group of first tightening hydraulic cylinders 15 is installed between the second fixed block 7 and the first fixed plate 13; the fourth support plate assembly includes a fourth support steel plate 16, a second fixed plate 17, two second support ribs 18, and two groups of second tightening hydraulic cylinders 19. The two second support ribs 18 are installed between the fourth support steel plate 16 and the second fixed plate 17, one group of second tightening hydraulic cylinders 19 is installed between the first fixed block 2 and the second fixed plate 17, and the other group of second tightening hydraulic cylinders 19 is installed between the second fixed block 7 and the second fixed plate 17. The third support plate assembly and the fourth support plate assembly adopted in the present invention can achieve the purpose of double support by pressing the support steel plate against the wall surface through the tightening hydraulic cylinder, and further improve the firmness of the foundation pit support.
[0034] Construction method: The construction method of the present invention comprises the following steps:
[0035] A. First, install the first fixing block and the second fixing block on the support frame, and the support frame is supported and fixed on the foundation pit ground;
[0036] B. Then, insert the first plug column on the first supporting steel plate into the side wall of the foundation pit, and insert the second plug column on the second supporting steel plate into the side wall of the foundation pit;
[0037] C. Weld the first support column and the second support column between the first support steel plate and the first fixing block, and weld the third support column and the fourth support column between the second support steel plate and the second fixing block;
[0038] D. Install the adjusting screw between the first fixing block and the second fixing block;
[0039] E. Then, two first supporting ribs are welded between the third supporting steel plate and the first fixing plate, and the first tightening hydraulic cylinder is installed between the first fixing plate and the first fixing block and the second fixing block, and the first tightening hydraulic cylinder is controlled to work to support the third supporting steel plate on the foundation pit wall;
[0040] F. Finally, weld the two second supporting ribs between the fourth supporting steel plate and the second fixed plate, install the second tightening hydraulic cylinder between the second fixed plate and the first fixed block and the second fixed block, control the second tightening hydraulic cylinder to work, and support the fourth supporting steel plate on the foundation pit wall.
[0041] In summary, the construction method of the present invention is simple, can provide high-strength support for the foundation pit inside the building in the karst area, can play a role in protecting the foundation pit, and is also convenient for disassembly and assembly, thereby reducing the cost of manual construction.
[0042] The circuits, electronic components and modules involved are all prior art and can be fully implemented by those skilled in the art. Needless to say, the content protected by the present invention does not involve improvements to software and methods.
[0043] It should also be noted that, in this specification, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "comprise", "include" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the statement "comprises a ..." does not exclude the presence of other identical elements in the process, method, article or device including the element.
Claims
1. The foundation pit retaining structure inside the building in the karst area is characterized by: The foundation pit retaining structure includes a first support plate assembly, a second support plate assembly, a third support plate assembly and a fourth support plate assembly. The first support plate assembly and the second support plate assembly are symmetrically arranged, and the third support plate assembly and the fourth support plate assembly are symmetrically arranged. The first support plate assembly, the second support plate assembly, the third support plate assembly and the fourth support plate assembly are supported around the foundation pit in the karst area.
2. The foundation pit retaining structure inside a karst area building according to claim 1, characterized in that: The first support plate mechanism comprises a first support steel plate (1), a first fixing block (2), a first support column (3) and a second support column (4); a plurality of first insertion columns (5) are installed on the outer side of the first support steel plate (1); the first insertion columns (5) are inserted into the side wall of the foundation pit; the first support column (3) and the second support column (4) are installed between the first support steel plate (1) and the first fixing block (2).
3. The foundation pit retaining structure inside a karst area building according to claim 1, characterized in that: The second support plate mechanism comprises a second support steel plate (6), a second fixed block (7), a third support column (8) and a fourth support column (9); a plurality of second plug columns (10) are installed on the outer side of the second support steel plate (6); the second plug columns (10) are inserted into the side wall of the foundation pit; the third support column (8) and the fourth support column (9) are installed between the second support steel plate (6) and the second fixed block (7).
4. The foundation pit retaining structure inside a karst area building according to claim 2, characterized in that: The first fixing block (2) and the second fixing block (7) are connected via an adjusting screw (11).
5. The foundation pit retaining structure inside a karst area building according to claim 1, characterized in that: The third support plate assembly comprises a third support steel plate (12), a first fixed plate (13), two first support ribs (14), and two groups of first tightening hydraulic cylinders (15); the two first support ribs (14) are installed between the third support steel plate (12) and the first fixed plate (13); one group of first tightening hydraulic cylinders (15) is installed between the first fixed block (2) and the first fixed plate (13); and the other group of first tightening hydraulic cylinders (15) is installed between the second fixed block (7) and the first fixed plate (13).
6. The foundation pit retaining structure inside a karst area building according to claim 1, characterized in that: The fourth support plate assembly comprises a fourth support steel plate (16), a second fixed plate (17), two second support ribs (18), and two groups of second tightening hydraulic cylinders (19); the two second support ribs (18) are installed between the fourth support steel plate (16) and the second fixed plate (17); one group of the second tightening hydraulic cylinders (19) is installed between the first fixed block (2) and the second fixed plate (17); and the other group of the second tightening hydraulic cylinders (19) is installed between the second fixed block (7) and the second fixed plate (17).
7. The foundation pit retaining structure inside a karst area building according to claim 1, characterized in that: The first fixed block (2) and the second fixed block (7) are supported on the foundation pit ground respectively through a support frame (20).
8. The construction method of the foundation pit retaining structure inside the karst area building is characterized by The construction method comprises the following steps: A. First, install the first fixing block and the second fixing block on the support frame, and the support frame is supported and fixed on the foundation pit ground; B. Then, insert the first plug column on the first supporting steel plate into the side wall of the foundation pit, and insert the second plug column on the second supporting steel plate into the side wall of the foundation pit; C. Weld the first support column and the second support column between the first support steel plate and the first fixing block, and weld the third support column and the fourth support column between the second support steel plate and the second fixing block; D. Install the adjusting screw between the first fixing block and the second fixing block; E. Then, two first supporting ribs are welded between the third supporting steel plate and the first fixing plate, and the first tightening hydraulic cylinder is installed between the first fixing plate and the first fixing block and the second fixing block, and the first tightening hydraulic cylinder is controlled to work to support the third supporting steel plate on the foundation pit wall; F. Finally, weld the two second supporting ribs between the fourth supporting steel plate and the second fixed plate, install the second tightening hydraulic cylinder between the second fixed plate and the first fixed block and the second fixed block, control the second tightening hydraulic cylinder to work, and support the fourth supporting steel plate on the foundation pit wall.